CN206177266U - A frock that is used for three -dimensional gauge head change frame to step down fast and reset again - Google Patents

A frock that is used for three -dimensional gauge head change frame to step down fast and reset again Download PDF

Info

Publication number
CN206177266U
CN206177266U CN201621299815.5U CN201621299815U CN206177266U CN 206177266 U CN206177266 U CN 206177266U CN 201621299815 U CN201621299815 U CN 201621299815U CN 206177266 U CN206177266 U CN 206177266U
Authority
CN
China
Prior art keywords
frame
frock
slide block
gauge head
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621299815.5U
Other languages
Chinese (zh)
Inventor
苏先河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Yuchai Machinery Co Ltd
Original Assignee
Guangxi Yuchai Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Yuchai Machinery Co Ltd filed Critical Guangxi Yuchai Machinery Co Ltd
Priority to CN201621299815.5U priority Critical patent/CN206177266U/en
Application granted granted Critical
Publication of CN206177266U publication Critical patent/CN206177266U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The utility model discloses a frock that is used for three -dimensional gauge head change frame to step down fast and reset again, the integrated detection tool comprises a detection platform, testing platform's top is equipped with the gauge head and changes the frame, the frock is including setting up testing platform and gauge head are changed between the frame, are just made shelf energy translation mechanism along the horizontal direction removal on testing platform is changed to the gauge head. The utility model discloses a frock that is used for three -dimensional gauge head change frame to step down fast and reset again, it has enlarged the gauge head and has changed the fitting limit of putting up, and it is more accurate that gauge head change frame resets to do not need the location of leveling again, saved the time, improved work efficiency.

Description

A kind of three coordinate gauge heads that are used for change the frock that frame is quickly stepped down and resetted again
Technical field
This utility model is related to gauge head replacing seat field, more particularly to a kind of three coordinate gauge heads replacing frame that is used for quickly is stepped down And the frock for resetting again.
Background technology
At present, the gauge head of three coordinate machine is changed frame and is directly installed in detection platform, and position is relatively by centre, side More side change head when just detecting small size part.When three coordinate machine will detect the larger part such as body spindle hole and cam hole axiality When, changed due to range and gauge head and there is interference problem between frame installation site, gauge head is changed frame before detection and is removed Gauge head detection can be verified;Gauge head is reinstalled back after having detected and changes frame, then leveling is carried out to gauge head replacing frame and fixed, gone forward side by side Row is repositioned.However, change gauge head dismounting, leveling and the positioning of frame to need to expend many times, normal three coordinate is affected Detection, and Jing often to change frame dismounted, arbitrarily put, exist damage change frame hidden danger.In addition, regular Demolition, installation, for the installing hole of three coordinate machine detection platform has damage, affect its accuracy of detection.
Utility model content
The purpose of this utility model is to provide a kind of three coordinate gauge heads that are used for and changes the work that frame is quickly stepped down and resetted again Fill, it expands the fitting limit that gauge head changes frame, gauge head is changed frame and resetted more accurately, and leveling need not position again, section The time has been saved, work efficiency has been improve.
For achieving the above object, this utility model provides a kind of quickly resigning for three coordinate gauge heads replacing frame and again multiple The frock of position, including detection platform, are provided with gauge head and change frame above the detection platform;The frock is described including being arranged on Detection platform and gauge head are changed between frame and enable the gauge head to change the translation that frame is moved in the horizontal direction in detection platform Mechanism.
Used as further improvement of the utility model, the translation mechanism includes guide rail and the slide block being adapted, described to lead Rail is fixed in the detection platform, and the bottom that the slide block changes frame with the gauge head is fixedly connected;The guide rail and slide block Between be provided with retaining mechanism.
Further improve as of the present utility model, the bottom of the slide block is provided with feather key, the top of the guide rail It is provided with the gathering sill being adapted with the feather key.
Further improve as of the present utility model, the slider bottom is provided with what width was adapted with the feather key Stopper slot, feather key is fixedly connected on the stopper slot of the slide block by screw.
Further improve as of the present utility model, the retaining mechanism includes the clamping screw perpendicular to detection platform And locking nut, the screw rod of the clamping screw from bottom to top through the slide block and with the locking above the slide block Nut connects, and the vertical cross-section of the gathering sill of the guide rail is " inverted T shape " structure, and the bolt head of the clamping screw is set in leads In the gathering sill of rail.
Further improve as of the present utility model, the vertical cross-section includes upper and lower cloth for the gathering sill of " inverted T shape " The sulculus put and vat, the bolt head of the clamping screw includes spiral shell respectively on the inside of the sulculus and vat of the gathering sill Bolt head top and bolt head bottom;The horizontal cross-section on the bolt head top is in flat-shaped structure, the length direction of the horizontal cross-section It is parallel with the bearing of trend of gathering sill;Width of the width of the bolt head bottom more than gathering sill sulculus.
Further improve as of the present utility model, the quantity of the guide rail and slide block is two, two guide rail phases Mutually it is arranged in parallel, between two slide blocks slide attachment plate is connected with;It is planer type structure that the gauge head changes frame, positioned at its both sides Two supporting leg bottoms be fixedly connected with two slide blocks respectively.
Further improve as of the present utility model, the two ends of the guide rail are equipped with baffle plate.
Beneficial effect
Compared with prior art, the three coordinate gauge heads that are used for of the present utility model change the work that frame is quickly stepped down and resetted again Harness has the advantage that:
1st, it can greatly expand the fitting limit that gauge head changes frame, and gauge head is changed the mobile simple and convenient of frame, saved time It is laborsaving;Gauge head is changed frame and is resetted accurately, and need not re-start leveling positioning, while it also avoid frequently dismounting to zero The damage of part;
2nd, translation mechanism includes guide rail and slide block, and its simple structure, production difficulty is low;
3rd, the feather key of slider bottom is adapted with the gathering sill of rail crown, it is ensured that slide block along guide rail move when direction Stability;
4th, it is split-type structural between feather key and slide block, reduces its production difficulty, and feather key using one section Abrasion can be produced after time, precision is affected, now only needs to change feather key, reduce its maintenance cost;Due to leading Fixed by screw between key and slide block, feather key may be rotated around slide block, and stopper slot can be played and prevent feather key from turning Dynamic effect, it is ensured that the accuracy of feather key and slide block relative position, it is ensured that slide block can normally slide and the side of slip along guide rail To degree of accuracy;
5th, clamping screw is prevented from slide block opposite rail and moves up and down, it is ensured that gauge head changes frame when moving horizontally Stability, reduces its danger toppled over;
6th, when needing to tighten locking nut, the side wall on bolt head top is stuck in the sulculus inner side of way, effectively Prevent clamping screw from rotating with locking nut, facilitate personnel to tighten locking nut;When locking nut is tightened, bolt head bottom Top surface and locking nut jointly by slider locking on guide rail, so as to reach the purpose that fixed gauge head changes rack position;
7th, the quantity of guide rail and slide block is two, it is adaptable to which the gauge head of planer type structure changes frame, and structural stability is more Good, gauge head replacing frame is more steady when moving horizontally, and further reduces gauge head and changes the probability that frame is toppled over;
8th, the two ends of guide rail are equipped with baffle plate, effectively prevent slide block and deviate from from guide rail two ends because of maloperation, prevent out Existing gauge head changes the danger that frame damaged or injured by a crashing object people because dropping, and improves safety.
By description below and accompanying drawing is combined, this utility model will become more fully apparent, these accompanying drawings are used to explain this The embodiment of utility model.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying creative work Under, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is a kind of front view for being used for the quick frock stepped down and reset again of three coordinate gauge heads replacing frame;
Fig. 2 is the A in Fig. 1 to enlarged diagram;
Fig. 3 is a kind of left side broken section for being used for the quick frock stepped down and reset again of three coordinate gauge heads replacing frame Figure;
Fig. 4 is the left view enlarged drawing of slide block;
Fig. 5 is the left side cutaway view Amplified image of slide block, feather key and guide rail;
Fig. 6 faces enlarged drawing for clamping screw;
Fig. 7 is the left view enlarged drawing of clamping screw;
Fig. 8 is the top perspective view of Fig. 7;
Fig. 9 is the left side cutaway view Amplified image of slide attachment plate, slide block, clamping screw, locking nut and guide rail.
In figure, 1, detection platform;2nd, gauge head changes frame;3rd, guide rail;4th, the first positioning baffle;5th, slide block;51st, stopper slot; 6th, clamping screw;61st, bolt head top;62nd, bolt head bottom;7th, slide attachment plate;8th, feather key;9th, the second positioning baffle; 10th, locking nut.
Specific embodiment
With reference now to Description of Drawings embodiment of the present utility model,.
Embodiment 1
Specific embodiment of the present utility model as shown in Figure 1 to Figure 3, for three coordinate gauge heads change frame and quickly allow by one kind Position and the frock for resetting again, including detection platform 1, the top of detection platform 1 is provided with gauge head and changes frame 2;The frock includes It is arranged on the detection platform 1 and gauge head is changed between frame 2 and enables the gauge head to change frame 2 in detection platform 1 along level The translation mechanism of direction movement.The frock can greatly expand the fitting limit that gauge head changes frame 2, and mobile simple and convenient is saved Shi Shengli;Gauge head is changed frame 2 and is resetted accurately, and need not re-start leveling and position, at the same it also avoid frequently dismounting it is right The damage of parts.
Translation mechanism includes guide rail 3 and the slide block 5 being adapted, and the guide rail 3 is fixed by screws in the detection platform 1 On, the top of the slide block 5 is provided with installing hole, and the gauge head is changed the bottom of frame 2 and injected in the installing hole at the top of slide block 5.Guide rail 3 Retaining mechanism is provided between slide block 5.
The bottom of slide block 5 is provided with feather key 8, and the top of the guide rail 3 is provided with the guiding being adapted with the feather key 8 Groove.
As shown in Figures 1 to 3, the quantity of guide rail 3 and slide block 5 is two, and two guide rails 3 are arranged parallel to, two cunnings Slide attachment plate 7 is connected between block 5, the two ends of slide attachment plate 7 are separately fixed at the top surface of two slide blocks 5 by screw On.It is planer type structure that the gauge head changes frame 2, fixes with two slide blocks 5 respectively positioned at two supporting leg bottoms of its both sides and connects Connect.It is planer type structure to change frame 2 due to gauge head, and the slide attachment plate 7 being connected with two slide blocks 5 makes overall structure stability more Good, two slide blocks 5 during moving along guide rail 3, change two supporting legs of frame 2 and will not move because of two slide blocks 5 by gauge head Asynchronous and situation that stress deformation occur, it is to avoid cause it finally to position because of the deformation that gauge head changes frame 2 inaccurate.
As shown in Fig. 2 the quantity of feather key 8 is two and is in rectangular-shape, it is split between feather key 8 and slide block 5 Formula structure.As shown in Figures 4 and 5, the bottom of slide block 5 is provided with the stopper slot 51 that width is adapted with feather key 8, stopper slot 51 along with lead The bearing of trend arrangement of rail 3.Two feather keys 8 are separately fixed at the two ends of stopper slot 51 by sunk screw, wherein, the countersunk head Screw is not contacted with guide rail 3.Feather key 8 can ensure that slide block 5 along guide rail 8 move when directional stability.Feather key 8 and slide block 5 Between adopt split-type structural, reduce its production difficulty, and feather key 8 can produce after used a period of time abrasion, Precision is affected, now only needs to change feather key 8, reduce its maintenance cost;Due to leading between feather key 8 and slide block 5 Cross sunk screw to fix, feather key 8 may be rotated around slide block 5, and stopper slot 51 can play the work for preventing feather key 8 from rotating With, it is ensured that the accuracy of feather key 8 and the relative position of slide block 5, it is ensured that slide block 5 can normally slide and glide direction along guide rail 3 Degree of accuracy.
Retaining mechanism includes the clamping screw 6 and locking nut 10 perpendicular to detection platform 1.The screw rod of clamping screw 6 is certainly Slide block 5 and slide attachment plate 7 are sequentially passed through on down, and is connected with the locking nut 10 positioned at the top of slide attachment plate 7.Locking Bolt 6 is located between two feather keys 8.The vertical cross-section of the gathering sill of guide rail 3 be " inverted T shape " structure, the bolt of clamping screw 6 Headgear is located in the gathering sill of guide rail 3.Clamping screw 6 is prevented from the opposite rail 3 of slide block 5 and moves up and down, it is ensured that gauge head is more Stability of the frame 2 when moving horizontally is changed, its danger toppled over is reduced.
As shown in figure 9, sulculus and vat that vertical cross-section includes arranging up and down for the gathering sill of " inverted T shape ".Such as Fig. 6,7,8 Shown, the bolt head of clamping screw 6 includes bolt head top 61 and bolt head bottom 62, and both are respectively positioned at the sulculus of gathering sill With vat inner side.Wherein, bolt head bottom does not contact with the bottom of the gathering sill of guide rail 3.The horizontal cross-section on bolt head top 61 is in Flat-shaped structure, the length direction of the horizontal cross-section is parallel with the bearing of trend of the gathering sill of guide rail 3.The width of bolt head bottom 62 More than the width of gathering sill sulculus, the top surface of bolt head bottom 62 is horizontal plane.When needing to tighten locking nut 10, bolt head The side wall on top 61 is stuck in the sulculus inner side of the gathering sill of guide rail 3, effectively prevents clamping screw 6 from rotating with locking nut 10, convenient Personnel tighten locking nut 10.When locking nut 10 is tightened, top surface and the locking nut 10 of bolt head bottom 62 jointly will be sliding Block 5 is locked on guides 3, so as to reach the purpose that fixed gauge head changes the position of frame 2.
Guide rail 3 is respectively arranged at two ends with the first positioning baffle 4 and the second positioning baffle 9, and both of which is fixed by screws in On guide rail 3.
When using, slide block 5 is shifted the position of the low order end of guide rail 3 onto, tighten locking nut 10.When need measure overall dimensions During larger part, the locking nut 10 of the upper end of clamping screw 6 can be first twisted, somewhat be unclamped, by the related gauge head of slide block 5 The high order end that frame 2 shifts together guide rail 3 onto is changed, locking nut 10 is re-tightened.Can be with same method after the completion of detection Make gauge head change frame 2 to reset.Positioning baffle may insure that gauge head changes frame 2 and returns to original position, it is not necessary to edit position again Put;In addition, positioning baffle effectively prevent slide block 5 deviating from from the two ends of guide rail 3 because of maloperation, prevent gauge head and change frame 2 The danger of people is damaged or injured by a crashing object because dropping, and improves safety.
This utility model is described above in association with most preferred embodiment, but this utility model is not limited to the above and takes off The embodiment shown, and various modification, the equivalent combinations carried out according to essence of the present utility model should be covered.

Claims (8)

1. a kind of three coordinate gauge heads that are used for change the frock that frame is quickly stepped down and resetted again, including detection platform (1), the inspection Survey and gauge head replacing frame (2) is provided with above platform (1);It is characterized in that, the frock also includes being arranged on the detection platform (1) change between frame (2) and make the gauge head change what frame (2) can in the horizontal direction be moved in detection platform (1) with gauge head Translation mechanism.
2. a kind of three coordinate gauge heads that are used for according to claim 1 change the frock that frame is quickly stepped down and resetted again, its It is characterised by, the translation mechanism includes guide rail (3) and the slide block (5) being adapted, and it is flat that the guide rail (3) is fixed on the detection On platform (1), the bottom that the slide block (5) changes frame (2) with the gauge head is fixedly connected;Between the guide rail (3) and slide block (5) It is provided with retaining mechanism.
3. a kind of three coordinate gauge heads that are used for according to claim 2 change the frock that frame is quickly stepped down and resetted again, its It is characterised by, the bottom of the slide block (5) is provided with feather key (8), is provided with the top of the guide rail (3) and the feather key (8) The gathering sill being adapted.
4. a kind of three coordinate gauge heads that are used for according to claim 3 change the frock that frame is quickly stepped down and resetted again, its It is characterised by, slide block (5) bottom is provided with the stopper slot (81) that width is adapted with the feather key (8), feather key (8) leads to Cross screw to be fixedly connected on the stopper slot of the slide block (5) (51).
5. a kind of three coordinate gauge heads that are used for according to claim 3 change the frock that frame is quickly stepped down and resetted again, its It is characterised by, the retaining mechanism includes the clamping screw (6) and locking nut (10) perpendicular to detection platform (1), the lock The screw rod of tight bolt (6) from bottom to top through the slide block (5) and with the locking nut (10) above the slide block (5) Connection, the vertical cross-section of the gathering sill of the guide rail (3) is " inverted T shape " structure, and the bolt head of the clamping screw (6) is set in In the gathering sill of guide rail (3).
6. a kind of three coordinate gauge heads that are used for according to claim 5 change the frock that frame is quickly stepped down and resetted again, its It is characterised by, sulculus and vat that the vertical cross-section includes arranging up and down for the gathering sill of " inverted T shape ", the clamping screw (6) bolt head includes bolt head top (61) and bolt head bottom respectively on the inside of the sulculus and vat of the gathering sill (62);The horizontal cross-section of the bolt head top (61) is in flat-shaped structure, the length direction of the horizontal cross-section and prolonging for gathering sill Stretch direction parallel;Width of the width of the bolt head bottom (62) more than gathering sill sulculus.
7. the one kind according to claim 2 to 6 any one is changed frame and is quickly stepped down and again multiple for three coordinate gauge heads The frock of position, it is characterised in that the quantity of the guide rail (3) and slide block (5) is two, two guide rails (3) are parallel to each other cloth Put, between two slide blocks (5) slide attachment plate (7) is connected with;It is planer type structure that the gauge head changes frame (2), positioned at its two Two supporting leg bottoms of side are fixedly connected respectively with two slide blocks (5).
8. the one kind according to claim 2 to 6 any one is changed frame and is quickly stepped down and again multiple for three coordinate gauge heads The frock of position, it is characterised in that the two ends of the guide rail (3) are equipped with baffle plate.
CN201621299815.5U 2016-11-30 2016-11-30 A frock that is used for three -dimensional gauge head change frame to step down fast and reset again Expired - Fee Related CN206177266U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621299815.5U CN206177266U (en) 2016-11-30 2016-11-30 A frock that is used for three -dimensional gauge head change frame to step down fast and reset again

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621299815.5U CN206177266U (en) 2016-11-30 2016-11-30 A frock that is used for three -dimensional gauge head change frame to step down fast and reset again

Publications (1)

Publication Number Publication Date
CN206177266U true CN206177266U (en) 2017-05-17

Family

ID=60242326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621299815.5U Expired - Fee Related CN206177266U (en) 2016-11-30 2016-11-30 A frock that is used for three -dimensional gauge head change frame to step down fast and reset again

Country Status (1)

Country Link
CN (1) CN206177266U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106441186A (en) * 2016-11-30 2017-02-22 广西玉柴机器股份有限公司 Tool for rapidly avoiding and resetting three-coordinate measurement head replacing frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106441186A (en) * 2016-11-30 2017-02-22 广西玉柴机器股份有限公司 Tool for rapidly avoiding and resetting three-coordinate measurement head replacing frame

Similar Documents

Publication Publication Date Title
CN108917517B (en) A kind of automobile cylinder cover measurement cubing
CN110307814A (en) A kind of full-automatic contact measuring apparatus and method
CN107336990A (en) Position lifting mechanism
CN206177266U (en) A frock that is used for three -dimensional gauge head change frame to step down fast and reset again
CN106441186A (en) Tool for rapidly avoiding and resetting three-coordinate measurement head replacing frame
CN104776780B (en) A kind of automobile gear shifting inhaul cable measures detection means
CN205981864U (en) Multiple spot detects auxiliary stand for resiliometer
CN205808293U (en) Bus body underframe Linearity surveying frock
CN208125002U (en) A kind of escalator upper detection tooling
CN204881469U (en) A device for detecting shoulder hole degree of depth size
CN109238204A (en) A kind of automobile cylinder cover measurement cubing
CN206496717U (en) A kind of medium-and low-speed maglev gauge measures frock
CN115655213A (en) Road longitudinal section elevation continuous measurement device
CN102226704B (en) Motorcycle vehicle frame fixing device
CN110671593B (en) Engineering cost site operation auxiliary device based on BIM
CN211032575U (en) Sensor positioning device
CN103105155B (en) Symmetry degree Measuring method of ball valve two end faces
CN203928995U (en) A kind of tool that knife bar upper aperture symmetry is measured
CN203100707U (en) Tool for verifying three-coordinate precision
CN215064457U (en) Flatness measuring device for wheel hub machining surface
CN205027338U (en) Detection apparatus for single bond groove symmetry
CN216159803U (en) High-precision linear guide rail operation precision measuring device
CN210368164U (en) Steel wire comb school needle workstation
CN221425545U (en) Auxiliary calibration jig for spandex winding panel
CN106767223A (en) A kind of double fixed outside micrometer monitor stations

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

Termination date: 20211130