CN206090652U - 一种新型监测管下管装置 - Google Patents

一种新型监测管下管装置 Download PDF

Info

Publication number
CN206090652U
CN206090652U CN201621143365.0U CN201621143365U CN206090652U CN 206090652 U CN206090652 U CN 206090652U CN 201621143365 U CN201621143365 U CN 201621143365U CN 206090652 U CN206090652 U CN 206090652U
Authority
CN
China
Prior art keywords
iron hoop
support iron
monitoring pipe
rubber
deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621143365.0U
Other languages
English (en)
Inventor
朱威威
陈国强
卫宏
胡俊
杜娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan University
Original Assignee
Hainan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan University filed Critical Hainan University
Priority to CN201621143365.0U priority Critical patent/CN206090652U/zh
Application granted granted Critical
Publication of CN206090652U publication Critical patent/CN206090652U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

本实用新型公开一种新型监测管下管装置,包括有支架铁箍和钢角撑,支架铁箍通过钢角撑进行支撑。支架铁箍为两个半圆形结构组合而成,两个半圆的一端连接处通过转轴进行枢接,两个半圆的另一端通过支架螺栓固定连接,支架铁箍的内侧壁设有橡皮,橡皮设有四块,两两相对对称设置。支架铁箍的周圈设有三个钢角撑进行支撑。有益效果:本实用新型提供的装置结构简单,操作方便,提高施工效率。有效控制了变形监测管初始变形和连接部位的弯曲,从而保证了变形监测管准确的反应土体的变形。

Description

一种新型监测管下管装置
技术领域
本实用新型涉及一种下管装置,特别涉及一种新型监测管下管装置。
背景技术
目前,随着经济的快速发展,建筑基坑开挖规模和深度不断增加,对周边环境的影响愈发显著,因此基坑监测工作的重要性愈发突出。基坑监测的内容主要包括:地表水平及竖向位移、地下水位变化、周边建筑竖向位移、深层土体水平位移等,其中深层土体水平位移的监测需要预先在土体中埋设土体变形监测管。同时,标准的变形监测管为每两米一根,连接部位用螺丝连接固定,由于基坑的深度一般较深,最高可达数十米。传统施工过程中,施工人员为施工方便,提高效率,往往事先把监测管拼装成两到三部分,然后再下放。这种施工方式,在将事先拼接好的部分立起的过程中,由于自身重力的影响,监测管已经产生了初始变形和弯曲,连接部位变形尤为突出,难以保证后期的测量数据的可靠性,也就无法对基坑的安全性做出准确的判断。
发明内容
本实用新型的目的是为了消除监测管下放至土体内部后管的弯曲及初始变形,而提供的一种新型监测管下管装置。
本实用新型提供的新型监测管下管装置包括有支架铁箍和钢角撑,支架铁箍通过钢角撑进行支撑。
支架铁箍为两个半圆形结构组合而成,两个半圆的一端连接处通过转轴进行枢接,两个半圆的另一端通过支架螺栓固定连接,支架铁箍的内侧壁设有橡皮,橡皮设有四块,两两相对对称设置。
支架铁箍的周圈设有三个钢角撑进行支撑。
本实用新型的设置原理:
在进行变形监测管下放施工前,将支架铁箍通过三个钢角撑固定于周边土体内,要保证支架铁箍圆心与基坑的孔口圆心重合,解开支架螺栓。,先下放一根变形监测管(2m),并将其上端放入支架铁箍中,锁定支架螺栓,通过橡皮的挤压,将变形监测管固定。然后与另一根变形监测管进行连接,用螺丝固定,松开螺栓,再次下放变形监测管,重复上述过程直至达到设计需要的长度。
本实用新型的有益效果:
本实用新型提供的装置结构简单,操作方便,提高施工效率。在变形监测管的连接过程,由于变形监测管固定于下管装置上,在前一根变形监测管连接下一根变形监测管时,有了着力点,连接起来简单快捷。同时,由于下管方式为每两米下放一次,有效控制了变形监测管初始变形和连接部位的弯曲,从而保证了变形监测管准确的反应土体的变形。
附图说明
图1为本实用新型整体结构主视图。
图2为本实用新型整体结构俯视图。
1、支架铁箍 2、钢角撑 3、转轴 4、支架螺栓 5、橡皮 6、变形监测管。
具体实施方式
请参阅图1和图2所示:
本实用新型提供的新型监测管下管装置包括有支架铁箍1和钢角撑2,支架铁箍1通过钢角撑2进行支撑。
支架铁箍1为两个半圆形结构组合而成,两个半圆的一端连接处通过转轴3进行枢接,两个半圆的另一端通过支架螺栓4固定连接,支架铁箍1的内侧壁设有橡皮5,橡皮5设有四块,两两相对对称设置。
支架铁箍1的周圈设有三个钢角撑2进行支撑。
本实用新型的设置原理:
在进行变形监测管6下放施工前,将支架铁箍1通过三个钢角撑2固定于周边土体内,要保证支架铁箍1圆心与基坑的孔口圆心重合,解开支架螺栓4。,先下放一根变形监测管(2m)6,并将其上端放入支架铁箍1中,锁定支架螺栓4,通过橡皮5的挤压,将变形监测管6固定。然后与另一根变形监测管6进行连接,用螺丝固定,松开螺栓,再次下放变形监测管6,重复上述过程直至达到设计需要的长度。

Claims (3)

1.一种新型监测管下管装置,其特征在于:包括有支架铁箍和钢角撑,支架铁箍通过钢角撑进行支撑。
2.根据权利要求1所述的一种新型监测管下管装置,其特征在于:所述的支架铁箍为两个半圆形结构组合而成,两个半圆的一端连接处通过转轴进行枢接,两个半圆的另一端通过支架螺栓固定连接,支架铁箍的内侧壁设有橡皮,橡皮设有四块,两两相对对称设置。
3.根据权利要求1所述的一种新型监测管下管装置,其特征在于:所述的支架铁箍的周圈设有三个钢角撑进行支撑。
CN201621143365.0U 2016-10-21 2016-10-21 一种新型监测管下管装置 Expired - Fee Related CN206090652U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621143365.0U CN206090652U (zh) 2016-10-21 2016-10-21 一种新型监测管下管装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621143365.0U CN206090652U (zh) 2016-10-21 2016-10-21 一种新型监测管下管装置

Publications (1)

Publication Number Publication Date
CN206090652U true CN206090652U (zh) 2017-04-12

Family

ID=58484372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621143365.0U Expired - Fee Related CN206090652U (zh) 2016-10-21 2016-10-21 一种新型监测管下管装置

Country Status (1)

Country Link
CN (1) CN206090652U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138005A (zh) * 2018-08-30 2019-01-04 中建七局第四建筑有限公司 一种用于既有受荷工程基桩检测结构措施的施工工艺

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138005A (zh) * 2018-08-30 2019-01-04 中建七局第四建筑有限公司 一种用于既有受荷工程基桩检测结构措施的施工工艺
CN109138005B (zh) * 2018-08-30 2021-05-07 中建七局第四建筑有限公司 一种用于既有受荷工程基桩检测结构措施的施工工艺

Similar Documents

Publication Publication Date Title
CN104712143B (zh) 一种圆形钢筋混凝土烟囱筒壁倒模施工方法
CN204286365U (zh) 基坑侧壁位移监测装置
CN103469802A (zh) 组合式格构钢架喷锚支护方法及其支护结构
CN203716169U (zh) 便携式塔吊基础预埋模板
CN206090652U (zh) 一种新型监测管下管装置
CN205676882U (zh) 一种新型的支护结构
CN103196684A (zh) 结构试验全方位通用加载***
CN204001424U (zh) 超大管径组拼式树杈柱
CN104278677B (zh) 一种用于防渗墙槽段浇筑过程中固定导管的装置及方法
CN206345617U (zh) 一种内收建筑塔吊附着装置
CN205605114U (zh) 一种喀斯特岩溶地区预应力锚索钻孔装置
CN105863649A (zh) 一种地表微创地下空间暗挖的构筑技术
CN109141716B (zh) 一种综合管廊大断面矩形顶管施工管土接触压力测试方法
CN113338951B (zh) 快速隧道交叉口三台阶挑顶施工方法
CN202325542U (zh) 弱胶结未成砂岩斜井挑顶与隧道初支转换结构
CN107705689A (zh) 一种适用于土木、水利和海洋工程室内模型实验槽的土面平整装置
CN203475418U (zh) 一种辅助灌注桩护筒定位的支架
CN106245598A (zh) 平面闸门门槽埋件支承装置及门槽埋件安装方法
CN203684226U (zh) 一种改进后逆作钢管柱的垂直控制装置
CN207700198U (zh) 一种超前支撑支护结构
CN209669885U (zh) 一种水闸基坑开挖基坑侧壁连续支护结构
CN206887960U (zh) 一种基于冲击钻的测桩孔的障碍清理装置
CN207244634U (zh) 一种建筑基坑内外支撑结构
CN111827890A (zh) ***钻孔控制施工设备及其施工方法
CN206495218U (zh) 基坑支护结构

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412

Termination date: 20171021