CN206142668U CN201620514849.5U CN201620514849U CN206142668U CN 206142668 U CN206142668 U CN 206142668U CN 201620514849 U CN201620514849 U CN 201620514849U CN 206142668 U CN206142668 U CN 206142668U
Authority
CN
China
Prior art keywords
girder
carriage
end carriage
adjusting nut
end beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620514849.5U
Other languages
Chinese (zh)
Inventor
梁海枰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Shunfa Hoisting Equipment Co Ltd
Original Assignee
Guangdong Shunfa Hoisting Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Shunfa Hoisting Equipment Co Ltd filed Critical Guangdong Shunfa Hoisting Equipment Co Ltd
Priority to CN201620514849.5U priority Critical patent/CN206142668U/en
Application granted granted Critical
Publication of CN206142668U publication Critical patent/CN206142668U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a girder and end beam connection structure of bridge crane crane span structure, include the both sides end beam and connect the girder between the end beam of both sides, its characterized in that, the bottom of girder is provided with the connection base, and the lower part of connecting the base is provided with toward the outer horizontal support board that extends, is provided with the bolt and the upper and lower adjusting nut that stand to setting up on the end beam, and the horizontal support board is passed to the one end of bolt, and upper and lower adjusting nut divides the upper and lower side who locates the horizontal support board. The utility model discloses simple structure, the installation is adjusted conveniently, and stability is good.

Description

The connection between girder and carriage structure of Overhead Crane Bridge
Technical field
This utility model is related to technical field of crane equipment, more particularly, to a kind of steel wire rope of linkage door Rate of tension adjusting means.
Background technology
Bridge crane be crossbearer in workshop, warehouse and stock ground overhead carry out material handling reset It is standby.Because its two ends are seated on tall and big concrete column or metal rack, shape is like bridge.Bridge-type The crane span structure of crane along be laid on both sides it is overhead on track it is longitudinally running, can make full use of under crane span structure The space handling material in face, is not hindered by ground installation.Bridge crane is in structure mainly by bridge Frame travelling mechanism, trolley are constituted, and crane span structure travelling mechanism is mainly made up of girder and end carriage, girder It is rigidly connected with end carriage, end carriage two ends are equipped with wheel, runs on overhead to support crane span structure, girder On be welded with track, for trolley operation.At present, girder usually adopts the side of being fixedly connected with end carriage Formula, therefore, it is very high to the requirement for horizontality of the end carriage of the side of girder two but unavoidable in work progress Larger error occurs, the setting of girder can not be up to the standard, affect the stability of equipment operation And accuracy.
The content of the invention
The purpose of this utility model be exactly the one kind provided to solve the deficiency of prior art not only Simple structure, install it is easy to adjust, it is ensured that the girder of the Overhead Crane Bridge of stable equipment operation with End carriage attachment structure.
This utility model is to realize above-mentioned purpose using following technical solution:A kind of overhead traveling crane The connection between girder and carriage structure of machine crane span structure, including both sides end carriage and the master that is connected between the end carriage of both sides Beam, it is characterised in that the bottom of the girder is provided with connect base, the bottom of connect base is arranged There is the horizontal supporting plate for extending outward, the bolt and upper and lower regulation spiral shell stood to arranging is provided with end carriage Mother, one end of bolt passes through horizontal supporting plate, upper and lower adjusting nut be divided into horizontal supporting plate it is upper, Lower section, by adjusting upper and lower adjusting nut, realizes the high high adjustment of connect base, it is ensured that the water of girder Pingdu.
Further illustrating as such scheme, the middle part of the connect base arranges fluted, girder The embedded groove in bottom in.
The two ends of the end carriage are respectively arranged with the axis hole for installing roller group, and the sidepiece of the axis hole is provided with Opening, is provided with cover plate on opening.
The two ends of the end carriage are respectively arranged with inclined-plane, and the bottom on inclined-plane is extended downwardly as facade, axis hole Opening extend to facade, end cap is fixed on facade.
This utility model is using the above-mentioned technical solution beneficial effect to be reached:
This utility model arranges connect base using in the bottom of girder, adopts between connect base and end carriage Connected with bolt and adjusting nut, by the relative position for adjusting adjusting nut and bolt, realize connection The high high adjustment of base, it is ensured that girder is at horizontally disposed state, simple structure is easy to adjust.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is end-beam arrangement schematic diagram of the present utility model;
Fig. 3 is end-beam arrangement schematic diagram of the present utility model;
Fig. 4 is the side view of Fig. 3.
Description of reference numerals:1st, end carriage 1-1, axis hole 1-2, opening 1-3, cover plate 1-4, It is inclined-plane 1-5, facade 2, girder 3, connect base 3-1, horizontal supporting plate 3-2, recessed Groove 4, bolt 5, upper adjusting nut 6, lower adjusting nut.
Specific embodiment
The technical program is explained in detail below in conjunction with specific embodiment.
As Figure 1-Figure 4, this utility model is that a kind of girder of Overhead Crane Bridge connects with end carriage Binding structure, including both sides end carriage 1 and the girder 2 that is connected between the end carriage of both sides, the bottom of girder sets Connect base 3 is equipped with, the bottom of connect base 3 is provided with the horizontal supporting plate 3-1 for extending outward, The bolt 4 and upper and lower adjusting nut 5,6 stood to arranging is provided with end carriage, one end of bolt is worn Horizontal supporting plate is crossed, upper and lower adjusting nut is divided into the upper and lower of horizontal supporting plate, by adjusting Up and down adjusting nut, realizes the high high adjustment of connect base, it is ensured that the levelness of girder.Connect base 3 middle part arranges fluted 3-2, in the embedded groove in bottom of girder.
Further, the two ends of the end carriage are respectively arranged with the axis hole 1-1 for installing roller group, the axle The sidepiece in hole is provided with opening 1-2, and cover plate 1-3 is provided with opening.Wherein, the two ends of end carriage point It is not provided with inclined-plane 1-4, the bottom on inclined-plane is extended downwardly as facade 1-5, the opening of axis hole is extended to Facade, end cap is fixed on facade.
This utility model compared with prior art, using in the bottom of girder connect base, connection is arranged Connected using bolt and adjusting nut between base and end carriage, by the phase for adjusting adjusting nut and bolt To position, the high high adjustment of connect base is realized, it is ensured that girder is at horizontally disposed state, knot Structure is simple, easy to adjust.
Above-described is only preferred implementation of the present utility model, it is noted that for this area Those of ordinary skill for, without departing from this utility model create design on the premise of, can also do Go out some deformations and improvement, these belong to protection domain of the present utility model.

Claims (4)

1. the connection between girder and carriage structure of a kind of Overhead Crane Bridge, including both sides end carriage and company The girder being connected between the end carriage of both sides, it is characterised in that the bottom of the girder is provided with connect base, The bottom of connect base is provided with the horizontal supporting plate for extending outward, is provided with end carriage and stands to setting Bolt and upper and lower adjusting nut, one end of bolt passes through horizontal supporting plate, upper and lower adjusting nut point Located at the upper and lower of horizontal supporting plate.
2. the connection between girder and carriage structure of Overhead Crane Bridge according to claim 1, Characterized in that, the middle part of the connect base arranges fluted, in the embedded groove in bottom of girder.
3. the connection between girder and carriage structure of Overhead Crane Bridge according to claim 1, Characterized in that, the two ends of the end carriage are respectively arranged with the axis hole for installing roller group, the side of the axis hole Portion is provided with opening, and cover plate is provided with opening.
4. the connection between girder and carriage structure of Overhead Crane Bridge according to claim 1, Characterized in that, the two ends of the end carriage are respectively arranged with inclined-plane, it is vertical that the bottom on inclined-plane extends downwardly Face, the opening of axis hole extends to facade, and end cap is fixed on facade.
CN201620514849.5U 2016-05-30 2016-05-30 Girder and end beam connection structure of bridge crane crane span structure Active CN206142668U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620514849.5U CN206142668U (en) 2016-05-30 2016-05-30 Girder and end beam connection structure of bridge crane crane span structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620514849.5U CN206142668U (en) 2016-05-30 2016-05-30 Girder and end beam connection structure of bridge crane crane span structure

Publications (1)

Publication Number Publication Date
CN206142668U true CN206142668U (en) 2017-05-03

Family

ID=58616302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620514849.5U Active CN206142668U (en) 2016-05-30 2016-05-30 Girder and end beam connection structure of bridge crane crane span structure

Country Status (1)

Country Link
CN (1) CN206142668U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109052161A (en) * 2018-09-06 2018-12-21 大连华锐重工起重机有限公司 The quickly device and its application method of assembling horizontal flange pattern gantry

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109052161A (en) * 2018-09-06 2018-12-21 大连华锐重工起重机有限公司 The quickly device and its application method of assembling horizontal flange pattern gantry
CN109052161B (en) * 2018-09-06 2023-07-25 大连华锐重工起重机有限公司 Device for quickly assembling horizontal flange type bridge and application method thereof

Similar Documents

Publication Publication Date Title
CN204455829U (en) Bridge-collision-avoidance wall construction equipment
CN202755635U (en) Movable-type basket support
CN206142668U (en) Girder and end beam connection structure of bridge crane crane span structure
CN205855825U (en) A kind of crane runs anti-derail unit
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN204455867U (en) The bracing structure of front outriggers of novel large-tonnage Bridge Erector midfoot support device
CN203201222U (en) Integrated communication base station
CN204917675U (en) Electronic dolly end beam structure of bridge crane
CN204822978U (en) Belt feeder steel vestibule structure
CN208294132U (en) A kind of construction adjustable support
CN206142667U (en) Bridge crane's crane span structure
CN107212673A (en) It is a kind of electric up-down bed
CN202719016U (en) Haff hinge capable of adjusting trolley level angle and lateral displacement
CN206031120U (en) Equal adjustable of height and track prevents smooth right angle tower wagon of preventing inclining
CN205443949U (en) Trolley for mounting anti -drop -beam check block
CN205187695U (en) Steel construction has hoisted gallows
CN204778289U (en) Cable support tower construction reinforcing bar festival section hoist
CN207312996U (en) A kind of high aerial rail road lifting gear
CN204958232U (en) Tower crane stock structure
CN201722065U (en) Gate type portal gantry
CN206090316U (en) Little case roof beam adjustment jacking frame
CN107150964B (en) A kind of wallflow formula crane structure
CN206142669U (en) Bridge crane trolley's frame mounting structure
CN204780611U (en) Positioner of wave form steel web
CN206888671U (en) A kind of convenient guard rail set up of rail construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant