CN206052746U - A kind of deep basal pit explosion discharge structure - Google Patents
A kind of deep basal pit explosion discharge structure Download PDFInfo
- Publication number
- CN206052746U CN206052746U CN201620916131.9U CN201620916131U CN206052746U CN 206052746 U CN206052746 U CN 206052746U CN 201620916131 U CN201620916131 U CN 201620916131U CN 206052746 U CN206052746 U CN 206052746U
- Authority
- CN
- China
- Prior art keywords
- foundation ditch
- drainage trench
- precipitation pipe
- pipe well
- discharge structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model discloses a kind of deep basal pit explosion discharge structure, including building is in the ground-connecting-wall of foundation ditch surrounding and sets in the precipitation pipe well of bottom of foundation ditch, blast hole and drainage trench, the drainage trench is connected with the precipitation pipe well, in the precipitation pipe well is provided with dewatering pump.This utility model is by using the structure that drainage trench is arranged in bottom of foundation ditch, using drainage trench by foundation ditch due to the reasons such as explosion formed Bedrock Crevice Water drain in dewatering well, it is pumped to outside foundation ditch using the dewatering pump in dewatering well, the Bedrock Crevice Water white-out that effectively foundation ditch explosion can be formed is clean, reaches expected dewatering effect.
Description
Technical field
This utility model is related to a kind of deep basal pit explosion discharge structure, is mainly used in railway traffic engineering and building construction
Deep basal pit substrate blasting engineering draining.
Background technology
The draining of current track traffic engineering and building construction deep basal pit blasting engineering is mainly carried out using dewatering well, precipitation
Well is to ensure one of measure of foundation ditch smooth construction.As basement rock can be shattered by foundation ditch explosion, various cracks are formed, causes basement rock
Crevice water is oozed out from crack, and traditional tube well dewatering pipe well effect is poor, it is impossible to the subsoil water in timely white-out foundation ditch.
The content of the invention
This utility model provides a kind of deep basal pit explosion discharge structure to solve technical problem present in known technology,
The Bedrock Crevice Water white-out that foundation ditch explosion effectively can be formed by the structure is clean, reaches expected dewatering effect.
This utility model is adopted the technical scheme that by solving technical problem present in known technology:A kind of deep basal pit
Explosion discharge structure, including building foundation ditch surrounding ground-connecting-wall and set the precipitation pipe well of bottom of foundation ditch, blast hole and
Drainage trench, the drainage trench are connected with the precipitation pipe well, in the precipitation pipe well are provided with dewatering pump.
Metalling or coarse sands layer are equipped with the drainage trench.
The drainage trench is connected between two precipitation pipe wells.
The depth of the drainage trench is not more than 20cm, and width is less than 20cm.
The diameter of the precipitation pipe well is not less than 315mm.
This utility model has the advantages and positive effects that:By adopting the structure that drainage trench is arranged in bottom of foundation ditch,
Using drainage trench by foundation ditch due to the reasons such as explosion formed Bedrock Crevice Water drain in dewatering well, using in dewatering well
Dewatering pump is pumped to outside foundation ditch, and the Bedrock Crevice Water white-out that effectively can be formed foundation ditch explosion is clean, is reached expected
Dewatering effect.
Description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:1st, ground-connecting-wall;2nd, dewatering pump;3rd, precipitation pipe well;4th, blast hole;5th, drainage trench.
Specific embodiment
For the content of the invention of the present utility model, feature and effect can be further appreciated that, following examples are hereby enumerated, and is coordinated
Accompanying drawing describes in detail as follows:
Fig. 1, a kind of deep basal pit explosion discharge structure, including building are referred in the ground-connecting-wall 1 of foundation ditch surrounding and is set
Precipitation pipe well 3, blast hole 4 and drainage trench 5 in bottom of foundation ditch, the drainage trench 5 is connected with the precipitation pipe well 3, described
Dewatering pump 2 is provided with precipitation pipe well 3.
In the present embodiment, metalling is equipped with the drainage trench 5, it is also possible to lay in the drainage trench 5 thick
The larger material layer of layer of sand or other permeabilitys.The drainage trench 5 is connected between two precipitation pipe wells 3, but is not limited to
In this, drainage trench 5 can connect everywhere, or part connection with the connection of precipitation pipe well, can be according to bedrock fracture
Water practical situation determines.The depth of the drainage trench 5 is not more than 20cm, and width is less than 20cm.The diameter of the precipitation pipe well 3
Not less than 315mm.
The construction method of above-mentioned discharge structure:
1) on ground first according to design requirement construction ground-connecting-wall 1 and precipitation pipe well 3, it is ensured that ground-connecting-wall 1 and precipitation pipe well 3 hang down
Straight degree and building-in depth meet requirement.
2) treat that excavation of foundation pit, to the rock basal plane for wanting explosion, sets blast hole 4 at hole bottom with rig.
3) drainage trench 5 is excavated in the position for having Bedrock Crevice Water after the completion of to be blasted, and rubble is laid on drainage trench
Or the material layer that other permeabilitys are larger.
4) by outside the foundation ditch of the Bedrock Crevice Water pump drainage being pooled in precipitation pipe well 3 by drainage trench 5.
Although being described to preferred embodiment of the present utility model above in conjunction with accompanying drawing, this utility model is not
Above-mentioned specific embodiment is confined to, above-mentioned specific embodiment is only schematic, is not restricted, ability
The those of ordinary skill in domain under enlightenment of the present utility model, without departing from this utility model objective and claimed
In the case of scope, many forms can also be made, these are belonged within protection domain of the present utility model.
Claims (5)
1. a kind of deep basal pit explosion discharge structure, it is characterised in that including building is in the ground-connecting-wall of foundation ditch surrounding and sets
The precipitation pipe well of bottom of foundation ditch, blast hole and drainage trench, the drainage trench is connected with the precipitation pipe well, in the precipitation pipe well
Dewatering pump is provided with inside.
2. deep basal pit explosion discharge structure according to claim 1, it is characterised in that be equipped with broken in the drainage trench
Rock layers or coarse sands layer.
3. deep basal pit explosion discharge structure according to claim 1, it is characterised in that the drainage trench is connected to two institutes
State between precipitation pipe well.
4. deep basal pit explosion discharge structure according to claim 1, it is characterised in that the depth of the drainage trench is not more than
20cm, width are less than 20cm.
5. deep basal pit explosion discharge structure according to claim 1, it is characterised in that the diameter of the precipitation pipe well is not little
In 315mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620916131.9U CN206052746U (en) | 2016-08-19 | 2016-08-19 | A kind of deep basal pit explosion discharge structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620916131.9U CN206052746U (en) | 2016-08-19 | 2016-08-19 | A kind of deep basal pit explosion discharge structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206052746U true CN206052746U (en) | 2017-03-29 |
Family
ID=58383483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620916131.9U Expired - Fee Related CN206052746U (en) | 2016-08-19 | 2016-08-19 | A kind of deep basal pit explosion discharge structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206052746U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110864593A (en) * | 2019-11-21 | 2020-03-06 | 上海市基础工程集团有限公司 | Earth-rock combined foundation pit and stone blasting excavation construction method |
-
2016
- 2016-08-19 CN CN201620916131.9U patent/CN206052746U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110864593A (en) * | 2019-11-21 | 2020-03-06 | 上海市基础工程集团有限公司 | Earth-rock combined foundation pit and stone blasting excavation construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207048739U (en) | A kind of low gaseous mine gas ground extraction technology drilled well bore structure | |
CN103953386B (en) | Upstream-blocking and downstream-seepage method for extracting gas in mining area | |
CN104453913A (en) | Vertical shaft working face ahead pre-grouting method | |
CN109026010B (en) | A kind of mine seepage well slip casting type sinking shaft construction method | |
CN103046931B (en) | Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode | |
CN104631438B (en) | Long auger guncreting uplift pile construction method | |
CN103114609B (en) | Newly, the linkage of old diaphragm wall and construction method | |
CN105804754B (en) | A kind of coal seam is Main aquifer pitshaft method for uncovering coal | |
CN112746849B (en) | Shaft water-carrying digging and building method | |
CN108222944A (en) | A kind of improved drop shaft sinking driving shaft construction method | |
CN102926392A (en) | Foundation pit dewatering system and construction method thereof | |
CN107816051A (en) | Pressure-bearing property phreatic aquifer deep basal pit combination well dewatering construction method | |
CN207143981U (en) | 3rd is rich water half diagenesis Sandstone Section Metro station excavation discharge structure | |
CN107620581A (en) | The construction method of the dual-purpose mine shaft inspection hole of one well | |
CN104775438B (en) | The method of tower position foundation pit construction in karst landform basis rainy season | |
CN108104814A (en) | High iron content underground reservoir is promoted restorative procedure by the artificial of Surface cracking | |
CN103343690B (en) | Construction method of shaft antiseep structure used when large section of inclined shaft passes through aquifer | |
CN206052746U (en) | A kind of deep basal pit explosion discharge structure | |
CN205152969U (en) | A precipitation tubular well structure for foundation ditch precipitation | |
CN209798792U (en) | open cut foundation pit deep silt layer vacuum dewatering system | |
CN204311464U (en) | A kind of foundation pit dewatering constructing structure | |
CN102979105A (en) | Underground water control method of wellhole grouting and seepage insulation | |
CN207048742U (en) | A kind of drilled well bore structure for weakening coal seam tight roof | |
CN202881962U (en) | Foundation pit dewatering structure | |
CN105064384B (en) | Vacuum tube well precipitation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 Termination date: 20210819 |
|
CF01 | Termination of patent right due to non-payment of annual fee |