CN206129155U - All -round both arms hydraulic pressure tunnelling drill carriage device for coal mine - Google Patents

All -round both arms hydraulic pressure tunnelling drill carriage device for coal mine Download PDF

Info

Publication number
CN206129155U
CN206129155U CN201621186247.8U CN201621186247U CN206129155U CN 206129155 U CN206129155 U CN 206129155U CN 201621186247 U CN201621186247 U CN 201621186247U CN 206129155 U CN206129155 U CN 206129155U
Authority
CN
China
Prior art keywords
drill carriage
electric hydaulic
carriage device
groups
sliding chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621186247.8U
Other languages
Chinese (zh)
Inventor
姚卸福
姚凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quzhou Fuchuang Industrial Design Co Ltd
Original Assignee
Quzhou Fuchuang Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quzhou Fuchuang Industrial Design Co Ltd filed Critical Quzhou Fuchuang Industrial Design Co Ltd
Priority to CN201621186247.8U priority Critical patent/CN206129155U/en
Application granted granted Critical
Publication of CN206129155U publication Critical patent/CN206129155U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a colliery drill carriage technical field's an all -round both arms hydraulic pressure tunnelling drill carriage device for coal mine, including the control chamber, the inner chamber bottom left side of control chamber sets up operation platform, operation platform's right side wall is provided with the controller, the right side outer wall of control chamber is provided with the drive case, the left side outer wall of control chamber is provided with the supporting seat, the left side bottom of supporting seat all is provided with electronic hydraulic telescoping rod with the right side bottom of drive case, compares with current both arms hydraulic pressure tunnelling drill carriage device, the utility model discloses simple structure, convenient operation, the utility model discloses a rotation of carousel makes the working direction of drilling rod change, just so can bore the work of digging to a plurality of directions on the mine mining face, and the electronic hydraulic telescoping rod that the bottom of both arms hydraulic pressure tunnelling drill carriage set up can carry out the during operation to its played a supporting role at the drill carriage for the drill carriage can be more stable carry out work.

Description

Drill carriage device is tunneled in a kind of colliery with comprehensive Double-arm hydraulic
Technical field
The utility model is related to colliery drill carriage technical field, and drill carriage is tunneled in specially a kind of colliery with comprehensive Double-arm hydraulic Device.
Background technology
Coal is topmost solid fuel, is one kind of kaustobilite.It is by certain geological epoch grow it is numerous Luxuriant plant, in suitable geological environment, is gradually piled into thick-layer, and is buried in the bottom or silt, through very long geology year The geochronic natural incoalation in generation and formed, colliery is the mankind in the region of the mining area exploitation coal resources rich in coal, general point For underground mine and open coal mine.When coal seam is away from earth's surface, it is typically chosen to underground and digs tunnel digging coal, this is well work Colliery.When distance of the coal seam away from earth's surface is close, it is typically chosen and directly peel off surface soil layer excavation coal, this is open coal mine. China's overwhelming majority colliery belongs to underground mine.Colliery scope includes the very big region of above and below ground and related facility.Colliery The proportional space that to be the mankind excavated when digging is rich in the geological stratification for having coal, generally includes tunnel, well cave and face etc. Deng, in China, mine stone drifting working face is substantially big gun tunneling process, and most of mining Mechanization Level is low, production effect Rate is low, and equipment and technology falls behind, and high energy consumption, security is poor, there is accident potential.Still there are many Coal Exploitations to be drilled with artificial hand pneumatic pick Operating type.Also there is part mining using driving drill carriage, but the longer propeller of driving drill carriage causes machine shape larger, In directional drilling, construction movement, swing process, its stability, flexibility are substantially reduced, and are limited only to bore blasthole operation, Because the volume of drill carriage is larger, be difficult on the face in mine it is in rotary moving, so allow for Normal hydraulic driving Drill carriage can only carry out unidirectional boring work, and common driving drill carriage mostly is single armed, and when carrying out blast hole operation, need to bore Multigroup blast hole, for this purpose, it is proposed that drill carriage device is tunneled in a kind of colliery with comprehensive Double-arm hydraulic.
Utility model content
The purpose of this utility model is to provide a kind of comprehensive Double-arm hydraulic in colliery driving drill carriage device, with solution Stating the common Double-arm hydraulic driving drill carriage proposed in background technology can only carry out unidirectional work and the work of single arm rig effect The low problem of rate.
For achieving the above object, the utility model provides following technical scheme:A kind of colliery is dug with comprehensive Double-arm hydraulic Enter drill carriage device, including operating room, the intracavity bottom left side of the operating room arranges operating platform, the right side of the operating platform Wall is provided with controller, and the bottom of the operating room is provided with Athey wheel, and the outer right wall of the operating room is provided with driving box, The left side outer wall of the operating room is provided with support base, and the left bottom of the support base and the bottom right side of driving box are respectively provided with The top left and right sides for having electric hydaulic expansion link, the support base is provided with electric hydaulic support column, electronic described in two groups Supporting table is provided with the top of hydraulic pressure support post, sliding chute seat, the left side wall of the sliding chute seat are provided with the top of the supporting table Electric drive hydraulic thruster is provided with, slipway beam is provided with the top of the sliding chute seat, the left side wall of the slipway beam is provided with push rod Connecting plate, and the bottom right side of push rod connecting plate is connected with the left of electric drive hydraulic thruster, the top right side of the slipway beam Motor is provided with, the top left side of the slipway beam and center are provided with handrail seat, and the left side power of the motor is defeated Go out end and be provided with drilling rod, and the left end of drilling rod extends through two groups of handrail seats, and drill bit, the control are provided with the left of the drilling rod Device processed is electrically connected with electric hydaulic support column, electric hydaulic expansion link, motor and electric drive hydraulic thruster.
Preferably, the surface bottom portion of the support base is provided with turned cavities, and dividing plate, institute are provided with the top of the turned cavities State and be provided with the top of dividing plate rotating disk groove, the intracavity bottom of the turned cavities is provided with slewing equipment, the top of the slewing equipment Portion's clutch end is provided with rotating shaft, and rotating shaft through dividing plate, and rotating disk is provided with the top of the rotating shaft, and rotating disk is located at and turns The intracavity bottom of dish groove, the controller is electrically connected with slewing equipment.
Preferably, the chute being engaged with slipway beam, the right side table of the sliding chute seat are offered at the top of the sliding chute seat Face bottom is provided with the push rod installing hole being engaged with electric drive hydraulic thruster, and push rod mounting hole site in the underface of chute.
Preferably, it is provided with the bearing being engaged with drilling rod on handrail seat described in two groups.
Preferably, the bottom of the electric hydaulic expansion link is provided with supporting pad.Preferably, the top of the support base from It is left-to-right to be disposed with four groups of electric hydaulic support columns, the top and right side of electric hydaulic support column described in the two adjacent groups of left side Supporting table is provided with the top of electric hydaulic support column described in the two adjacent groups of side.
Compared with prior art, the beneficial effects of the utility model are:Drill carriage device phase is tunneled with existing Double-arm hydraulic Than the utility model simple structure is easy to operate, and the utility model causes the operative orientation of drilling rod to occur by the rotation of rotating disk Change, thus can the multiple directions on coal mine excavation face be carried out with drilling work, and Double-arm hydraulic tunnels the bottom of drill carriage The electric hydaulic expansion link of setting can play a supporting role when drill carriage is operated to it so that drill carriage can more be stablized Be operated.
Description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model clamping support schematic diagram;
Fig. 3 is the utility model sliding chute seat structural representation;
Fig. 4 is the utility model left view.
In figure:1 operating room, 2 operating platforms, 3 controllers, 4 Athey wheels, 5 driving box, 6 support bases, 61 turned cavities, 62 every Plate, 63 rotating disk grooves, 64 slewing equipments, 65 rotating shafts, 66 rotating disks, 7 electric hydaulic expansion links, 8 electric hydaulic support columns, 9 supporting tables, 10 sliding chute seats, 101 chutes, 102 push rod installing holes, 11 electric drive hydraulic thrusters, 12 slipway beams, 13 push rod connecting plates, 14 motors, 15 Handrail seat, 16 drilling rods, 17 drill bits.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:Bored with comprehensive Double-arm hydraulic driving in a kind of colliery Car device, including operating room 1, the intracavity bottom left side of the operating room 1 arranges operating platform 2, the right side of the operating platform 2 Wall is provided with controller 3, and the bottom of the operating room 1 is provided with Athey wheel 4, and the outer right wall of the operating room 1 is provided with drive Dynamic case 5, the left side outer wall of the operating room 1 is provided with support base 6, the left bottom of the support base 6 and the right side of driving box 5 Bottom is provided with electric hydaulic expansion link 7, and the top left and right sides of the support base 6 is provided with electric hydaulic support column 8, The top of electric hydaulic support column 8 described in two groups is provided with supporting table 9, and the top of the supporting table 9 is provided with sliding chute seat 10, institute The left side wall for stating sliding chute seat 10 is provided with electric drive hydraulic thruster 11, and the top of the sliding chute seat 10 is provided with slipway beam 12, described The left side wall of slipway beam 12 is provided with push rod connecting plate 13, and the bottom right side of push rod connecting plate 13 and electric drive hydraulic thruster 11 Left side is connected, and the top right side of the slipway beam 12 is provided with motor 14, in the top left side and top of the slipway beam 12 Heart position is provided with handrail seat 15, and the left side power output end of the motor 14 is provided with drilling rod 16, and the left end of drilling rod 16 Two groups of handrail seats 15 are extended through, the left side of the drilling rod 16 is provided with drill bit 17, and the controller 3 is electrically connected with electronic Hydraulic pressure support post 8, electric hydaulic expansion link 7, motor 14 and electric drive hydraulic thruster 11.
Wherein, the surface bottom portion of the support base 6 is provided with turned cavities 61, and the top of the turned cavities 61 is provided with dividing plate 62, the top of the dividing plate 62 is provided with rotating disk groove 63, and the intracavity bottom of the turned cavities 61 is provided with slewing equipment 64, described The top clutch end of slewing equipment 64 is provided with rotating shaft 65, and rotating shaft 65 through dividing plate 62, the top of the rotating shaft 65 Rotating disk 66 is provided with, and rotating disk 66 is located at the intracavity bottom of rotating disk groove 63, the controller 3 is electrically connected with slewing equipment 64, When needing to be changed the operative orientation of drill bit 17, rotating disk 66 is driven to be rotated by slewing equipment 64, so that boring 17 operative orientation changes, and the top of the sliding chute seat 10 offers the chute 101 being engaged with slipway beam 12, described The right lateral surface bottom of sliding chute seat 10 is provided with the push rod installing hole 102 being engaged with electric drive hydraulic thruster 11, and push rod is installed Hole 102 is located at the underface of chute 101, and the bearing being engaged with drilling rod 16 is provided with handrail seat 15 described in two groups so that Drilling rod 16 preferably carries out rotary work, and the bottom of the electric hydaulic expansion link 7 is provided with supporting pad, prevents hydraulically extensible bar 7 directly in ground contact, it is to avoid electric hydaulic expansion link 7 causes to damage due to the extruding with ground, the support base 6 Top is from left to right disposed with four groups of electric hydaulic support columns 8, the top of electric hydaulic support column 8 described in the two adjacent groups of left side Portion and the top of electric hydaulic support column 8 described in the two adjacent groups of right side side are provided with supporting table 9, and the top of support base 6 is provided with Two groups of drilling equipments, can be very good to improve operating efficiency.
Operation principle:Drill carriage is opened the place for delivering to work, driving box 5 provides driving power, drilled for drill carriage Before work, staff is operated before the operating platform 2 of operating room 1, is first passed through the control electric hydaulic of controller 3 and is stretched Bar 7 is extended, until the supporting pad of the bottom of electric hydaulic expansion link 7 is contacted with ground, then is controlled electric hydaulic support column 8 and is entered Row work so that supporting table 9 rises to the working depth specified, controls again afterwards slewing equipment 64 and is operated so that rotating disk 66 are rotated with slewing equipment 64, until drill bit 17 moves to operating position, the controlled motor 14 of controller 3 is operated, Motor 14 drives drilling rod 16 to rotate, and drilling rod 16 drives drill bit 17 to be rotated, and finally by controller 3 electric drive hydraulic thruster is controlled 11 carry out stretching motion so that push rod connecting plate 13 drives in chute 101 of the slipway beam 12 on sliding chute seat 10 and moved, And then drill bit 17 is travelled forward, complete boring work.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out various changes in the case of without departing from principle of the present utility model and spirit, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of comprehensive Double-arm hydraulic in colliery tunnels drill carriage device, including operating room(1), it is characterised in that:The operation Room(1)Intracavity bottom left side arrange operating platform(2), the operating platform(2)Right side wall be provided with controller(3), institute State operating room(1)Bottom be provided with Athey wheel(4), the operating room(1)Outer right wall be provided with driving box(5), it is described Operating room(1)Left side outer wall be provided with support base(6), the support base(6)Left bottom and driving box(5)Right side bottom Portion is provided with electric hydaulic expansion link(7), the support base(6)The top left and right sides be provided with electric hydaulic support column (8), electric hydaulic support column described in two groups(8)Top be provided with supporting table(9), the supporting table(9)Top be provided with Sliding chute seat(10), the sliding chute seat(10)Left side wall be provided with electric drive hydraulic thruster(11), the sliding chute seat(10)Top It is provided with slipway beam(12), the slipway beam(12)Left side wall be provided with push rod connecting plate(13), and push rod connecting plate(13) Bottom right side and electric drive hydraulic thruster(11)Left side be connected, the slipway beam(12)Top right side be provided with motor (14), the slipway beam(12)Top left side and top center be provided with handrail seat(15), the motor(14)'s Left side power output end is provided with drilling rod(16), and drilling rod(16)Left end extend through two groups of handrail seats(15), the drilling rod (16)Left side be provided with drill bit(17), the controller(3)It is electrically connected with electric hydaulic support column(8), electric hydaulic Expansion link(7), motor(14)And electric drive hydraulic thruster(11).
2. drill carriage device is tunneled in a kind of colliery according to claim 1 with comprehensive Double-arm hydraulic, it is characterised in that:It is described Support base(6)Surface bottom portion be provided with turned cavities(61), the turned cavities(61)Top be provided with dividing plate(62), it is described every Plate(62)Top be provided with rotating disk groove(63), the turned cavities(61)Intracavity bottom be provided with slewing equipment(64), it is described Slewing equipment(64)Top clutch end be provided with rotating shaft(65), and rotating shaft(65)Through dividing plate(62), the rotating shaft (65)Top be provided with rotating disk(66), and rotating disk(66)Positioned at rotating disk groove(63)Intracavity bottom, the controller(3)Electrically Connection slewing equipment(64).
3. drill carriage device is tunneled in a kind of colliery according to claim 1 with comprehensive Double-arm hydraulic, it is characterised in that:It is described Sliding chute seat(10)Top offer and slipway beam(12)The chute being engaged(101), the sliding chute seat(10)Right lateral surface Bottom is provided with and electric drive hydraulic thruster(11)The push rod installing hole being engaged(102), and push rod installing hole(102)Positioned at chute (101)Underface.
4. drill carriage device is tunneled in a kind of colliery according to claim 1 with comprehensive Double-arm hydraulic, it is characterised in that:Two groups The handrail seat(15)On be provided with and drilling rod(16)The bearing being engaged.
5. drill carriage device is tunneled in a kind of colliery according to claim 1 with comprehensive Double-arm hydraulic, it is characterised in that:It is described Electric hydaulic expansion link(7)Bottom be provided with supporting pad.
6. drill carriage device is tunneled in a kind of colliery according to claim 1 with comprehensive Double-arm hydraulic, it is characterised in that:It is described Support base(6)Top be from left to right disposed with four groups of electric hydaulic support columns(8), electronic liquid described in the two adjacent groups of left side Pressure support column(8)Top and electric hydaulic support column described in the two adjacent groups of right side(8)Top be provided with supporting table(9).
CN201621186247.8U 2016-10-28 2016-10-28 All -round both arms hydraulic pressure tunnelling drill carriage device for coal mine Expired - Fee Related CN206129155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621186247.8U CN206129155U (en) 2016-10-28 2016-10-28 All -round both arms hydraulic pressure tunnelling drill carriage device for coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621186247.8U CN206129155U (en) 2016-10-28 2016-10-28 All -round both arms hydraulic pressure tunnelling drill carriage device for coal mine

Publications (1)

Publication Number Publication Date
CN206129155U true CN206129155U (en) 2017-04-26

Family

ID=58577773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621186247.8U Expired - Fee Related CN206129155U (en) 2016-10-28 2016-10-28 All -round both arms hydraulic pressure tunnelling drill carriage device for coal mine

Country Status (1)

Country Link
CN (1) CN206129155U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816319A (en) * 2017-10-18 2018-03-20 何金英 A kind of massif mining apparatus
CN109339697A (en) * 2018-11-28 2019-02-15 卢小玲 A kind of Spiral digging machine propulsion device for promoting effect good
CN114075922A (en) * 2020-08-17 2022-02-22 杨兴友 Simple to operate's colliery drilling equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816319A (en) * 2017-10-18 2018-03-20 何金英 A kind of massif mining apparatus
CN107816319B (en) * 2017-10-18 2018-07-13 中国冶金地质总局广西地质勘查院 A kind of massif mining apparatus
CN109339697A (en) * 2018-11-28 2019-02-15 卢小玲 A kind of Spiral digging machine propulsion device for promoting effect good
CN114075922A (en) * 2020-08-17 2022-02-22 杨兴友 Simple to operate's colliery drilling equipment

Similar Documents

Publication Publication Date Title
CN102031950B (en) Hole-forming process method for comb gas extraction borehole in coal seam roof
WO2017156970A1 (en) Drilling and bursting heading machine
CN201106451Y (en) Track-mounted liftable top-side construction drilling machine for anchor bar and anchor wire
CN201236704Y (en) Coal drift drill shipping and anchoring integrated machine
CN209011836U (en) A kind of rock tunnel(ling) machine and its forward probe and suspension roof support complex conversion mechanism
CN101832102A (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN206129155U (en) All -round both arms hydraulic pressure tunnelling drill carriage device for coal mine
CN104196547B (en) Integrated support system and the tunnel machine of this integrated support system is housed
CN101403302B (en) Pedrail type liftable anchor bar anchor cable construction drill rig and double-lane fast digging technique
CN101169036B (en) Pedrail type lifting top slope anchor shaft anchor cable construction drilling machine and single-alley fast tunneling technique
CN110671107A (en) Tunneling, supporting and anchoring all-in-one machine system for underground rapid tunneling and using method thereof
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN105525870B (en) Drill jumbo
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN105909284B (en) A kind of high working face coal wall caving prevents control method
CN101781972B (en) Crawler-type lifting top and slope bolt and anchor construction drill
CN205370442U (en) Drill jumbo
CN203296686U (en) Crawler-type full-hydraulic combination rock drilling machine
CN105065048A (en) Temporary support for driving working face under coal mine
CN213350911U (en) Novel anchor rod drilling machine
CN109869145A (en) A kind of portal support type pick, branch, fortune, bores all-in-one machine at anchor
CN106894822A (en) Cutting head of roadheader and stretching structure with rake teeth and subsidiary drilling tool
CN204082166U (en) Integrated support system and the tunnel machine of this integrated support system is housed
CN110836118A (en) Equipment and method for rapid and safe tunnel construction under high ground stress and high geological hazards
CN108343400B (en) Method for extracting coal seam group gas by directional drilling bedding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170426

Termination date: 20181028