CN206115265U - Dormancy awakens aggregate unit up - Google Patents
Dormancy awakens aggregate unit up Download PDFInfo
- Publication number
- CN206115265U CN206115265U CN201621122546.5U CN201621122546U CN206115265U CN 206115265 U CN206115265 U CN 206115265U CN 201621122546 U CN201621122546 U CN 201621122546U CN 206115265 U CN206115265 U CN 206115265U
- Authority
- CN
- China
- Prior art keywords
- dormancy
- industrial computer
- vobc
- information
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Measurement Of The Respiration, Hearing Ability, Form, And Blood Characteristics Of Living Organisms (AREA)
Abstract
The utility model discloses a dormancy awakens aggregate unit up sets up in the dormancy awakens the predetermined indoor test region of test up, still is provided with in the indoor test region to be listed as turning mold and to plan bridge, VOBC and supplementary driving device, and dormancy awakens aggregate unit up includes: industrial computer and electrical component, electrical component is connected to the industrial computer, supplementary driving device is still connected to the industrial computer, supplementary driving device received after dormancy that TIAS sent instructs information or awaken instruction information up, instructed the dormancy information or awaken up and instruct message routing to VOBC, VOBC is to supplementary driving device feedback dormancy notice information or awaken notice information up to make supplementary driving device send dormancy operational information or awaken operational information up to the industrial computer, after the industrial computer was received dormancy operational information or was awaken operational information up control electrical component to VOBC with be listed as turning mold and plan the bridge and carry out the dormancy or awaken the operation up. The utility model discloses indoor dormancy can be be applied to and the examination of scene antithetical couplet dynamic testing awaken up.
Description
Technical field
This utility model is related to technical field of rail traffic, and in particular to a kind of dormancy awakening linkage.
Background technology
Full-automatic driving is a kind of train operation control system of full-automatic, high concentration control, possesses train certainly
Dynamic wake-up starts with dormancy, come in and go out parking lot, the automatically work(such as cleaning, automatic running, automatic stopping, automatic opening/closing car door automatically
Can, and there is the multiple operational modes such as conventional operation, degraded running and disaster operating mode.
Used as one of important operation scene of full-automatic driving, it is very crucial to carry out indoors testing checking to dormancy awakening
It is necessary.But, rail traffic signal system and train complex automatic system (Train Integration are carried out indoors
Automatic System, TIAS) the linkage validation test of dormancy awakening scene when, be limited to the restriction in place, again without actual
Train, needs to build a set of dormancy awakening linkage that can be applied to interior, so as to realize the test and validation of interior.
Utility model content
In view of the above problems, the utility model proposes overcoming the problems referred to above or solving the above problems at least in part
A kind of dormancy awakening linkage.
For this purpose, the utility model proposes a kind of dormancy awakening linkage, the dormancy awakening linkage setting
Test in default indoor test region in dormancy awakening, in the indoor test region, be additionally provided with the train simulation of test
Bridge, Vehicle Controller VOBC and the assistant equipments on board associated with the VOBC, the dormancy awakening linkage bag
Include:
Industrial computer and electric component;
The industrial computer connects the electric component;
The industrial computer is also connected with the assistant equipments on board;
The assistant equipments on board receives the dormancy configured information of train complex automatic system TIAS transmission or wake-up
After configured information, the dormancy configured information or the wake-up configured information are sent to into the VOBC;The VOBC is to described
Assistant equipments on board feeds back dormancy announcement information or wakes up announcement information, so that the assistant equipments on board is sent out to the industrial computer
Send sleep operation information or wake operation information;The industrial computer receives the sleep operation information or wake operation letter
The electric component is controlled after breath carries out dormancy or wake operation to the VOBC and the train simulation bridge.
Optionally, the train simulation bridge be provided with dormancy button and wake up button, and with the dormancy button
Bonded controller is pressed with waking up;
The industrial computer is communicated to connect with the controller;
After the controller receives the dormancy button or wakes up the signal that button is triggered, send to the industrial computer
Sleep operation information or wake operation information;The industrial computer receives the sleep operation information or the wake operation information
After control the electric component dormancy or wake operation carried out to the VOBC and the train simulation bridge.
Optionally, the electric component includes:Driving plate group, collection plate group and portable tester;
The driving plate group, the collection plate group, the portable tester are designed to 6U standard European plates, to be arranged on
In 6U subracks;
The 6U subracks install 4 sets of the driving plate groups, 4 sets of collection plate groups and 2 sets of portable testers, with
Realize multiple spot bit test and speed-position detection simultaneously.
Optionally, the dormancy awakening linkage also includes:Power supply subrack;
The power supply subrack by 220V alternating current power supplys be converted into 8 tunnels it is controlled 110V DC sources output, 2 tunnels it is controlled
24V DC sources are exported and 2 road 24V direct currents are often exported;
8 tunnel controlled 110V DC sources are exported and are driven to the VOBC and the train simulation by the power supply subrack
Sail platform to power;2 tunnel controlled 24V DC sources are exported and are powered to the assistant equipments on board by the power supply subrack;Institute
State power supply subrack the 2 road 24V direct currents are often exported and power to the electric component.
Optionally, the power supply subrack, including:First panel;
The first panel is provided with 8 the first control knobs, defeated for controlling the controlled 110V DC sources in 8 tunnel
Go out;The first panel is additionally provided with 2 the second control knobs, the 24V DC source output controlled for controlling 2 tunnel.
Optionally, the power supply subrack, also includes:Second panel;
The second panel is provided with 1 DB25 interface and No. 12 wall outlet connector outputs.
Compared to prior art, the utility model proposes dormancy awakening linkage can be applicable to indoor dormancy awakening field
Scape linkage test.Further, acquisition controlling mechanism is driven using multichannel, supports the driving acquisition controlling combined with other systems
Scheme.
Description of the drawings
A kind of dormancy awakening linkage structures schematic diagram that Fig. 1 is provided for this utility model first embodiment.
Specific embodiment
It is to make purpose, technical scheme and the advantage of this utility model embodiment clearer, new below in conjunction with this practicality
Accompanying drawing in type embodiment, is explicitly described to the technical scheme in this utility model embodiment, it is clear that described reality
It is a part of embodiment of this utility model to apply example, rather than the embodiment of whole.
It should be noted that herein, " first " and " second " is used merely to make a distinction identical title, and not
It is to imply the relation or order between these titles.
As shown in figure 1, the present embodiment discloses a kind of dormancy awakening linkage 11, dormancy awakening linkage 11 is arranged on
Dormancy awakening is tested in default indoor test region, and the train simulation that test is additionally provided with the indoor test region is driven
Sail platform 12, Vehicle Controller 13 (Vehicle On-Board Controller, VOBC) and auxiliary with what the VOBC13 was associated
Steer 14, the dormancy awakening linkage 11 is helped to include:
Industrial computer 111 and electric component 112.
The industrial computer 111 connects the electric component 112.
The industrial computer 111 is also connected with the assistant equipments on board 14.
The assistant equipments on board 14 receives the dormancy configured information of the transmission of train complex automatic system (TIAS) 15
Or after waking up configured information, the dormancy configured information or the wake-up configured information are sent to into the VOBC13;It is described
VOBC13 feeds back dormancy announcement information to the assistant equipments on board 14 or wakes up announcement information, so that the assistant equipments on board
14 send sleep operation information or wake operation information to the industrial computer 111;The industrial computer 111 receives the dormancy behaviour
112 couples of VOBC13 of the electric component and the train simulation bridge are controlled after making information or the wake operation information
12 carry out dormancy or wake operation.
Dormancy awakening linkage disclosed in the present embodiment can be applicable to indoor dormancy awakening scene linkage test.
The present embodiment realizes long-range dormancy and Remote Wake Up.Remotely sleep procedure is:TIAS passes through two-way redundant network
Dormancy configured information, such as sleep command, communication power boards of the VOBC by assistant equipments on board are assigned to assistant equipments on board
After receiving sleep command, determine current train in can notify that dormancy announcement information notifies that auxiliary driving sets behind dormancy position
It is standby to carry out sleep operation.Assistant equipments on board exports sleep operation information and gives dormancy awakening linkage, dormancy awakening linkage dress
Putting carries out sleep operation to VOBC and train simulation bridge.Assistant equipments on board is reported to TIAS by two-way redundant network and is stopped
Dormancy state.
Remote wakeup procedure is:TIAS assigns wake-up configured information, example to assistant equipments on board by two-way redundant network
Such as wake command, after assistant equipments on board receives wake command, by controlling dormancy awakening linkage to VOBC and train mould
Intending bridge carries out wake operation.VOBC self-inspections are normal and receive train simulation bridge by dormancy awakening linkage and called out
After successful state of waking up, two-way redundant network is passed through by status information reporting TIAS by assistant equipments on board.
In a specific example, the train simulation bridge 12 be provided with the dormancy button not shown in Fig. 1 and
Button is waken up, and with the dormancy button and wake-up by bonded controller.
The industrial computer 111 is communicated to connect with the controller.
After the controller receives the dormancy button or wakes up the signal that button is triggered, to the industrial computer 111
Send sleep operation information or wake operation information;The industrial computer 111 receives the sleep operation information or the wake-up
112 couples of VOBC13 of the electric component and the train simulation bridge 12 are controlled after operation information carries out dormancy or wake-up
Operation.
The present embodiment realizes local dormancy and long-range dormancy awakening.Local sleep procedure is as follows:Driver presses Train mould
Intend the dormancy button of bridge, after dormancy awakening linkage receives sleep operation information, control VOBC and train simulation are driven
Sailing platform carries out sleep operation.
Local wakeup process is as follows:Driver presses the wake-up button of train simulation bridge, and dormancy awakening linkage connects
After receiving wake operation information, control VOBC and train simulation bridge carry out wake operation.
In a specific example, the electric component 112 is included not shown in Fig. 1:Driving plate group, collection plate group
And portable tester;
The driving plate group, the collection plate group, the portable tester are designed to 6U standard European plates, to be arranged on
In 6U subracks;
The 6U subracks install 4 sets of the driving plate groups, 4 sets of collection plate groups and 2 sets of portable testers, with
Realize multiple spot bit test and speed-position detection simultaneously.
In the present embodiment, the electric component 112 may also include backboard.
In a specific example, the dormancy awakening linkage 11 is also including not shown in Fig. 1:Power supply is inserted
Case;
The power supply subrack by 220V alternating current power supplys be converted into 8 tunnels it is controlled 110V DC sources output, 2 tunnels it is controlled
24V DC sources are exported and 2 road 24V direct currents are often exported;
8 tunnel controlled 110V DC sources are exported and are driven to the VOBC and the train simulation by the power supply subrack
Sail platform to power;2 tunnel controlled 24V DC sources are exported and are powered to the assistant equipments on board by the power supply subrack;Institute
State power supply subrack the 2 road 24V direct currents are often exported and power to the electric component.
In a specific example, the power supply subrack, including:First panel;
The first panel is provided with 8 the first control knobs, defeated for controlling the controlled 110V DC sources in 8 tunnel
Go out;The first panel is additionally provided with 2 the second control knobs, the 24V DC source output controlled for controlling 2 tunnel.
In the present embodiment, first panel can for example be the front panel of the power supply subrack.
In a specific example, the power supply subrack also includes:Second panel;
The second panel is provided with 1 DB25 interface and No. 12 wall outlet connector outputs.
In the present embodiment, second panel can for example be the rear board of the power supply subrack.
In a specific example, industrial computer can for many PCI (Peripheral Component Interconnect,
Peripheral Component Interconnect standard) interface industrial computer, 2 piece of 128 railway digital capture card can be installed, 2 piece of 128 railway digital output card, 1 piece
8 railway digital capture cards.
In a specific example, the dormancy awakening linkage also includes:Test cable, test cable are 32
Cable, 2 self-control power supply cables, 1 self-control control fare cable, 8 100 core shielded cables are adopted in self-control drive.
Drive adopts cable one end for connecting electric component, and one end is used to connect VOBC and train simulation bridge.Power supply control
Cable one end processed is used to connect power supply subrack, and one end is used to connect electric component.Control fare cable one end is used to connect VOBC and row
Car drive simulating platform, one end are used for the industrial computer for connecting many pci interfaces.100 core shielded cable one end are used to connect many pci interfaces
Industrial computer, one end be used for connect electric component.
Although it will be appreciated by those of skill in the art that some embodiments described herein are wrapped in including other embodiments
Some features for including rather than further feature, but the combination of the feature of different embodiments means in model of the present utility model
Within enclosing and form different embodiments.
Although being described in conjunction with the accompanying embodiment of the present utility model, those skilled in the art can without departing from
Various modifications and variations are made in the case of spirit and scope of the present utility model, such modification and modification are each fallen within by appended
Within claim limited range.
Claims (6)
1. a kind of dormancy awakening linkage, it is characterised in that the dormancy awakening linkage is arranged on dormancy awakening test
In default indoor test region, the train simulation bridge of test, vehicle-mounted control in the indoor test region, are additionally provided with
Device VOBC processed and the assistant equipments on board associated with the VOBC, the dormancy awakening linkage are included:
Industrial computer and electric component;
The industrial computer connects the electric component;
The industrial computer is also connected with the assistant equipments on board;
The assistant equipments on board receives the dormancy configured information of train complex automatic system TIAS transmission or wakes up and indicates
After information, the dormancy configured information or the wake-up configured information are sent to into the VOBC;The VOBC is to the auxiliary
Steer feeds back dormancy announcement information or wakes up announcement information, so as to the assistant equipments on board is sent to the industrial computer stop
Dormancy operation information or wake operation information;After the industrial computer receives the sleep operation information or the wake operation information
Controlling the electric component carries out dormancy or wake operation to the VOBC and the train simulation bridge.
2. device according to claim 1, it is characterised in that the train simulation bridge is provided with dormancy button and calls out
Awake button, and with the dormancy button and wake-up by bonded controller;
The industrial computer is communicated to connect with the controller;
After the controller receives the dormancy button or wakes up the signal that button is triggered, dormancy is sent to the industrial computer
Operation information or wake operation information;The industrial computer is controlled after receiving the sleep operation information or the wake operation information
Making the electric component carries out dormancy or wake operation to the VOBC and the train simulation bridge.
3. device according to claim 1, it is characterised in that the electric component includes:Driving plate group, collection plate group with
And portable tester;
The driving plate group, the collection plate group, the portable tester are designed to 6U standard European plates, to insert installed in 6U
In case;
The 6U subracks install 4 sets of the driving plate groups, 4 sets of collection plate groups and 2 sets of portable testers, with simultaneously
Realize multiple spot bit test and speed-position detection.
4. device according to claim 1, it is characterised in that the dormancy awakening linkage also includes:Power supply subrack;
It is straight that 220V alternating current power supplys are converted into the 24V that the controlled 110V DC sources in 8 tunnels are exported, 2 tunnels are controlled by the power supply subrack
The output of stream power supply and 2 road 24V direct currents are often exported;
The power supply subrack exports 8 tunnel controlled 110V DC sources to the VOBC and the train simulation bridge
Power supply;2 tunnel controlled 24V DC sources are exported and are powered to the assistant equipments on board by the power supply subrack;The electricity
The 2 road 24V direct currents are often exported and are powered to the electric component by source subrack.
5. device according to claim 4, it is characterised in that the power supply subrack, including:First panel;
The first panel is provided with 8 the first control knobs, the 110V DC source output controlled for controlling 8 tunnel;
The first panel is additionally provided with 2 the second control knobs, the 24V DC source output controlled for controlling 2 tunnel.
6. device according to claim 5, it is characterised in that the power supply subrack, also includes:Second panel;
The second panel is provided with 1 DB25 interface and No. 12 wall outlet connector outputs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621122546.5U CN206115265U (en) | 2016-10-13 | 2016-10-13 | Dormancy awakens aggregate unit up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621122546.5U CN206115265U (en) | 2016-10-13 | 2016-10-13 | Dormancy awakens aggregate unit up |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206115265U true CN206115265U (en) | 2017-04-19 |
Family
ID=58529372
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621122546.5U Active CN206115265U (en) | 2016-10-13 | 2016-10-13 | Dormancy awakens aggregate unit up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206115265U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109229149A (en) * | 2018-08-29 | 2019-01-18 | 交控科技股份有限公司 | Regional Rail Transit fully automatic operation interconnects train operation control system |
WO2019134678A1 (en) * | 2018-01-08 | 2019-07-11 | 比亚迪股份有限公司 | Train wake-up method and device, train sleep method and device |
CN111003023A (en) * | 2019-12-26 | 2020-04-14 | 天津津航计算技术研究所 | Automatic dormancy equipment is awaken up in dual system end to end dual redundant special automation of train |
CN111559413A (en) * | 2018-08-16 | 2020-08-21 | 浙江众合科技股份有限公司 | Management method for dormancy awakening of unmanned automatic driving train |
CN112744258A (en) * | 2019-10-31 | 2021-05-04 | 株洲中车时代电气股份有限公司 | Apparatus, method and storage medium for controlling operating state of in-vehicle device |
CN115148067A (en) * | 2022-08-19 | 2022-10-04 | 南京中车浦镇城轨车辆有限责任公司 | Driving auxiliary lighting operation console applied to rail vehicle training |
-
2016
- 2016-10-13 CN CN201621122546.5U patent/CN206115265U/en active Active
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019134678A1 (en) * | 2018-01-08 | 2019-07-11 | 比亚迪股份有限公司 | Train wake-up method and device, train sleep method and device |
CN110015322A (en) * | 2018-01-08 | 2019-07-16 | 比亚迪股份有限公司 | Train awakening method and device, train dormancy method and device |
CN110015322B (en) * | 2018-01-08 | 2020-12-25 | 比亚迪股份有限公司 | Train awakening method and device and train sleeping method and device |
CN111559413A (en) * | 2018-08-16 | 2020-08-21 | 浙江众合科技股份有限公司 | Management method for dormancy awakening of unmanned automatic driving train |
CN111559413B (en) * | 2018-08-16 | 2022-06-10 | 浙江众合科技股份有限公司 | Management method for dormancy awakening of unmanned automatic driving train |
CN109229149A (en) * | 2018-08-29 | 2019-01-18 | 交控科技股份有限公司 | Regional Rail Transit fully automatic operation interconnects train operation control system |
CN112744258A (en) * | 2019-10-31 | 2021-05-04 | 株洲中车时代电气股份有限公司 | Apparatus, method and storage medium for controlling operating state of in-vehicle device |
CN112744258B (en) * | 2019-10-31 | 2022-05-06 | 株洲中车时代电气股份有限公司 | Apparatus, method and storage medium for controlling operating state of in-vehicle device |
CN111003023A (en) * | 2019-12-26 | 2020-04-14 | 天津津航计算技术研究所 | Automatic dormancy equipment is awaken up in dual system end to end dual redundant special automation of train |
CN111003023B (en) * | 2019-12-26 | 2022-02-11 | 天津津航计算技术研究所 | Automatic dormancy equipment is awaken up in dual system end to end dual redundant special automation of train |
CN115148067A (en) * | 2022-08-19 | 2022-10-04 | 南京中车浦镇城轨车辆有限责任公司 | Driving auxiliary lighting operation console applied to rail vehicle training |
CN115148067B (en) * | 2022-08-19 | 2023-11-14 | 南京中车浦镇城轨车辆有限责任公司 | Driving auxiliary lighting operation table applied to railway vehicle training |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206115265U (en) | Dormancy awakens aggregate unit up | |
CN107672627B (en) | Rapid positioning method for dormant train through trackside ATP storage memory | |
CN205540264U (en) | Vehicle control unit testing arrangement | |
CN106444744A (en) | Driverless onboard control device | |
CN111123739B (en) | Network control system semi-physical simulation experiment platform used in full-automatic unmanned mode | |
CN204095711U (en) | Entire car controller and wake-up circuit thereof and electronlmobil | |
CN100334512C (en) | Traction control system for stationary reconnection locomotive | |
CN102183953A (en) | Vehicle power electronic unit (PEU) testboard | |
CN110281977A (en) | A kind of axis-counting device | |
CN209570651U (en) | Advanced repair of CRH3 type EMU hangs together testing equipment | |
CN208897058U (en) | A kind of novel track vehicle operation control device based on security architecture | |
CN112590745A (en) | Integrated electronic parking system for multi-axle vehicle and parking method thereof | |
CN112829774B (en) | Electric screen cabinet for rail transit vehicle and state monitoring method | |
CN211498316U (en) | Pneumatic control system of steel rail grinding train | |
CN107664995A (en) | One kind is based on unpiloted control system | |
CN115102261A (en) | Self-locking circuit | |
CN109407585A (en) | A kind of rail transit used air-conditioner controller | |
CN209928256U (en) | Carriage air purification system based on singlechip | |
CN209265262U (en) | A kind of sliding plug door of motor train unit controller internal element discrete detection platform | |
CN209038824U (en) | The pneumatic control device and elevator device of lift car | |
CN202171744U (en) | PEU testboard | |
CN207232700U (en) | Rail carriages power supply remote monitoring and control system | |
CN206344655U (en) | A kind of ventilator for vehicle | |
CN220826548U (en) | Automatic parking system of rolling stock | |
CN217048608U (en) | Control device of shielding door climate conversion system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |