CN206144577U - Assembled tunnel supporting rack - Google Patents

Assembled tunnel supporting rack Download PDF

Info

Publication number
CN206144577U
CN206144577U CN201621178602.7U CN201621178602U CN206144577U CN 206144577 U CN206144577 U CN 206144577U CN 201621178602 U CN201621178602 U CN 201621178602U CN 206144577 U CN206144577 U CN 206144577U
Authority
CN
China
Prior art keywords
arched girder
screw rod
longeron
fixed
arched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621178602.7U
Other languages
Chinese (zh)
Inventor
吕汉川
林本涛
洪习成
王芳
张磊
巩江峰
钟昌桂
卿伟宸
赵杰
陈泉
曾宏飞
王建捷
王加
王加一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN OST SLOPE PROTECTION ENGINEERING CO., LTD.
SICHUAN RUITIE TECHNOLOGY CO., LTD.
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
SICHUAN RUITIE TECHNOLOGY Co Ltd
SICHUAN AOTE MACHINERY EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN RUITIE TECHNOLOGY Co Ltd, SICHUAN AOTE MACHINERY EQUIPMENT CO Ltd filed Critical SICHUAN RUITIE TECHNOLOGY Co Ltd
Priority to CN201621178602.7U priority Critical patent/CN206144577U/en
Application granted granted Critical
Publication of CN206144577U publication Critical patent/CN206144577U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses an assembled tunnel supporting rack, including arched girder and longeron, a plurality of arched girder parallel arrangement, and the arched girder radian is the same with the hole body radian that will support, a plurality of fixed longerons at the interval on the arched girder, longeron and arched girder mutually perpendicular, every net that forms at longeron and arched girder all is fixed with steel wire mesh sheet, every arched girder both ends all is fixed with altitude controller, altitude controller's structure does: nut upper portion sets up the screw rod, and the lower part sets up down the screw rod, and goes up screw rod and lower screw flight opposite direction, it is terminal to go up the fixed arched girder of screw rod, and the sole is fixed to lower screw rod. The utility model discloses a combination structural design, the swift installation of being convenient for, and arched girder height -adjustable easily realize reaching and initiatively preventing the effect tunnel top back pressure, the all standing is all carried out to steel wire mesh sheet gemel arch girder system, has realized that the tunnel total cross -section protects.

Description

Assembled tunnel support frame
Technical field
This utility model is related to railway traffic construction field, and in particular to a kind of assembling for railway tunnel internal protection Formula tunnel support frame.
Background technology
At present, the protection for local concrete slump occurring to railway tunnel inside is only that wood is set up in the middle of steel column with some Plate carries out emergency processing, or is having local at slump to carry out mesh sheet anchoring, and such pretective acreage is limited, poor reliability, it is impossible to real Now tunnel internal carries out long-term total cross-section protection.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of assembled tunnel support frame, realizes arched girder and indulges Beam quickly splicing and back-pressure is implemented at the top to tunnel, plays active preventive effect, and protective range width, quick for installation, safety can Lean on.
To solve above-mentioned technical problem, the technical solution adopted in the utility model is:
A kind of assembled tunnel support frame, including arched girder and longeron, some arched girders are arranged in parallel, and arched girder radian with The hole body radian to be supported is identical, and fixed some longerons are spaced on the arched girder, and the longeron is mutually perpendicular to arched girder; Each grid that longeron and arched girder are formed is fixed with steel fabric sheet;Each arched girder two ends is fixed with height adjuster.
Further, the structure of the height adjuster is:Nut top arranges upper screw rod, and bottom arranges lower screw rod, and Upper screw rod is in opposite direction with lower screw flight;Upper screw rod fixes arched girder end, and lower screw rod fixes sole.
Further, the arched girder is multisection type, is connected by flange between per section.
Further, the connected mode between the longeron and arched girder is:Connecting plate is fixed with arched girder, longeron is connected to On connecting plate.
Further, the longeron is bolted with connecting plate.
Compared with prior art, the beneficial effects of the utility model are:Combined structure design is employed, is easy to quick peace Dress, and arched girder height adjustable, it is easy to accomplish to tunnel top back-pressure, so as to reach active preventive effect, steel fabric sheet is to arched girder System carries out all standing, realizes tunnel total cross-section protection.
Description of the drawings
Fig. 1 is this utility model assembled tunnel support frame using effect schematic diagram.
Fig. 2 is this utility model assembled tunnel support frame overall structure diagram.
Fig. 3 is the mesh sheet structural representation of this utility model assembled tunnel support frame.
Fig. 4 is the flange connection diagram of this utility model assembled tunnel support frame.
Fig. 5 is the arched girder and longeron connection diagram of this utility model assembled tunnel support frame.
Fig. 6 is the height regulator structure schematic diagram of this utility model assembled tunnel support frame.
In figure:1- height adjusters;2- flanges;3- steel fabric sheets;4- arched girders;5- longerons;6- connecting plates;The upper screw rods of 7-; 8- nuts;Screw rod under 9-.
Specific embodiment
This utility model is described in further detail with reference to the accompanying drawings and detailed description.This utility model is carried For a kind of assembled tunnel support frame, its structure is:Including arched girder 4 and longeron 5, some arched girders 4 are arranged in parallel, and encircle The radian of beam 4 is identical with the hole body radian to be supported, and fixed some longerons 5, the longeron 5 and arch are spaced on the arched girder 4 Beam 4 is mutually perpendicular to;Each grid formed in longeron 5 and arched girder 4 is fixed with steel fabric sheet 3;Each two ends of arched girder 4 is solid Surely there is height adjuster 1.
The structure of the height adjuster 1 is:The top of nut 8 arranges upper screw rod 7, and bottom arranges lower screw rod 9, and upper screw rod 7 is contrary with the hand of spiral of lower screw rod 9;Upper screw rod 7 fixes the end of arched girder 4, and lower screw rod 9 fixes sole.Employ upper and lower two The device of the engagement composition of screw rod 7,9 of different rotation directions, is machined with upper and lower two kinds different rotation direction screw threads in nut 8, rotate nut 8 When, screw rod 7 and lower screw rod 9 synchronously rise or fall on two, realize hangar tunnel integral elevating, reach and implement back-pressure to tunnel top Purpose.
Fig. 2 shows this utility model device assembled tunnel support frame, and this device is made up of multispan, often across for one Unit, unit is consisted of:There is the arched girder 4 that multistage is spliced, per section docks by flange 2;In the two ends bottom of every arched girder 4 The height adjuster 1 of bidirectional screw is installed, for realizing back-pressure of the arched girder 4 to tunnel top, there are four per unit.Per root Evenly spaced mesh sheet gripper shoe is welded with arched girder 4, the shackle hung when installing for steel fabric sheet 3 and on steel fabric sheet 3 connects Connect;Many longerons 5 are evenly equipped between two arched girders 4, by means of two ends installing hole bolt the connecting plate 6 of arched girder 4 is anchored on On.
After building and completing bow member device and tighten each node connecting bolt, then carry out soft protecting net i.e. steel fabric sheet 3 paving is hung, and the periphery of steel fabric sheet 3 is installed with steel wire rope, and the two ends of steel wire rope are tight with rope kayser.During paving steel fabric sheet 3, with interval Uniform shackle passes through the steel wire rope of the surrounding of steel fabric sheet 3, and is connected with the gripper shoe being welded on arched girder 4, by steel fabric sheet 3 Reinforce on arched girder 4.

Claims (5)

1. a kind of assembled tunnel support frame, it is characterised in that including arched girder (4) and longeron (5), some arched girders (4) are put down Row arrangement, and arched girder (4) radian is identical with the hole body radian to be supported, and fixed some longerons are spaced on the arched girder (4) (5), the longeron (5) is mutually perpendicular to arched girder (4);Each grid formed in longeron (5) and arched girder (4) is fixed with steel Silk netting (3);Each arched girder (4) two ends is fixed with height adjuster (1).
2. assembled tunnel support frame as claimed in claim 1, it is characterised in that the structure of the height adjuster (1) For:Nut (8) top arranges the screw thread side of upper screw rod (7), the lower screw rod (9) of bottom setting, and upper screw rod (7) and lower screw rod (9) To contrary;Upper screw rod (7) fixes arched girder (4) end, and lower screw rod (9) fixes sole.
3. assembled tunnel support frame as claimed in claim 1, it is characterised in that the arched girder (4) is multisection type, per section Between by flange (2) connect.
4. the assembled tunnel support frame as described in claim 1 or 2 or 3, it is characterised in that the longeron (5) and arched girder (4) connected mode between is:Connecting plate (6) is fixed with arched girder (4), longeron (5) is connected on connecting plate (6).
5. assembled tunnel support frame as claimed in claim 4, it is characterised in that the longeron (5) is led to connecting plate (6) Cross bolt connection.
CN201621178602.7U 2016-11-03 2016-11-03 Assembled tunnel supporting rack Active CN206144577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621178602.7U CN206144577U (en) 2016-11-03 2016-11-03 Assembled tunnel supporting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621178602.7U CN206144577U (en) 2016-11-03 2016-11-03 Assembled tunnel supporting rack

Publications (1)

Publication Number Publication Date
CN206144577U true CN206144577U (en) 2017-05-03

Family

ID=58623898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621178602.7U Active CN206144577U (en) 2016-11-03 2016-11-03 Assembled tunnel supporting rack

Country Status (1)

Country Link
CN (1) CN206144577U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106321118A (en) * 2016-11-03 2017-01-11 四川奥特机械设备有限公司 Assembled type tunnel supporting and protecting shed frame
CN109184759A (en) * 2018-10-24 2019-01-11 梅茜 A kind of mining tunnel suspension device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106321118A (en) * 2016-11-03 2017-01-11 四川奥特机械设备有限公司 Assembled type tunnel supporting and protecting shed frame
CN109184759A (en) * 2018-10-24 2019-01-11 梅茜 A kind of mining tunnel suspension device

Similar Documents

Publication Publication Date Title
CN203531417U (en) Movable safety rope net for aloft roof
CN206144577U (en) Assembled tunnel supporting rack
CN103306193A (en) Vertical beam falling-off prevention system
CN104652911A (en) Pole falling prevention device
CN206902556U (en) It is a kind of to combine protector across both wired bridge constructions
CN207079828U (en) A kind of oblique outer reverse erecting device of eaves panel of large cantilever
CN206693950U (en) Oil pipe bridge fixing locker and ground pipe arranging device
CN106320191A (en) Pre-tensioning steel wire and polymer mortar externally-added layer reinforcing device
CN105178615A (en) Discharging platform
CN106321118A (en) Assembled type tunnel supporting and protecting shed frame
CN202416823U (en) Aerial work platform
CN107060230A (en) Reverse installation device for large-cantilever oblique outer eave panel and manufacturing method
CN207933868U (en) Self-anchored suspension bridge
CN203669328U (en) Quick-disassembly high-altitude working hanging basket
CN209194706U (en) Prestressed steel truss structure system with large column spacing
CN207453995U (en) A kind of assembled tunnel support frame
US2417825A (en) Bridge structure
CN107806237A (en) A kind of high building hydraulic climbing protecting screen and its construction method
CN207847037U (en) A kind of high building hydraulic climbing protecting screen
CN108820128A (en) The bulkhead peculiar to vessel that keeps out the wind
RU188380U1 (en) Double deck traverse
RU2400889C1 (en) Ladder
CN207934292U (en) One kind is baroclined bar truss beam string composite structure
RU169612U1 (en) Cable-stayed cable-stayed construction
CN205046861U (en) Discharging platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170428

Address after: 610000 Jinniu District, Chengdu, Phoenix Road, No. 99, No.

Co-patentee after: China Railway Eryuan Engineering Group Co., Ltd.

Patentee after: SICHUAN RUITIE TECHNOLOGY CO., LTD.

Co-patentee after: SICHUAN OST SLOPE PROTECTION ENGINEERING CO., LTD.

Address before: Green Village Xiangyang town 618308 Sichuan city of Deyang province Guanghan City

Co-patentee before: SICHUAN RUITIE TECHNOLOGY CO., LTD.

Patentee before: Sichuan Aote Machinery Equipment Co., Ltd.