CN206034275U - Steel anchor case - Google Patents

Steel anchor case Download PDF

Info

Publication number
CN206034275U
CN206034275U CN201621034854.2U CN201621034854U CN206034275U CN 206034275 U CN206034275 U CN 206034275U CN 201621034854 U CN201621034854 U CN 201621034854U CN 206034275 U CN206034275 U CN 206034275U
Authority
CN
China
Prior art keywords
steel anchor
bearing plate
steel
side panel
rear side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621034854.2U
Other languages
Chinese (zh)
Inventor
郑育林
杨益波
郭永伟
陈义
陈帅
李海元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201621034854.2U priority Critical patent/CN206034275U/en
Application granted granted Critical
Publication of CN206034275U publication Critical patent/CN206034275U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a steel anchor case, it includes a plurality of steel anchor festival section, a plurality of steel anchor festival section connects gradually from bottom to top and forms a steel anchor case, steel anchor festival section is including front side panel, rear side panel, left end portion bearing plate, right -hand member portion bearing plate, oblique sleeve and anchor slab, left end portion bearing plate and right -hand member portion bearing plate interval set up, and both ends are passed through around the left and right tip bearing plate front side panel and rear side panel are connected. The utility model provides a pair of steel anchor case, steel anchor case is bulky, the tonnage is big, and the simultaneous altitude is high to structural strength is big, the tensile can the reinforce, through the modularized design, each module forms holistic steel anchor case in the off -site back that completes in scene concatenation, and the construction is very convenient with the installation from this, and the efficiency of construction is higher.

Description

A kind of steel anchor box
Technical field
This utility model is related to technology for cable-stayed bridges field, more particularly, to a kind of steel anchor box of cable-stayed bridge.
Background technology
The anchor-hold section of Cable-stayed Bridge Pylon be by the concentration power of suspension cable safely, be delivered evenly to the important of king-post and receive Power component.In order to avoid tower wall concrete ftractures under the powerful concentration power effect of drag-line, anchoring of the usual drag-line on tower can Using steel anchor box or annular prestressed anchorage style.
And the anchor-hold mode of steel anchor box, it is made up of two kinds of different materials of steel and concrete, bears jointly drawing A kind of combinative structure of power, using steel construction intensity it is big, resistance to tension is strong the characteristics of bear drag-line horizontal pull.
Its Force principle is the horizontal pull of the drag-line for being anchored at steel anchor box two ends, by the horizontal steel plate of steel anchor box with And the vertical steel plate at two ends is balancing, the vertical force component of drag-line is passed to mixed by the WELDING STUDS on the vertical steel plate in steel anchor box two ends In solidifying soil king-post, as steel construction intensity is big, most of horizontal pull of drag-line can be born, the pulling force suffered by Concrete-filled steel tube compared with It is little therefore favourable to concrete pylon stress.Meanwhile, steel anchor box easy construction, efficiency of construction are high.
Utility model content
The purpose of this utility model is to provide a kind of steel anchor box, and the steel anchor box volume is big, tonnage big, while height is high, And structural strength is big, resistance to tension is strong, construct and install very convenient, efficiency of construction is higher.
For solution above-mentioned technical problem, a kind of steel anchor box that this utility model is provided, which includes several steel anchor sections, if A dry steel anchor sections is in turn connected to form a steel anchor box from bottom to top;
The steel anchor sections include front panel, rear side panel, left part bearing plate, right part bearing plate, oblique sleeve and Anchor slab;
The left part bearing plate and right part bearing plate interval setting, the rear and front end of left and right end bearing plate passes through The front panel and the connection of rear side panel;
The oblique sleeve oblique cutting is filled on the left and right end bearing plate, for drag-line is introduced steel anchor segmented interior;
Tiltedly sleeve is provided with the anchor slab for being fixedly connected stay wire end in one end of steel anchor segmented interior;
The gripper shoe for supporting the anchor slab is provided between anchor slab and end bearing plate.
Further, the steel anchor sections also includes top connecting plate and bottom connecting plate, two before and after top connecting plate End is connected with the top of the front panel and rear side panel respectively;The rear and front end of the bottom connecting plate respectively with it is described before The bottom connection of side panel and rear side panel.
Further, the front panel and rear side panel are H types, are respectively arranged with front panel and rear side panel Recess and lower recess, the top connecting plate and bottom connecting plate are U-shaped, are separately positioned in the upper notch and lower recess.
Further, shearing nail is provided with the lateral surface of the left part bearing plate and right part bearing plate.
Further, vertically arranged muscle is provided with the lateral surface of the left part bearing plate and right part bearing plate Plate, multiple gusset interval settings.
Further, shearing nail, vertical gusset and laterally is provided with the lateral surface of the front panel and rear side panel Gusset.
Further, the anchor slab upper surface is provided with backing plate.
Further, the steel anchor box includes the 2-15 steel anchor sections.
Further, the steel anchor box includes 9 steel anchor sections.
Further, the steel anchor segmental height is 2.8m~4.6m, and the weight of the steel anchor sections is 39.6-76.7 Ton.
Further, the steel anchor box is arranged on the Sarasota, is provided with embedded board at the top of Sarasota, is arranged on embedded board There is column, the steel anchor box is fixedly installed on the column.
Further, the column horizontal cross-section is " king " font.
Further, the steel anchor box is arranged on Sarasota, and outer wrap has concrete.
Further, the steel anchor sections segmented is spliced by two.
Further, it is described it is segmented including it is left segmentation and right segmentation, along the front panel and rear side panel it is vertical in Steel anchor sections is divided into left-right parts by line, and left and right two parts are then respectively the left segmentation and right segmentation.
A kind of installation method of above-mentioned steel anchor box, which specifically includes following steps:
Step 1:Each steel anchor sections is divided into into basic plate unit, piecemeal is made, each Slab element is carried out in factory Spelling, welding job;
Superelevation super large steel anchor sections is divided into left and right segmentation, is welded to form the steel anchor sections of one after transporting scene;
Step 2:Preassembling is carried out to steel anchor sections, by each steel anchor fragmented transport to engineering site after preassembling is qualified;
Step 3:Lifting is positioned and is welded and fixed the steel anchor sections successively from bottom to top.
Further, in the step 3, comprise the following steps that during lifting positioning:
1) Primary Location
Steel anchor sections starts to steel anchor sections mounting surface to belong to Primary Location from lifting;
During positioning, prior setting-out goes out datum line, and side on the basis of phase selection neighbour both sides, in benchmark line position stationary positioned steel plate, is made Steel plate is oriented to for lifting dropping place;
It is possible thereby to substantially reduce positioning time, priority condition is created to being subsequently accurately positioned;
2) it is accurately positioned
After the lower mouth contact of steel anchor sections is finished, four azimuths of interface on steel anchor sections are surveyed using total powerstation Amount, and measurement data is carried out recording, analyzed, by the use of jack, bottle gouard moved by hands as tool kit, four sides of interface in regulation The elevation of position and the coordinate figure in X/Y directions;
3), during precise positioning, using the surrounding for acting against steel anchor sections at the top of 4 jack, lean at the top of jack On the reinforcing bar of surrounding, 1 bottle gouard moved by hands is arranged in the base plate centre of steel anchor sections, with reserved steel bar phase in manhole Even;
4) anchor point coordinate measurement
After steel anchor sections positioning is finished, the equal thickness lumps of wood or horizon rule is laid in anchor point upper end, using sash weight method anchor Solid point is guided on the lumps of wood, sets up prism on the lumps of wood, and anchoring point height deducts anchor point to lumps of wood vertical dimension for actual measurement elevation;
5) angular coordinate and anchor point coordinate measurement
Anchor point detection carries out being welded and fixed steel anchor sections after finishing, after welding to steel anchor sections angle point and anchor point again Detected whether be subjected to displacement in observation steel anchor sections welding process;
6) measure again and check location data.
Further, in the step 3, when being welded and fixed the steel anchor segmentation, for preventing the segmentation of steel anchor from welding Shrink in journey, cause steel anchor segmentation position that deviation occurs, before welding, code plate is set in position while welding, after accomplishing fluently yard plate, Backing welding is carried out simultaneously in steel anchor segmentation surrounding, using symmetrical, layering welding, reduce welding deformation amount;
Postwelding measures steel anchor sections each point absolute altitude suitable for reading in time, is adjusted according to departure so as to reach requirement setting Elevation.
Using above-mentioned technical proposal, this utility model has the advantages that:
A kind of steel anchor box that this utility model is provided, steel anchor box volume is big, tonnage big, while height is high, and structure is strong Degree is big, resistance to tension is strong;By modularized design, after modules complete outside the venue, it is spliced to form at the scene overall Steel anchor box, thus constructs and installs very convenient, and efficiency of construction is higher.
Description of the drawings
In order to be illustrated more clearly that this utility model specific embodiment or technical scheme of the prior art below will be right Needed for specific embodiment or description of the prior art, accompanying drawing to be used is briefly described, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is the steel anchor bay structural schematic diagram that this utility model embodiment 1 is provided;
Fig. 2 is the split type steel anchor sections decomposition view that this utility model embodiment 1 is provided.
Reference:
10- steel anchor sections;11- front panels;Panel on rear side of 12-;
13- left parts bearing plate;14- right parts bearing plate;The oblique sleeves of 15-;
16- anchor slabs;17- top connecting plates;18- bottom connecting plates;
19- gripper shoes;20- gussets;The left segmentations of 10a-;
The right segmentations of 10b-;17a- through holes.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described Embodiment is a part of embodiment of this utility model, rather than the embodiment of whole.Based on the embodiment in this utility model, this The every other embodiment obtained under the premise of creative work is not made by field those of ordinary skill, belongs to practical Novel protected scope.
In description of the present utility model, it should be noted that term " " center ", " on ", D score, "left", "right", " perpendicular Directly ", the orientation of the instruction such as " level ", " interior ", " outward " or position relationship are, based on orientation shown in the drawings or position relationship, to be only For the ease of describe this utility model and simplify description, rather than indicate or imply indication device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.Additionally, term " the One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or implying relative importance.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, term " peace Dress ", " being connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly Connection;Can be mechanically connected, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in this utility model.
The steel anchor bay structural schematic diagram that Fig. 1 is provided for this utility model embodiment;Fig. 2 is carried for this utility model embodiment For split type steel anchor sections decomposition view.
Explanation is further explained to this utility model with reference to specific embodiment.
Embodiment 1
As shown in Figure 1-2, a kind of steel anchor box that the present embodiment is provided, which includes several steel anchor sections 10, several steel Anchor sections 10 is in turn connected to form a steel anchor box from bottom to top;
Steel anchor sections 10 includes front panel 11, rear side panel 12, left part bearing plate 13, right part bearing plate 14, tiltedly Sleeve 15 and anchor slab 16;
14 interval setting of left part bearing plate 13 and right part bearing plate, left part bearing plate 13 and right part bearing plate 14 Rear and front end pass through front panel 11 and rear side panel 12 and connect;Left part bearing plate 13, rear side panel 12, right part pressure-bearing Together with plate 14 is linked in sequence successively with front panel 11, a cylinder is formed, the horizontal cross-section of the cylinder is rectangle, the cylinder With upper opening and lower opening, anchor slab 16 in cylinder, is provided with.
In two neighboring steel anchor sections 10, the cylinder of the cylinder lower opening of upper square steel anchor sections 10 and lower square steel anchor sections 10 Body upper opening shape and length and width consistent size, weld together after docking in order to both.
In the present embodiment, steel anchor box is made up of 9 steel anchor sections 10, the left and right of the steel anchor box that steel anchor sections 10 is spliced into Length become larger from top to bottom, and width in front and back is tapered into from top to bottom.
Top-down steel anchor sections cartridge openings size such as following table:
Tiltedly on 15 oblique cutting of sleeve dress left part bearing plate 13 and right part bearing plate 14, for drag-line is introduced steel anchor sections Inside 10;
Tiltedly the one end of sleeve 15 inside steel anchor sections 10 is provided with the anchor slab 16 for being fixedly connected stay wire end;
The gripper shoe 19 for supporting anchor slab 16 is provided between anchor slab 16 and end bearing plate.
Steel anchor sections 10 also includes top connecting plate 17 and bottom connecting plate 18, the rear and front end difference of top connecting plate 17 It is connected with the top of front panel 11 and rear side panel 12;The rear and front end of bottom connecting plate 18 respectively with front panel 11 and after The bottom connection of side panel 12.
Front panel 11 and rear side panel 12 are H types, are respectively arranged with upper notch on front panel 11 and rear side panel 12 With lower recess, top connecting plate 17 and bottom connecting plate 18 are U-shaped, are separately positioned in upper notch and lower recess.
Correspondence position in top connecting plate 17 in 15 upper end open of oblique sleeve is provided with through hole 17a, is easy to the later stage to install When or the when of maintenance operation is carried out to drag-line.
Shearing nail is provided with the lateral surface of left part bearing plate 13 and right part bearing plate 14.
It is provided with the lateral surface of left part bearing plate 13, right part bearing plate 14, front panel 11 and rear side panel 12 Vertical or horizontal gusset 20,20 interval setting of multiple gussets.Shearing nail (not shown) is provided between gusset 20.
16 upper surface of anchor slab is provided with backing plate (not shown).
10 height of steel anchor sections in the present embodiment is 2.8m~4.6m, and the weight of steel anchor sections 10 is 39.6-76.7 tons.
Steel anchor box is arranged on Sarasota, is provided with embedded board at the top of Sarasota, is provided with column on embedded board, and steel anchor box is fixed It is arranged on column.
Column horizontal cross-section is " king " font.
Steel anchor box is arranged on Sarasota, and outer wrap has concrete.
Steel anchor sections 10 is provided with the otic placode or suspension hook of lifting on the top at four angles.
When steel anchor sections volume is excessive, steel anchor sections 10 can adopt split type, you can so that steel anchor sections 10 to be split It is segmented for two.
As shown in Fig. 2 steel anchor sections 10 includes left segmentation 10a and right segmentation 10b, along front panel 11 and rear side panel 12 Steel anchor sections 10 is divided into left-right parts by vertical center line, and left and right two parts are then respectively left segmentation 10a and right segmentation 10b.
Two segmented to manufacture respectively in factory, and before marching into the arena, after examination splicing success, transport respectively is hung to engineering site Both are welded together after dress splicing.
A kind of steel anchor box that this utility model is provided, steel anchor box volume is big, tonnage big, while height is high, and structure is strong Degree is big, resistance to tension is strong;By modularized design, after modules complete outside the venue, it is spliced to form at the scene overall Steel anchor box, thus constructs and installs very convenient, and efficiency of construction is higher.
Embodiment 2
A kind of installation method of above-mentioned steel anchor box is present embodiments provided, which specifically includes following steps:
Step 1:Each steel anchor sections is divided into into basic plate unit, piecemeal is made, each Slab element is carried out in factory Spelling, welding job;
Superelevation super large steel anchor sections is divided into left and right segmentation, is welded to form the steel anchor sections of one after transporting scene;
Step 2:Using temporary connection or adpting flange, preassembling is carried out to steel anchor sections, will after preassembling is qualified Each steel anchor fragmented transport is to engineering site;
Preassembling is installed for simulation, with the matching precision for checking the linear beam section seam of steel anchor box bridge, assembled beam section Length and width, anchor point Horizontal Distance etc..Some sizes (the such as length of beam, width etc.) can be suitably adjusted in assembly, After each portion's dimensional gaughing is qualified, the flange that is located by connecting temporarily is installed.
Steel anchor box is segmented complete after, all of steel anchor sections is transported to job site using large-scale Pallet Truck.
Step 3:Lift the steel anchor sections from bottom to top successively;
Before lifting, the column foot position pad that the steel anchor in bottom is segmented places embedded board, and king's font column, adjusts vertical Post absolute altitude is positioned on column after steel anchor box lifting to designed elevation;
Comprise the following steps that during lifting positioning:
1) Primary Location
Steel anchor sections starts to steel anchor sections mounting surface to belong to Primary Location from lifting;
During positioning, prior setting-out goes out datum line, and side on the basis of phase selection neighbour both sides, in benchmark line position stationary positioned steel plate, is made Steel plate is oriented to for lifting dropping place;
It is possible thereby to substantially reduce positioning time, priority condition is created to being subsequently accurately positioned;
2) it is accurately positioned
After the lower mouth contact of steel anchor sections is finished, four azimuths of interface on steel anchor sections are surveyed using total powerstation Amount, and measurement data is carried out recording, analyzed, by the use of jack, bottle gouard moved by hands as tool kit, four sides of interface in regulation The elevation of position and the coordinate figure in X/Y directions;
3), during precise positioning, using the surrounding for acting against steel anchor sections at the top of 4 jack, lean at the top of jack On the reinforcing bar of surrounding, 1 bottle gouard moved by hands is arranged in the base plate centre of steel anchor sections, with reserved steel bar phase in manhole Even;
4) anchor point coordinate measurement
After steel anchor sections positioning is finished, the equal thickness lumps of wood or horizon rule is laid in anchor point upper end, using sash weight method anchor Solid point is guided on the lumps of wood, sets up prism on the lumps of wood, and anchoring point height deducts anchor point to lumps of wood vertical dimension for actual measurement elevation;
5) angular coordinate and anchor point coordinate measurement
Anchor point detection carries out being welded and fixed steel anchor sections after finishing, after welding to steel anchor sections angle point and anchor point again Detected whether be subjected to displacement in observation steel anchor sections welding process;
6) measure again and appraise and decide location data.
In the step 3, when being welded and fixed the steel anchor segmentation, for preventing the segmentation of steel anchor from occurring to receive in welding process Contracting, causes steel anchor segmentation position that deviation occurs, before welding, arranges code plate in position while welding, after accomplishing fluently yard plate, be segmented in steel anchor Surrounding carries out backing welding simultaneously, using symmetrical, layering welding, reduces welding deformation amount;
Postwelding measures steel anchor sections each point absolute altitude suitable for reading in time, is adjusted according to departure so as to reach requirement setting Elevation.
Finally it should be noted that:Various embodiments above is only illustrating the technical solution of the utility model, rather than which is limited System;Although being described in detail to this utility model with reference to foregoing embodiments, one of ordinary skill in the art should Understand:Which still can be modified to the technical scheme described in foregoing embodiments, or to which part or whole Technical characteristic carries out equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from this practicality new The scope of each embodiment technical scheme of type.

Claims (10)

1. a kind of steel anchor box, it is characterised in which includes several steel anchor sections, and several steel anchor sections connect from bottom to top successively Connect to form a steel anchor box;
The steel anchor sections includes front panel, rear side panel, left part bearing plate, right part bearing plate, oblique sleeve and anchor slab;
The left part bearing plate and right part bearing plate interval setting, the rear and front end of left and right end bearing plate is by described Front panel and the connection of rear side panel;
The oblique sleeve oblique cutting is filled on the left and right end bearing plate, for drag-line is introduced steel anchor segmented interior;
Tiltedly sleeve is provided with the anchor slab for being fixedly connected stay wire end in one end of steel anchor segmented interior;
The gripper shoe for supporting the anchor slab is provided between anchor slab and end bearing plate.
2. steel anchor box according to claim 1, it is characterised in that the steel anchor sections also includes top connecting plate and bottom Connecting plate, the rear and front end of top connecting plate are connected with the top of the front panel and rear side panel respectively;The bottom connects The rear and front end of fishplate bar is connected with the bottom of the front panel and rear side panel respectively.
3. steel anchor box according to claim 2, it is characterised in that the front panel and rear side panel are H types, leading flank Upper notch and lower recess is respectively arranged with plate and rear side panel;The top connecting plate and bottom connecting plate are U-shaped, are set respectively Put in the upper notch and lower recess.
4. steel anchor box according to claim 1, it is characterised in that the left part bearing plate and right part bearing plate it is outer Shearing nail is provided with side.
5. the steel anchor box according to claim 1 or 4, it is characterised in that the left part bearing plate and right part bearing plate Lateral surface on be provided with vertically arranged gusset, multiple gusset interval settings.
6. steel anchor box according to claim 1, it is characterised in that set on the lateral surface of the front panel and rear side panel It is equipped with shearing nail, vertical gusset and horizontal gusset.
7. steel anchor box according to claim 1, it is characterised in that the steel anchor box is arranged on Sarasota, is set at the top of Sarasota Embedded board is equipped with, column on embedded board, is provided with, the steel anchor box is fixedly installed on the column.
8. steel anchor box according to claim 1, it is characterised in that the steel anchor box is arranged on Sarasota, and outer wrap has Concrete.
9. steel anchor box according to claim 1, it is characterised in that the steel anchor sections segmented is spliced by two.
10. steel anchor box according to claim 9, it is characterised in that described segmented including left segmentation and right segmentation, along institute State front panel and rear side panel vertical center line and steel anchor sections is divided into into left-right parts, left and right two parts are then respectively the left side Segmentation and right segmentation.
CN201621034854.2U 2016-08-31 2016-08-31 Steel anchor case Active CN206034275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621034854.2U CN206034275U (en) 2016-08-31 2016-08-31 Steel anchor case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621034854.2U CN206034275U (en) 2016-08-31 2016-08-31 Steel anchor case

Publications (1)

Publication Number Publication Date
CN206034275U true CN206034275U (en) 2017-03-22

Family

ID=58298877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621034854.2U Active CN206034275U (en) 2016-08-31 2016-08-31 Steel anchor case

Country Status (1)

Country Link
CN (1) CN206034275U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400675A (en) * 2016-08-31 2017-02-15 中交公局第三工程有限公司 Steel anchor box and mounting method thereof
CN108103949A (en) * 2017-12-29 2018-06-01 南通华凯重工有限公司 A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN110331673A (en) * 2019-08-19 2019-10-15 中冶建工集团有限公司 A kind of construction method of the segmented installation of bridge steel anchor box

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400675A (en) * 2016-08-31 2017-02-15 中交公局第三工程有限公司 Steel anchor box and mounting method thereof
CN106400675B (en) * 2016-08-31 2018-08-03 中交一公局第三工程有限公司 A kind of steel anchor box and its installation method
CN108103949A (en) * 2017-12-29 2018-06-01 南通华凯重工有限公司 A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN110331673A (en) * 2019-08-19 2019-10-15 中冶建工集团有限公司 A kind of construction method of the segmented installation of bridge steel anchor box

Similar Documents

Publication Publication Date Title
CN104775564B (en) Unsupported installation method for bidirectional tilting great-section box latticed columns
CN206034275U (en) Steel anchor case
CN103410322A (en) Large-span parallel truss steel connective corridor construction method
CN111794119B (en) Temporary supporting system and hoisting method for basket type steel box tie bar arch
CN109853394A (en) Arch bridge cable hoisting tower button integrated construction engineering method
CN106400675A (en) Steel anchor box and mounting method thereof
CN109763569B (en) Construction method of cantilever awning
CN113463522B (en) Auxiliary device and method for bent cap construction
CN109235903A (en) Steel structure modularization construction method
CN115419277B (en) Construction method of heavy steel box type diagonal column
CN109252445A (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure and its construction method
CN206503141U (en) A kind of overlength casing in bridge pile foundation construction is accurately positioned mounting tool
CN115162182B (en) Cantilever type steel box girder high-precision cable hoisting construction method
CN112627055A (en) Bridge bent cap formwork support adjusting device and bridge bent cap construction method
CN108755665A (en) Enclose the integrated platform construction method of brill
CN115467421A (en) Hoisting construction method for complex large-span steel roof
CN108792922B (en) Hoisting method for special-shaped sections of pouring jacket
CN208219384U (en) A kind of overlapping girder segment
CN117145051A (en) High-altitude assembly structure of large-span space broken line truss and construction method
CN108517779B (en) Across the high speed door opening assembling Method for Installation of low clearance variable cross-section curved box girder
CN106245531B (en) Steel structural bridge installation method is hung under bilateral derrick type
CN212477455U (en) Pre-buried positioner of bridge suspension cable anchor cylinder
CN212426749U (en) Hybrid reinforced concrete joint section
CN208293437U (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure
CN210238492U (en) Crown beam type miniature pile construction formwork capable of being circulated

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant