CN206057307U - A kind of gas pumping laboratory simulation device - Google Patents

A kind of gas pumping laboratory simulation device Download PDF

Info

Publication number
CN206057307U
CN206057307U CN201620894700.4U CN201620894700U CN206057307U CN 206057307 U CN206057307 U CN 206057307U CN 201620894700 U CN201620894700 U CN 201620894700U CN 206057307 U CN206057307 U CN 206057307U
Authority
CN
China
Prior art keywords
gas
air inlet
valve
gas leakage
pumping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620894700.4U
Other languages
Chinese (zh)
Inventor
张天军
宋爽
李树刚
张超
包若羽
王乾
张磊
尚宏波
魏文伟
董晓刚
石涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201620894700.4U priority Critical patent/CN206057307U/en
Application granted granted Critical
Publication of CN206057307U publication Critical patent/CN206057307U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a kind of gas pumping laboratory simulation device, including lucite tube, gas handling system and extract system, one end of lucite tube is connected with the first plug, the other end of lucite tube is connected with the second plug, lucite tube is provided with air inlet, venthole and multiple gas leakage measured holes, gas leakage measurement pipe is connected with gas leakage measured hole, gas leakage controlled valve in gas leakage measurement pipe, is connected with;Gas handling system includes methane gas bottle, bumping bag, dilution valve, methane gas bottle switch valve, gas pressure regulating valve, first pressure table and air intake valve, air inlet sampling bag, air inlet sample cock and air inlet optics watt inspection instrument;Extract system includes the first vacuum pump, second pressure table, air suction sampling bag, air suction sampling valve and pumping optics watt inspection instrument.This utility model simple structure, novel in design rationally it is convenient to realize, is to develop mash gas pumping drilling Gas leak position detection means to provide the foundation, and practical, using effect is good, is easy to promote the use of.

Description

A kind of gas pumping laboratory simulation device
Technical field
This utility model belongs to coal mine gas drainage technical field, and in particular to a kind of gas pumping laboratory simulation dress Put.
Background technology
Coal bed gas extraction is to prevent and treat one of technical measures of coal and gas prominent, is at home and abroad obtained in projecting mine Extensive application is arrived.Coal bed gas extraction effect depends not only on coal-bed gas and generates and occurrence condition, and is decided by gas Extraction construction quality.Mine gas extraction amount is not up to standard mostly at present for China, traces it to its cause and does except coal-bed gas element task Not enough, the method choice that draws out methane it is improper outer, it is also one heavy that mash gas pumping drilling sealing of hole effect can not meet engine request Want reason, therefore sealing of hole effect and the key that quality testing is coal bed gas extraction.But, in prior art, also lack structure letter It is single, novel in design rationally, using easy to operate, practical mash gas pumping drilling Gas leak position detection means.And in order to grind Suitable mash gas pumping drilling Gas leak position detection means is made, is accomplished by first being studied in experiment interior, design is realized Coal mine gas extraction drill hole Gas leak position testing laboratory analog systemss, be extraction borehole axial gas migration law study, Rationally hole sealing depth and method for sealing, raising extraction efficient studies provide theoretical and realistic basis, are that gas pumping provides safeguard; And when laboratory design realizes coal mine gas extraction drill hole Gas leak position testing laboratory's analog systemss, first have to design and realize Gas pumping laboratory simulation device, in prior art, also lack simple structure, it is novel in design rationally, using easy to operate, real With the strong gas pumping laboratory that can be used in coal mine gas extraction drill hole Gas leak position testing laboratory analog systemss of property Analog.
Utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, there is provided a kind of gas Extraction laboratory simulation device, its simple structure, novel in design rationally it is convenient to realize, is to develop mash gas pumping drilling gas leakage position Put detection means to provide the foundation, practical, using effect is good, is easy to promote the use of.
To solve above-mentioned technical problem, the technical solution adopted in the utility model is:A kind of gas pumping laboratory simulation Device, it is characterised in that:It is including for simulating lucite tube, gas handling system and the extract system of mash gas pumping drilling, described One end of lucite tube is connected with the first plug, and the other end of the lucite tube is connected with the second plug, described organic Part on glass tubing near the first plug is provided with air inlet, arranges near the part of the second plug on the lucite tube There is venthole, the part being located between air inlet and venthole on the lucite tube is evenly arranged with multiple gas leakage measurements Hole, is connected with gas leakage measurement pipe, is connected with gas leakage controlled valve in the gas leakage measurement pipe on the gas leakage measured hole;It is described enter Gas system includes methane gas bottle and bumping bag, and dilution valve is connected with the bumping bag, and the air inlet of the bumping bag leads to The gas outlet that the first air inlet pipe is crossed with methane gas bottle is connected, and is connected with methane gas bottle on the gas outlet of the methane gas bottle Switch valve, be provided with gas pressure regulating valve, first pressure table and air intake valve in first air inlet pipe, the bumping bag goes out QI KOU is connected with air inlet by the second air inlet pipe, is connected with air inlet sampling by the 3rd air inlet pipe in second air inlet pipe Bag, is provided with air inlet sample cock, air inlet optics watt inspection instrument is connected with the air inlet sampling bag in the 3rd air inlet pipe;Institute Stating extract system includes the first vacuum pump, and the air inlet of first vacuum pump is connected with venthole by the first exhaust tube, institute State and on the first exhaust tube, be provided with second pressure table, the gas outlet of first vacuum pump is connected with pumping by the second exhaust tube Sampling bag, is provided with air suction sampling valve on second exhaust tube, pumping optics watt inspection is connected with the air suction sampling bag Instrument.
A kind of above-mentioned gas pumping laboratory simulation device, it is characterised in that:The quantity of the gas leakage measured hole is six Individual, the quantity of the corresponding gas leakage measurement pipe and gas leakage controlled valve is six.
This utility model has advantages below compared with prior art:
1st, simple structure of the present utility model, novel in design reasonable, it is convenient to realize.
2nd, this utility model can be provided to study coal mine gas extraction drill hole Gas leak position testing laboratory analog systemss Gas pumping laboratory simulation device, by the device, coordinates mash gas pumping drilling Gas leak position testing laboratory analog The simulation of coal mine gas extraction drill hole Gas leak position testing laboratory is carried out, negative pressure shape can be detected by way of laboratory simulation Gas density, extraction negative pressure under state in extraction borehole at different depth etc., can be the axial gas migration rule of extraction borehole Rule research, reasonable hole sealing depth and method for sealing research provide theoretical and realistic basis.
3rd, this utility model can be used in design realize coal mine gas extraction drill hole Gas leak position testing laboratory simulation system System, designs the coal mine gas extraction drill hole Gas leak position testing laboratory analog systemss realized, can effectively verify gas pumping The effectiveness of drilling Gas leak position detection means, effectively can be directed to the gas leakage situation after down-hole drilling sealing of hole and be examined Survey, gas leakage detection is carried out to positions such as hole sealing tube, sealing of hole sections, coalmass crevasses, effective Gas leak position judges to can determine rationally Hole sealing depth, optimizes hole-sealing technology.
4th, this utility model can truly simulate coal mine gas drainage process, be to develop the inspection of mash gas pumping drilling Gas leak position Survey device to provide the foundation, practical, using effect is good, is easy to promote the use of.
In sum, simple structure of the present utility model, novel in design rationally it is convenient to realize, is to develop gas pumping to bore Hole Gas leak position detection means provides the foundation, practical, and using effect is good, is easy to promote the use of.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
Description of reference numerals:
1-lucite tube;2-air inlet;3-gas leakage measured hole;
4-venthole;5-1-the first plug;5-2-the second plug;
6-methane gas bottle;7-the first air inlet pipe;8-first pressure table;
9-air intake valve;10-bumping bag;11-dilution valve;
12-air inlet sample cock;13-air inlet optics watt inspection instrument;14-air inlet sampling bag;
15-second pressure table;16-the first exhaust tube;17-the first vacuum pump;
18-gas leakage measurement pipe;19-air suction sampling valve;20-air suction sampling bag;
21-pumping optics watt inspection instrument;22-gas leakage controlled valve;23-the second air inlet pipe;
24-the three air inlet pipe;25-the second exhaust tube;26-methane gas bottle switch valve;
27-gas pressure regulating valve.
Specific embodiment
As shown in figure 1, gas pumping laboratory simulation device of the present utility model, including for simulating mash gas pumping drilling Lucite tube 1, gas handling system and extract system, one end of the lucite tube 1 is connected with the first plug 5-1, described The other end of lucite tube 1 is connected with the second plug 5-2, and the part on the lucite tube 1 near the first plug 5-1 sets Air inlet 2 is equipped with, the part on the lucite tube 1 near the second plug 5-2 is provided with venthole 4, the lucite The part being located between air inlet 2 and venthole 4 on pipe 1 is evenly arranged with multiple gas leakage measured holes 3, the gas leakage measured hole 3 On be connected with gas leakage measurement pipe 18, be connected with gas leakage controlled valve 22 in the gas leakage measurement pipe 18;The gas handling system includes Methane gas bottle 6 and bumping bag 10, are connected with dilution valve 11 on the bumping bag 10, the air inlet of the bumping bag 10 passes through First air inlet pipe 7 is connected with the gas outlet of methane gas bottle 6, is connected with methane gas on the gas outlet of the methane gas bottle 6 Bottle switch valve 26, is provided with gas pressure regulating valve 27, first pressure table 8 and air intake valve 9 in first air inlet pipe 7, described The gas outlet of bumping bag 10 is connected with air inlet 2 by the second air inlet pipe 23, passes through the 3rd air inlet in second air inlet pipe 23 Pipe 24 is connected with air inlet sampling bag 14, and air inlet sample cock 12, the air inlet sampling bag are provided with the 3rd air inlet pipe 24 Air inlet optics watt inspection instrument 13 is connected with 14;The extract system includes the first vacuum pump 17, and first vacuum pump 17 enters QI KOU is connected with venthole 4 by the first exhaust tube 16, is provided with second pressure table 15 on first exhaust tube 16, and described The gas outlet of one vacuum pump 17 is connected with air suction sampling bag 20 by the second exhaust tube 25, is provided with second exhaust tube 25 Air suction sampling valve 19, is connected with pumping optics watt inspection instrument 21 on the air suction sampling bag 20.
In the present embodiment, the quantity of the gas leakage measured hole 3 is six, and the corresponding gas leakage measurement pipe 18 and gas leakage are switched The quantity of valve 22 is six.As shown in figure 1, six gas leakage measured holes 3 are respectively gas leakage measured hole A1, gas leakage measurement Hole A2, gas leakage measured hole A3, gas leakage measured hole A4, gas leakage measured hole A5 and gas leakage measured hole A6.
Adopt this utility model to carry out the process of coal mine gas drainage laboratory simulation for:
Step one, evacuation is carried out to lucite tube 1, detailed process is:Keep multiple gas leakage controlled valves 22, dilution Valve 11, air intake valve 9 and air inlet sample cock 12 are closed mode, open air suction sampling valve 19, the first vacuum pump 17 Start, evacuation is carried out to lucite tube 1, the pressure in 15 pairs of the first exhaust tubes 16 of the second pressure table is examined in real time Survey and show, when pressure reaches the negative threshold of evacuation, close air suction sampling valve 19, close the first vacuum pump 17, the One vacuum pump 17 stops evacuation, and the pressure that now second pressure table 15 shows is designated as F0
Methane gas are poured in step 2, past lucite tube 1, detailed process is:Methane gas bottle switch valve 26 is opened, And gas pressure regulating valve 27 is opened, the methane gas pressure of output in methane gas bottle 6 is adjusted, 8 pairs, first pressure table Real-time detection is carried out into the methane gas pressure in the first air inlet pipe 7 and is shown, when methane gas pressure and atmospheric pressure phase Deng after, air intake valve 9, dilution valve 11 and air inlet sample cock 12 are opened, the methane gas of output pass through in methane gas bottle 6 First air inlet pipe 7 enters bumping bag 10, mixes with the air entered in bumping bag 10 by diluting valve 11, obtains methane gas To dilution, the methane gas after dilution pass through the second air inlet pipe 23 and air inlet 2 is entered in lucite tube 1, air inlet optics watt Inspection instrument 13 carries out real-time detection and shows to gas density, in the first exhaust tube 16 detected up to the second pressure table 15 Pressure stability, the pressure that now second pressure table 15 shows is designated as into F1, and now air inlet optics watt inspection instrument 13 is detected Gas density recorded;
Gas density during the normal extraction of step 3, gas is determined, and detailed process is:Keep air intake valve 9, dilution Valve 11 and air inlet sample cock 12 are open mode, open air suction sampling valve 19, and start the first vacuum pump 17, to having Machine glass tubing 1 carries out gas pumping, simulates the process of coal mine gas drainage, the pressure in 15 pairs of the first exhaust tubes 16 of second pressure table Power carries out real-time detection and shows, pumping optics watt inspection instrument 21 carries out real-time detection and shows to gas density, works as second pressure When the pressure that table 15 shows reaches the pressure threshold of gas pumping, the pressure that now second pressure table 15 shows is designated as into F2, and The gas density detected to being now evacuated optics watt inspection instrument 21 is recorded.
The above, is only preferred embodiment of the present utility model, not this utility model is imposed any restrictions, every Any simple modification, change and equivalent structure change above example made according to this utility model technical spirit, still Belong in the protection domain of technical solutions of the utility model.

Claims (2)

1. a kind of gas pumping laboratory simulation device, it is characterised in that:Including for simulating organic glass of mash gas pumping drilling Glass pipe (1), gas handling system and extract system, one end of the lucite tube (1) are connected with the first plug (5-1), described to have The other end of machine glass tubing (1) is connected with the second plug (5-2), near the first plug (5-1) on the lucite tube (1) Part is provided with air inlet (2), and the part on the lucite tube (1) near the second plug (5-2) is provided with venthole (4) part, being located between air inlet (2) and venthole (4) on the lucite tube (1) is evenly arranged with multiple gas leakage and surveys Metering-orifice (3), is connected with gas leakage measurement pipe (18), is connected with Lou on the gas leakage measurement pipe (18) on the gas leakage measured hole (3) Air cock valve (22);The gas handling system includes methane gas bottle (6) and bumping bag (10), connects on the bumping bag (10) There is dilution valve (11), the air inlet of the bumping bag (10) is by the first air inlet pipe (7) and the gas outlet of methane gas bottle (6) Connection, is connected with methane gas bottle switch valve (26), first air inlet pipe (7) on the gas outlet of the methane gas bottle (6) On be provided with gas pressure regulating valve (27), first pressure table (8) and air intake valve (9), the gas outlet of the bumping bag (10) leads to Cross the second air inlet pipe (23) to be connected with air inlet (2), be connected with by the 3rd air inlet pipe (24) on second air inlet pipe (23) Air inlet sampling bag (14), is provided with air inlet sample cock (12), the air inlet sampling bag (14) on the 3rd air inlet pipe (24) On be connected with air inlet optics watt inspection instrument (13);The extract system includes the first vacuum pump (17), first vacuum pump (17) Air inlet be connected with venthole (4) by the first exhaust tube (16), be provided with second pressure on first exhaust tube (16) Table (15), the gas outlet of first vacuum pump (17) are connected with air suction sampling bag (20) by the second exhaust tube (25), described Air suction sampling valve (19) is provided with second exhaust tube (25), pumping optics watt inspection on the air suction sampling bag (20), is connected with Instrument (21).
2. according to a kind of gas pumping laboratory simulation device described in claim 1, it is characterised in that:The gas leakage measured hole (3) quantity is six, and the quantity of the corresponding gas leakage measurement pipe (18) and gas leakage controlled valve (22) is six.
CN201620894700.4U 2016-08-17 2016-08-17 A kind of gas pumping laboratory simulation device Expired - Fee Related CN206057307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620894700.4U CN206057307U (en) 2016-08-17 2016-08-17 A kind of gas pumping laboratory simulation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620894700.4U CN206057307U (en) 2016-08-17 2016-08-17 A kind of gas pumping laboratory simulation device

Publications (1)

Publication Number Publication Date
CN206057307U true CN206057307U (en) 2017-03-29

Family

ID=58380867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620894700.4U Expired - Fee Related CN206057307U (en) 2016-08-17 2016-08-17 A kind of gas pumping laboratory simulation device

Country Status (1)

Country Link
CN (1) CN206057307U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942030A (en) * 2017-12-18 2018-04-20 河南理工大学 A kind of biaxial loadings gas pumping gas leakage analogue experiment installation and method
CN112945862A (en) * 2021-02-01 2021-06-11 重庆梅安森科技股份有限公司 Handheld terminal of patrolling and examining of colliery gas

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942030A (en) * 2017-12-18 2018-04-20 河南理工大学 A kind of biaxial loadings gas pumping gas leakage analogue experiment installation and method
CN112945862A (en) * 2021-02-01 2021-06-11 重庆梅安森科技股份有限公司 Handheld terminal of patrolling and examining of colliery gas
CN112945862B (en) * 2021-02-01 2023-02-28 重庆梅安森科技股份有限公司 Handheld terminal of patrolling and examining of colliery gas

Similar Documents

Publication Publication Date Title
CN206292074U (en) A kind of piston drawing-in type ground water fixed depth harvester
CN205670146U (en) A kind of Fractured Gas Reservoir working solution damage appraisement device of simulation stratum condition
CN103411868A (en) Measuring method for coal seam gas permeability coefficient
CN106057061B (en) Coal mine gas extraction drill hole Gas leak position testing laboratory's simulation system and method
CN106248555B (en) A kind of clamper for measuring full-hole core permeability anisotropy
CN205477605U (en) Crack - matrix coupling of simulated formation condition is flowed and is harmd evaluation device
CN204154541U (en) Groundwater sampling device
CN206057307U (en) A kind of gas pumping laboratory simulation device
CN203904966U (en) Rapid water sampling device pressed with cone penetration device
CN206057308U (en) A kind of coal mine gas extraction drill hole Gas leak position testing laboratory analog
CN206479368U (en) A kind of underground water detects sampler
CN102706768A (en) Gas desorption instrument
CN108222926A (en) Relief well kill-job analogue experiment installation and method
CN106370789A (en) Simulation device and method for testing contamination degree of coal reservoir in drilling process
CN106872651A (en) The experimental rig and analogy method of a kind of enhanced underground heat exploitation simulation
CN205895225U (en) Gas drainage drilling gas leakage position detecting device
CN108732329A (en) A kind of determination of coal seam gas pressure analog simulation experimental device and method
CN110441221A (en) Full diameter shale core ring packing cabin clamping device and measurement technique
CN207379769U (en) A kind of soil liquid self-cleaning sampler
CN106501156B (en) Scene determines the outer tube drawdown double-tube method of outer tube aquiclude hydrogeological parameter
CN210604056U (en) Soil gas acquisition and detection device
CN205778845U (en) A kind of downhole annulus pressure analogue experiment installation
CN106680175B (en) Scene determines the outer tube drawdown double-tube method of inner tube aquiclude hydrogeological parameter
CN206190279U (en) Simulation boring test platform
CN202710434U (en) Gas desorption instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20170817