CN205976150U CN201620518573.8U CN201620518573U CN205976150U CN 205976150 U CN205976150 U CN 205976150U CN 201620518573 U CN201620518573 U CN 201620518573U CN 205976150 U CN205976150 U CN 205976150U
Authority
CN
China
Prior art keywords
side fascia
node
upper side
fascia
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620518573.8U
Other languages
Chinese (zh)
Inventor
俞大有
李昌州
陈定球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongmin Zhuyou Architectural Design Co ltd
Zhuyou Zhizao Technology Investment Co ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201620518573.8U priority Critical patent/CN205976150U/en
Application granted granted Critical
Publication of CN205976150U publication Critical patent/CN205976150U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model belongs to the building structure field discloses a side fascia installation node, including last side fascia, lower side fascia and crossbeam to and be used for the fixed connecting piece of going up the side fascia, the connecting piece includes connecting plate and anchor assembly, connecting plate upper portion is provided with the locating part, it includes heat preservation and concrete structure inter -layer with lower side fascia at least to go up the side fascia, the tip of going up side fascia and lower side fascia is concrete structure, the joint interface who goes up side fascia and lower side fascia is provided with waterproof tongue -and -groove, it has the concatenation seam to go up the side fascia and reserve between the side fascia down, the inboard and the outside of concatenation seam all are equipped with the sealing member, go up the side fascia and/or down the side fascia be equipped with the injected hole, through the injected hole is in waterproof slurry has been filled in the concatenation seam. The utility model discloses construction convenience, water -proof effects is good, the node is firm, has improved assembly type structure's production efficiency and building quality.

Description

Node installed by a kind of Side fascia
Technical field
The utility model belongs to building structure field and in particular to node installed by a kind of Side fascia.
Background technology
In assembled architecture industry, Side fascia carries out factorial praluction by the way of prefabricated, then Assembling, thus Enable to standardize, and quality controllable, efficient quick.At present, in the installation process of Side fascia, generally there are two methods, one Planting is that wet extension connects, and is stretched into the in-situ layer on composite beam top by the connection reinforcing bar epimere being embedded in Side fascia, carries out cast-in-place mixed Solidifying soil is fixedly connected, and the mode of this simple use bar connecting built on the sand, and is also easy to produce by mistake in building concrete construction Difference, skew, the later stage installs and is not easy to revise;Another way adopt cladding connection, in Side fascia bury longer dowel or Steel plate connector, dowel or steel plate connector pass through angle steel and carry out rigidly connecting with another kind of built-in fitting being embedded in Vierendeel girder Connect, this mode is shorter relative to the duration, but install inconvenience, design when built-in fitting according to preset space length carry out pre-buried it is desirable to Design size is very accurate, is otherwise difficult to dock successfully, once not docking, not only taking work consuming, or even causing Side fascia no Method mounts, and causes to waste.
Meanwhile, during the assembled in situ of precast wall panel, water-proofing treatment to be carried out to its stitching portion, it is to avoid rainwater edge is outer The splicing seams of wallboard penetrate into indoor, if infiltration phenomenon is serious simultaneously, will cause that connecting portion is loose, Long-Time Service leads to prefabricated Effective bearing load ability of exterior wall declines, and brings great hidden dangers in project.The waterproof of traditional out-hung panel typically exists Seam crossing breaks marine glue, and the workload not only constructed is big, and marine glue occurring for a long time over time is aging, finally results in The generation of drainage, the water resistance of impact assembled architecture and construction quality.
In sum, need badly and develop a kind of easy construction, node installed by the Side fascia of good water-proof effect.
Utility model content
The purpose of this utility model is that node installed by the Side fascia providing a kind of easy construction, good water-proof effect.
Above-mentioned purpose is to be achieved through the following technical solutions:A kind of installation node of Side fascia, including upper Side fascia, lower outer Wallboard and crossbeam, and the connector for fixing upper Side fascia, described connector includes connecting plate and anchoring piece, described connection Plate top arranges finite place piece, and described anchoring piece is located at connecting plate bottom and is connected with connecting plate, and described crossbeam upper end is provided with existing Pour layer, described anchoring piece is anchored in in-situ layer, described locating part is by the upper Side fascia of upper Side fascia bottom insertion;Described outer Wallboard and lower Side fascia at least include heat-insulation layer and concrete, and the end of described upper Side fascia and lower Side fascia is coagulation Soil structure, described upper Side fascia is provided with waterproof tongue and groove, described upper Side fascia and lower Side fascia with the linkage interface of lower Side fascia Between be reserved with splicing seams, the inner side and outer side of described splicing seams is equipped with seal, described upper Side fascia and/or lower Side fascia It is provided with injected hole, waterproofing slurry is perfused with described splicing seams by described injected hole.In the assembling process of wallboard, lower exterior wall After plate dropping place, at least in the inner side and outer side setting seal of the top surface of lower Side fascia, preferably it is all provided with seal in its surrounding, when So seal also can be arranged before lower Side fascia dropping place, preferably stamps glue in seal and lower Side fascia contact site, described glue Water is preferably marine glue;In work progress, before in-situ layer does not pour, described anchoring piece is fixed on position to be poured, Then casting concrete, with the solidification of cast-in-place layer concrete, anchoring piece is fixedly connected in in-situ layer, with upper Side fascia Dropping place, the bottom surface of upper Side fascia is close to above seal, so, reserved splicing between described upper Side fascia and lower Side fascia Seam is enclosed by seal, and described locating part inserts in described upper Side fascia, and such connector is played a supporting role to upper Side fascia, Bear its fractional load.After the completion of assembly, by the injected hole that is arranged in upper Side fascia or lower Side fascia in described splicing seams In be perfused with waterproofing slurry, form one layer of waterproof layer, can effectively stop outdoor rain from leaking out to interior, there is provided reliable waterproof Ensure that the waterproof tongue and groove of exterior wall board interface setting simultaneously also can stop outdoor rain from leaking out to interior;For thermal insulation external wall panel, The end of Side fascia is all arranged to xoncrete structure, that is, is xoncrete structure at the waterproof tongue and groove arranging, in the mistake of docking Bad heat-insulation layer will not be knocked in journey as the part of tongue and groove tenon, also be not in the problem knocking bad architectural surface simultaneously.Assemble Cheng Hou, in order to improve waterproof effect, can adopt marine glue to block in the medial and lateral of upper Side fascia and the junction of lower Side fascia. Above-mentioned waterproof type had both gone for frame system and had been equally applicable to shear wall system.The utility model is using setting waterproof enterprise Mouth and the measure blocking splicing seams in splicing seams grouting formation waterproof layer, integrated control, thoroughly solve the anti-of Side fascia Water problems, improves the construction quality of assembled architecture.
Further, the discrepancy in elevation waterproof tongue and groove that described waterproof tongue and groove is high inside wainscot sheathing, outside is low.
Further, described waterproof tongue and groove includes the tenon being arranged on lower Side fascia and the tongue-and-groove being arranged on Side fascia, institute State tenon to stretch in described tongue-and-groove.Described tongue-and-groove can be reserved during upper Side fascia is prefabricated or install During open up.
Further, described upper Side fascia and/or lower Side fascia are provided with plural injected hole.Because Side fascia has Certain width, on the one hand only one injected hole of setting is difficult to be filled up completely with the splicing seams between upper Side fascia and lower Side fascia Closely knit, on the other hand arrange multiple holes can slip casting simultaneously, improve efficiency of construction.
Further, described upper Side fascia and/or lower Side fascia are provided with steam vent.It is arranged such, favourable during slip casting The discharge of air in splicing seams.
Further, described seal bottom is coated with adhesive or is provided with double faced adhesive tape.It is arranged such, be conducive to seal solid It is scheduled on lower Side fascia, it is to avoid during cornice sheathing dropping place, seal position changes, thus affecting the sealing of seal Property.The frame preferably rectangular in shape of described seal, its four side is matched with lower exterior wall plate top surface.
Further, the top surface of the bottom surface of described upper Side fascia and lower Side fascia is matsurface.Be arranged such, waterproofing slurry with The top of the bottom of upper Side fascia and lower Side fascia connects even closer.
Further, described wainscot sheathing top is provided with least one blind hole.It is arranged such, during slip casting, described blind Be perfused with slurry in hole, so, in splicing seams formed waterproof layer be connected on lower external wall panel structure more firm.
Further, described injected hole is hollow hole or pre-buried hollow bushing.In the prefabrication process of described hollow hole wallboard Core pulling is formed, and injected hole is preferably formed by way of pre-buried hollow bushing, and shaping is more easy.
Further, described waterproofing slurry is waterproof mortar or foam concrete.Waterproof mortar has good weatherability, resistance to Property long, impermeability, density and high bonding force and extremely strong water-tight corrosion-proof effect.Also possessed anti-using foam concrete The effect of water, simultaneously works as blocking the effect of heat bridge.
Further, it is embedded with the securing member for fixing described locating part in described upper Side fascia.Installation in Side fascia During, by connector, upper Side fascia is connected with the in-situ layer on crossbeam top, the pre-buried of securing member facilitates insertion into exterior wall Locating part in plate is formed with upper Side fascia and is reliably connected.
Further, described securing member is grout pipe, and described grout pipe connects bottom and the side wall of described cornice sheathing, described limit Position part is inserted in described grout pipe by upper Side fascia bottom, is perfused with slurry in described grout pipe.The process of Side fascia in lifting In make described locating part by upper Side fascia bottom insert described grout pipe in, then pour into slurry from the other end of grout pipe, So connector is played a supporting role to upper Side fascia, bears its fractional load.The utility model overcomes conventional outer wall plate peace The defect of dress mode, is not only connected firmly, and easy for installation.It should be noted that described grout pipe can be used as above-mentioned Injected hole uses, that is, pass through grout pipe and also slip casting in splicing seams can be formed waterproof layer, thus need not be still further in upper exterior wall Injected hole is opened up in plate or lower Side fascia.
Further, described securing member is to connect box, and the base plate of described connection box is provided with patchhole, and described locating part passes through institute Insert after stating patchhole in described connection box.Described locating part is made to be inserted by upper Side fascia bottom during Side fascia in lifting Enter in described connection box, such connector is played a supporting role to upper Side fascia, bears its fractional load.Pre-buried connection box is permissible Upper Side fascia local is strengthened, then in upper Side fascia dropping place, connecting portion will not break up because local stress is excessive Upper exterior wall board concrete, the base plate being simultaneously connected with box is contacted with connector, can meet the requirement of local compression.Should illustrate Be, in order that locating part be connected that box docking is convenient, described connect the size of patchhole that box plate opens up, location and shape can Set according to the concrete condition of installation process.
Further, described anchoring piece one end is connected with connecting plate, and the other end extends to the direction away from adjustable member, described anchor Firmware is parallel with connecting plate.In the past in order to increase anchor force in in-situ layer for the anchoring piece, therefore anchoring piece is arranged to and is connected The vertical mode of plate, as far as possible increase the extension elongation in in-situ layer for the anchoring piece, but due to being embedded with elongated muscle, hoop in in-situ layer The reinforcing bars such as muscle, reinforcing bar is closeer, more, situation that anchoring piece with embedded bar position fought often occurs, has a strong impact on installation Efficiency.Anchoring piece is arranged to the mode parallel with connecting plate by the utility model, and so, anchoring piece stretches to the position in in-situ layer Put not deep, anchoring piece and the reinforcement location in in-situ layer in installation process can be prevented effectively from and fight, that is, be not in anchoring Part avoids embedded bar and leads to not ensure the situation of connecting plate and the link position of cladding panel, increases efficiency of construction.Certainly, In order to increase anchor force, by way of welding, embedded bar can be connected with anchoring piece.
Further, the anchoring supporting leg that described anchoring piece is be arranged in parallel by two or more is constituted.Be arranged such, anchoring supporting leg it Between there is gap, anchoring piece can be avoided further to fight with embedded bar position.
Further, described connector also includes adjustable member, and described adjustable member is worn and connect described connecting plate can relative connecting plate Move in vertical direction.The fine setting of the height being provided for Side fascia of adjustable member, upper Side fascia is fixed on predetermined peace Holding position is so that the installation of Side fascia is more accurate, careful.
Further, described adjustable member includes the screw being opened on connecting plate and the screw rod using cooperatively with described screw, Described screw rod is worn and is connect described screw can be along the axial movement of described screw.It is arranged such, make screw rod edge by rotating screw rod The axial movement of described screw, screw tip is withstood Side fascia and then drives upper Side fascia to move, and upper Side fascia is moved extremely Predetermined installation site.
Further, described connecting plate offers through hole, and described adjustable member includes being fixedly connected on described connecting plate bottom surface to be opened Nut at hole and the screw rod using with described nut screw connection, described screw rod is worn and is connect described nut and through hole can be along described through hole Axial movement.It is arranged such, make screw rod along the axial movement of described through hole by rotating screw rod, screw tip is withstood outer Wallboard and then drive upper Side fascia movement, by mobile for upper Side fascia to predetermined installation site.
Further, described adjustable member also includes adjustable plate, and described adjustable plate is fixedly connected on described screw tip, described limit Position part is connected to the top of described adjustable plate.The setting of adjustable plate, mainly expands adjustable member contact with upper Side fascia bottom Area, is conducive to adjustable member to bear the load of Side fascia.Described locating part is connected to the top of described adjustable plate, so may be used By adjusting the position of adjustable member adjustable limit part, it is easily made to dock with grout pipe.
Further, described locating part and adjustable member axial offset are arranged.Axial offset setting described herein refers to spacing The axis of part and screw rod is not on the same line.It is arranged such, make locating part along screw rod on adjustable plate by rotating screw rod Axis rotate, so the position of locating part can be adjusted, be easy to docking of locating part and grout pipe, improve to install and imitate Rate, improves the serious forgiveness of Side fascia installation process.
Further, described connecting plate bottom surface is provided with protector, and described protector is enclosed in described screw rod and passes through described through hole One end.It is arranged such, can prevent concrete from eating extremely threaded rod first, lead to threaded rod cannot adjust, in addition, can also be square Just the fixation of whole Side fascia, most importantly, an end face of protector is close to in-situ layer, in in-situ layer concrete setting Afterwards, concrete can form the leaning support to protector end face, prevents connecting plate because bearing the deadweight of wallboard and flexural deformation.
Further, described grout pipe is bellows.It is arranged such, grout pipe can be effectively increased and pour into slurry in grout pipe Contact area, and then increase cohesive force therebetween.
Brief description
The accompanying drawing constituting a part of the present utility model is used for providing further understanding to of the present utility model, and this practicality is new The schematic description and description of type is used for explaining the utility model, does not constitute to improper restriction of the present utility model.
Fig. 1 is the sectional view of the Side fascia installation node involved by a kind of embodiment of the utility model;
Fig. 2 is the sectional view that involved Side fascia in Fig. 1 installs at the connectionless part of node;
Fig. 3 is the sectional view of the Side fascia installation node involved by the utility model another embodiment;
Fig. 4 is the sectional view that involved Side fascia in Fig. 3 installs at the connectionless part of node;
Fig. 5 is the stereochemical structure sectional view that node installed by involved Side fascia in Fig. 4;
Fig. 6 is involved connecting-piece structure schematic diagram in Fig. 1;
Fig. 7 is the front view of involved connector in 6;
Fig. 8 is the left view of involved connector in Fig. 6;
Fig. 9 is the right view of involved connector in Fig. 6;
Figure 10 is the top view of involved connector in Fig. 6;
The structural representation of the connector involved by Figure 11 the utility model another embodiment.
In figure:
2 times Side fascias of Side fascia, 3 seal 4 injected hole on 1
5 waterproof layer, 6 discrepancy in elevation waterproof tongue and groove 7 tongue-and-groove 8 tenon
20 heat-insulation layer, 21 concrete, 22 locating part 23 anchoring piece
24 connecting plate, 25 screw rod, 26 nut 27 adjustable plate
28 protector, 29 grout pipe 30 connects box 31 crossbeam
32 in-situ layers
Specific embodiment
Below in conjunction with the accompanying drawings the utility model is described in detail, the description of this part is only exemplary and explanatory, Should not there is any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiment.
The utility model embodiment is as follows, sees figures.1.and.2, a kind of installation node of Side fascia, including upper Side fascia 1, Lower Side fascia 2 and crossbeam 31, and the connector for fixing upper Side fascia 1, described connector includes connecting plate 24 and anchoring Part 23, described connecting plate 24 top arranges finite place piece 22, described anchoring piece 23 be located at connecting plate 24 bottom and with connecting plate 24 It is connected, described crossbeam 31 upper end is provided with in-situ layer 32, and described anchoring piece 23 is anchored in in-situ layer 32, described locating part 22 is by upper In the upper Side fascia 1 of Side fascia 1 bottom insertion;Described upper Side fascia 1 and lower Side fascia 2 at least include heat-insulation layer 20 and concrete knot Structure layer 21, the end of described upper Side fascia 1 and lower Side fascia 2 is xoncrete structure, described upper Side fascia 1 and lower Side fascia 2 Linkage interface is provided with waterproof tongue and groove, is reserved with splicing seams between described upper Side fascia 1 and lower Side fascia 2, described splicing seams Inner side and outer side is equipped with seal 3, and described upper Side fascia 1 and/or lower Side fascia 2 are provided with injected hole 4, by described injected hole 4 are perfused with waterproofing slurry in described splicing seams.In the assembling process of wallboard, after lower Side fascia 2 dropping place, at least in lower Side fascia The inner side and outer side setting seal 3 of 2 top surface, is preferably all provided with seal 3 in its surrounding, and certain seal 3 also can be lower outer Arrange before wallboard 2 dropping place, preferably stamp glue in seal 3 and lower Side fascia 2 contact site, described glue is preferably marine glue; In work progress, before in-situ layer 32 does not pour, described anchoring piece 23 is fixed on position to be poured, then pours coagulation Soil, with the solidification of in-situ layer 32 concrete, anchoring piece 23 is fixedly connected in in-situ layer 32;With the dropping place of upper Side fascia 1, The bottom surface of upper Side fascia 1 is close to above seal 3, so, reserved splicing between described upper Side fascia 1 and lower Side fascia 2 Seam is enclosed by seal 3, and described locating part 22 inserts in described upper Side fascia 1, and such connector plays support to upper Side fascia 1 Effect, bears its fractional load.After the completion of assembly, by the injected hole 4 that is arranged in upper Side fascia 1 or lower Side fascia 2 in institute State and in splicing seams, be perfused with waterproofing slurry, form one layer of waterproof layer 5, can effectively stop outdoor rain from leaking out to interior, there is provided Reliable waterproof ensures, the waterproof tongue and groove of exterior wall board interface setting simultaneously, and outdoor rain also can be stoped to leak out to interior;For guarantor Warm Side fascia, the end of Side fascia is all arranged to xoncrete structure, that is, be xoncrete structure at the waterproof tongue and groove arranging, Bad heat-insulation layer 20 will not be knocked during docking as the part of tongue and groove tenon 8, also be not in knock bad architectural surface simultaneously Problem.After the completion of assembling, in order to improve waterproof effect, can adopt in the medial and lateral of upper Side fascia 1 and the junction of lower Side fascia 2 Blocked with marine glue.Splicing is seamed by the utility model using setting waterproof tongue and groove and in splicing seams grouting formation waterproof layer 5 Stifled measure, integrated control, thoroughly solve the waterproof problem of Side fascia, improve the construction quality of assembled architecture.Described Waterproofing slurry can be expansive mortar or expansive concrete or foam mortar or foam concrete, not office certainly It is limited to above-mentioned waterproof material it should be understood that arbitrarily going for waterproof material of the present utility model.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 3 and Fig. 4, described waterproof tongue and groove is Discrepancy in elevation waterproof tongue and groove 6 high inside wainscot sheathing, that outside is low.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1 and Fig. 2, described waterproof tongue and groove bag Include the tenon 8 being arranged on lower Side fascia 2 and the tongue-and-groove 7 being arranged on Side fascia 1, described tenon 8 stretches in described tongue-and-groove 7. Described tongue-and-groove 7 can be reserved during upper Side fascia 1 is prefabricated or installation process in open up.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 5, described upper Side fascia 1 and/or Lower Side fascia 2 is provided with plural injected hole 4.Because Side fascia has certain width, on the one hand only setting one is noted Slurry hole 4 is difficult to be filled up completely with the splicing seams between upper Side fascia 1 and lower Side fascia 2 closely knit, and on the other hand arranging multiple holes can Slip casting simultaneously, improves efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the utility model, described upper Side fascia 1 and/or lower exterior wall Plate 2 is provided with steam vent.It is arranged such, the discharge of air in favourable splicing seams during slip casting.
On the basis of above-described embodiment, in another embodiment of the utility model, described seal 3 bottom is coated with gluing Agent or be provided with double faced adhesive tape.It is arranged such, be conducive to seal 3 to be fixed on lower Side fascia 2, it is to avoid during cornice sheathing dropping place Seal 3 position changes, thus affecting the sealing of seal 3.The frame preferably rectangular in shape of described seal 3, its Four sides are matched with lower Side fascia 2 top surface.
On the basis of above-described embodiment, in another embodiment of the utility model, the bottom surface of described upper Side fascia 1 and lower outer The top surface of wallboard 2 is matsurface.It is arranged such, waterproofing slurry is connected more with the bottom of upper Side fascia 1 and the top of lower Side fascia 2 Step up close.
On the basis of above-described embodiment, in another embodiment of the utility model, described wainscot sheathing top is provided with least one Individual blind hole.It is arranged such, during slip casting, in described blind hole, be perfused with slurry, so, the waterproof layer of formation in splicing seams 5 be connected in lower Side fascia 2 structure more firm.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 2, described injected hole 4 is hollow hole Or pre-buried hollow bushing.Core pulling in the prefabrication process of described hollow hole wallboard is formed, and injected hole 4 preferably passes through pre-buried hollow sleeve The mode of pipe is formed, and shaping is more easy.
On the basis of above-described embodiment, in another embodiment of the utility model, described waterproofing slurry be waterproof mortar or Foam concrete.Waterproof mortar has good weatherability, durability, impermeability, density and high bonding force and pole Strong water-tight corrosion-proof effect.Also possess the effect of waterproof using foam concrete, simultaneously work as blocking the effect of heat bridge.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1 and Fig. 3, described upper Side fascia 1 Inside it is embedded with the securing member for fixing described locating part 22.In the installation process of Side fascia, by connector by upper exterior wall Plate 1 is connected with the in-situ layer 32 on crossbeam 31 top, and the pre-buried locating part 22 facilitating insertion in Side fascia 1 of securing member is outer with upper Wallboard 1 forms and is reliably connected.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, described securing member is grout pipe 29, described grout pipe 29 connects bottom and the side wall of described cornice sheathing, and described locating part 22 is described by the insertion of upper Side fascia 1 bottom In grout pipe 29, in described grout pipe 29, it is perfused with slurry.Described locating part 22 is made by upper during Side fascia 1 in lifting Side fascia 1 bottom is inserted in described grout pipe 29, and then the other end from grout pipe 29 pours into slurry, and such connector is to upper outer Wallboard 1 is played a supporting role, and bears its fractional load.The utility model overcomes the defect of conventional outer wall plate mounting means, no Only it is connected firmly, and easy for installation.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 3, described securing member is to connect box 30, the described base plate connecting box 30 is provided with patchhole, and described locating part 22 inserts described connection box 30 after passing through described patchhole In.Described locating part 22 is made to connect in box 30 by the insertion of upper Side fascia 1 bottom is described during Side fascia 1 in lifting, this Sample connector is played a supporting role to upper Side fascia 1, bears its fractional load.Pre-buried connection box 30 can be to 1 innings of upper Side fascia Portion is strengthened, then in upper Side fascia 1 dropping place, and connecting portion will not break up upper Side fascia 1 and mix because local stress is excessive Solidifying soil, the base plate being simultaneously connected with box 30 is contacted with connector, can meet the requirement of local compression.It should be noted that in order to Make locating part 22 and be connected that box 30 docking is convenient, described connect the size of patchhole that box 30 base plate opens up, location and shape can Set according to the concrete condition of installation process.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 6~9, described anchoring piece 23 one end It is connected with connecting plate 24, the other end extends to the direction away from adjustable member, described anchoring piece 23 is parallel with connecting plate 24.It was in the past Increase anchor force in in-situ layer 32 for the anchoring piece 23, therefore anchoring piece 23 is arranged to the mode vertical with connecting plate 24, to the greatest extent The increase anchoring piece 23 of amount is in the extension elongation of in-situ layer 32, but is embedded with the reinforcing bars such as elongated muscle, stirrup due in in-situ layer 32, Reinforcing bar is closeer, more, situation that anchoring piece 23 with embedded bar position fought often occurs, has a strong impact on installation effectiveness.This Anchoring piece 23 is arranged to the mode parallel with connecting plate 24 by utility model, and so, anchoring piece 23 stretches in in-situ layer 32 Position is not deep, can be prevented effectively from anchoring piece 23 and the reinforcement location in in-situ layer 32 in installation process and fight, will not go out Existing anchoring piece 23 avoids embedded bar and leads to not ensure the situation of connecting plate 24 and the link position of cladding panel, increases construction Efficiency.Certainly, in order to increase anchor force, by way of welding, embedded bar can be connected with anchoring piece 23.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 6, described anchoring piece 23 is by two The anchoring supporting leg more than be arrangeding in parallel is constituted.It is arranged such, there is gap between anchoring supporting leg, anchoring piece 23 can be avoided further Fight with embedded bar position.
On the basis of above-described embodiment, in another embodiment of the utility model, described connector also includes adjustable member, institute State adjustable member and wear and connect described connecting plate 24 and can move in vertical direction relative to connecting plate 24.Adjustable member be provided for exterior wall The fine setting of the height of plate 1, upper Side fascia 1 is fixed on predetermined installation site so that the installation of Side fascia is more accurate, thin Cause.
On the basis of above-described embodiment, in another embodiment of the utility model, described adjustable member includes being opened in connection Screw on plate 24 and the screw rod 25 using cooperatively with described screw, described screw rod 25 is worn and is connect described screw can be along described screw Axial movement.It is arranged such, make screw rod 25 along the axial movement of described screw by rotating screw rod 25, screw rod 25 top is pushed up Live in Side fascia 1 and then drive upper Side fascia 1 mobile, by mobile for upper Side fascia 1 to predetermined installation site.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 6~9, described connecting plate 24 opens up There is through hole, described adjustable member is included being fixedly connected on the nut 26 of described connecting plate 24 bottom surface tapping and joined with described nut 26 Close the screw rod 25 using, described screw rod 25 is worn and connect described nut 26 and through hole can be along the axial movement of described through hole.So set Put, make screw rod 25 along the axial movement of described through hole by rotating screw rod 25, screw rod 25 top is withstood Side fascia 1 and then carried Dynamic upper Side fascia 1 is mobile, by mobile for upper Side fascia 1 to predetermined installation site.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 6~10, described adjustable member is also wrapped Include adjustable plate 27, described adjustable plate 27 is fixedly connected on described screw rod 25 top, described locating part 22 is connected to described adjustable plate 27 top.The setting of adjustable plate 27, mainly expands the contact area of adjustable member and upper Side fascia 1 bottom, is conducive to adjustable Part bears the load of Side fascia 1.Described locating part 22 is connected to the top of described adjustable plate 27, so can by regulation Adjust the position of part adjustable limit part 22, so that it is docked with grout pipe 29.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Figure 11, described locating part 22 with adjustable Part axial offset is arranged.Axial offset setting described herein refers to locating part 22 and the axis of screw rod 25 not in same straight line On.It is arranged such, by rotating screw rod 25, the axis along screw rod 25 on adjustable plate 27 for the locating part 22 is rotated, so can be right The position of locating part 22 is adjusted, and is easy to docking of locating part 22 and grout pipe 29, improves installation effectiveness, improves Side fascia peace The serious forgiveness of dress process.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 6 and Fig. 7, described connecting plate 24 bottom Face is provided with protector 28, and described protector 28 is enclosed in one end that described screw rod 25 passes through described through hole.It is arranged such, first may be used To prevent concrete from eating extremely threaded rod, lead to threaded rod cannot adjust, in addition, the fixation of whole Side fascia can also be facilitated, For importantly, an end face of protector 28 is close to in-situ layer 32, after in-situ layer 32 concrete setting, concrete can be with shape The leaning support of protector 28 end face, prevents connecting plate 24 because bearing the deadweight of wallboard and flexural deformation in pairs.
On the basis of above-described embodiment, in another embodiment of the utility model, described grout pipe 29 is bellows.So Setting, the contact area that grout pipe 29 can be effectively increased with the slurry that pours into grout pipe in 29, and then increase bonding therebetween Power.
The above is only preferred embodiment of the present utility model it is noted that common skill for the art For art personnel, on the premise of without departing from the utility model principle, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (22)

1. node installed by a kind of Side fascia, and including upper Side fascia, lower Side fascia and crossbeam, described upper Side fascia and lower Side fascia are extremely Include heat-insulation layer and concrete less it is characterised in that also including the connector for fixing upper Side fascia, described connection Part includes connecting plate and anchoring piece, and described connecting plate top arranges finite place piece, described anchoring piece be located at connecting plate bottom and with Connecting plate is connected, and described crossbeam upper end is provided with in-situ layer, and described anchoring piece is anchored in in-situ layer, and described locating part is by upper exterior wall In the upper Side fascia of plate bottom insertion;The end of described upper Side fascia and lower Side fascia be xoncrete structure, described upper Side fascia with The linkage interface of lower Side fascia is provided with waterproof tongue and groove, is reserved with splicing seams between described upper Side fascia and lower Side fascia, described The inner side and outer side of splicing seams is equipped with seal, and described upper Side fascia and/or lower Side fascia are provided with injected hole, by described note Slurry hole is perfused with waterproofing slurry in described splicing seams.
2. Side fascia according to claim 1 installs node it is characterised in that described waterproof tongue and groove is inside lower Side fascia Discrepancy in elevation waterproof tongue and groove high, that outside is low.
3. Side fascia according to claim 1 installs node it is characterised in that described waterproof tongue and groove includes being arranged on outside lower The tenon of wallboard and the tongue-and-groove being arranged on Side fascia, described tenon stretches in described tongue-and-groove.
4. Side fascia according to Claims 2 or 3 installs node it is characterised in that described upper Side fascia and/or lower exterior wall Plate is provided with plural injected hole.
5. Side fascia according to Claims 2 or 3 installs node it is characterised in that described upper Side fascia and/or lower exterior wall Plate is provided with steam vent.
6. Side fascia according to claim 4 installs node it is characterised in that described seal bottom is coated with adhesive Or it is provided with double faced adhesive tape.
7. Side fascia according to claim 6 installs node it is characterised in that the bottom surface of described upper Side fascia and lower exterior wall The top surface of plate is matsurface.
8. Side fascia according to claim 7 installs node it is characterised in that described lower Side fascia top is provided with least one Individual blind hole.
9. Side fascia according to claim 8 installs node it is characterised in that described injected hole is hollow hole or pre-buried Hollow bushing.
10. Side fascia according to claim 9 node is installed it is characterised in that described waterproofing slurry be waterproof mortar or Foam concrete.
11. Side fascias according to claim 1 nodes are installed it is characterised in that be embedded with described upper Side fascia for The securing member of fixing described locating part.
Node installed by 12. Side fascias according to claim 11 it is characterised in that described securing member is grout pipe, described Grout pipe connects bottom and the side wall of described upper Side fascia, and described locating part inserts in described grout pipe by upper Side fascia bottom, It is perfused with slurry in described grout pipe.
Node installed by 13. Side fascias according to claim 11 it is characterised in that described securing member is to connect box, described The base plate connecting box is provided with patchhole, and described locating part inserts after passing through described patchhole in described connection box.
14. Side fascias according to claim 12 or 13 node is installed it is characterised in that described anchoring piece one end be connected Plate is connected, and the other end extends to the direction away from adjustable member, and described anchoring piece is parallel with connecting plate.
15. Side fascias according to claim 14 install node it is characterised in that described anchoring piece is parallel by two or more The anchoring supporting leg of setting is constituted.
16. Side fascias according to claim 15 install node it is characterised in that described connector also includes adjustable member, Described adjustable member is worn and is connect described connecting plate and can move in vertical direction relative to connecting plate.
17. Side fascias according to claim 16 install node it is characterised in that described adjustable member includes being opened in connection Screw on plate and the screw rod using cooperatively with described screw, described screw rod is worn and is connect described screw can be along the axial direction of described screw Mobile.
18. Side fascias according to claim 16 install node it is characterised in that described connecting plate offers through hole, institute State adjustable member and include being fixedly connected on the nut of described connecting plate bottom surface tapping and the screw rod using with described nut screw connection, institute State screw rod and wear and connect described nut and through hole can be along the axial movement of described through hole.
19. Side fascias according to claim 18 install node it is characterised in that described adjustable member also includes adjustable plate, Described adjustable plate is fixedly connected on described screw tip, and described locating part is connected to the top of described adjustable plate.
Node installed by 20. Side fascias according to claim 19 it is characterised in that described locating part is wrong with adjustable member axis Position setting.
21. Side fascias according to claim 19 install node it is characterised in that described connecting plate bottom surface is provided with protection Part, described protector is enclosed in one end that described screw rod passes through described through hole.
Node installed by 22. Side fascias according to claim 12 it is characterised in that described grout pipe is bellows.
CN201620518573.8U 2016-05-31 2016-05-31 Side fascia installation node Expired - Fee Related CN205976150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620518573.8U CN205976150U (en) 2016-05-31 2016-05-31 Side fascia installation node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620518573.8U CN205976150U (en) 2016-05-31 2016-05-31 Side fascia installation node

Publications (1)

Publication Number Publication Date
CN205976150U true CN205976150U (en) 2017-02-22

Family

ID=58020047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620518573.8U Expired - Fee Related CN205976150U (en) 2016-05-31 2016-05-31 Side fascia installation node

Country Status (1)

Country Link
CN (1) CN205976150U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971155A (en) * 2016-05-31 2016-09-28 中民筑友科技投资有限公司 Installation joint for outer wallboards
CN110080457A (en) * 2019-06-06 2019-08-02 呼和浩特市中朵兴泰远大建筑工业有限公司 A kind of out-hung panel and vertical connection structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971155A (en) * 2016-05-31 2016-09-28 中民筑友科技投资有限公司 Installation joint for outer wallboards
CN110080457A (en) * 2019-06-06 2019-08-02 呼和浩特市中朵兴泰远大建筑工业有限公司 A kind of out-hung panel and vertical connection structure

Similar Documents

Publication Publication Date Title
CN104563288B (en) Reinforced concrete frame gridding slab prefabricated energy-saving house
CN206034677U (en) Side fascia installation node
CN110872869A (en) Waterproof construction method for joints of external wall panels
CN108678279A (en) Based on the built-in assembled architecture and its construction method for leading to high bellows prefabricated panel
CN109610693A (en) Shear wall connection structure and its construction technology
CN107476491A (en) Fill concrete wallboard and its manufacture method in a kind of prefabricated thermal insulation
CN205976143U (en) Side fascia installation node
CN205894390U (en) Compound incubation exterior sheathing and take wall body of compound incubation exterior sheathing
CN105863103A (en) Outer wallboard mounting node
CN105908878A (en) External wall panel mounting joint
CN205976150U (en) Side fascia installation node
CN206220315U (en) A kind of Side fascia installs node
CN105863135A (en) Mounting node for external wall panel
CN205976146U (en) Side fascia installation node
CN105971155A (en) Installation joint for outer wallboards
CN209456992U (en) Low damage unilateral formwork supporting structure under campshed support system
CN209114658U (en) A kind of precast concrete partition plate structure for staircase
CN206189675U (en) Side fascia installation node
CN105971152A (en) Installation joint for outer wallboards
CN207469550U (en) A kind of across wall balcony slab of assembled
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN107587476B (en) Wave-blocking wall with prefabricated reverse arc olecranon structure and design and construction method thereof
CN206034702U (en) Outer waterproof wall panel node
CN205976147U (en) Side fascia installation node
CN105863125A (en) Mounting joint for external wall panel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co.,Ltd.

Address before: 410205 room 3005, complex building, Changsha Jin Xia bonded logistics center, 30 Xingang Road, Kaifu District, Changsha, Hunan.

Patentee before: Zhongmin Zhuyou Technology Investment Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201215

Address after: No. 10, Zhongshi Road, Kaifu District, Changsha City, Hunan Province

Patentee after: ZHONGMIN ZHUYOU ARCHITECTURAL DESIGN CO.,LTD.

Address before: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee before: Zhuyou Zhizao Technology Investment Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee