CN206015639U - Water oil stain intercepts removing system - Google Patents
Water oil stain intercepts removing system Download PDFInfo
- Publication number
- CN206015639U CN206015639U CN201620940948.XU CN201620940948U CN206015639U CN 206015639 U CN206015639 U CN 206015639U CN 201620940948 U CN201620940948 U CN 201620940948U CN 206015639 U CN206015639 U CN 206015639U
- Authority
- CN
- China
- Prior art keywords
- plate
- oiled
- flat board
- connecting plate
- long
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/20—Controlling water pollution; Waste water treatment
- Y02A20/204—Keeping clear the surface of open water from oil spills
Landscapes
- Water Treatment By Sorption (AREA)
Abstract
The utility model discloses a kind of water oil stain intercepts removing system, including intercepting system and oil collecting system, oil collecting system is located at intercepting system side;Intercepting system includes some interception units being connected in series in left-right direction, each interception unit includes floating mat and blocks oiled-plate method, floating mat includes horizontally disposed flat board, block oiled-plate method to be arranged on front side of flat board along slab length direction, block oiled-plate method to be connected with flat board by height adjustment mechanism, connected by angle adjusting mechanism between adjacent two pieces of flat boards, adjacent two pieces are blocked between oiled-plate method by buffering connector connection;The utility model simple structure, simple operation is efficient, security reliability is strong, high degree of automation, labour intensity are low, applied widely, and the interception of greasy dirt, recovery, detached action integration are completed, and efficiency is higher.
Description
Technical field
The utility model belongs to cleaning oil pollution technical field, more particularly to a kind of water oil stain intercepts removing system.
Background technology
1432 kilometers of South-to-North Water Diversion Middle Route Project general main canal total length, nearly 600 there along crossing roads, along canal lock station
The set of related electromechanical equipment nearly thousand, in nearly engineering operation more than a year and maintenance processes, because traffic accident, lock station electromechanical equipment therefore
The many reasons such as barrier repair and maintenance, cause some fluid to enter in the channel of trunk canal, directly contribute the pollution of water quality, to Nan Shuibei
The Water quality of tune causes very big impact.Water source in south water to north channel is drinking water, and the pollution of water quality directly jeopardized
The mankind's is healthy, and the oil pollution material that therefore removes in water transferring canal is most important.
The method for clearing up greasy dirt class material at present in ocean has physical method, chemical method and biotechnology method.According to
The characteristic at south water to north water source, is not suitable for processing using chemical method, because the chemical substance of residual equally can be made to human body
Into harm.Biotechnology method requires that the cycle is long, and is not suitable for using during channel water delivery, is suitable in lake, ocean
Process a small amount of oil pollution phenomenon.Therefore preferably processed using physical method in the river course of the south water to north.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided a kind of simple structure, simple operation efficiently,
Security reliability is strong, the water oil stain that high degree of automation, labour intensity are low, applied widely intercepts removing system and its experiment
Method.
For solving above-mentioned technical problem, the utility model is adopted the following technical scheme that:
Water oil stain intercepts removing system, and including the intercepting system in river course and oil collecting system, oil collecting system is located at
Intercepting system side;Intercepting system includes that some interception units being connected in series in left-right direction, each interception unit include
With oiled-plate method, floating mat is blocked, floating mat includes that horizontally disposed flat board, flat board lower surface are provided with two rows along its length and connect in yi word pattern
The buoyancy aid of connection, two row's buoyancy aids are arranged in both sides before and after flat board lower surface, block oiled-plate method be arranged on along slab length direction flat
On front side of plate, block oiled-plate method and be connected with flat board by height adjustment mechanism, connected by angle adjusting mechanism between adjacent two pieces of flat boards
Connect, adjacent two pieces are blocked between oiled-plate method by buffering connector connection;
Height adjustment mechanism includes that two pieces are fixedly connected on the location-plate on front side of flat board, and two pieces of location-plates are along slab length side
To interval setting, location-plate is spaced from top to bottom and offers location hole, block oiled-plate method trailing flank be fixedly connected with two respectively with fixed
The corresponding mounting seat of position plate, mounting seat cross section is square structure and inner hollow, correspondingly hangs down with rear side on front side of mounting seat
Head straight for being provided with mounting groove, two mounting grooves are connected with inside mounting seat, right in two mounting grooves and one of location hole
Installation bolt should be inserted with;
Angle adjusting mechanism includes that the first connecting plate, hinge and two piece of second connecting plate, the first connecting plate are connected to flat board
Left end, two piece of second connecting plate be both connected to the right-hand member of flat board and upper and lower interval setting, and two piece of second connecting plate surrounds connection
Groove;
Level is fixedly connected on the flat board left and right sides, adjacent two pieces of flat boards respectively for first connecting plate and two piece of second connecting plate
In, the first connecting plate positioned at the one flat plate on right side is horizontally inserted in the link slot of the one flat plate in left side;
Correspondingly offer through hole on first connecting plate and two piece of second connecting plate, hinge vertically insert the first connecting plate and
In through hole on two piece of second connecting plate and will be hinged to the first connecting plate and the second connecting plate;
Oil collecting system includes the profit collecting box that cross section is square, profit collecting box open topped, profit collecting box one
Side connects and is provided with inlet with oiled-plate method is blocked, and is provided with screen pack, is provided with installing rack, on installing rack in profit collecting box at inlet
Sewage pump is provided with, the inlet of sewage pump is connected with pipette, in the middle part of profit collecting box, sewage pump goes out liquid to imbibition tube opening
Mouth is connected with oil water separator by drain pipe, and oil water separator is located at outside profit collecting box;
Profit collecting box upper inside wall is provided with greasy dirt detector and controller, and the height of greasy dirt detector is less than inlet
Highly,
Height of the height of controller higher than inlet, greasy dirt detector and sewage pump are respectively by holding wire and controller
It is connected, controller is externally provided with waterproof cover.
Before and after flat board upper surface, both sides are arranged at intervals with connecting seat along slab length direction respectively, and connecting seat includes fixed plate
With the sleeve pipe being fixedly connected on the inside of fixed plate, sleeve pipe is arranged in vertical, and is inserted with column vertically in each sleeve pipe,
Between the adjacent two root posts top in left and right, level connection joint has chain.
Block oiled-plate method back side edge to be folded upward at forming crimping, block depression formation downwards in the middle part of oiled-plate method and block oil groove, buffer connector
Vertical cross-section along the longitudinal direction is identical with oiled-plate method vertical cross-section along the longitudinal direction is blocked, and in the middle part of buffering connector, undulate is curved
Folding forms corrugated plate portion.
Profit collecting box at inlet is provided with control valve, and control valve includes valve body, upper top cover, valve seat and long valve rod;
Three-port structure of the valve body in inner hollow, is provided with long-neck axocoel in valve body, long valve rod is plugged in long-neck axocoel vertically, long valve
Bar lower end is connected with pulling axis, and valve body left end is provided with the left joint with valve body in integrative-structure, and valve body right-hand member is solid by connecting bolt
Right connector is connected with surely, and valve inner is provided with the spheroid below long-neck axocoel lower port;Valve seat is provided with two, two valve seats
It is respectively provided between valve interior wall and the spheroid left and right sides, two valve seats are symmetrical arranged with regard to ball centre;Set at the top of spheroid
The bottom for having slot, pulling axis is provided with inserted block, and pulling axis is plugged in slot by the inserted block of bottom, and the bottom of pulling axis is provided with one
The individual shaft shoulder with pulling axis integrative-structure, the diameter with diameter greater than pulling axis of the shaft shoulder, the inside of valve body are provided with one and are mutually fitted with the shaft shoulder
Match somebody with somebody and accommodate the annular groove of the spacing shaft shoulder, between the shaft shoulder and annular groove, be provided with thrust gasket seal;Long valve rod is by bottom
The thinner section composition on wider section and top, the diameter of thinner section are less than the diameter of wider section, the external diameter of wider section and long-neck axocoel
Internal diameter is equal, has from up to down been sequentially filled airtight and watertight padding and packing seal pad between thinner section outer wall and long-neck axocoel inwall
Piece, airtight and watertight padding and packing seal pad are compressed by the gland on the downside of upper top cover, and the top of long valve rod is upward through length
Neck axocoel simultaneously stretches out upper top cover, and the upper end of long valve rod is connected with handle.
Using above-mentioned technical proposal, the utility model has the advantages that:
1st, greasy dirt density is less than the density of water, and therefore greasy dirt can swim in the upper surface of water, and follow water downstream to flow
Dynamic, the utility model will be kept afloat using intercepting system according to greasy dirt and the characteristic of water, the method using post processing is first intercepted
Upper oil stain intercepting gets off, then the greasy dirt for intercepting is concentrated extraction by oil collecting system;Substantially increased using said method
The efficiency of river channel greasy dirt, and simple to operate, reliable operation is removed, the greasy dirt that separates can be again sharp after process
With.
2nd, in intercepting system of the present utility model, each interception unit is connected into yi word pattern, root angled with river course
According to force resolution principle, oil supernatant on water is dirty and the mixed liquor of water flow through block at oiled-plate method when, make in the interception for blocking oiled-plate method
With under, the mixed liquor of greasy dirt and water can collect from trend river course side, be easy to collect greasy dirt.
3rd, oil supernatant on water dirt flows to profit collecting box along oil groove is blocked, and opens control valve, the mixing of greasy dirt and water
Liquid is entered in profit collecting box by inlet, and the liquid level in profit collecting box constantly rises, when greasy dirt detector is detected
During greasy dirt, greasy dirt detector transmits a signal to controller, and controller sends signal enabling sewage pump, and profit is collected by sewage pump
The mixed liquor of greasy dirt and water in case is extracted out, is entered in oil water separator by drain pipe, and the mixed liquor of greasy dirt and water is through oil
Greasy dirt is separated by separator effect;When there is no greasy dirt in greasy dirt detector detects profit collecting box, greasy dirt is examined
Survey device and transmit a signal to controller, controller sends signal-off sewage pump;Using said apparatus, easy to operate, work as the water surface
On when there is greasy dirt, it is possible to achieve collect automatically, when on the water surface without greasy dirt, oil collecting system quits work.
4th, of the present utility model control valve concrete operating principle be:When valve is by the mixed liquor of greasy dirt and water, valve
Door internal pressure increases, when rotating handle control valve and opening, close, in the presence of body cavity pressure medium, pulling axis to
Upper motion, the shaft shoulder of pulling axis are contacted with the annular groove of valve body and play thrust function, and the thrust between pulling axis and annular groove is close
Gasket seals, and pressure more high pressure must be tighter, can not only play the de- effect of erosion control, moreover it is possible to avoid the mixed liquor of greasy dirt and water
Spill, while thrust gasket seal can also reduce the abrasion between shaft shoulder end face and annular groove step, increase service life.
5th, the utility model can be adjusted by height adjustment mechanism and block the height of oiled-plate method, it is to avoid block oiled-plate method drinking water too deep or
Cross shallow, to adapt to different waters so that intercept greasy dirt effect more preferable;The utility model can be adjusted by angle adjusting mechanism
Save the flowing velocity of the mixed liquor of the angle between each interception unit and river course, different its corresponding greasy dirts for intercepting of angle and water
Difference, angle are bigger, and the flow velocity of the mixed liquor of corresponding greasy dirt and water is bigger, suitably can increase respectively in the big waters of greasy dirt amount
Angle between interception unit and river course, can suitably reduce the angle between each interception unit and river course in the little waters of greasy dirt amount
Degree.
6th, column is set on the flat board of each interception unit, is connected by chain between adjacent upright posts, operating personnel exist
When each floating mat being installed and blocking oiled-plate method, can be using chain as handrail;In addition operating personnel need to make regular check on the oil on the water surface
Dirty interception situation, to make corresponding adjustment, arranging column and chain can increase the security of its work.
7th, adjacent two pieces are blocked between oiled-plate method by buffering connector connection, it is to avoid each interception unit phase under the impact of current
Mutually collide, simultaneously work as closed effect, prevent greasy dirt from flowing out from two pieces of gaps that blocks between oiled-plate method, adopt the buffering connector can be with
Increase and block oily effect.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation in Fig. 1 at angle adjusting mechanism;
Fig. 3 is the structural representation of height adjustment mechanism;
Fig. 4 is the structural representation of mounting seat;
Fig. 5 is the structural representation that adjacent floating mat is linked together by angle adjusting mechanism;
Fig. 6 is the enlarged drawing in Fig. 5 at A;
Fig. 7 is the structural representation of profit collecting box;
Fig. 8 is the structural representation for blocking oiled-plate method with buffering at connector cooperation;
Fig. 9 is the structural representation for controlling valve;
Figure 10 is the enlarged drawing in Fig. 9 at B.
Specific embodiment
As shown in Figures 1 to 10, water oil stain of the present utility model intercepts removing system, including the interception in river course
System and oil collecting system, oil collecting system are located at intercepting system side;Intercepting system includes some being connected in series in left-right direction
Interception unit, each interception unit includes floating mat and blocks oiled-plate method 1, and floating mat includes horizontally disposed flat board 2,2 lower surface of flat board
Buoyancy aid 3 that two rows in yi word pattern be connected in series is provided with along its length, before and after two row's buoyancy aids 3 are arranged in 2 lower surface of flat board
Both sides, block oiled-plate method 1 and are arranged on front side of flat board 2 along 2 length direction of flat board, block oiled-plate method 1 and are connected with flat board 2 by height adjustment mechanism
Connect, connected by angle adjusting mechanism 90 between adjacent two pieces of flat boards 2, adjacent two pieces are blocked between oiled-plate method 1 by buffering connector 4
Connection;
Height adjustment mechanism includes that two pieces of location-plates 5 being fixedly connected on front side of flat board 2, two pieces of location-plates 5 are grown along flat board 2
Degree direction interval setting, location-plate 5 are spaced from top to bottom and offer location hole 6, block 1 trailing flank of oiled-plate method and be fixedly connected with two points
Not corresponding with location-plate 5 mounting seat 7,7 cross section of mounting seat are square structure and inner hollow, on front side of mounting seat 7 with after
Side is corresponding vertically to offer mounting groove 8, two mounting grooves 8 be connected inside mounting seat 7, two mounting grooves 8 and wherein
In one location hole 6, corresponding inserted has installation bolt 9;In Fig. 1, height adjustment mechanism is blocked oiled-plate method 1 and is blocked.
When needing to raise the height for blocking oiled-plate method 1, by installation bolt 9 in the location hole 6 above its original position;Need
When reducing the height for blocking oiled-plate method 1, by installation bolt 9 in the location hole 6 below its original position, the height of hurdle oiled-plate method 1 is adjusted
Degree is very flexible.
Angle adjusting mechanism 90 includes that the first connecting plate 10, hinge 11 and two piece of second connecting plate 12, the first connecting plate connect
The left end of flat board 2 is connected on, two piece of second connecting plate is both connected to the right-hand member of flat board 2 and upper and lower interval setting, two piece of second connection
Plate surrounds link slot;
Level is fixedly connected on 2 left and right sides of flat board respectively for first connecting plate 10 and two piece of second connecting plate 12, and adjacent two
In block flat board 2, positioned at the company that the first connecting plate 10 of the one flat plate 2 on right side is horizontally inserted the one flat plate 2 positioned at left side
In access slot;
Through hole is correspondingly offered on first connecting plate 10 and two piece of second connecting plate 12, and hinge 11 vertically inserts the first company
In through hole on fishplate bar 10 and two piece of second connecting plate 12 and will be hinged to the first connecting plate and the second connecting plate;
Oil collecting system includes that the profit collecting box 13 that cross section is square, 13 open topped of profit collecting box, profit are collected
13 side of case connects and is provided with inlet 21 with oiled-plate method 1 is blocked, and is provided with screen pack, is provided with peace in profit collecting box 13 at inlet 21
14 are shelved, installing rack 14 is provided with sewage pump 15, the inlet 21 of sewage pump 15 is connected with pipette 16, and pipette 16 is open
In the middle part of profit collecting box 13, the liquid outlet of sewage pump 15 is connected with oil water separator 18, oil water separator 18 by drain pipe 17
It is located at outside profit collecting box 13;
13 upper inside wall of profit collecting box is provided with greasy dirt detector 19 and controller 20, and the height of greasy dirt detector 19 is less than
The height of inlet 21, so that ensure that greasy dirt detector 19 can be easy to detect profit less than the liquid level in profit collecting box 13
Greasy dirt in collecting box 13.
Height of the height of controller 20 higher than inlet 21, so that the height of controller 20 is higher than profit collecting box 13
Interior liquid level, prevents 20 long period of soaking of controller from breaking down under water.
Greasy dirt detector 19 is connected with controller 20 by holding wire 22 respectively with sewage pump 15, and controller 20 is externally provided with
Waterproof cover.
Screen pack is conventional equipment, not shown.The proportion of oil is less than water, and the most of oil in profit collecting box 13 is all located at
The middle and upper part of profit collecting box 13, the bottom of profit collecting box 13 mostly are water, and therefore pipette 16 is open in profit collecting box 13
Oil-polluted water can either be sent, and excessively not pulled water out by middle part, so as to both complete the task of collecting greasy dirt, and only
The energy expended needed for drawing water more.
Before and after 2 upper surface of flat board, both sides are arranged at intervals with connecting seat along 2 length direction of flat board respectively, and connecting seat includes fixing
Plate 23 and the sleeve pipe 24 being fixedly connected on the inside of fixed plate 23, sleeve pipe 24 is arranged in vertical, along axle in each sleeve pipe 24
To column 25 is inserted with, between adjacent 25 top of two root posts in left and right, level connection joint has chain 26.Staff is along flat board 2
During walking, column 25 and chain 26 serve protective action, staff is not fallen in water from the both sides of flat board 2.
Block 1 back side edge of oiled-plate method to be folded upward at forming crimping 27, block depression formation downwards in the middle part of oiled-plate method 1 and block oil groove 28, buffer
The vertical cross-section along the longitudinal direction of connector 4 is identical with the vertical cross-section along the longitudinal direction of oiled-plate method 1 is blocked, so that both can be with complete
U.S. docking;Buffering 4 middle part undulate of connector is bent to form corrugated plate portion 29;The setting of corrugated plate portion 29, substantially increases
The elasticity of buffering connector 4, can play a part of buffering in two neighboring blocking when oiled-plate method 1 occurs relative displacement, make adjacent two
The individual relative position for blocking oiled-plate method 1 has certain elasticity.
Profit collecting box 13 at inlet 21 is provided with control valve 35, and control valve 35 includes valve body 51, upper top cover 53, valve
Seat 54 and long valve rod 56;Three-port structure of the valve body 51 in inner hollow, is provided with long-neck axocoel 58 in valve body 51, and long valve rod 56 is along axle
To being plugged in long-neck axocoel 58,56 lower end of long valve rod is connected with pulling axis 55, and 51 left end of valve body is provided with to be tied in one with valve body 51
The left joint 61 of structure, 51 right-hand member of valve body are fixedly connected with right connector 52 by connecting bolt, are provided with positioned at long-neck inside valve body 51
Spheroid 62 below 58 lower port of axocoel;Valve seat 54 is provided with two, and two valve seats 54 are respectively provided at 51 inwall of valve body and spheroid 62
Between the left and right sides, two valve seats 54 are arranged with regard to 62 Central Symmetry of spheroid;The top of spheroid 62 is provided with slot, under pulling axis 55
End is provided with inserted block 63, and pulling axis 55 is plugged in slot by the inserted block 63 of bottom, and the bottom of pulling axis 55 is provided with one and dials
The shaft shoulder 64 of 55 integrative-structure of axle, the diameter with diameter greater than pulling axis 55 of the shaft shoulder 64, the inside of valve body 51 are provided with one and the shaft shoulder
64 annular grooves 65 for being adapted and accommodating the spacing shaft shoulder 64, are provided with thrust gasket seal between the shaft shoulder 64 and annular groove 65
66;Long valve rod 56 is made up of the wider section of bottom and the thinner section on top, and the diameter of thinner section is less than the diameter of wider section, more slightly
The external diameter of section is equal with 58 internal diameter of long-neck axocoel, has from up to down been sequentially filled between 58 inwall of thinner section outer wall and long-neck axocoel
Airtight and watertight padding 72 and packing seal pad 73, airtight and watertight padding 72 and packing seal pad 73 are by the filler pressure on the downside of upper top cover 53
Lid 74 is compressed, and the top of long valve rod 56 is upward through long-neck axocoel 58 and stretches out upper top cover 53, the upper end connection of long valve rod 56
There is handle 75.
Water oil stain intercepts the experimental technique of removing system, comprises the following steps:
(1)The flow velocity that current in river course are measured using current meter, and record;
(2)The floating mat of one interception unit is fixed on left side river course side with rope, successively by the floating of each interception unit
Row is connected in series, and is connected by angle adjusting mechanism 90 between two neighboring floating mat, adjusts angular adjustment during installation
Mechanism 90 so that each linear arrangement of floating mat totality, each floating mat totality forms an angle across river course and with river course, by position
In right side river course while floating mat by rope be fixed on right side river course while;
(3)Column 25 is installed by each connecting seat on the flat board 2 of each floating mat, between 25 top of adjacent two root posts
It is horizontally mounted chain 26;
(4)Oiled-plate method 1 will be blocked correspondingly to be connected on the flat board 2 of each floating mat by height adjustment mechanism respectively, and each
Oiled-plate method 1 is blocked towards river course upstream, adjacent two pieces block between oiled-plate method 1 by buffer connector 4 connect;
(5)According to greasy dirt through blocking the flow direction after 1 interception function of oiled-plate method, profit collecting box 13 is fixed on by rope
Left side river course while or during the river course of right side, and the flow direction phase of the direction of the inlet 21 on profit collecting box 13 and greasy dirt
Instead;
(6)Oil supernatant on water soiled ends current drive and flow to intercepting system, to side under the interception function for blocking oiled-plate method 1
River course deviates, and flows to profit collecting box 13 along oil groove 28 is blocked;The mixed liquor for opening control valve 35, greasy dirt and water passes through feed liquor
Mouth is entered in profit collecting box 13, and the liquid level in profit collecting box 13 constantly rises, when greasy dirt detector 19 detects greasy dirt
When, greasy dirt detector 19 transmits a signal to controller 20, and controller 20 sends signal enabling sewage pump 15, and sewage pump 15 is by oil
The mixed liquor of greasy dirt and water in water collection tank 13 is extracted out, mixed liquor is entered in oil water separator 18 by drain pipe 17,
Greasy dirt is separated from the mixed liquor by oil water separator 18;When greasy dirt detector 19 detects profit collecting box
When there is no greasy dirt in 13, greasy dirt detector 19 transmits a signal to controller 20, and 20 time delay of controller sends letter in 3-6 second
Number closing sewage pump 15.By 3-6 second closing sewage pump of time delay, can be abundant by the upper liquid in profit collecting box 13
Extract out, it is to avoid sewage pump excessively continually starts and cuts out.
The present embodiment not makees any pro forma restriction, every foundation to shape of the present utility model, material, structure etc.
Any simple modification, equivalent variations and modification that technical spirit of the present utility model is made to above example, belong to this reality
Protection domain with new technique scheme.
Claims (4)
1. water oil stain intercepts removing system, it is characterised in that:Including the intercepting system in river course and oil collecting system, oil-collecting
System is located at intercepting system side;Intercepting system includes some interception units being connected in series in left-right direction, and each interception is single
Unit includes floating mat and blocks oiled-plate method, and floating mat includes that horizontally disposed flat board, flat board lower surface are provided with two rows along its length in one
The buoyancy aid that font is connected in series, two row's buoyancy aids are arranged in both sides before and after flat board lower surface, block oiled-plate method along slab length direction
It is arranged on front side of flat board, blocks oiled-plate method and be connected with flat board by height adjustment mechanism, is adjusted by angle between adjacent two pieces of flat boards
The connection of section mechanism, adjacent two pieces are blocked between oiled-plate method by buffering connector connection;
Height adjustment mechanism includes that two pieces are fixedly connected on the location-plate on front side of flat board, and two pieces of location-plates are along between slab length direction
Every setting, location-plate is spaced from top to bottom and offers location hole, block oiled-plate method trailing flank be fixedly connected with two respectively with location-plate
Corresponding mounting seat, mounting seat cross section are square structure and inner hollow, correspond to and vertically open with rear side on front side of mounting seat
Mounting groove is provided with, two mounting grooves are connected with inside mounting seat, is correspondingly inserted in two mounting grooves and one of location hole
It is provided with installation bolt;
Angle adjusting mechanism includes that the first connecting plate, hinge and two piece of second connecting plate, the first connecting plate are connected to a left side for flat board
End, two piece of second connecting plate are both connected to the right-hand member of flat board and upper and lower interval setting, and two piece of second connecting plate surrounds link slot;
Level is fixedly connected on the flat board left and right sides respectively for first connecting plate and two piece of second connecting plate, in adjacent two pieces of flat boards,
The first connecting plate for being located at the one flat plate on right side is horizontally inserted in the link slot of the one flat plate in left side;
Through hole is correspondingly offered on first connecting plate and two piece of second connecting plate, and hinge vertically inserts the first connecting plate and two pieces
In through hole on second connecting plate and will be hinged to the first connecting plate and the second connecting plate;
Oil collecting system includes the profit collecting box that cross section is square, profit collecting box open topped, profit collecting box side with
Blocking oiled-plate method to connect and be provided with inlet, screen pack being provided with inlet, installing rack is provided with profit collecting box, installing rack is provided with
Sewage pump, the inlet of sewage pump are connected with pipette, and in the middle part of profit collecting box, the liquid outlet of sewage pump leads to imbibition tube opening
Cross drain pipe and be connected with oil water separator, oil water separator is located at outside profit collecting box;
Profit collecting box upper inside wall is provided with greasy dirt detector and controller, and the height of greasy dirt detector is less than the height of inlet
Degree,
Height of the height of controller higher than inlet, greasy dirt detector are connected with controller by holding wire respectively with sewage pump
Connect, controller is externally provided with waterproof cover.
2. water oil stain according to claim 1 intercepts removing system, it is characterised in that:Both sides point before and after flat board upper surface
Connecting seat is not arranged at intervals with along slab length direction, and connecting seat includes fixed plate and the set being fixedly connected on the inside of fixed plate
Pipe, sleeve pipe are arranged in vertical, and are inserted with column vertically, between the adjacent two root posts top in left and right in each sleeve pipe
Level connection joint has chain.
3. water oil stain according to claim 1 and 2 intercepts removing system, it is characterised in that:Block oiled-plate method back side edge upwards
Crimping is bent to form, depression formation downwards in the middle part of oiled-plate method is blocked and is blocked oil groove, buffer connector vertical cross-section along the longitudinal direction and block
Oiled-plate method vertical cross-section along the longitudinal direction is identical, and in the middle part of buffering connector, undulate is bent to form corrugated plate portion.
4. water oil stain according to claim 3 intercepts removing system, it is characterised in that:Profit collecting box at inlet
Control valve is provided with, control valve includes valve body, upper top cover, valve seat and long valve rod;Three-port structure of the valve body in inner hollow, valve body
Long-neck axocoel is inside provided with, and long valve rod is plugged in long-neck axocoel vertically, and long valve rod lower end is connected with pulling axis, and valve body left end is provided with
With left joint of the valve body in integrative-structure, valve body right-hand member is fixedly connected with right connector by connecting bolt, and valve inner is provided with position
Spheroid below long-neck axocoel lower port;Valve seat is provided with two, and two valve seats are respectively provided at valve interior wall and spheroid or so two
Between side, two valve seats are symmetrical arranged with regard to ball centre;Slot is provided with the top of spheroid, and the bottom of pulling axis is provided with inserted block,
Pulling axis is plugged in slot by the inserted block of bottom, and the bottom of pulling axis is provided with the shaft shoulder of and pulling axis integrative-structure, the shaft shoulder
The diameter with diameter greater than pulling axis, the inside of valve body is provided with an annular groove for being adapted with the shaft shoulder and accommodating the spacing shaft shoulder,
Thrust gasket seal is provided between the shaft shoulder and annular groove;Long valve rod is made up of the wider section of bottom and the thinner section on top, compared with
Diameter of the diameter of thin segment less than wider section, the external diameter of wider section is equal with long-neck axocoel internal diameter, thinner section outer wall and long-neck axle
Airtight and watertight padding and packing seal pad have from up to down been sequentially filled between cavity wall, and airtight and watertight padding and packing seal pad pass through
Gland on the downside of upper top cover is compressed, and the top of long valve rod is upward through long-neck axocoel and stretches out upper top cover, long valve rod upper
End is connected with handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620940948.XU CN206015639U (en) | 2016-08-26 | 2016-08-26 | Water oil stain intercepts removing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620940948.XU CN206015639U (en) | 2016-08-26 | 2016-08-26 | Water oil stain intercepts removing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206015639U true CN206015639U (en) | 2017-03-15 |
Family
ID=58251495
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620940948.XU Active CN206015639U (en) | 2016-08-26 | 2016-08-26 | Water oil stain intercepts removing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206015639U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108595836A (en) * | 2018-04-24 | 2018-09-28 | 华北水利水电大学 | A kind of optimum design method of the floating body of hydraulic mechanical equipment |
CN111206555A (en) * | 2020-03-15 | 2020-05-29 | 陈春阳 | River channel trash device with reposition of redundant personnel hinders function |
-
2016
- 2016-08-26 CN CN201620940948.XU patent/CN206015639U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108595836A (en) * | 2018-04-24 | 2018-09-28 | 华北水利水电大学 | A kind of optimum design method of the floating body of hydraulic mechanical equipment |
CN108595836B (en) * | 2018-04-24 | 2021-10-22 | 华北水利水电大学 | Optimization design method for floating body of hydraulic mechanical equipment |
CN111206555A (en) * | 2020-03-15 | 2020-05-29 | 陈春阳 | River channel trash device with reposition of redundant personnel hinders function |
CN111206555B (en) * | 2020-03-15 | 2021-08-24 | 刘利萍 | River channel trash device with reposition of redundant personnel hinders function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206015639U (en) | Water oil stain intercepts removing system | |
CN107558600A (en) | A kind of hoisting type device for dragging dregs | |
CN109505289B (en) | Cleaning device for floaters at water diversion port of water channel | |
CN105625483A (en) | Water pressure control method for underground construction | |
CN106245575B (en) | River channel oil stain intercepting removes experimental method | |
CN207237452U (en) | A kind of efficient reversed cleaning device of pipeline Inner filter net | |
CN206746050U (en) | A kind of spiral-flow type defoaming device | |
CN206101328U (en) | Bottom of pool drainage | |
CN206015636U (en) | River channel oil slick suction system | |
CN205557770U (en) | Inspection shaft of heavy mud room in area | |
CN204952435U (en) | Sewage treatment uses horizontal filter screen | |
CN106320305B (en) | River channel oil stain intercepting removes experimental provision | |
CN106013022A (en) | Combined device for intercepting water hyacinth in navigable channel | |
CN207436237U (en) | A kind of hoisting type device for dragging dregs | |
CN203048640U (en) | Oil water separation device for separation and recovery of thin oil film | |
CN110126995A (en) | A kind of double ships cooperation device for cleaning water surface rubbish and operational method | |
CN109364555A (en) | Automatic retention filtering ponds, retention filter device, system and method | |
CN206015642U (en) | Cleaning oil pollution duckbill Oil sucking device in water | |
JP5752230B2 (en) | Foreign matter offshore treatment system | |
CN206015640U (en) | River channel greasy dirt oil collector sump tank | |
CN204958821U (en) | High temperature is taken super viscous crude slug flow entrapment of vapour and is handled integrated device | |
CN204385710U (en) | Two-way opened enclosed blocks bleaching device | |
CN206156888U (en) | Rain sewage filter equipment of quick construction installation | |
CN208743171U (en) | A kind of recyclable metal surface water washing device | |
CN208073541U (en) | A kind of horizontal deslagging water discharging device and deslagging drainage system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450006 No. 29, Huaihe Road, Zhongyuan District, Henan, Zhengzhou Patentee after: Huanghe Machinery Co.,Ltd. Address before: 450006 No. 29, Huaihe Road, Zhongyuan District, Henan, Zhengzhou Patentee before: YELLOW RIVER MACHINERY FACTORY, YELLOW RIVER CONSERVANCY COMMISSION |
|
CP01 | Change in the name or title of a patent holder |