CN206053328U - A kind of middle buried water stop fixing device - Google Patents

A kind of middle buried water stop fixing device Download PDF

Info

Publication number
CN206053328U
CN206053328U CN201620833514.XU CN201620833514U CN206053328U CN 206053328 U CN206053328 U CN 206053328U CN 201620833514 U CN201620833514 U CN 201620833514U CN 206053328 U CN206053328 U CN 206053328U
Authority
CN
China
Prior art keywords
upper die
fastening band
die plate
support column
rubber fastening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620833514.XU
Other languages
Chinese (zh)
Inventor
张具林
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201620833514.XU priority Critical patent/CN206053328U/en
Application granted granted Critical
Publication of CN206053328U publication Critical patent/CN206053328U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of middle buried water stop fixing device, including support column, base plate, two Screw arbor with nut at both-ends, support flitch, upper die plate and lower templates;Support column is vertically installed on base plate;It is parallel on the support columns to be provided with two pieces of clamping plates for clamping rubber fastening band;Two Screw arbor with nut at both-ends are separately mounted to support column on upper die plate and lower template;Upper die plate and lower template are vertically installed at the both sides up and down of rubber fastening band respectively;Flitch is supported to support installed between support column and upper die plate and lower template.The rubber fastening band fixing device can carry out clamping position to rubber fastening band, and in preventing concreting process, rubber fastening band is shifted over, while also without compromising on rubber fastening band, with preferable application effect.

Description

A kind of middle buried water stop fixing device
Technical field
This utility model is related to a kind of waterstop fixing device, it is especially a kind of in buried rubber fastening band fixed dress Put.
Background technology
In buried rubber fastening band is a large amount of in architectural engineering, commonly use, particularly after architectural engineering advanced water-stopping Pour and have extensive utilization in water structures with what position, new and old building thing were connected position and industrial building;In buried rubber (Steel plate)Waterstop mainly solves the problems, such as three aspects:First is to solve the problems, such as that structure one-off construction is long(Pour after i.e. Band problem);Second is to solve the problems, such as that adjacent structure sedimentation is different;3rd is to solve the problems, such as structurally waterproof.
For a long time, the buried rubber in(Steel plate)The construction fixing meanss of waterstop, neither one unification, effectively Method, both can guarantee that rubber fastening band fixation, it is impossible to damage rubber fastening band in the formwork reinforcement at this position(Such as ferrum Follow closely fixed etc.), can guarantee that in concreting process rubber fastening band is not shifted again.
And if in construction rubber(Steel plate)Waterstop is not constructed, then this position easily occurs percolating water phenomenon, and And its seepage is difficult radical cure.
Utility model content
Utility model purpose:There is provided one kind can be to rubber(Steel plate)Waterstop is fixed, it is ensured that concreting Rubber fastening band is guaranteed in journey(Steel plate)Do not shift.
Technical scheme:Middle buried water stop fixing device described in the utility model, including support column, base plate, two it is right Draw screw rod, support flitch, upper die plate and lower template;Support column is vertically installed on base plate;It is parallel on the support columns to be provided with two Block is used for the clamping plate for clamping rubber fastening band;Two Screw arbor with nut at both-ends are separately mounted to support column on upper die plate and lower template;On Template and lower template are vertically installed at the both sides up and down of rubber fastening band respectively;Flitch is supported to support installed in support column and upper mould Between plate and lower template.
The clamping position of rubber fastening band is completed using upper die plate and lower template and two clamping plates collective effect, prevents from mixing In solidifying soil casting process, rubber fastening band is shifted over;The stability of support column can effectively be strengthened using base plate, construction is prevented During occur it is crooked.
Used as further limits scheme of the present utility model, upper die plate and lower template are perpendicular with Screw arbor with nut at both-ends.This sets Meter guarantees the perpendicularity of upper die plate and lower template, it is ensured that facade effect.
As further limits scheme of the present utility model, the rubber in the middle part of upper die plate and lower template and rubber fastening band The end of reinforcing ring contact is equipped with a slope;Slope is cylindrical tangent with rubber reinforcing ring.Designed using slope Can be bonded to each other with the rubber reinforcing ring in the middle of rubber fastening band tight, and without compromising on rubber fastening band.
Compared with prior art, its advantage is this utility model:(1)Using upper die plate and lower template and two pieces of folders Plate collective effect completes the clamping position of rubber fastening band, and in preventing concreting process, rubber fastening band is shifted over;(2) The stability of support column can effectively be strengthened using base plate, occurred in preventing work progress crooked;(3)Energy is designed using slope Rubber reinforcing ring in the middle of enough and rubber fastening band is bonded to each other tight, and without compromising on rubber fastening band.
Description of the drawings
Fig. 1 is side structure schematic diagram of the present utility model.
In figure:1st, support column, 2, base plate, 3, clamping plate, 4, Screw arbor with nut at both-ends, 5, support flitch, 6, rubber fastening band, 7, upper mould Plate, 8, lower template, 9, rubber reinforcing ring, 10, slope.
Specific embodiment
Below in conjunction with the accompanying drawings technical solutions of the utility model are described in detail, but protection domain of the present utility model It is not limited to the embodiment.
Embodiment 1:
As shown in figure 1, middle buried water stop fixing device of the present utility model includes:Support column 1, base plate 2, two are to drawing Screw rod 4, several support flitch 5, upper die plate 7 and lower templates 8.
Wherein, support column 1 is vertically-mounted on a base plate 2;It is parallel on support column 1 to be provided with two pieces for clamping rubber water-proof With 6 clamping plate 3;Two Screw arbor with nut at both-ends 4 are separately mounted to support column 1 on upper die plate 7 and lower template 8;Upper die plate 7 and lower template 8 both sides up and down for being vertically installed at rubber fastening band 6 respectively;Support flitch 5 support installed in support column 1 and upper die plate 7 and Between lower template 8;Upper die plate 7 and lower template 8 are perpendicular with Screw arbor with nut at both-ends 4;In upper die plate 7 and lower template 8 and rubber water-proof The end contacted with the rubber reinforcing ring 9 in the middle part of in the of 6 is equipped with a slope 10;Slope 10 is cylindrical with rubber reinforcing ring 9 It is tangent.
Middle buried water stop fixing device of the present utility model is needed long according to the construction of rubber fastening band 6 in construction Fixing device of the degree using corresponding number, adjacent fixation devices are spaced between 1 ~ 2m;Upper die plate 7 needs to be higher by structural plane 150mm, so as to prevent trickling to beyond template on waterstop in structure base slab concreting process, in case pollution and cleaning are tired It is difficult;Screw arbor with nut at both-ends 4 can be using being welded and fixed with the upper and lower cage bar of the structural slab in left side after passing through upper die plate 7 or lower template 8; In order to ensure that the rubber fastening band 6 for being reserved in outside is not damaged during formwork reinforcement, using two-stage flitch transition, three-level wood The method of Fang Jiagu;Support not of uniform size, the quantity of flitch 5 not to limit, can according to support column 1 and upper die plate 7 and lower template 8 it Between distance selected, it is ensured that it is stable between support column 1 and upper die plate 7 and lower template 8 to support.
As described above, although this utility model has been represented and described with reference to specific preferred embodiment, which must not It is construed to the restriction to this utility model itself.In the spirit and scope of the present utility model defined without departing from claims Under the premise of, can various changes can be made in the form and details to which.

Claims (3)

1. a kind of middle buried water stop fixing device, it is characterised in that:Including support column(1), base plate(2), two pieces Screw arbor with nut at both-ends (4), support flitch(5), upper die plate(7)And lower template(8);Support column(1)It is vertically installed at base plate(2)On;In support column (1)It is above parallel to be provided with two pieces for clamping rubber fastening band(6)Clamping plate(3);Two Screw arbor with nut at both-ends(4)By support column(1)Point An Zhuan not upper die plate(7)And lower template(8)On;Upper die plate(7)And lower template(8)Rubber fastening band is vertically installed at respectively (6)Both sides up and down;Support flitch(5)Support installed in support column(1)With upper die plate(7)And lower template(8)Between.
2. middle buried water stop fixing device according to claim 1, it is characterised in that:Upper die plate(7)And lower template(8) And Screw arbor with nut at both-ends(4)It is perpendicular.
3. middle buried water stop fixing device according to claim 1 and 2, it is characterised in that:In upper die plate(7)With lower mould Plate(8)With rubber fastening band(6)The rubber reinforcing ring at middle part(9)The end of contact is equipped with a slope(10);Slope (10)With rubber reinforcing ring(9)It is cylindrical tangent.
CN201620833514.XU 2016-08-02 2016-08-02 A kind of middle buried water stop fixing device Active CN206053328U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620833514.XU CN206053328U (en) 2016-08-02 2016-08-02 A kind of middle buried water stop fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620833514.XU CN206053328U (en) 2016-08-02 2016-08-02 A kind of middle buried water stop fixing device

Publications (1)

Publication Number Publication Date
CN206053328U true CN206053328U (en) 2017-03-29

Family

ID=58379742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620833514.XU Active CN206053328U (en) 2016-08-02 2016-08-02 A kind of middle buried water stop fixing device

Country Status (1)

Country Link
CN (1) CN206053328U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372133A (en) * 2018-12-04 2019-02-22 中国核工业华兴建设有限公司 In buried rubber fastening band positioning construction method is installed
CN109594662A (en) * 2019-01-16 2019-04-09 中建八局第建设有限公司 A kind of middle buried water stop fixing means and its grip device
CN110499781A (en) * 2019-09-12 2019-11-26 成都交投建筑工业化有限公司 Electric power piping lane tube coupling sealing section molding die and electric power piping lane tube coupling forming method
CN110952494A (en) * 2019-11-28 2020-04-03 中国水利水电第五工程局有限公司 Mixed double-water-stop formwork and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372133A (en) * 2018-12-04 2019-02-22 中国核工业华兴建设有限公司 In buried rubber fastening band positioning construction method is installed
CN109594662A (en) * 2019-01-16 2019-04-09 中建八局第建设有限公司 A kind of middle buried water stop fixing means and its grip device
CN109594662B (en) * 2019-01-16 2024-01-30 中建八局第一建设有限公司 Method for fixing embedded water stop and clamp device thereof
CN110499781A (en) * 2019-09-12 2019-11-26 成都交投建筑工业化有限公司 Electric power piping lane tube coupling sealing section molding die and electric power piping lane tube coupling forming method
CN110952494A (en) * 2019-11-28 2020-04-03 中国水利水电第五工程局有限公司 Mixed double-water-stop formwork and construction method thereof
CN110952494B (en) * 2019-11-28 2021-07-20 中国水利水电第五工程局有限公司 Mixed double-water-stop formwork and construction method thereof

Similar Documents

Publication Publication Date Title
CN206053328U (en) A kind of middle buried water stop fixing device
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN205100120U (en) Bury mounting structure of formula waterstop in box culvert
CN204982970U (en) Mould is fixed to bottom plate steel limit rubber waterstop
CN207794605U (en) The positioning protection device of deformation joint rubber fastening band when concreting
CN205604290U (en) Frame energy dissipation formula of turning up utility tunnel structure
CN203613797U (en) Bottom plate post-pouring belt template provided with water-stopping steel plates
CN205531326U (en) L type dysmorphism post template
CN106381883B (en) Bar Seepage method through walls
CN203113371U (en) Concrete foundation pillar top structure with steel plate embedded parts
CN203334661U (en) Scaffold-hole-free formwork construction device for brick-concrete structure construction column
CN201972395U (en) Steel-frame double-layer-net building template
CN207131070U (en) A kind of Concrete Double wall formwork support process improves construction
CN205604289U (en) Can resist single storehouse underground pipe gallery of large deformation
CN203403434U (en) Basement
CN204645615U (en) Top board rubber watertight strip fixed mould
CN206956795U (en) Concrete prefabricated aproll
CN201276843Y (en) Internal corner adapter for wall beam template
CN108532631A (en) Formwork reinforcement structure and construction method at a kind of underground pipe gallery horizontal construction joint
CN203213022U (en) Mobile temporary prestress tensioning anchor block
CN206418776U (en) A kind of slab thickness controls prefabricated components
CN203393536U (en) Road side ditch
CN206859263U (en) A kind of large formwork construction device of subway station side wall
CN206457821U (en) A kind of domatic building concrete layer landslide-proofing fixing device
CN207419781U (en) A kind of T shaped steels pipe bundle combinations welding structure device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant