CN206129304U - Stock anchor agent erector - Google Patents

Stock anchor agent erector Download PDF

Info

Publication number
CN206129304U
CN206129304U CN201621032771.XU CN201621032771U CN206129304U CN 206129304 U CN206129304 U CN 206129304U CN 201621032771 U CN201621032771 U CN 201621032771U CN 206129304 U CN206129304 U CN 206129304U
Authority
CN
China
Prior art keywords
cavity
erector
pipe
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621032771.XU
Other languages
Chinese (zh)
Inventor
张恩山
孙彪
覃同新
张旭
王旭
成海军
严飞
刘日华
侯俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG PROVINCE TUNNEL ENGINEERING Co
Original Assignee
ZHEJIANG PROVINCE TUNNEL ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG PROVINCE TUNNEL ENGINEERING Co filed Critical ZHEJIANG PROVINCE TUNNEL ENGINEERING Co
Priority to CN201621032771.XU priority Critical patent/CN206129304U/en
Application granted granted Critical
Publication of CN206129304U publication Critical patent/CN206129304U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an installing anchor struts the instrument of usefulness, the utility model discloses a stock anchor agent erector, it includes cavity (1), pipe (2), cavity (1) communicates with each other with pipe (2), be equipped with the valve that keeps out the wind (3) in cavity (1), it is equipped with piston (5) in valve (3) to keep out the wind, the one end of piston (5) is equipped with pull rod (6), pull rod (6) overcoat has spring (7), the one end of pull rod (6) is worn out cavity (1) and is worn out the part has air door handle (8) through threaded connection, pipe (2) connect (9) through the activity and are connected with high -pressure air pipe (10), and high -pressure air pipe (10) are connected with the air compressor machine, are equipped with gate valve (4) of the control amount of wind on pipe (2). The utility model discloses can high -efficient swift installation anchor agent, avoided the operating personnel operation of ascending a height, reduced installer, moreover obvious reduction operating personnel's intensity of labour.

Description

Fixing agent for anchor poles erector
Technical field
This utility model is related to install the instrument of suspension roof support, more particularly to a kind of fixing agent for anchor poles erector.
Background technology
Suspension roof support is the most basic ingredient of current underground engineering construction supporting, is to improve geotechnical stability and solution One of most economical effective method of complicated Geotechnical Engineering stable problem.Suspension roof support now is applied not only to mine, is also used for opposite side Slope, tunnel, dam body etc. carry out active reinforcing, and the engineerings such as railway, highway, landslide are processed.In suspension roof support During, it is an important step to install fixing agent for anchor poles, and general employing is manually carried out, and Anchor Agent handss clamp-on one by one drilling peace Dress, Anchor Agent easily damages or fills in leakiness, and installation effectiveness is low and spillage of material is serious, and anchoring quality also is difficult to ensure. Often also need to personnel to ascend a height operation, operating difficultiess also have certain potential safety hazard.Thus it is a kind of anchor rod anchored to be badly in need of exploitation Agent erector, to ensure underground labour's construction safety, improves work efficiency, saves spillage of material, it is ensured that the construction quality of anchor pole.
Utility model content
This utility model is directed to shortcoming of the prior art, there is provided a kind of small volume, structure is more compact, simple, Easy to operate fixing agent for anchor poles erector.
In order to solve above-mentioned technical problem, this utility model is addressed by following technical proposals:
Fixing agent for anchor poles erector, including cavity, conduit, cavity is communicated with conduit, and baffle valve, baffle valve are provided with cavity Piston is inside provided with, one end of piston is provided with pull bar, and one end of pull bar passes cavity and passes part and has been threaded connection air door Handle;Conduit is connected with high-pressure air hose by active joint, and high-pressure air hose is connected with air compressor machine, and conduit is provided with control air quantity Gate valve.
Preferably, cavity is provided with powder stick put in storage lid, the powder stick lid that puts in storage is snapped connection with cavity.By snapping connection, Cavity is set to keep air-tight state.
Preferably, the bottom of cavity is fixedly connected with handle.Handle can be designed according to the weight balancing of erector Position, handle can facilitate operator to grip and ensure erector stability operationally.
Preferably, one end of cavity is provided with movable extension rod, movable extension rod is threadedly coupled with cavity.By the one of cavity End arrange movable extension rod, it can be disassembled from erector according to drilling depth, at the same can according to drilling hole depth and Pore size selects the movable extension rod being engaged.
This utility model as a result of above technical scheme, with significant technique effect:This utility model is using high Calm the anger as power resources, as long as being put into Anchor Agent in erector, just can efficient quick installation Anchor Agent, it is to avoid operator Member ascends a height operation, reduces installation personnel, is installed to reduce to a people by original at least two people and is installed, and improves personnel's utilization Rate, and significantly reduce the labor intensity of operator.This utility model has compact conformation, simple, easy to operate Feature.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is sectional view of the present utility model;
The toponym that each number designation is referred in accompanying drawing is as follows:1-cavity, 2-conduit, 3-baffle valve, 4-lock Valve, 5-piston, 6-pull bar, 7-spring, 8-throttle lever, 9-active joint, 10-high-pressure air hose, 11-powder stick put in storage Lid, 12-handle, 13-movable extension rod.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in further detail with embodiment.
Embodiment 1
Fixing agent for anchor poles erector, as shown in Fig. 1~Fig. 2, including cavity 1, conduit 2, cavity 1 is communicated with conduit 2, cavity It is provided with 1 in baffle valve 3, baffle valve 3 and is provided with piston 5, the section of piston 5 is trapezoidal, increases the compactness with baffle valve 3, living One end of plug 5 is provided with outside pull bar 6, pull bar 6 and is cased with spring 7, and one end of pull bar 6 is passed cavity 1 and passes part and connected by screw thread It is connected to throttle lever 8;Conduit 2 is connected with high-pressure air hose 10 by active joint 9, and high-pressure air hose 10 is connected with air compressor machine, conduit 2 It is provided with the gate valve 4 of control high-pressure blast air quantity.Cavity 1 is provided with powder stick and puts in storage lid 11, and the powder stick lid 11 that puts in storage connects with the buckle of cavity 1 Connect.
The bottom of cavity 1 is fixedly connected with handle 12.The position of handle, handss can be designed according to the weight balancing of erector Handle 12 can facilitate operator to grip and ensure erector stability operationally.
One end of cavity 1 is provided with movable extension rod 13, and movable extension rod 13 is threadedly coupled with cavity 1.By in one end of cavity 1 Arrange movable extension rod 13, it can be disassembled from erector according to drilling depth, at the same can according to drilling hole depth and Pore size selects the movable extension rod 13 being engaged.
When using, it is first turned on powder stick and puts in storage lid 11, add Anchor Agent, gate valve 4 is opened afterwards, handle 12 is held on the other hand, One is held by throttle lever 8, and high-pressure blast departs from baffle valve 3 by entering cavity 1, piston 5 at conduit 2 under the pulling force of pull bar 6, High-pressure blast is pushed to Anchor Agent in drilling.After having sent, unclamp throttle lever 8, piston 5 spring 7 elastic force effect under with gear Air-valve 3 is adjacent to.Significantly improve work efficiency, save spillage of material, it is ensured that the construction quality of anchor pole.
In a word, preferred embodiment of the present utility model is the foregoing is only, it is all according to this utility model claim institute The impartial change of work and modification, should all belong to the covering scope of this utility model patent.

Claims (4)

1. fixing agent for anchor poles erector, including cavity (1), conduit (2), cavity (1) is communicated with conduit (2), it is characterised in that:Chamber It is provided with body (1) in baffle valve (3), baffle valve (3) and is provided with piston (5), one end of piston (5) is provided with pull bar (6), pull bar (6) Spring (7) is cased with outward, and one end of pull bar (6) passes cavity (1) and passes part and has been threaded connection throttle lever (8);Lead Pipe (2) is connected with high-pressure air hose (10) by active joint (9), and high-pressure air hose (10) is connected with air compressor machine, and conduit (2) is provided with The gate valve (4) of control air quantity.
2. fixing agent for anchor poles erector according to claim 1, it is characterised in that:Cavity (1) is provided with powder stick and puts in storage lid (11), the powder stick lid (11) that puts in storage is snapped connection with cavity (1).
3. fixing agent for anchor poles erector according to claim 1, it is characterised in that:The bottom of cavity (1) is fixedly connected with Handle (12).
4. fixing agent for anchor poles erector according to claim 1, it is characterised in that:One end of cavity (1) is provided with activity and connects Bar (13), movable extension rod (13) is threadedly coupled with cavity (1).
CN201621032771.XU 2016-08-31 2016-08-31 Stock anchor agent erector Active CN206129304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621032771.XU CN206129304U (en) 2016-08-31 2016-08-31 Stock anchor agent erector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621032771.XU CN206129304U (en) 2016-08-31 2016-08-31 Stock anchor agent erector

Publications (1)

Publication Number Publication Date
CN206129304U true CN206129304U (en) 2017-04-26

Family

ID=58568412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621032771.XU Active CN206129304U (en) 2016-08-31 2016-08-31 Stock anchor agent erector

Country Status (1)

Country Link
CN (1) CN206129304U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044294A (en) * 2017-05-03 2017-08-15 刘军 A kind of Anchor Agent is automatically filled in device
CN110130957A (en) * 2019-06-27 2019-08-16 张福学 A kind of pneumatic anchor pole means for loading of mine down-hole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044294A (en) * 2017-05-03 2017-08-15 刘军 A kind of Anchor Agent is automatically filled in device
CN107044294B (en) * 2017-05-03 2019-09-17 刘军 A kind of Anchor Agent is automatically filled in device
CN110130957A (en) * 2019-06-27 2019-08-16 张福学 A kind of pneumatic anchor pole means for loading of mine down-hole
CN110130957B (en) * 2019-06-27 2021-05-18 张福学 Mine underground pneumatic anchor rod charging device

Similar Documents

Publication Publication Date Title
CN103643977A (en) Full-anchor partition pressure transferring grouting anchor rod and application method thereof
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN206129304U (en) Stock anchor agent erector
CN205089345U (en) Anchor rope is put by pressure equipment
CN108643951A (en) A kind of mining self-drilling type umbrella grouted anchor bar and anchoring process
CN209493940U (en) A kind of roofbolt construction arrangement of architectural engineering
CN101858196A (en) Low gravity center three-axle spiral drilling machine and drilling method thereof
CN106869136A (en) One kind expands end formula soil bolt
CN201236340Y (en) Novel tool type hanging steel bar
CN201883668U (en) Crown plate drilling device
CN205653821U (en) Anti device that floats of soft soil foundation basement
CN208594573U (en) The preset burnt gas valve well of hat type
CN103334433A (en) Pile pulling construction method
CN209244293U (en) A kind of activity arch bar temporary fastening device
CN208473912U (en) A kind of mining self-drilling type umbrella grouted anchor bar
CN208347803U (en) A kind of dedicated Quick installer of mining tunnel supporting resin and portland cement anchor rolling rod
CN208105280U (en) One kind can apply prestressed complete anchor system
CN207891893U (en) A kind of multi-functional deep foundation pit supporting structure
CN201730538U (en) Low-gravity-center three-shaft spiral drilling machine
CN205025478U (en) Novel bolt installation(3) structure
CN205421249U (en) Electric power construction is with multiway stock of scalable regulation
CN205663452U (en) Resin anchor agent installation device
CN220746889U (en) Karst cave pile foundation construction structure
CN205638229U (en) Anchor rope angle appearance with adjustable
CN218479834U (en) Novel anti-pulling anchor rod of labor-saving type

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant