CN206112254U - Water system riser installation carousel formula bracket - Google Patents

Water system riser installation carousel formula bracket Download PDF

Info

Publication number
CN206112254U
CN206112254U CN201621162508.2U CN201621162508U CN206112254U CN 206112254 U CN206112254 U CN 206112254U CN 201621162508 U CN201621162508 U CN 201621162508U CN 206112254 U CN206112254 U CN 206112254U
Authority
CN
China
Prior art keywords
bearing
steel pipe
steel plate
ball bearing
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621162508.2U
Other languages
Chinese (zh)
Inventor
王玏
孙尔雷
高永军
王克正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Thermoelectric Group Co Ltd
Original Assignee
Hefei Thermoelectric Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Thermoelectric Group Co Ltd filed Critical Hefei Thermoelectric Group Co Ltd
Priority to CN201621162508.2U priority Critical patent/CN206112254U/en
Application granted granted Critical
Publication of CN206112254U publication Critical patent/CN206112254U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model discloses a water system riser installation carousel formula bracket, including the base steel sheet, base steel sheet top level is equipped with the bed course steel sheet, the vertical ball bearing that is equipped with on the bed course steel sheet, bearing steel tube altogether central hub on the ball bearing outer lane, the bearing steel tube inner wall is as an organic whole with the welding of ball bearing outer lane, bearing steel tube is total to central hub outward has tray overcoat steel pipe, tray overcoat steel pipe, connect as an organic wholely through connector plates between the bearing steel tube bottom, the competent work conduit saddle dish steel sheet of bearing steel tube top welding, and the conduit saddle dish steel sheet outer wall of working is as an organic whole with the welding of tray overcoat steel pipe inner wall. The utility model discloses subtract and join in marriage electric block, need not not add at the top layer again and establish interim power consumption facility. Can realize the successive layer welding, the successive layer carries out the leg joint. Construction flow reasonable in design practices thrift artifically. Can be with cutting, dig hole, the welding of silk head, the concentrated arrangement of pipe cap installation jobs in the ground processing district.

Description

Water system standpipe installs rotating disc type bracket
Technical field
This utility model is related to air-conditioner water system standpipe installation tool field, and mainly a kind of water system standpipe installs rotating disk Formula bracket.
Background technology
With the development of social economy, skyscraper is increasing.Skyscraper is because air-conditioning, water supply, the needs of fire-fighting Deposit substantial amounts of water system pipe well standpipe construction.Water system pipe well standpipe is because pressure-bearing, the restriction of floor height generally adopt seamless steel Tube welding process is constructed.The welding quality of skyscraper grey water system pipeline is decisive for the use function of whole building is played Effect, therefore standpipe installment work is most important.
At present the working measure of employing is:Electric block is set up in the top layer of pipe well.Seamless steel pipe enters pipe well from one layer After welded, drawn high with electric block after the completion of welding, then add and drawn high again after new sealing of tube.This step is circulated to complete The connection of support is carried out into after the welding of seamless pipe.After the completion of supervisor and support welding procedure, a head is successively carried out on supervisor Interface is dug a hole, then silk head is soldered on supervisor, so far completes the construction of air-conditioning standpipe.
Column defects in the presence of this traditional construction measure:1st, the erection of electric block, must add temporary electricity and set in top layer Apply.2nd, the connection of support can not be carried out during electrician calabash is drawn high, and whole steady pipe concentrates stress in electrician calabash, deposits In security risk.3rd, traditional handicraft weld when cause because pipe well position is narrow and small circular weld the back side cannot normal weld, weldering Seam is of low quality.
Utility model content the purpose of this utility model is to provide a kind of water system standpipe and installs rotating disc type bracket, can be by Standpipe weld seam is freed from narrow and small pipe well space, is easy to welder's operation construction to improve welding quality.
In order to achieve the above object, the technical scheme that this utility model is adopted for:
A kind of water system standpipe installs rotating disc type bracket, it is characterised in that:Including horizontal base steel plate, base steel plate top Portion's level is provided with bed course steel plate, and ball bearing is vertically provided with bed course steel plate, and ball bearing inner ring lower end is welded on bed course steel On plate, the Steel Pipe For Bearing also including concentrically axle sleeve on ball bearing outer ring, Steel Pipe For Bearing peak is highly higher than ball axle Peak height is held, and Steel Pipe For Bearing inwall is welded as a whole with ball bearing outer ring, concentrically axle sleeve has support outside Steel Pipe For Bearing Disk outer steel pipe, pallet outer steel pipe peak is highly higher than Steel Pipe For Bearing peak height, pallet outer steel pipe, Steel Pipe For Bearing Connected as one by junction steel plate between bottom, the Steel Pipe For Bearing top is welded with horizontal instrumentation tubes pallet steel plate, and Instrumentation tubes pallet steel plate outer wall is welded as a whole with pallet outer steel pipe inwall.
A kind of described water system standpipe installs rotating disc type bracket, it is characterised in that:The ball bearing inner ring top pressure Horizontal card laminated steel is provided with, and card laminated steel is connected by the fixing bolt passed through from ball bearing with base steel plate.
A kind of described water system standpipe installs rotating disc type bracket, it is characterised in that:The base steel plate bottom is provided with props up The feet of support base steel plate.
In this utility model, rotating disk is constituted by Steel Pipe For Bearing, pallet outer steel pipe, instrumentation tubes pallet steel plate, junction steel plate, When using, position is fixed by bottom steel plate, first seamless pipe A is stood on instrumentation tubes pallet steel plate, then will be seamless Pipe B and A is welded, and ball bearing rotational whole rotating disk is utilized during welding, and it is convenient at pipe well door that the weld seam of patch wall side is gone to Welding procedure.Drawn high in pipe well top layer using electric block after the completion of seamless pipe A, B welding, then the weight on instrumentation tubes pallet steel plate Newly increasing C pipes carries out welding procedure.
The beneficial effects of the utility model are:1st, subtract with electric block, without in top layer adding temporary electricity facility again. 2nd, can realize successively welding, successively carry out support connection.Construction process is reasonable in design, saves artificial.3rd, can be by cutting, digging Hole, the welding of silk head, pipe cap installation exercise are concentrated and are arranged in ground processing district.The utilization rate of tubing is improve, borehole link is improved Make efficiency and quality, it is ensured that silk head welding weldquality and silk head perpendicularity.The perpendicularity of silk head will affect To the zinc-plated pipeline of later stage pipe well and the installation quality of valve.4th, the Special turntable design of riser bottom, by the weldering of the seamless pipe back side Seam is freed from narrow and small pipe well, greatly improves welder's operating environment, improves weldquality, reduces weld seam leak general Rate.
Description of the drawings
Fig. 1 is this utility model overall structure front view.
Fig. 2 is this utility model ball bearing structure sectional view.
Specific embodiment
As shown in Figure 1, 2, a kind of water system standpipe installs rotating disc type bracket, including horizontal base steel plate 2, base steel plate 2 top horizontals are provided with bed course steel plate 3, and ball bearing 5 is vertically provided with bed course steel plate 3, and the lower end of 5 inner ring of ball bearing 14 is welded On bed course steel plate 3, the Steel Pipe For Bearing 9 also including concentrically axle sleeve on the outer ring 12 of ball bearing 5, the peak of Steel Pipe For Bearing 9 Highly it is welded as a whole with the outer ring 12 of ball bearing 5 higher than the peak of ball bearing 5 height, and the inwall of Steel Pipe For Bearing 9, bearing steel The outer concentrically axle sleeve of pipe 9 has pallet outer steel pipe 8, and the peak of pallet outer steel pipe 8 is highly high higher than the peak of Steel Pipe For Bearing 9 Degree, is connected as one between pallet outer steel pipe 8, the bottom of Steel Pipe For Bearing 9 by junction steel plate 7, and the top of Steel Pipe For Bearing 9 is welded with The instrumentation tubes pallet steel plate 10 of level, and the outer wall of instrumentation tubes pallet steel plate 10 is welded as a whole with the inwall of pallet outer steel pipe 8.
The top of 5 inner ring of ball bearing 14 pressure is provided with horizontal card laminated steel 6, and card laminated steel 6 by from ball bearing 5 The fixing bolt 4 for passing through is connected with base steel plate 2.
The bottom of base steel plate 2 is provided with the feet 1 of support base steel plate 2.
Rotation is realized by ball 13 between the outer ring 12 of ball bearing 5, inner ring 14.
Making of the present utility model.First step rotary base steel plate cutting:Base steel plate should estimating according to its load capacity Value adopts the steel plate materialses of reliable thickness, each model steel plate to meet Standard;Second step runner is chosen:Runner model is selected Select and be considered as coordinating seamless pipe cross-sectional sizes;3rd step runner is fixed and outer steel pipe welding:Outer steel pipe caliber should be greater than turning Wheel cross section ensures freely be rotated on rotating disk after seamless steel pipe is upright.
Application of the present utility model.1st, calculate floor height, carry out the calculating of each layer length of seamless pipe, carry out in ground processing district The cutting pipe arrangement of seamless length of tube.2nd, digging a hole on seamless pipe supervisor and silk head welding procedure are carried out in ground processing district, is anti- Only later stage foreign body is into the pipe cap that inside the Pass silk head goes out while being installed in place.3rd, by the band silk head for processing and the seamless pipe of pipe cap, Each layer is transported to using people's goods elevator.4th, the standpipe rotating disc type bracket for specially designing and producing is fixed in one layer of pipe well.5th, start Successively going up pipe carries out weld job, be able to will be carried on the back with the entirety of spanner rotational stem post when the sealing run of patch wall is run into during welding Face weld seam goes to front and is welded.And welding process does not affect the installation of each layer sliding support.

Claims (3)

1. a kind of water system standpipe installs rotating disc type bracket, it is characterised in that:Including horizontal base steel plate, base steel plate top Level is provided with bed course steel plate, and ball bearing is vertically provided with bed course steel plate, and ball bearing inner ring lower end is welded on bed course steel plate On, the Steel Pipe For Bearing also including concentrically axle sleeve on ball bearing outer ring, Steel Pipe For Bearing peak is highly higher than ball bearing Peak height, and Steel Pipe For Bearing inwall is welded as a whole with ball bearing outer ring, concentrically axle sleeve has pallet outside Steel Pipe For Bearing Outer steel pipe, pallet outer steel pipe peak is highly higher than Steel Pipe For Bearing peak height, pallet outer steel pipe, Steel Pipe For Bearing bottom Connected as one by junction steel plate between end, the Steel Pipe For Bearing top is welded with horizontal instrumentation tubes pallet steel plate, and work Make conduit saddle disk steel plate outer wall to be welded as a whole with pallet outer steel pipe inwall.
2. a kind of water system standpipe according to claim 1 installs rotating disc type bracket, it is characterised in that:The ball bearing Inner ring top pressure is provided with horizontal card laminated steel, and card laminated steel is by the fixing bolt that passes through from ball bearing and base steel Plate connects.
3. a kind of water system standpipe according to claim 1 installs rotating disc type bracket, it is characterised in that:The base steel plate Bottom is provided with the feet of support base steel plate.
CN201621162508.2U 2016-10-25 2016-10-25 Water system riser installation carousel formula bracket Expired - Fee Related CN206112254U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621162508.2U CN206112254U (en) 2016-10-25 2016-10-25 Water system riser installation carousel formula bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621162508.2U CN206112254U (en) 2016-10-25 2016-10-25 Water system riser installation carousel formula bracket

Publications (1)

Publication Number Publication Date
CN206112254U true CN206112254U (en) 2017-04-19

Family

ID=58526850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621162508.2U Expired - Fee Related CN206112254U (en) 2016-10-25 2016-10-25 Water system riser installation carousel formula bracket

Country Status (1)

Country Link
CN (1) CN206112254U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106439221A (en) * 2016-10-25 2017-02-22 合肥热电集团有限公司 Rotating-disk type bracket for mounting of vertical pipe of water system
CN107504265A (en) * 2017-08-31 2017-12-22 安徽大地环保科技有限公司 A kind of rotating disc type support of pipelines

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106439221A (en) * 2016-10-25 2017-02-22 合肥热电集团有限公司 Rotating-disk type bracket for mounting of vertical pipe of water system
CN107504265A (en) * 2017-08-31 2017-12-22 安徽大地环保科技有限公司 A kind of rotating disc type support of pipelines
CN107504265B (en) * 2017-08-31 2019-11-05 安徽米徽环境科技有限公司 A kind of rotating disc type support of pipelines

Similar Documents

Publication Publication Date Title
CN206112254U (en) Water system riser installation carousel formula bracket
CN104060971B (en) Assembly type underwater manifold structure
WO2020133847A1 (en) Assembly- and disassembly-free pipeline system for pipe jacking machine, and construction method therefor
CN203547753U (en) Profile steel concrete shaft wall base
CN103244134A (en) Anti-floating ballasting method for shield tunnel under negative earthing condition
CN206346737U (en) A kind of supporting major diameter curve pipe curtain
CN206599781U (en) A kind of pile of deep water pile foundation ribs built-in steel casing
CN207402377U (en) A kind of building iron tubing string auxiliary welding equipment
CN106439221A (en) Rotating-disk type bracket for mounting of vertical pipe of water system
CN205954681U (en) A structure for locating assembly piping lane reinforcing bar
CN206929551U (en) The rubber diaphragm sealed gas holder of unistage type of regular polygon thin oil seal gas holder reconstruction
CN207863959U (en) A kind of shield section centre closed steel bushing that misses the stop of ventilating shaft
CN205711770U (en) A kind of easy steel pipe arch bridge arch rib closure device
CN100557285C (en) A kind of sliding support that is used in a sleeve pipe, wearing many core pipes
CN203514353U (en) Glass fiber reinforced plastics inspection well
CN202923457U (en) High-flow drainage vehicle
CN206359986U (en) With the double Pin large diameter steel pipe inner support beams of layer
CN203440847U (en) Bridge frame for dredger
CN207130727U (en) A kind of spheroidal graphite cast-iron screw pile
CN105908778A (en) Comprehensive pipe rack for corrugated spiral pipe structure
CN206555620U (en) A kind of Large Diameter Pipeline bend pipe bearing
CN206428787U (en) A kind of non-excavation rehabilitation caves in the steel loop structure of pipeline rehabilitation pretreatment
CN208933979U (en) A kind of easy collapse hole stratum Application of light well point precipitation structure
CN207228143U (en) A kind of novel plug formula steel construction tank base
CN214785997U (en) Pre-buried sleeve mounting structure of pipe well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170419

Termination date: 20191025