CN206158685U - Move fortune rig blowout preventer stack fixing device fast - Google Patents

Move fortune rig blowout preventer stack fixing device fast Download PDF

Info

Publication number
CN206158685U
CN206158685U CN201621187180.XU CN201621187180U CN206158685U CN 206158685 U CN206158685 U CN 206158685U CN 201621187180 U CN201621187180 U CN 201621187180U CN 206158685 U CN206158685 U CN 206158685U
Authority
CN
China
Prior art keywords
pressure testing
base
blowout preventer
preventer
rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621187180.XU
Other languages
Chinese (zh)
Inventor
王玲
周小峰
王东
蔡京儒
陈德刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Baoji Oilfield Machinery Co Ltd
CNPC National Oil and Gas Drilling Equipment Engineering Technology Research Center Co Ltd
Original Assignee
Baoji Oilfield Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Oilfield Machinery Co Ltd filed Critical Baoji Oilfield Machinery Co Ltd
Priority to CN201621187180.XU priority Critical patent/CN206158685U/en
Application granted granted Critical
Publication of CN206158685U publication Critical patent/CN206158685U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a move fortune rig blowout preventer stack fixing device fast, construct including hoisting support and pressure test machine, pressure test machine constructs and sets up in the base lower part, and pressure test machine constructs center part and installs the pressure testing stake, and the pressure testing stake upwards is connected with the casing head, the casing head upwards and annular blowout preventer fixed connection, annular blowout preventer upwards and hoisting support fixed connection, hoisting support upwards passes through guy wire mechanism and is connected with base upper portion, other guy wire mechanism and base sub -unit connection are passed through to the annular blowout preventer lower part. The utility model discloses a device, blowout preventer stack can move fortune along with the base, has reduced a large amount of blowout preventer stack dismantlement works, improves the rig and moves fortune efficiency, reduces the rig and moves the fortune cost, pressure test machine constructs the base that also can regard as blowout preventer stack machinery closely to reach sealing test.

Description

Rapid transporting rig preventer group fixing device
Technical field
The utility model belongs to technical field of petroleum machinery, is related to a kind of rapid transporting rig preventer group fixing device.
Background technology
In recent years, with World Oil Market sustainable development, intensified competition, Ge You companies and drilling company are to moving drilling machine Time and cost of transportation require more and more higher;Both at home and abroad each big drilling company is also proposed to the movement performance of rig and clearly Ask, it is desirable to which rig can quickly move.But, because preventer group cannot reliably be fixed on base, need during each movement by Preventer assembling and dismantling are unloaded.Preventer group includes the part such as annular preventer, ram preventer, four-way and valve, dismounting workload it is big and Need to reform mechanical tight and sealing test when reinstalling after dismounting to preventer group.
Utility model content
The purpose of this utility model is to provide a kind of rapid transporting rig preventer group fixing device, solves prior art Because preventer group cannot reliably be fixed on base, preventer assembling and dismantling need to be unloaded during each movement, be wasted time and energy, affect work Efficiency;And the mechanical tight and sealing test that preventer group need to be reformed when reinstalling after preventer assembly and disassembly, hence it is evident that increase work The problem that work is measured.
The technical scheme that the utility model is adopted is, a kind of rapid transporting rig preventer group fixing device, including hanging Dress support and pressure testing mechanism, pressure testing mechanism is arranged on base bottom, and pressure testing mechanism centre is provided with pressure testing stake, pressure testing stake to Upper to be connected with casing head, casing head is fixedly connected upwards with annular preventer, and annular preventer is fixed with hoisting bracket connect upwards Connect, hoisting bracket is connected upwardly through tight cable with base top, annular preventer bottom by other tight cable with Base bottom connects.
Rapid transporting rig preventer group fixing device of the present utility model, is further characterized in that:
The structure of hoisting bracket is, including main frame body, and edge is placed with support round platform on the axis through-hole of main frame body upper surface; Support and be respectively fixed with four ear mounts by four studs on round platform, four ear mounts are each via a set of bolt I and nut I and ring The upper end of shape preventer is connected;Main frame body side aperture position is provided with rotating beam, and rotating beam two ends pass through respectively a bearing pin It is connected with main frame body.
Pressure testing mechanism structure includes main beam, and in main beam centre upper surface an adpting flange is welded with, and connects The upper surface of flange is fixedly connected by a circle bolt II and nut II with pressure testing stake lower surface flange.
Tight cable includes eight guy wires, and every guy wire outer end is connected with the ear mount on base, and every guy wire the inner passes through Shackle is connected with annular preventer or main frame body.
The beneficial effects of the utility model are conveniently and efficiently preventer group to be fixed on base, are really achieved The rapid transporting of rig, improves rig movement efficiency, reduces rig movement cost, safe ready;Can be used as preventer group machinery The base of tight and sealing test.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the hoisting bracket schematic diagram in the utility model;
Fig. 3 is the hoisting bracket top view in the utility model;
Fig. 4 is the pressure testing structural scheme of mechanism in the utility model;
Fig. 5 is the pressure testing mechanism top view in the utility model;
Fig. 6 is the tight cable schematic diagram of the utility model use state.
In figure, 1. hoisting bracket, 2. pressure testing mechanism, 3. tight cable, 4. ear mount, 5. supports round platform, 6. main frame body, 7. revolves Turn beam, 8. stud, 9. guy wire otic placode, 10. bearing pin, 11. bolts I, 12. nuts I, 13. main beams, 14. bolts II, 15. nuts II, 16. adpting flanges, 17. shackles, 18. guy wires, 19. bolts III, 20. nuts III, 21. bases, 22. annular preventers, 23. Casing head, 24. test piles.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
With reference to Fig. 1, structure of the present utility model is, including hoisting bracket 1 and pressure testing mechanism 2, and pressure testing mechanism 2 is arranged on bottom 21 bottoms of seat, the centre of pressure testing mechanism 2 is provided with pressure testing stake 24, and pressure testing stake 24 is connected upwards with casing head 23, casing head 23 It is fixedly connected with annular preventer 22 upwards, annular preventer 22 is fixedly connected upwards with hoisting bracket 1, and hoisting bracket 1 is upwards It is connected with the top of base 21 by tight cable 3, the bottom of annular preventer 22 is by other tight cable 3 and the bottom of base 21 Connection;
With reference to Fig. 2, Fig. 3, the structure of hoisting bracket 1 is, including main frame body 6, and edge is put on the upper surface axis through-hole of main frame body 6 Support round platform 5 is equipped with, supports round platform 5 to be only placed in above main frame body 6, between the two without any connection;Pass through on round platform 5 is supported Four studs 8 are respectively fixed with four ear mounts 4, before annular preventer 22 is completed, annular preventer 22 are placed on Support on round platform 5, four ear mounts 4 are connected each via a set of bolt I 11 and nut I 12 with the upper end of annular preventer 22;It is main The side aperture position of support body 6 is provided with rotating beam 7, and the two ends of rotating beam 7 are connected respectively by a bearing pin 10 with main frame body 6, rotation Turning beam 7 can rotate around bearing pin 10;When needing to block support round platform 5, rotating beam 7 is gone to into operating position, plug bearing pin 10, i.e., Can block and fall under support round platform 5.
With reference to Fig. 4, Fig. 5, preventer group machinery serves as tight and close again as the support base of casing head 23 in pressure testing mechanism 2 The base of envelope test, structure includes main beam 13, in the centre upper surface of main beam 13 adpting flange 16 is welded with, connects The upper surface of acting flange 16 is fixedly connected by a circle bolt II 14 and nut II 15 with the lower surface flange of pressure testing stake 24.
With reference to Fig. 6, tight cable 3 includes eight guy wires 18, and upper and lower is each four, the every outer end of guy wire 18 and base Ear mount on 21 is connected, and every the inner of guy wire 18 is connected by shackle with annular preventer 22 or main frame body 6, and each shackle is led to Cross bolt III 19 and nut III 20 is hinged.
The device that is connected of the present utility model, by hoisting bracket 1, pressure testing mechanism 2, tight cable 3, easily will Annular preventer 22 (preventer group) is fixed on base 21, and realizing preventer group can transport with base, reach rig Rapid transporting, improve rig movement efficiency, reduce rig movement cost, and pressure testing mechanism 2 is alternatively arranged as preventer group Mechanical tight and sealing test base, compact conformation function is more.

Claims (4)

1. a kind of rapid transporting rig preventer group fixing device, it is characterised in that:Including hoisting bracket (1) and pressure testing mechanism (2), pressure testing mechanism (2) is arranged on base (21) bottom, and pressure testing mechanism (2) centre is provided with pressure testing stake (24), pressure testing stake (24) it is connected with casing head (23) upwards, casing head (23) is fixedly connected upwards with annular preventer (22), annular preventer (22) it is fixedly connected with hoisting bracket (1) upwards, hoisting bracket (1) connects upwardly through tight cable (3) and base (21) top Connect, annular preventer (22) bottom is connected by other tight cable (3) with base (21) bottom.
2. rapid transporting rig preventer group fixing device according to claim 1, it is characterised in that:Described lifting The structure of frame (1) is, including main frame body (6), and edge is placed with support round platform (5) on the axis through-hole of main frame body (6) upper surface;Propping up Hold round and be respectively fixed with four ear mounts (4) by four studs (8) on platform (5), four ear mounts 4 are each via a set of bolt I And nut I (12) is connected with the upper end of annular preventer (22) (11);Main frame body (6) side aperture position is provided with rotating beam (7), rotating beam (7) two ends are connected respectively by a bearing pin (10) with main frame body (6).
3. rapid transporting rig preventer group fixing device according to claim 1, it is characterised in that:Described pressure testing machine Structure (2) structure includes main beam (13), and in main beam (13) centre upper surface an adpting flange (16) is welded with, and connects The upper surface of flange (16) is fixedly connected by a circle bolt II (14) and nut II (15) with pressure testing stake (24) lower surface flange.
4. rapid transporting rig preventer group fixing device according to claim 1, it is characterised in that:Described guy wire machine Structure (3) includes eight guy wires (18), and upper and lower is each four, the ear mount phase on every guy wire (18) outer end and base (21) Even, every guy wire (18) the inner is connected by shackle with annular preventer (22) or main frame body (6).
CN201621187180.XU 2016-11-04 2016-11-04 Move fortune rig blowout preventer stack fixing device fast Expired - Fee Related CN206158685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621187180.XU CN206158685U (en) 2016-11-04 2016-11-04 Move fortune rig blowout preventer stack fixing device fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621187180.XU CN206158685U (en) 2016-11-04 2016-11-04 Move fortune rig blowout preventer stack fixing device fast

Publications (1)

Publication Number Publication Date
CN206158685U true CN206158685U (en) 2017-05-10

Family

ID=58656401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621187180.XU Expired - Fee Related CN206158685U (en) 2016-11-04 2016-11-04 Move fortune rig blowout preventer stack fixing device fast

Country Status (1)

Country Link
CN (1) CN206158685U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107965281A (en) * 2017-11-22 2018-04-27 宝鸡石油机械有限责任公司 A kind of marine module drilling rig preventer board migration device and movement method
CN110576945A (en) * 2018-06-11 2019-12-17 广州海洋地质调查局 Scientific investigation drilling ship

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107965281A (en) * 2017-11-22 2018-04-27 宝鸡石油机械有限责任公司 A kind of marine module drilling rig preventer board migration device and movement method
CN107965281B (en) * 2017-11-22 2020-02-18 宝鸡石油机械有限责任公司 Offshore module drilling rig blowout preventer moving device and moving method
CN110576945A (en) * 2018-06-11 2019-12-17 广州海洋地质调查局 Scientific investigation drilling ship

Similar Documents

Publication Publication Date Title
CN105155571B (en) Replaceable prestressed anchor bolt assembly and mounting and replacement construction method thereof
CN206158685U (en) Move fortune rig blowout preventer stack fixing device fast
CN203846786U (en) Nuclear power containment upper end socket and lower end socket assembly jig frame structure
CN202175518U (en) Attached type light derrick
CN103342296A (en) Adhering self-elevating-type tower crane for hoisting wind power equipment
CN103061521B (en) Coliseum Steel Cantilever Truss torque type mounting method
CN106677994A (en) Impeller assembling device and impeller assembling method
CN201834673U (en) Hoisting device for shell of megawatt wind power generator
CN201351093Y (en) Connecting device for connecting top rotating part and rotary supporting device of crane
CN103993730B (en) Steel coal hopper abutting joint constructing operation platform
CN105883602A (en) Fan blade hanger support with clamp mechanism
CN203594106U (en) Upper-and-lower layer strut connecting component of integrated houses
CN203650082U (en) Turnover device
CN102815609A (en) Tank body assembling electric lifting system by flip chip method and hoisting method thereof
CN203867275U (en) Internal suspension derrick rotatable craning cover
CN203298984U (en) Tower crane general test platform
CN210457249U (en) Electric pole holding structure with self-jacking machine body
CN212127273U (en) Hoisting accessory of large-scale cylindric spare part
CN203905426U (en) Steel coal scuttle butt-connection installation construction operation table
CN204473257U (en) Product joint sealing steering hardware on a kind of conveyor line
CN203664947U (en) Tower-type cargo boom transitional joint splicing welding tool
CN207593154U (en) A kind of wind power foundation ring is turned over connection lifting lug
CN202594608U (en) Turnover device for large-size wind generating set rack
KR101171714B1 (en) Integrated tower with a crane for wind power generator and construction method of the wind power generator using thereof
CN206632607U (en) A kind of turnable frock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210112

Address after: 721002 No.2 Dongfeng Road, Jintai District, Baoji City, Shaanxi Province

Patentee after: BAOJI OILFIELD MACHINERY Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC national oil and gas drilling equipment Engineering Technology Research Center Co.,Ltd.

Address before: 721002 No. 2 Dongfeng Road, Shaanxi, Baoji

Patentee before: Baoji Oilfield Machinery Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170510

CF01 Termination of patent right due to non-payment of annual fee