CN206174455U - Main muscle pore mould is reserved to constructional column - Google Patents

Main muscle pore mould is reserved to constructional column Download PDF

Info

Publication number
CN206174455U
CN206174455U CN201621082131.XU CN201621082131U CN206174455U CN 206174455 U CN206174455 U CN 206174455U CN 201621082131 U CN201621082131 U CN 201621082131U CN 206174455 U CN206174455 U CN 206174455U
Authority
CN
China
Prior art keywords
constructional column
reserved
mould
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621082131.XU
Other languages
Chinese (zh)
Inventor
杨日震
郭栋
丁平军
段晋芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Installation Group Co Ltd
Original Assignee
SHANXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd filed Critical SHANXI INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority to CN201621082131.XU priority Critical patent/CN206174455U/en
Application granted granted Critical
Publication of CN206174455U publication Critical patent/CN206174455U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a constructional column construction field, concretely relates to main muscle pore mould is reserved to constructional column. The utility model discloses a technical scheme do: main muscle pore mould is reserved to constructional column, main muscle pore mould is reserved to constructional column, including the mould body, the mould body wholly is the toper, goes up slightly down carefully top -down taper off, mould body upper end is equipped with and is used for the through -hole extracted. The utility model has the characteristics of the construction is simple, can improve the whole anti -seismic performance of two secondary structure.

Description

Constructional column reserves cage bar duct mould
Technical field
The utility model is related to Constructional Col-umn Construction field, and in particular to constructional column reserves cage bar duct mould.
Background technology
Carried out by the way of later stage bar planting more than the existing constructional column reinforcing bar of building trade, the tensile strength and many factors of bar planting It is relevant:1st, drilling depth, the drilling depth of reinforcing steel implant directly influences rebar-planting quality, so must carry out one by one to bar planting hole Check;2nd, the cleaning of hole and reinforcing bar, hole and reinforcing bar cleaning are done badly, and can make to be combined not between the reinforcing bar of implantation and hole wall Closely, the pulling capacity that design is wanted is not reached;3rd, the packing of bar planting injecting glue stick, injecting glue stick is few, and gluing dosage is not Enough, the reinforcing bar of implantation is also unable to reach the pulling capacity that design is wanted;4th, bar planting joint bar, reinforcing bar should be along one during bar planting joint bar Direction is rotating and is inserted to bottom hole, in order to avoid gas is produced in hole retaining, affects rebar-planting quality;These tedious process, construction quality It is closely related with the supervision of the quality of labor service workman, and administrative staff, according to current status, existing majority planting reinforcement pull strength is not Meet code requirement, and later stage bar planting is costly.
Utility model content
The utility model overcomes the shortcomings of that prior art is present, there is provided one kind construction is simple, can improve secondary structure entirety The reserved cage bar duct mould of the constructional column of anti-seismic performance.
In order to solve above-mentioned technical problem, the technical solution adopted in the utility model is:The reserved cage bar porthole die of constructional column Tool, including die ontology, the die ontology is integrally conical, upper coarse and lower fine, is tapered from top to bottom;The die ontology Upper end is provided with the through hole for extracting.It is during cast concrete that the reserved cage bar duct mould of the constructional column of this programme is pre-buried in advance, When concrete reaches 1.2map, the reserved cage bar duct mould of constructional column is pulled out by through hole, penetrate constructional column reinforcing bar, then 1 is injected in preformed hole:1 lean concrete grout adds building adhesive.After strength of cement grout reaches, colligation constructional column reinforcing bar can be started.
Preferably, the die ontology includes top and bottom, and the upper end diameter is 20mm, and the lower end diameter is 15mm, a diameter of 6.5mm of the through hole.Using this programme, the rebar sizes during practice of construction can be matched.
The utility model has compared with prior art following beneficial effect:
1. make simple.The utility model is got out the through hole for extracting, is made using round steel polishing processing, small size lathe Make simple, can be processed using reinforcing bar waste material, and can be used in turn.2. working procedure is simple, good with agent structure switching performance, Compared with the mode of traditional rearmounted plant anchor, the globality and anti-seismic performance of secondary structure is considerably increased.
Description of the drawings
Fig. 1 is the reserved cage bar duct mould structure front view of constructional column;
Fig. 2 is the reserved cage bar duct mould of constructional column generalized section in use;
Fig. 3 is the reserved cage bar duct mould of constructional column top plan view in use;
Fig. 4 is reserved state diagram of the cage bar duct mould during specifically used of constructional column;
Fig. 5 is the reserved cage bar duct mould annexation figure in use of constructional column;
Wherein, 1, upper end;2nd, through hole;3rd, die ontology;4. lower end;5th, preformed hole;6th, reinforcing bar.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail, below Embodiment is used to illustrate the utility model, but is not limited to scope of the present utility model.
It is as Figure 1-5 the reserved cage bar duct mould 3 of constructional column, is integrally conical, it is upper coarse and lower fine, from top to bottom gradually Attenuate;The a diameter of 20mm in upper end 1, a diameter of 15mm in lower end 4, upper end 1 is provided with the through hole 2 for extracting, through hole 2 it is a diameter of 6.5mm 。
It is during cast concrete that the reserved cage bar duct mould 3 of structure constructional column is pre-buried in advance, when concrete reaches 1.2map, The reserved cage bar duct mould 3 of constructional column is pulled out by through hole 2, penetrates constructional column reinforcing bar 6, the then injection 1 in preformed hole 5: 2.5 dry cement mortar.After dry strength of cement mortar reaches, colligation constructional column reinforcing bar 6 can be started.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, although ginseng The utility model is described in detail according to previous embodiment, for a person skilled in the art, it still can be with Technical scheme described in foregoing embodiments is modified, or equivalent is carried out to which part technical characteristic, it is all Within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc. should be included in this practicality Within new protection domain.

Claims (2)

1. constructional column reserves cage bar duct mould, it is characterised in that:Including die ontology(3), the die ontology(3)It is in integrally Taper, it is upper coarse and lower fine, it is tapered from top to bottom;The die ontology(3)Upper end is provided with the through hole for extracting(2).
2. constructional column as claimed in claim 1 reserves cage bar duct mould, it is characterised in that:The die ontology(3)Including Upper end(1)And lower end(4), the upper end(1)A diameter of 20mm, the lower end(4)A diameter of 15mm, the through hole(2)It is straight Footpath is 6.5mm.
CN201621082131.XU 2016-09-27 2016-09-27 Main muscle pore mould is reserved to constructional column Active CN206174455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621082131.XU CN206174455U (en) 2016-09-27 2016-09-27 Main muscle pore mould is reserved to constructional column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621082131.XU CN206174455U (en) 2016-09-27 2016-09-27 Main muscle pore mould is reserved to constructional column

Publications (1)

Publication Number Publication Date
CN206174455U true CN206174455U (en) 2017-05-17

Family

ID=58676750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621082131.XU Active CN206174455U (en) 2016-09-27 2016-09-27 Main muscle pore mould is reserved to constructional column

Country Status (1)

Country Link
CN (1) CN206174455U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117605281A (en) * 2024-01-05 2024-02-27 广东建邦兴业集团有限公司 Novel constructional column pouring device and pouring method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117605281A (en) * 2024-01-05 2024-02-27 广东建邦兴业集团有限公司 Novel constructional column pouring device and pouring method thereof

Similar Documents

Publication Publication Date Title
CN104389314B (en) A kind of shallow clay grouting and reinforcing device and method
CN201908308U (en) Grouting sleeve valve pipe
CN202466569U (en) Integrated solid-hollow concrete pile
CN206646502U (en) A kind of steel pipe type soil nailing
CN104631460A (en) Girdling splitting type integral pile breaking method
CN102808413A (en) Reinforcement-replacing sectional-grouting pipe with inner piston and construction method thereof
CN206174455U (en) Main muscle pore mould is reserved to constructional column
CN202039368U (en) Simple hand-operated spiral soil borrowing device for reinforcement of prestressed tubular pile core
CN203891007U (en) Precast reinforced concrete hollow plum blossom pile
CN101942830A (en) Combined concrete soil pile with core pile and construction method as well as construction device thereof
CN105649074B (en) The squeezed concrete stiff composite pile of tubular pole and its construction method
CN207686338U (en) A kind of simple injecting glue tool of building structure bar planting
CN102061781A (en) Anchored epoxy bar-planted rod with expanded double-end
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN203200741U (en) Spiral reinforced sand bag well
CN204356772U (en) Anti-pulling pipe piles structure
CN211171950U (en) Prestressed concrete pipe pile with glass fiber material rib and reinforcing steel bar mixed reinforcement
CN205676886U (en) One pile for one column reducing steel reinforcement cage
CN103967135B (en) Precast concrete body of wall slip casting slurry outlet plugging device
CN203977418U (en) Prevent cast-in-place pile concrete loss device
CN107338969B (en) Simple glue injection tool for building structure bar planting and application method thereof
CN202731299U (en) Novel reserved sleeve device of cast-in-place floor plate
CN208363089U (en) The steel strand reinforced structure of Pulling-Resistant Anchor Rod in a kind of stake
CN208934703U (en) A kind of construction joint of tunnel and deformation joint open defect renovate structure
CN204475320U (en) A kind of screw pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 030032 No. 8, Xinhua Road, Tanghuai Industrial Park, Shanxi transformation and comprehensive reform demonstration zone, Taiyuan City, Shanxi Province

Patentee after: Shanxi Installation Group Co.,Ltd.

Address before: 030032 No.8 Xinhua Road, Xiaodian District, Taiyuan City, Shanxi Province

Patentee before: SHANXI INDUSTRIAL EQUIPMENT INSTALLATION Co.,Ltd.

CP03 Change of name, title or address