CN206112973U - Horizontal arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower - Google Patents
Horizontal arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower Download PDFInfo
- Publication number
- CN206112973U CN206112973U CN201621162828.8U CN201621162828U CN206112973U CN 206112973 U CN206112973 U CN 206112973U CN 201621162828 U CN201621162828 U CN 201621162828U CN 206112973 U CN206112973 U CN 206112973U
- Authority
- CN
- China
- Prior art keywords
- tower
- chimney
- desulfurization
- cooling stack
- horizontal arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Chimneys And Flues (AREA)
Abstract
The utility model discloses a horizontal arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower arranges wet -type electrostatic precipitator, desulfurization absorption tower and chimney level in proper order in natural draft cooling tower, and messenger's flue distance is the shortest, the technology of discharging fume is smooth reasonable, and make full use of tower inner wind is pressed in the line and is discharged fume, reduces the height of chimney, practices thrift the construction cost of chimney, practices thrift wet -type electrostatic precipitator, desulfurization absorption tower and the occupation of land of chimney outside the tower, the area of saving the area on the whole.
Description
【Technical field】
This utility model is related to the arrangement of desulfuration absorbing tower, wet electrical dust precipitator, chimney and cooling stack,
The horizontal arrangement of desulfurization and dedusting smoke extractor in specifically related to a kind of cooling stack.
【Background technology】
As China increasingly payes attention to environmental conservation, the control to atmospheric pollution is more and more stricter, and environmental administration is to combustion
The flue gas of coal-fired plant proposes the requirement of ultra-clean discharge, after desulfuration absorbing tower humidification-type electric cleaner be solution it
One.Desulfuration absorbing tower, wet electrical dust precipitator, chimney and cooling stack belong to different monomers building.It is in recent years section
About land used, each construction of structures of power plant requires to merge arrangement as far as possible, to optimizing plant area's floor space, reduces investment.
【Utility model content】
The purpose of this utility model is to overcome prior art defect, there is provided desulfurization and dedusting in a kind of cooling stack
The horizontal arrangement of smoke extractor, with reference to specific engine request, by desulfuration absorbing tower, wet electrical dust precipitator, chimney with it is cold
But tower is combined arrangement, reduces investment outlay and plant area's floor space.
To reach above-mentioned purpose, this utility model is adopted the following technical scheme that:
The horizontal arrangement of desulfurization and dedusting smoke extractor in a kind of cooling stack, desulfurization and dedusting smoke extractor bag
Desulfuration absorbing tower, wet electrical dust precipitator and chimney are included, desulfuration absorbing tower, wet electrical dust precipitator and chimney level are sequentially arranged in certainly
So in aerating and cooling tower, flue is connected in desulfuration absorbing tower through cooling stack level, and boiler combustion is discharged fume from flue
Directly in desulfuration absorbing tower, the desulfurization of Jing absorption towers is entered and go in wet electrical dust precipitator smoke abatement, most after Jing chimneys discharge.
Further, cooling stack includes gravity-flow ventilation indirect dry cooling tower and natural ventilating wet-type crossing current tower.
Further, chimney is located at cooling stack center or near tower center.
Further, using 90 ° of bend pipe arrangements in tower, material is steel pipe to chimney, and length is about 16m.
Further, wet electrical dust precipitator and chimney are fixed in cooling stack using steel support structure.
Desulfuration absorbing tower, wet electrical dust precipitator and chimney are arranged horizontally in successively cooling stack by this utility model
It is interior.Using the exhaustion smoke height of the natural air lifting chimney of cooling tower, chimney stack is changed into into short chimney, the civil engineering for saving chimney is thrown
Rate are used, and shorten the chimney construction period, while reaching the environmental requirement of fume emission height and diffusion.
This utility model has further the advantage that:
1st, the desulfuration absorbing tower of power plant, wet electrical dust precipitator and chimney are arranged in cooling stack, three kinds set
Standby to press horizontally disposed successively in tower, smoke evacuation technique is smooth rationally, according to the arrangement height of flue, chimney emission level is connected to
In desulfuration absorbing tower, chimney turning path is reduced, make flue distance most short, reduce smoke evacuation resistance, reduce power of fan, reduce factory
Power consumption rate.
2nd, chimney is located at centre of cooling column or near tower center, makes corroded area of the chimney emission to indirect cool tower inwall
Minimum, saves anti-corrosion material, reduces investment outlay.
3rd, chimney is arranged in cooling tower, can air pressure difference in effectively utilizes tower, make exhaustion smoke height lifting, pollutant diffusion
Effect is good.When tower trunk of funnel is individually arranged, chimney structure is built-in steel pipe reinforced concrete enveloped structure, highly about 180m~
210m.Chimney 90 ° of bend pipe arrangements in tower, material is steel pipe, and length is about 16m.The chimney section arranged in tower outside relative to tower
About the civil engineering costs such as steel and concrete, reduce investment outlay, while dramatically shortening the construction period of chimney.
4th, the fresh water (FW) of wet electrical dust precipitator can gravity stream reused in desulfuration absorbing tower, reduce pipeline use
Amount.
【Description of the drawings】
Fig. 1 site plans of the present utility model
Fig. 2 profiles of the present utility model
In figure:1- cooling stacks;2- desulfuration absorbing towers;3- wet electrical dust precipitators;4- chimneys;5- flues;6- steel
Supporting construction.
【Specific embodiment】
It is right below in conjunction with the accompanying drawings in order to clearer explanation this utility model implements technological means, the creation characteristic of realization
This utility model is further elaborated.
As depicted in figs. 1 and 2, in cooling stack desulfurization and dedusting smoke extractor horizontal arrangement, desulfurization removes
Dirt smoke extractor includes desulfuration absorbing tower 2, wet electrical dust precipitator 3 and chimney 4, desulfuration absorbing tower 2, wet electrical dust precipitator 3 and cigarette
The level of chimney 4 is sequentially arranged in cooling stack 1, and flue 5 is connected to desulfuration absorbing tower through the level of cooling stack 1
In 2, boiler combustion is discharged fume from flue 5 directly in desulfuration absorbing tower 2, Jing after the desulfurization of absorption tower, in entering wet electrical dust precipitator 3
Remove smoke abatement, most after Jing chimneys 4 discharge.
In arrangement of the present utility model, flue, desulfuration absorbing tower, wet electrical dust precipitator, air flue horizontal arrangement, construction
When can respectively be constructed according to equipment arrival situation, final physical connection, the construction and installation between each device are independent of each other.Cigarette
Road is accessed nearby in desulfuration absorbing tower from the outer level of cooling tower, reduces flue bent pipe, makes flue distance most short, reduces smoke evacuation resistance
Power, reduces power of fan, reduces station service power consumption rate.The fresh water (FW) of wet scrubber can gravity stream carry out in desulfuration absorbing tower weight
It is multiple to utilize, reduce pipeline consumption.
Cooling stack 1 includes gravity-flow ventilation indirect dry cooling tower and natural ventilating wet-type crossing current tower.Chimney 4 is located at certainly
The right center of aerating and cooling tower 1 or close tower center.Using 90 ° of bend pipes arrangement in tower, material is steel pipe to chimney 4, length
About 16m.Wet electrical dust precipitator 3 and chimney 4 are fixed in cooling stack 1 using steel support structure 6.
The above-mentioned description to embodiment is to be understood that for ease of those skilled in the art and use practical new
Type.Person skilled in the art obviously easily can make various modifications to these embodiments, and described herein
General Principle is applied in other embodiment without through performing creative labour.Therefore, this utility model is not limited to above-mentioned reality
Apply example, those skilled in the art the improvement made without departing from this utility model category and are repaiied according to announcement of the present utility model
Changing all should be within protection domain of the present utility model.
Claims (5)
1. in a kind of cooling stack desulfurization and dedusting smoke extractor horizontal arrangement, it is characterised in that:Desulfurization and dedusting
Smoke extractor includes desulfuration absorbing tower (2), wet electrical dust precipitator (3) and chimney (4), desulfuration absorbing tower (2), wet electrical dust precipitator
(3) it is sequentially arranged in cooling stack (1) with chimney (4) level, flue (5) is through cooling stack (1) water
Flush to desulfuration absorbing tower (2), boiler combustion smoke evacuation is from flue (5) interior, Jing absorption towers desulfurization directly into desulfuration absorbing tower (2)
Afterwards, enter smoke abatement in wet electrical dust precipitator (3), most after Jing chimneys (4) discharge.
2. in cooling stack according to claim 1 desulfurization and dedusting smoke extractor horizontal arrangement, it is special
Levy and be:Cooling stack (1) includes gravity-flow ventilation indirect dry cooling tower and natural ventilating wet-type crossing current tower.
3. in cooling stack according to claim 1 desulfurization and dedusting smoke extractor horizontal arrangement, it is special
Levy and be:Chimney (4) is positioned at cooling stack (1) center or near tower center.
4. in the cooling stack according to claim 1,2 or 3 desulfurization and dedusting smoke extractor horizontal arrangement,
It is characterized in that:Using 90 ° of bend pipe arrangements in tower, material is steel pipe to chimney (4), and length is about 16m.
5. in the cooling stack according to claim 1,2 or 3 desulfurization and dedusting smoke extractor horizontal arrangement,
It is characterized in that:Wet electrical dust precipitator (3) and chimney (4) are fixed on cooling stack (1) using steel support structure (6)
It is interior.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621162828.8U CN206112973U (en) | 2016-10-25 | 2016-10-25 | Horizontal arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621162828.8U CN206112973U (en) | 2016-10-25 | 2016-10-25 | Horizontal arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206112973U true CN206112973U (en) | 2017-04-19 |
Family
ID=58526959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621162828.8U Active CN206112973U (en) | 2016-10-25 | 2016-10-25 | Horizontal arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206112973U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109663428A (en) * | 2018-12-29 | 2019-04-23 | 中国神华能源股份有限公司 | Smoke processing system |
-
2016
- 2016-10-25 CN CN201621162828.8U patent/CN206112973U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109663428A (en) * | 2018-12-29 | 2019-04-23 | 中国神华能源股份有限公司 | Smoke processing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107185341A (en) | A kind of efficiently building dust arrester | |
CN204233970U (en) | The board-like airflow uniform distribution device of a kind of flue gas desulfurization demister | |
CN205227364U (en) | Arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower | |
CN104437870B (en) | Overhead type rectangular wet electric precipitator | |
CN103954126A (en) | Vertical flue gas desulfurization purifying device for annular moving tunnel kiln | |
CN206112973U (en) | Horizontal arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower | |
CN203656950U (en) | Novel smoke discharging chimney | |
CN206593127U (en) | No smoke environmental protection and energy conservation chimney device | |
CN105258267A (en) | Mechanical ventilation device and method for underground stereo garage | |
CN203132415U (en) | Cooling tower | |
CN205042607U (en) | Wet electrostatic precipitator | |
CN205308577U (en) | Tower top venturi tube formula wet -type electrostatic precipitator | |
CN203798150U (en) | Vertical type flue gas desulfurization purifying device for annular movable type tunnel kiln | |
CN204147759U (en) | A kind of device improving wet desulfurization system mass-transfer efficiency | |
CN213193052U (en) | Domestic waste burns burning furnace and supporting equipment is handled to flue gas thereof | |
CN205102148U (en) | Coal fired power plant's boiler purifier that discharges fume | |
CN204201922U (en) | Flue gas processing device after a kind of coal boiler | |
CN202893507U (en) | Wet sintering and desulfurizing flue gas deep purifying device | |
CN205701040U (en) | The structure of the vertical wet electrical dust precipitator of a kind of side air-out is arranged | |
CN206027935U (en) | Wet -type is hot air blowing system for electrostatic precipitator | |
CN206008406U (en) | A kind of coal-burning power plant's minimum discharge device | |
CN206046266U (en) | A kind of low temperature electric cleaner high-voltage insulating system | |
CN200992558Y (en) | Converter roofing dust collecting device | |
CN205569986U (en) | Vertical haze purger | |
CN205886584U (en) | High -efficient integrated process of desulfurization and dust removal device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |