CN205977238U - Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck - Google Patents
Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck Download PDFInfo
- Publication number
- CN205977238U CN205977238U CN201621045540.2U CN201621045540U CN205977238U CN 205977238 U CN205977238 U CN 205977238U CN 201621045540 U CN201621045540 U CN 201621045540U CN 205977238 U CN205977238 U CN 205977238U
- Authority
- CN
- China
- Prior art keywords
- section
- template
- girder
- support body
- sets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621045540.2U CN205977238U (en) | 2016-08-29 | 2016-08-29 | Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621045540.2U CN205977238U (en) | 2016-08-29 | 2016-08-29 | Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205977238U true CN205977238U (en) | 2017-02-22 |
Family
ID=58040479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621045540.2U Active CN205977238U (en) | 2016-08-29 | 2016-08-29 | Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205977238U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756895A (en) * | 2018-05-07 | 2018-11-06 | 安徽省公路桥梁工程有限公司 | A kind of tunnel excavation support construction method |
-
2016
- 2016-08-29 CN CN201621045540.2U patent/CN205977238U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756895A (en) * | 2018-05-07 | 2018-11-06 | 安徽省公路桥梁工程有限公司 | A kind of tunnel excavation support construction method |
CN108756895B (en) * | 2018-05-07 | 2019-09-03 | 安徽省公路桥梁工程有限公司 | A kind of tunnel excavation support construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109538238B (en) | Tunnel arch prefabricated segment construction device and control method | |
CN104097253B (en) | Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system | |
CN206092022U (en) | Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling | |
CN201474704U (en) | Needle beam type hydraulic steel mould carrier | |
CN102337905B (en) | Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel | |
CN205805577U (en) | A kind of arch wall type open cut tunnel chassis | |
CN204662952U (en) | A kind of self-propelled tool single side formwork formwork system | |
CN207315404U (en) | Municipal tunnel big cross section culvert and piping lane trolley | |
CN202544854U (en) | Lining trolley for subway station | |
CN205618174U (en) | Box culvert platform truck | |
CN110130937B (en) | Tunnel construction trolley | |
CN206409242U (en) | Tunnel double-lining formwork jumbo | |
CN201963317U (en) | Single-side steel mould trolley | |
CN110173281A (en) | A kind of sliding mode system for circular tunnel concreting | |
CN205977238U (en) | Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck | |
CN202416190U (en) | Formwork for prefabricated box girder of rear poured flange slab | |
CN210827111U (en) | Environment-friendly down self-propelled steel trestle structure | |
CN106988762B (en) | Full-section two-lining inverted arch shield equipment | |
CN206636581U (en) | A kind of shield tunnel Second Lining Construction chassis | |
CN206092017U (en) | Diversion tunnel inclined shaft, complete general steel mould trolley of section of flat section | |
CN205135656U (en) | Modular two lining platform trucks of multipurpose | |
CN213235079U (en) | Concrete formwork supporting structure for underground excavation tunnel deformation joint post-cast strip | |
CN210317334U (en) | A template platform truck for tunnel thin wall mid-board concrete placement | |
CN114294023A (en) | Preliminary bracing trolley with formwork | |
CN204729105U (en) | A kind of sliding-mode trolley for the concreting of gateway opening type inclined shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170420 Address after: 471000 Henan city of Luoyang Province Red Shan Xigong District under the village of Dragon Road No. 16 Patentee after: LUOYANG GAOFEI BRIDGE AND TUNNEL MACHINERY Co.,Ltd. Address before: 471000 Yanshi province big mouth Township grass Temple Village Hao street, No. 18 Patentee before: Huang Gaofei |
|
TR01 | Transfer of patent right | ||
CP01 | Change in the name or title of a patent holder |
Address after: 471000 No. 16, Longteng North Road, Xiagou Village, Hongshan Township, Xigong District, Luoyang City, Henan Province Patentee after: Luoyang Gaofei Bridges and Tunnels Machinery Co.,Ltd. Address before: 471000 No. 16, Longteng North Road, Xiagou Village, Hongshan Township, Xigong District, Luoyang City, Henan Province Patentee before: LUOYANG GAOFEI BRIDGE AND TUNNEL MACHINERY Co.,Ltd. |
|