CN206144154U - Novel template frame for external wall construction - Google Patents

Novel template frame for external wall construction Download PDF

Info

Publication number
CN206144154U
CN206144154U CN201621228316.7U CN201621228316U CN206144154U CN 206144154 U CN206144154 U CN 206144154U CN 201621228316 U CN201621228316 U CN 201621228316U CN 206144154 U CN206144154 U CN 206144154U
Authority
CN
China
Prior art keywords
pipe
horizontal
utility
model
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621228316.7U
Other languages
Chinese (zh)
Inventor
朱力
王杰
汪瑛
熊萍萍
唐国良
李辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621228316.7U priority Critical patent/CN206144154U/en
Application granted granted Critical
Publication of CN206144154U publication Critical patent/CN206144154U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a novel template frame for external wall construction, it includes supporting platform, the first horizontal pipe that is connected with supporting platform, the horizontal pipe of a plurality of second, a plurality of vertical pipe, four -way pipe and pre -buried anchor, supporting platform passes through the bolt and installs on the wall, first horizontal pipe end portion is provided with clamping block, supporting platform is last be provided with with the through -hole that clamping block suited, be close to the wall body two openings of four -way pipe level end connect respectively in horizontal first pipe, horizontal second pipe, two openings of the vertical end of four -way pipe are all connected in vertical pipe, be close ground the bottom of vertical pipe is provided with pre -buried anchor. The utility model discloses simple structure, the design science, the template frame installation is stable, firm, and it is convenient to dismantle, has reduced operating personnel intensity of labour, has improved work efficiency, repeatedly usable, the security is high, and practicality is excellent, has comparatively wide market prospect.

Description

A kind of external wall construction New-type mould grillage
Technical field
This utility model belongs to technical field of building construction, more particularly to a kind of external wall construction New-type mould grillage.
Background technology
When constructing to external wall, it is often necessary to build template frame to construct.Current template frame generally existing Install complicated, dismounting is difficult, install that insecure, stability is poor and the low defect of recycling rate of waterused.
In view of the defect that above-mentioned prior art is present, the positive in addition research and innovation of this utility model is a kind of outer to creating New-type mould grillage is used in wall construction so as to more practicality.
Utility model content
In order to overcome the defect of above-mentioned prior art, the purpose of this utility model to be to provide a kind of external wall construction New-type mould Grillage.
This utility model takes technical scheme below to realize:A kind of external wall construction New-type mould grillage, it includes The second horizontal pipe, multiple endings that the first horizontal pipe that support platform is connected with support platform, multiple endings are connected Vertical pipe, four-way pipe and the surface-based pre-buried anchor being connected, the support platform is arranged on wall by bolt On face, the first horizontal pipe end portion is provided with clamping block, is provided with the support platform and is mutually fitted with the clamping block The through hole answered;Horizontal first pipe, laterally is connected near two of four-way pipe horizontal ends openings of body of wall Second pipe, two openings of the four-way pipe vertical end are all connected to Vertically tube;Jie Jin the described vertical circle on the ground The bottom of pipe is provided with pre-buried anchor;The pre-buried anchor includes the multiple installations arranged on sleeve, chassis and chassis side face Hole;Horizontal first pipe, horizontal second pipe upper and lower surface are provided with buckle, two on the vertical position buckle it Between compression spring is installed.
Further, the sleeve is vertically set on the center on the chassis.
Further, the sleeve inner is set with the Vertically tube.
In sum this utility model has the advantages that:This utility model simple structure, design science, template frame Install stable, firm, by clamping block, support platform the first horizontal pipe and body of wall are installed, fixed and convenient disassembly, pass through Four-way pipe realizes the extension in the horizontally and vertically direction of the template frame, by arranging pre-buried anchor on ground, makes the template frame peace Dress is stable, and by compression spring the stability of the template frame is further improved, meanwhile, the device is removed and installed conveniently, is reduced Labor intensity of operating staff, improves work efficiency, and reusable, safe, Practical Performance is excellent, with more wide Market prospect.
Description of the drawings
Fig. 1 is this utility model structural representation;
Fig. 2 is the pre-buried anchor structural representation of this utility model structure;
Wherein:1st, metope;2nd, ground;3rd, pre-buried anchor;31st, chassis;32nd, sleeve;33rd, installing hole;4th, first is laterally round Pipe;5th, vertical pipe;6th, four-way pipe;7th, support platform;8th, clamping block;9th, adjustable spring;10th, the second horizontal pipe.
Specific embodiment
Technological means, creation characteristic, reached purpose and effect to realize this utility model is easy to understand, below With reference to specific embodiment, this utility model is expanded on further.
As illustrated in fig. 1 and 2, a kind of external wall construction New-type mould grillage, it is connected including support platform 7 with support platform 7 The first horizontal pipe 4, multiple the second horizontal pipe 10, the multiple vertical pipes 5, four being connected that finish up being connected that finish up for connecing Siphunculus 6 and the pre-buried anchor 3 installed in ground 2, the support platform 7 is arranged on metope 1 by bolt, and described first is horizontal The end head of pipe 4 is provided with clamping block 8, the through hole being adapted with the clamping block 8 is provided with the support platform 7.
As preferred version of the present utility model, two near the horizontal ends of the four-way pipe 6 of body of wall 1 of this utility model Opening is connected to horizontal first pipe 4, horizontal second pipe 10, and two openings of the vertical end of the four-way pipe 6 are equal It is connected to Vertically tube 5.
As preferred version of the present utility model, bottom of this utility model be close to the Vertically tube 5 on the ground 2 It is provided with pre-buried anchor 3.
Used as preferred version of the present utility model, pre-buried anchor 3 of the present utility model includes sleeve 32, chassis 31 and bottom The multiple installing holes 33 arranged on the side face of disk 31.
Used as preferred version of the present utility model, horizontal first pipe 4 of the present utility model, horizontal second pipe are about 10 Surface is provided with buckle, and between two on the vertical position buckle compression spring 9 is provided with.
Used as preferred version of the present utility model, sleeve of the present utility model 32 is vertically set on the center on the chassis 31 On position.
As preferred version of the present utility model, the inside of the sleeve of the present utility model 32 suit Vertically tube 5.
This utility model simple structure, design science, template frame installs stable, firm, removes and installs conveniently, reduces Labor intensity of operating staff, improves work efficiency, and reusable, Practical Performance is excellent, with more wide market prospect.
Ultimate principle of the present utility model and principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry it should be appreciated that this utility model is not restricted to the described embodiments, described in above-described embodiment and description Simply illustrate principle of the present utility model, on the premise of without departing from this utility model spirit and scope, this utility model is also Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed this utility model.This utility model Claimed scope is by appending claims and its equivalent thereof.

Claims (3)

1. a kind of external wall construction New-type mould grillage, it is characterised in that it include that support platform is connected with support platform the Vertical pipe, four-way pipe and peace that the second horizontal pipe that one horizontal pipe, multiple endings are connected, multiple endings are connected The pre-buried anchor on ground is mounted in, the support platform is arranged on metope by bolt, and the first horizontal pipe end portion sets Clamping block is equipped with, the through hole being adapted with the clamping block is provided with the support platform;Near the four-way pipe of body of wall Two of horizontal ends are open and are connected to horizontal first pipe, horizontal second pipe, and the two of the four-way pipe vertical end Individual opening is all connected to Vertically tube;Bottom Jie Jin the Vertically tube on the ground is provided with pre-buried anchor;It is described pre- Anchor is buried including the multiple installing holes arranged on sleeve, chassis and chassis side face;Horizontal first pipe, horizontal second circle Pipe upper and lower surface is provided with buckle, and between two on the vertical position buckle compression spring is provided with.
2. a kind of external wall construction New-type mould grillage according to claim 1, it is characterised in that:The sleeve is vertically arranged On the center on the chassis.
3. a kind of external wall construction New-type mould grillage according to claim 1 and 2, it is characterised in that:The sleeve inner It is set with the Vertically tube.
CN201621228316.7U 2016-11-09 2016-11-09 Novel template frame for external wall construction Expired - Fee Related CN206144154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621228316.7U CN206144154U (en) 2016-11-09 2016-11-09 Novel template frame for external wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621228316.7U CN206144154U (en) 2016-11-09 2016-11-09 Novel template frame for external wall construction

Publications (1)

Publication Number Publication Date
CN206144154U true CN206144154U (en) 2017-05-03

Family

ID=58626182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621228316.7U Expired - Fee Related CN206144154U (en) 2016-11-09 2016-11-09 Novel template frame for external wall construction

Country Status (1)

Country Link
CN (1) CN206144154U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057305A (en) * 2018-07-21 2018-12-21 筑梦高科建筑有限公司 A kind of segmented scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057305A (en) * 2018-07-21 2018-12-21 筑梦高科建筑有限公司 A kind of segmented scaffold

Similar Documents

Publication Publication Date Title
CN206144154U (en) Novel template frame for external wall construction
CN201574507U (en) Soft film ceiling mounting structure
CN206110172U (en) Compact municipal administration utility tunnel feed opening
CN209618661U (en) The hoisting mechanism of pipe robot
CN203846780U (en) Semi-automatic lifting type operating platform device
CN203531345U (en) Movable cantilever frame
CN205959574U (en) Outdoor easy -to -draw is precious
CN207092504U (en) A kind of scaffold for building
CN204202135U (en) The pre-buried air conditoner support of construction wall
CN212026379U (en) Sand shovel suitable for building site
CN206090614U (en) Formwork support spare in underground pipe gallery construction
CN207245046U (en) A kind of guardrail
CN203964214U (en) A kind of air conditioner mounting bracket
CN203890893U (en) Supporting bracket for integral lifting of hollow slab girder
CN204061461U (en) EXPANSION ANCHOR BOLTS embedded part
CN201127208Y (en) Wall hanging type flower bed
CN203563924U (en) Multifunctional support frame for blackboard writing
CN206554957U (en) A kind of steady monomer column attachment means
CN204175008U (en) Transformer station's combined enclosure
CN205377197U (en) Concentrator for high -rise building convenient to installation and dismantlement
CN203213664U (en) Three-tube portable integrated base station
CN214741430U (en) Tunnel ventilation equipment hoists frame
CN203654734U (en) Crossbeam clamp
CN213774470U (en) A top holds in palm for building templates
CN207352885U (en) A kind of portable gardens direction board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170503

Termination date: 20171109

CF01 Termination of patent right due to non-payment of annual fee