CN206173819U - Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring - Google Patents

Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring Download PDF

Info

Publication number
CN206173819U
CN206173819U CN201621062818.7U CN201621062818U CN206173819U CN 206173819 U CN206173819 U CN 206173819U CN 201621062818 U CN201621062818 U CN 201621062818U CN 206173819 U CN206173819 U CN 206173819U
Authority
CN
China
Prior art keywords
main longitudinal
typhoon
hanging basket
continuous beam
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621062818.7U
Other languages
Chinese (zh)
Inventor
宋伟俊
纪尊众
余绍宾
陈宁贤
龚国锋
樊立龙
张亚锋
唐小军
巨红亮
张斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201621062818.7U priority Critical patent/CN206173819U/en
Application granted granted Critical
Publication of CN206173819U publication Critical patent/CN206173819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility creatively provides a stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring, including hanging basket and truss system, truss system includes two levels and mutual parallel arrangement's main longitudinal grider, each the main longitudinal grider is equipped with two landing legs along its length direction at least it is equipped with the front beam to connect between two main longitudinal grider front ends, it includes centre form system, external mold system and die block system to hang the basket, external mold system configuration is on the landing leg. The utility model discloses create a stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring, the utility model discloses the creation sets up truss system having pour under the roof beam face of section when being under construction, and in the work progress, the position relation who controls centre form system, external mold system and die block intersystem through lifting device realizes section pouring of section bridge, and the construction is simply quick, and what the assurance was under construction goes on smoothly.

Description

A kind of Anti-Typhoon rapid construction stealth Hanging Basket of continuous beam cantilever placing installation
Technical field
The invention belongs to bridge construction field, Anti-Typhoon quick more particularly, to a kind of continuous beam cantilever placing installation The stealthy Hanging Basket of construction.
Background technology
In bridge construction, continuous rigid frame (continuous beam) cantilever pouring equipment typically uses Hanging Basket, commonly has Hanging Basket and presses structure Appearance formula can be divided into truss-like (including flat string is without balance weight type, rhombus, bowstring type), cable-stayed type, shaped steel formula and hybrid four kinds, Several structure type Hanging Baskets have problem is:When strong wind weather is suffered from, it is higher by beam face and causes because trussing is located at Suffered wind-force increase, in turn results in constructional difficulties.
The content of the invention
In view of this, the invention is directed to a kind of stealthy extension of the Anti-Typhoon rapid construction of continuous beam cantilever placing installation Basket, even if to meet the requirement of the construction operation under strong wind weather underbeam face.
To reach above-mentioned purpose, what the technical scheme of the invention was realized in:
A kind of Anti-Typhoon rapid construction stealth Hanging Basket of continuous beam cantilever placing installation, including Hanging Basket and trussing, it is described Trussing includes two main longitudinal griders being arranged horizontally and mutually in parallel, and each described main longitudinal grider at least sets along its length There are two supporting legs, front beam is connected between described two main longitudinal grider front ends, between the Hanging Basket is arranged on two main longitudinal griders, The Hanging Basket includes inner formwork system, outer modular system and bed die system, and the outer modular system is arranged on supporting leg, in the main longitudinal grider Front end is provided with preceding suspension rod, and the bed die system front end is hung on front beam by preceding suspension rod, after the bed die System Back-end passes through Suspension rod is hung on sections concrete has been poured, and the inner formwork system is located in outer modular system, and the inner formwork system is suspended in and has poured Build on the inner slide beam that sections concrete front end and main longitudinal grider are set in the same direction.
Further, two main longitudinal griders just to side be respectively equipped with cross spacing jack, and be arranged in one Cross spacing jack on individual main longitudinal grider is with the cross spacing jack being arranged on another main longitudinal grider just to setting.
Further, each described main longitudinal grider is the two i shaped steels composition just to setting.
Further, the inner formwork system is welded by shaped steel and steel plate.
Further, the outer modular system is welded by shaped steel and steel plate.
Further, the bed die system is welded by shaped steel and steel plate.
Relative to prior art, a kind of Anti-Typhoon rapid construction of continuous beam cantilever placing installation described in the invention is hidden Shape Hanging Basket has the advantage that:
The Anti-Typhoon rapid construction stealth Hanging Basket of a kind of continuous beam cantilever placing installation described in the invention, present invention wound Make and be arranged on trussing under the beam face for having poured sections in construction, in work progress, by hanging device control Position relationship between inner formwork system, outer modular system and bed die system realizes the cast of sections bridge, constructs simple and quick, it is ensured that apply Work is smoothed out.
Brief description of the drawings
The accompanying drawing for constituting the part of the invention is used for providing further understanding the invention, present invention wound The schematic description and description made does not constitute the improper restriction to the invention for explaining the invention. In accompanying drawing:
Fig. 1 is the stealthy extension of the Anti-Typhoon rapid construction of a kind of continuous beam cantilever placing installation described in the invention embodiment Basket front view;
Fig. 2 is the stealthy extension of the Anti-Typhoon rapid construction of a kind of continuous beam cantilever placing installation described in the invention embodiment Basket right view;
Fig. 3 is the stealthy extension of the Anti-Typhoon rapid construction of a kind of continuous beam cantilever placing installation described in the invention embodiment Cross spacing jack installing structure figure in basket.
Description of reference numerals:
1- main longitudinal griders;2- cross spacing jack;Suspension rod before 3-;4- rear suspension bars;
5- front beams;6- inner formwork systems;7- bed die systems;The outer modular systems of 8-;
9- supporting legs.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the invention can To be mutually combined.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", D score, The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " are Based on orientation shown in the drawings or position relationship, it is for only for ease of description the invention and simplifies description, rather than instruction Or imply that the device or element of meaning with specific orientation, with specific azimuth configuration and operation, therefore must not be understood that It is the limitation to the invention.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating Or imply relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined Feature can express or implicitly include one or more this feature.In the description of the invention, unless separately It is described, " multiple " is meant that two or more.
, it is necessary to explanation, unless otherwise clearly defined and limited, term " is pacified in the description of the invention Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly Connection;Can mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, Can be two connections of element internal.For the ordinary skill in the art, can be by concrete condition understanding State concrete meaning of the term in the invention.
Describe the invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As Figure 1-3, the Anti-Typhoon rapid construction stealth Hanging Basket of a kind of continuous beam cantilever placing installation, including Hanging Basket and purlin Frame system, the trussing includes two main longitudinal griders 1 being arranged horizontally and mutually in parallel, and two main longitudinal griders 1 symmetrically set Each described main longitudinal grider 1 is put for two i shaped steels just to setting are constituted.Each described master, during construction, longeron 1 is located at Poured below the edge of a wing of beam sections face, each main longitudinal grider 1 along its length at least provided with two supporting legs 9, described two Front beam 5 is connected between the front end of individual main longitudinal grider 1, between the Hanging Basket is arranged on two main longitudinal griders 1, the Hanging Basket includes internal model System 6, outer modular system 8 and bed die system 7, the inner formwork system 6 are welded by shaped steel and steel plate, the outer modular system 8 by Shaped steel and steel plate are welded, and the bed die system 7 is welded by shaped steel and steel plate;The outer modular system 8 is arranged on supporting leg 9 On, the suspension rod 3 before the front end of the main longitudinal grider 1 is provided with, the front end of bed die system 7 is hung on front beam 5 by preceding suspension rod 3, The rear end of bed die system 7 is hung on sections concrete has been poured by rear suspension bar 4, and the inner formwork system 6 is located at outer modular system 8 Interior, the inner formwork system 6 is suspended in and has poured on the inner slide beam that sections concrete front end and main longitudinal grider 1 are set in the same direction.
In the present embodiment, in order to ensure the centering of beam sections, two main longitudinal griders 1 just to side be respectively equipped with Cross spacing jack 2, and the cross spacing jack 2 being arranged on a main longitudinal grider 1 and be arranged on another main longitudinal grider 1 Cross spacing jack 2 just to set;During construction, by adjust cross spacing jack 2 adjust two main longitudinal griders 1 between position Relation is put, and then ensures to be arranged on the Hanging Basket on girder 1 in the middle of two main longitudinal griders 1, and then ensure the right of cast beam sections It is neutral.
The preferred embodiment of the invention is the foregoing is only, creation is not intended to limit the invention, it is all at this Within the spirit and principle of innovation and creation, any modification, equivalent substitution and improvements made etc. should be included in the invention Protection domain within.

Claims (6)

1. a kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket, it is characterised in that:Including Hanging Basket and truss System, the trussing includes two main longitudinal griders being arranged horizontally and mutually in parallel (1), each described main longitudinal grider (1) edge Its length direction is connected with front beam (5), institute at least provided with two supporting legs (9) between two main longitudinal grider (1) front ends State between Hanging Basket is arranged on two main longitudinal griders (1), the Hanging Basket includes inner formwork system (6), outer modular system (8) and bed die system (7), The outer modular system (8) is arranged on supporting leg (9), and preceding suspension rod (3), the bed die system are provided with the main longitudinal grider (1) front end (7) front end is hung on front beam (5) by preceding suspension rod (3), and bed die system (7) rear end is hung by rear suspension bar (4) Pour on sections concrete, in outer modular system (8), the inner formwork system (6) is suspended in and has poured section the inner formwork system (6) On the inner slide beam that section concrete front end and main longitudinal grider (1) are set in the same direction.
2. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature It is:Two main longitudinal griders (1) just to side be respectively equipped with cross spacing jack (2), and be arranged in a master and indulge Cross spacing jack (2) on beam (1) and the cross spacing jack (2) that is arranged on another main longitudinal grider (1) just pair are setting Put.
3. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature It is:Each described main longitudinal grider (1) is that two i shaped steels just to setting are constituted.
4. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature It is:The inner formwork system (6) is welded by shaped steel and steel plate.
5. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature It is:The outer modular system (8) is welded by shaped steel and steel plate.
6. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature It is:The bed die system (7) is welded by shaped steel and steel plate.
CN201621062818.7U 2016-09-18 2016-09-18 Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring Active CN206173819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621062818.7U CN206173819U (en) 2016-09-18 2016-09-18 Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621062818.7U CN206173819U (en) 2016-09-18 2016-09-18 Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring

Publications (1)

Publication Number Publication Date
CN206173819U true CN206173819U (en) 2017-05-17

Family

ID=58676511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621062818.7U Active CN206173819U (en) 2016-09-18 2016-09-18 Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring

Country Status (1)

Country Link
CN (1) CN206173819U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192778A (en) * 2016-09-18 2016-12-07 中国铁建大桥工程局集团有限公司 A kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192778A (en) * 2016-09-18 2016-12-07 中国铁建大桥工程局集团有限公司 A kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket

Similar Documents

Publication Publication Date Title
CN209583387U (en) Be used for adjustable hoist of assembled stair hoist and mount
CN205076713U (en) Crane with at least one crane beam
CN204454226U (en) A kind of welded suspension centre adjustable and balancing beam of I-shaped steel
CN206173819U (en) Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring
CN205314586U (en) Prefabricated element slings
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN107419665A (en) A kind of method of large-span steel girder hoisting appliance and its hoisting steel beam
CN207293909U (en) A kind of precast beam reinforced bar skeleton hanging apparatus
CN106192778A (en) A kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket
CN208666889U (en) A kind of adjustable beam type suspender of suspension centre
CN203668857U (en) Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates
CN207890943U (en) The combined attachment device of tower crane
CN205802766U (en) A kind of framework of steel reinforcement integral hoisting tool
CN215858986U (en) Crane beam operation cage
CN204914203U (en) Prefabricated template turning device that inverts of new jersey safety barrier
CN207143742U (en) A kind of large-span steel girder hoisting appliance
CN209568537U (en) A kind of suspension type floor structure
CN207974502U (en) Operation platform in a kind of combined electrical stair shaft
CN204282816U (en) A kind of girder template
CN208294101U (en) Large-span girder steel installation slides and promotes combination device
CN208310300U (en) Hoisting structure and hanging device
CN203529707U (en) Double-plate-hole type H-steel balance beam with bending moment
CN206735623U (en) Framework of steel reinforcement hanging apparatus
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN208120533U (en) A kind of moveable super large precast slab hanging device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant