CN206127989U - Quick reinforcing construction module of river dam road bed bank protection - Google Patents
Quick reinforcing construction module of river dam road bed bank protection Download PDFInfo
- Publication number
- CN206127989U CN206127989U CN201620925806.6U CN201620925806U CN206127989U CN 206127989 U CN206127989 U CN 206127989U CN 201620925806 U CN201620925806 U CN 201620925806U CN 206127989 U CN206127989 U CN 206127989U
- Authority
- CN
- China
- Prior art keywords
- module
- bank protection
- riveting
- dovetail
- stubs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model provides a quick reinforcing construction module of river dam road bed bank protection, the module is consolidated by the bank protection to its structure, it constitutes with two forked tail linking module to rivet a module, wherein, the bank protection is consolidated the module and is the rectangle, four limit portions that the module was consolidated to the bank protection are provided with the dovetail, the center is provided with rivets a module jack, two forked tail linking module are two forked tail structures, every forked tail is identical with the dovetail of bank protection reinforcement module limit portion, two forked tail linking module inlay in the two forked tail recesses that form are consolidated with two limits of adjacent bank protection reinforcement module to the bank protection after the module is alignd, it passes in riveting a module jack from the centre that the module upper surface was consolidated to the bank protection and constitutes the solidification bank protection in the earth that inserts river dam road bed to rivet module, can guarantee the bank protection and consolidate the module and do not raiseed by water -washed or stormy waves and cause the dam -break slope of bursting, make whole continental rise river dam like by precast concrete net or stone material cylinder mould cover indestructible, once the investment is century -old is benefited.
Description
Technical field
This utility model is related to continental rise sill may technical field of construction, specifically a kind of sill may roadbed bank protection rapid reinforcement
Construction module.
Background technology
The sill may roadbed bank protection of prior art is mostly built into stone, and the deficiency for existing in use is that firmness is not enough,
Run into the punching of stormy waves water or mud-rock flow, damage of easily caving in, it is often more important that although stone can gather materials on the spot, specification
Disunity, engineering is time-consuming to take a lot of work, and the hole between stone is easily burrowed by mouse, piping is easily formed in flood season, with potential
Dam break burst transportation work style danger, the solution also not had at present.
The content of the invention
The purpose of this utility model is to provide a kind of sill may roadbed bank protection rapid reinforcement construction module.
The purpose of this utility model realizes in the following manner, and a kind of sill may roadbed bank protection rapid reinforcement is constructed module,
Module, riveting stubs and double dovetail link blocks are reinforced including bank protection, wherein, it is rectangle that bank protection reinforces module, and bank protection adds solid model
Four edge of block are provided with dovetail groove, are provided centrally with riveting stubs jack, and double dovetail link blocks are in wing tips, often
Individual dovetail and bank protection are reinforced the dovetail groove of module edge and are matched, double dovetail link blocks be embedded in bank protection reinforce module with it is adjacent
Bank protection is reinforced in the double dovetail grooves formed after two sides of module are alignd, and riveting stubs are reinforced in module upper surface from bank protection
Between in riveting stubs jack through composition solidification bank protection in the soil of insertion sill may roadbed.
The beneficial effects of the utility model are:Using advanced processing of stone technology and concrete prefabricated technology, mark is made
The bank protection of standardization reinforces module, links part and rivet, can be with rapid construction, due to having used connector and having reinforced riveting stake during construction
Module, bank protection reinforces module and bank protection is reinforced and fitted together perfectly between module, the chance for burrowing will not be left to mouse, by connection
Part is mutually linked, it is therefore prevented that bank protection reinforces the displacement of module and the fissure of displacement, and reinforcing module due to each bank protection has riveting stubs to consolidate
Among being scheduled on soil, more can guarantee that bank protection is reinforced module and do not started by water punching or stormy waves and cause dam break to burst slope, make whole continental rise river
Century-old being benefited once is invested as indestructible by concrete prefabricated net or stone material cylinder mould cover in dam.
Description of the drawings
Fig. 1 is the structural representation that bank protection is reinforced after module construction.
Fig. 2 is the structural representation that single bank protection reinforces module.
Fig. 3 is the structural representation of double dovetail link blocks.
Fig. 4 is the structural representation of riveting stubs;
Description of reference numerals:Bank protection reinforces module 1, double dovetail link blocks 2, dovetail groove 3, riveting stubs jack 4, riveting
Stubs 5.
Specific embodiment
Following detailed is made to a kind of sill may roadbed bank protection rapid reinforcement construction module of the present utility model with reference to Figure of description
Carefully illustrate.
A kind of sill may roadbed bank protection rapid reinforcement construction module, its structure is to reinforce module 1, the and of riveting stubs 5 by bank protection
Double dovetail link blocks 2 are constituted, wherein, it is rectangle that bank protection reinforces module 1, and bank protection reinforces four edge of module 1 and is provided with swallow
Stern notch 3, is provided centrally with riveting stubs jack 4, and double dovetail link blocks 2 are in wing tips, and each dovetail is reinforced with bank protection
The dovetail groove 3 of module edge matches, and double dovetail link blocks 2 are embedded in bank protection and reinforce module with adjacent bank protection reinforcing module
In the double dovetail grooves formed after two side alignment, riveting stubs 5 are inserted from the middle riveting stubs that bank protection reinforces the upper surface of module 1
Through composition solidification bank protection in the soil of insertion sill may roadbed in hole 4.
Embodiment
Construction method is as follows:
1)Now sill may roadbed bank protection is arranged into smooth compacting standby;
2)Accurately diced into sections, by diced into sections laying bank protection module is reinforced, and makes sill may roadbed bank protection by bank protection plus solid model
Block is completely covered;
3)Double dovetail link blocks are embedded in the double of the relative formation in side that bank protection reinforces module with adjacent bank protection reinforces module
Among dovetail Austria groove, bank protection is reinforced module and adjacent bank protection and is reinforced and mutually link part between module and be fixed together;
4)First deep hole is pricked out to sill may roadbed bank protection with drill rod alignment riveting stubs jack, then beaten riveting stubs with mallet
Among entering deep hole, bank protection reinforcing module is secured firmly on sill may roadbed bank protection;
5)All gaps that bank protection reinforces module are filled with fine sand or cement, all bank protections are reinforced module edge and used
Compo modification covering makes it not reveal soil.
Described sill may roadbed bank protection rapid reinforcement construction module, bank protection reinforces module, double dovetail link blocks and riveting stake
Module by precast reinforced concrete into or using rock section, cutting and drilling batch production make.
For this utility model person of an ordinary skill in the technical field, in the premise without departing from present inventive concept
Under, its framework form can be flexible and changeable, simply makes some simple deduction or replace, should all be considered as belonging to this utility model
The scope of patent protection determined by the claims submitted to.
In addition to the technical characteristic described in description, the known technology of those skilled in the art is.
Claims (2)
1. a kind of sill may roadbed bank protection rapid reinforcement is constructed module, it is characterised in that reinforce module, riveting stubs including bank protection
With double dovetail link blocks, wherein, bank protection reinforce module be rectangle, bank protection reinforce module four edge be provided with dovetail groove,
Riveting stubs jack is provided centrally with, double dovetail link blocks are in wing tips, and each dovetail reinforces module edge with bank protection
Dovetail groove match, double dovetail link blocks are embedded in bank protection and reinforce module and adjacent bank protection and reinforce two sides of module aligns
In the double dovetail grooves for being formed afterwards, riveting stubs are from the middle riveting stubs jack of bank protection reinforcing module upper surface through insertion
Composition solidification bank protection in the soil of sill may roadbed.
2. sill may roadbed bank protection rapid reinforcement according to claim 1 is constructed module, it is characterised in that bank protection adds solid model
Block, double dovetail link blocks and riveting stubs be by precast reinforced concrete into or using rock section, cutting and drilling factory
Change is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620925806.6U CN206127989U (en) | 2016-08-24 | 2016-08-24 | Quick reinforcing construction module of river dam road bed bank protection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620925806.6U CN206127989U (en) | 2016-08-24 | 2016-08-24 | Quick reinforcing construction module of river dam road bed bank protection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206127989U true CN206127989U (en) | 2017-04-26 |
Family
ID=58565715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620925806.6U Expired - Fee Related CN206127989U (en) | 2016-08-24 | 2016-08-24 | Quick reinforcing construction module of river dam road bed bank protection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206127989U (en) |
-
2016
- 2016-08-24 CN CN201620925806.6U patent/CN206127989U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106958208A (en) | A kind of novel reinforced method of double curvature arched bridge | |
CN105887806A (en) | Assembled type underground diaphragm wall and construction method thereof | |
CN104389610B (en) | A kind of ultrashort step construction method of traversing operation freeway tunnel | |
CN203174619U (en) | Reverse raft concrete terrace | |
CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
CN103938512A (en) | Reverse construction method of newly built road with existing expressway in underneath penetrating manner | |
CN104818732A (en) | Embedded type ecological block retaining wall and construction method thereof | |
CN104846781A (en) | Ecological interlocking block and ecological interlocking block type slope protection construction method | |
CN108265735A (en) | High latitude High Temperature Permafrost area highway raft plate-pile composite foundation and process for constructing | |
CN116335757A (en) | Filling retaining wall with negative poisson ratio structure and construction method thereof | |
CN103215950B (en) | Pile foundation extension construction method in backfilling area | |
CN107489106A (en) | A kind of rocky bed subaqueous bearing platform construction method | |
CN204097889U (en) | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement | |
CN103835310A (en) | Crib gravity retaining wall | |
CN206127989U (en) | Quick reinforcing construction module of river dam road bed bank protection | |
CN203334301U (en) | Cave slope strengthening protection structure | |
CN205669211U (en) | A kind of prefabricated Gravity Retaining Wall | |
JPS6245809A (en) | Construction for dam | |
CN105002891B (en) | A kind of cast-in-situ bored pile exempts from inter-pile soil excavation construction method | |
CN106245668A (en) | A kind of truss-like pile foundation and construction method thereof | |
CN106592587A (en) | Prefabricated PHC tube pile | |
CN217651845U (en) | Reinforced earth retaining wall structure is moulded to assembled panel steel | |
CN110055845A (en) | A kind of construction method that highway bridge and culvert two sides are soft soil roadbed | |
CN106120654A (en) | A kind of sill may roadbed bank protection rapid reinforcement construction module | |
CN206127984U (en) | Quick reinforcing apparatus of river dam road bed bank protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170426 Termination date: 20170824 |
|