CN205936635U - Tunnel lining construction device based on portable full hall scaffold frame - Google Patents

Tunnel lining construction device based on portable full hall scaffold frame Download PDF

Info

Publication number
CN205936635U
CN205936635U CN201620876752.9U CN201620876752U CN205936635U CN 205936635 U CN205936635 U CN 205936635U CN 201620876752 U CN201620876752 U CN 201620876752U CN 205936635 U CN205936635 U CN 205936635U
Authority
CN
China
Prior art keywords
arch
tunnel
lining
side wall
pilot tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620876752.9U
Other languages
Chinese (zh)
Inventor
周玉兵
胡立正
徐磊
岳阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Original Assignee
China Railway 20th Bureau Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp filed Critical China Railway 20th Bureau Group Corp
Priority to CN201620876752.9U priority Critical patent/CN205936635U/en
Application granted granted Critical
Publication of CN205936635U publication Critical patent/CN205936635U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a tunnel lining construction device based on portable full hall scaffold frame, including putting up and install the template assembly on the full hall scaffold frame of movable type at the internal portable full hall scaffold who carries out the back -and -forth movement in the preliminary excavation hole in tunnel hole, the region that lies in the internal side in preliminary excavation hole in the tunnel hole is regional for follow -up excavation, is provided with in the hunch of the hunch foot lining cutting hogging foot section inverted arch lining cutting of tunnel hole secondary lining structure to encircle foot section inverted arch backfill structure, full portable scaffold frame is equipped with the upper portion traveling system that can carry out the translation on follow -up excavation region including upper portion scaffold frame and two lateral part scaffold framves, upper portion scaffold rest base portion, and every lateral part scaffold rest base portion all is equipped with and is encircleing the structural lower part traveling system who carries out the translation of foot section inverted arch backfill. The utility model has the advantages of simple structure and reasonable design and use easy and simple to handle, excellent in use effect, can be at the internal back -and -forth movement that carries on in the preliminary excavation hole in tunnel hole to portably, accomplish the tunnel lining construction process fast.

Description

Lining construction device based on portable full hall scaffold
Technical field
This utility model belongs to technical field of tunnel construction, especially relates to a kind of tunnel based on portable full hall scaffold Road lining construction device.
Background technology
Two side-wall pilot tunnel is a kind of mode of tunnel excavation, also known as twin side heading method or glasses working, belongs to new Austria One branch of method, with New Austrian Tunneling Method ultimate principle as foundation.When carrying out tunnel excavation using two side-wall pilot tunnel, adopted opens Wa Mian branch is generally in the form of and for tunnel excavation section to be divided into four pieces, i.e. left side wall base tunnel (also referred to as left side wall pilot tunnel), right side Wall base tunnel (also referred to as right side wall pilot tunnel), top Core Soil region base tunnel (also referred to as top Core Soil region pilot tunnel) and get out of a predicament or an embarrassing situation Excavate base tunnel (excavation pilot tunnel of also referred to as getting out of a predicament or an embarrassing situation).Field measurement shows, the subsidence caused by two side-wall pilot tunnel is only The 1/2 of short benching tunnelling method.Although two side-wall pilot tunnel excavated section piecemeal is many, disturbance is big, the time of initial support tunneling boring closure Long, but each piecemeal is each self-closing immediately after excavation, thus hardly develop in construction intermediate deformation.Double side wall is led Hole method construction safety, but speed is slower, relatively costly.
Lining cutting be for prevent surrouding rock deformation or cave in along the materials such as tunnel trunk periphery armored concrete build permanent Property supporting construction.When carrying out tunnel excavation using two side-wall pilot tunnel, because excavated section piecemeal is many, thus tunnel-liner is corresponding Constructed using piecemeal, difficulty of construction is larger and construction procedure is complicated, and construction quality is difficult to ensure that.
Utility model content
Technical problem to be solved in the utility model is, for above-mentioned deficiency of the prior art, to provide one kind to be based on The lining construction device of portable full hall scaffold, its structure is simple, reasonable in design and uses easy and simple to handle, using effect Good, can be moved forward and backward in the preliminary excavation hole body of Tunnel so as easy, be rapidly completed lining construction process.
For solving above-mentioned technical problem, the technical solution adopted in the utility model is:One kind is based on portable full hall foot handss The lining construction device of frame it is characterised in that:Movable including carrying out in the preliminary excavation hole body of Tunnel Portable full hall scaffold and the arch wall lining cutting to Tunnel carry out the template assembly of molding construction, and described template assembly is arranged on On described movable type full hall scaffold;
Described Tunnel includes left side wall pilot tunnel, right side wall pilot tunnel, top Core Soil region pilot tunnel and is located at described top Excavation pilot tunnel of getting out of a predicament or an embarrassing situation immediately below the pilot tunnel of Core Soil region, described left side wall pilot tunnel and described right side wall pilot tunnel symmetrically cloth If, described top Core Soil region pilot tunnel and excavation pilot tunnel of getting out of a predicament or an embarrassing situation be respectively positioned on described left side wall pilot tunnel and right side wall pilot tunnel it Between;Described top Core Soil region pilot tunnel is divided into arch pilot tunnel and is located at the middle part pilot tunnel immediately below the pilot tunnel of arch;Described left side Wall pilot tunnel, described right side wall pilot tunnel and arch pilot tunnel form described preliminary excavation hole body, are located at described preliminary excavation in Tunnel In the body of hole, the region of side is follow-up excavation region;The secondary liner structure of described Tunnel is to carry out tunneling boring supporting to Tunnel Concrete lining, described secondary liner structure includes the arch wall to Tunnel and carries out the described arch wall lining cutting of supporting, to tunnel Hole bottom carries out the tunnel bottom inverted arch lining cutting of supporting and left and right two is connected to described arch wall lining cutting and is faced upward with tunnel bottom Arch springing lining cutting between arch lining block, two described arch springing lining cutting are symmetrically laid in the left and right sides of tunnel bottom inverted arch lining cutting;Institute State arch springing lining cutting to include the side wall bottom lining cutting positioned at described arch wall lining cutting bottom and be located at outside tunnel bottom inverted arch lining cutting Arch springing section inverted arch lining cutting;Described arch wall lining cutting includes Tunnel arch is carried out the Arch lining of supporting and two respectively to tunnel The left and right sides abutment wall in hole carries out the side wall lining of supporting, and two described side wall linings are symmetrically laid in the left and right two of Arch lining Side-lower;Described arch springing lining cutting includes the side wall bottom lining cutting positioned at described arch wall lining cutting bottom and is located at tunnel bottom inverted arch lining Build the arch springing section inverted arch lining cutting in outside, in the arch of described arch springing section inverted arch lining cutting, be provided with arch springing section inverted arch backfill structure;
Described movable type full hall scaffold include the upper falsework that is erected in the pilot tunnel of arch and two be erected on respectively Sidepiece scaffold in described left side wall pilot tunnel and described right side wall pilot tunnel, described upper falsework bottom is equipped with can subsequently open The top running gear being translated is dug on region, each described sidepiece scaffold bottom is respectively arranged with and can backfill in arch springing section inverted arch The lower running system being translated in structure;Described template assembly includes Arch lining is carried out with the arch molding of molding construction Template and two abutment wall forming panels that respectively two described side wall linings are carried out with molding construction, two described abutment wall shaping moulds Plate is symmetrically laid in below the left and right sides of arch forming panel;Described arch forming panel is supported in above upper falsework, Two described abutment wall forming panels are respectively supported at outside two described sidepiece scaffolds.
The above-mentioned lining construction device based on portable full hall scaffold, is characterized in that:Described arch springing section inverted arch returns Filling out structure is xoncrete structure.
The above-mentioned lining construction device based on portable full hall scaffold, is characterized in that:Described upper falsework and Two described sidepiece scaffolds are all to be set up the scaffold being formed by steel pipe.
The above-mentioned lining construction device based on portable full hall scaffold, is characterized in that:Two described sidepiece foot handss Frame is symmetrically laid;All by laterally connecting between the left and right sides of described upper falsework and two described sidepiece scaffold tops Access node structure is fastenedly connected, and described transverse connection structure includes multiple lateral connection framves laid from the front to the back.
The above-mentioned lining construction device based on portable full hall scaffold, is characterized in that:On described upper falsework It is provided with the upper mould bracing frame that arch forming panel is supported, the outside of two described sidepiece scaffolds is provided with The side template bracing frame that described abutment wall forming panel is supported.
The above-mentioned lining construction device based on portable full hall scaffold, is characterized in that:Described left side wall pilot tunnel with Right side wall pilot tunnel is all from top to bottom divided into upper lateral part pilot tunnel, middle sidepiece pilot tunnel and following side pilot tunnel;
Described side wall lining is divided into lower side wall lining and the upper side wall lining above lower side wall lining, described lower abutment wall Junction between lining cutting and upper side wall lining is located in middle sidepiece pilot tunnel;
Described abutment wall forming panel includes lower side wall lining being carried out with the lower abutment wall forming panel of molding construction and to top Wall lining builds the upper abutment wall forming panel carrying out molding construction, and described upper abutment wall forming panel is located above lower abutment wall forming panel;
Described side template bracing frame includes the lower sidewall template bracing frame that lower abutment wall forming panel is supported and right The upper sidewall template bracing frame that upper abutment wall forming panel is supported.
The above-mentioned lining construction device based on portable full hall scaffold, is characterized in that:Described upper falsework and The length of two described sidepiece scaffolds is 9m~12m.
The above-mentioned lining construction device based on portable full hall scaffold, is characterized in that:Described follow-up excavation region Upper tiling has the upper backup pad that upper falsework is supported, described upper backup pad is provided with from left to right multiple along tunnel The top translation track that longitudinal extension direction is laid;Described top running gear includes multigroup carrying out in top translation track respectively Movable top road wheel, top road wheel described in every group all includes multiple being arranged on upper falsework bottom from the front to the back And it is mounted on the top road wheel on the translation track of same described top;
The quantity that described arch springing section inverted arch backfills structure is two, and two described arch springing section inverted arch backfill structures are located at respectively The follow-up left and right sides excavating region;It is respectively arranged with left and right two in each described arch springing section inverted arch backfill structure longitudinally to prolong along tunnel Stretch the bottom translation track of direction laying;Described lower running system includes two groups of left and right and translates rail two described bottoms respectively Road carries out movable lower running wheel, and lower running wheel described in every group all includes multiple being arranged on sidepiece foot handss from the front to the back Frame bottom and be mounted on the lower running wheel on the translation track of same described bottom.
The above-mentioned lining construction device based on portable full hall scaffold, is characterized in that:Described top translation track It is shaped steel track with bottom translation track, during described shaped steel track includes one described channel-section steel and is laid in inside described channel-section steel The angle steel in portion, described top road wheel and lower running wheel are and can carry out movable steel wheel along described angle steel.
This utility model compared with prior art has advantages below:
1st, structure is simple, reasonable in design and input cost is relatively low.
2nd, the traveling centering structure being adopted is simple, reasonable in design and sets up simplicity, flexibly, and using effect is good, bag Include the upper falsework being erected in the pilot tunnel of arch and two sidepieces being erected on respectively in left side wall pilot tunnel and right side wall pilot tunnel Scaffold, upper falsework bottom is equipped with the top running gear that can be translated on follow-up excavation region, each sidepiece foot Hand cradle bottom is respectively arranged with and can backfill, in arch springing section inverted arch, the lower running system being translated in structure.On in traveling centering Portion's scaffold and sidepiece scaffold are separately set up, and process of setting up is easy, are not subject to Tunnel (specifically tentatively to excavate hole Body) inner space limit, the use demand in different cross section Tunnel can be met.
3rd, the template assembly being adopted includes Arch lining is carried out the arch forming panel of molding construction and two difference Two side wall linings are carried out with the abutment wall forming panel of molding construction, two abutment wall forming panels are symmetrically laid in arch shaping mould Below the left and right sides of plate;Arch forming panel is supported in above upper falsework, and two abutment wall forming panels are respectively supported at Outside two sidepiece scaffolds, formwork erection is easy and supports firm.
4th, occupation mode flexibly, both synchronously can have been constructed it is also possible to upper to upper side wall lining and lower side wall lining Side wall lining and lower side wall lining are constructed respectively.
5th, use easy and simple to handle and using effect is good, can easy, be rapidly completed lining construction process.
In sum, this utility model structure is simple, reasonable in design and good using easy and simple to handle, using effect, can be in tunnel Moved forward and backward in the preliminary excavation hole body in road hole, so as easy, be rapidly completed lining construction process.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Brief description
Fig. 1 is structural representation of the present utility model.
Fig. 2 is use state of the present utility model with reference to figure.
Fig. 3 is the structural representation of the constructed secondary lining of this utility model.
Fig. 4 is the structural representation of this utility model top road wheel and top translation track.
Description of reference numerals:
1 upper lateral part pilot tunnel;Sidepiece pilot tunnel in 2;3 following side pilot tunnels;
4 top translation tracks;5 top road wheels;6 follow-up excavation regions;
7 arch pilot tunnels;8 middle part pilot tunnels;9 get out of a predicament or an embarrassing situation excavation pilot tunnel;
9-1 Tunnel;10 preliminary bracing structures;11 bottom translation tracks;
12 arch springing section inverted arch backfill structures;13-1 arch springing lining cutting;
13-2 tunnel bottom inverted arch lining cutting;13-3 Arch lining;Side wall lining under 13-4;
The upper side wall lining of 13-5;14-1 upper falsework;14-2 sidepiece scaffold;
14-3 lateral connection frame;15-1 arch forming panel;
Abutment wall forming panel under 15-2;15-3 upper abutment wall forming panel;
16-1 upper mould bracing frame;Sidewall template bracing frame under 16-2;
16-3 upper sidewall template bracing frame;17 upper backup pads;18 lower running wheels;
19 lower supporting plates.
Specific embodiment
As shown in Figure 1 and Figure 2, this utility model includes to be moved forward and backward in the preliminary excavation hole body of Tunnel 9-1 Portable full hall scaffold and the template assembly that the arch wall lining cutting of Tunnel 9-1 is carried out with molding construction, described template assembly It is arranged on described movable type full hall scaffold;
In conjunction with Fig. 3, described Tunnel 9-1 includes left side wall pilot tunnel, right side wall pilot tunnel, top Core Soil region pilot tunnel and position Excavation pilot tunnel 9 of getting out of a predicament or an embarrassing situation immediately below the pilot tunnel of described top Core Soil region, described left side wall pilot tunnel and described right side wall are led Hole is symmetrically laid, and described top Core Soil region pilot tunnel and excavation pilot tunnel 9 of getting out of a predicament or an embarrassing situation are respectively positioned on described left side wall pilot tunnel and the right side Between the wall pilot tunnel of side;Described top Core Soil region pilot tunnel is divided into arch pilot tunnel 7 and the middle part immediately below arch pilot tunnel 7 to lead Hole 8;Described left side wall pilot tunnel, described right side wall pilot tunnel and arch pilot tunnel 7 form described preliminary excavation hole body, in Tunnel 9-1 In the body of described preliminary excavation hole, the region of side is follow-up excavation region 6;The secondary liner structure of described Tunnel 9-1 is right Tunnel 9-1 carries out the concrete lining of tunneling boring supporting, and described secondary liner structure includes the arch wall of Tunnel 9-1 is carried out The described arch wall lining cutting of supporting, the tunnel bottom inverted arch lining cutting 13-2 that Tunnel 9-1 bottom is carried out with supporting and two points of left and right It is not connected to the arch springing lining cutting 13-1 between described arch wall lining cutting and tunnel bottom inverted arch lining cutting 13-2, two described arch springing lining cutting 13-1 is symmetrically laid in the left and right sides of tunnel bottom inverted arch lining cutting 13-2;Described arch springing lining cutting 13-1 is included positioned at described arch wall The side wall bottom lining cutting of lining cutting bottom and the arch springing section inverted arch lining cutting outside tunnel bottom inverted arch lining cutting 13-2;Described arch wall Lining cutting includes Tunnel 9-1 arch is carried out the Arch lining 13-3 of supporting and two left and right sides to Tunnel 9-1 respectively Abutment wall carries out the side wall lining of supporting, and two described side wall linings are symmetrically laid in below the left and right sides of Arch lining 13-3; Described arch springing lining cutting 13-1 includes the side wall bottom lining cutting positioned at described arch wall lining cutting bottom and is located at tunnel bottom inverted arch lining cutting Arch springing section inverted arch lining cutting outside 13-2, is provided with arch springing section inverted arch backfill structure 12 in the arch of described arch springing section inverted arch lining cutting;
Described movable type full hall scaffold include the upper falsework 14-1 that is erected in arch pilot tunnel 7 and two take respectively Sidepiece scaffold 14-2 in described left side wall pilot tunnel with described right side wall pilot tunnel, described upper falsework 14-1 bottom dress Having can be in the follow-up top running gear excavated and translated on region 6, and each described sidepiece scaffold 14-2 bottom is respectively arranged with In arch springing section inverted arch, the lower running system being translated can be backfilled on structure 12;Described template assembly is included to Arch lining 13-3 carry out the arch forming panel 15-1 of molding construction and two respectively molding construction is carried out to two described side wall linings Abutment wall forming panel, two described abutment wall forming panels are symmetrically laid in below the left and right sides of arch forming panel 15-1;Institute State arch forming panel 15-1 and be supported in above upper falsework 14-1, two described abutment wall forming panels are respectively supported at two Outside described sidepiece scaffold 14-2.
In the present embodiment, described arch springing section inverted arch backfill structure 12 is xoncrete structure.
In the present embodiment, described upper falsework 14-1 and two described sidepiece scaffold 14-2 are all to set up shape by steel pipe The scaffold becoming.
And, in described upper falsework 14-1 and two described sidepiece scaffold 14-2 between adjacent two described steel pipes All it is attached by steel tube fastener.
In the present embodiment, two described sidepiece scaffold 14-2 symmetrically lay;The left and right of described upper falsework 14-1 All it is fastenedly connected by transverse connection structure between both sides and two described sidepiece scaffold 14-2 tops, described laterally connected Access node structure includes multiple lateral connection frame 14-3 laying from the front to the back.
When actually used, described upper falsework 14-1 is provided with the top that arch forming panel 15-1 is supported Formwork-support 16-1, the outside of two described sidepiece scaffold 14-2 is provided with and described abutment wall forming panel is supported Side template bracing frame.
In the present embodiment, as shown in figure 3, described left side wall pilot tunnel and right side wall pilot tunnel are all from top to bottom divided into upper lateral part to lead Hole 1, middle sidepiece pilot tunnel 2 and following side pilot tunnel 3;
Described side wall lining is divided into lower side wall lining 13-4 and is located at the upper side wall lining 13- above lower side wall lining 13-4 5, the junction between described lower side wall lining 13-4 and upper side wall lining 13-5 is located in middle sidepiece pilot tunnel 2;
Described abutment wall forming panel includes lower side wall lining 13-4 is carried out with the lower abutment wall forming panel 15-2 of molding construction With the upper abutment wall forming panel 15-3 that upper side wall lining 13-5 is carried out with molding construction, described upper abutment wall forming panel 15-3 is located at Above lower abutment wall forming panel 15-2;
Described side template bracing frame includes the lower sidewall template bracing frame that lower abutment wall forming panel 15-2 is supported The 16-2 and upper sidewall template bracing frame 16-3 that upper abutment wall forming panel 15-3 is supported.
In the present embodiment, the length of described upper falsework 14-1 and two described sidepiece scaffold 14-2 be 9m~ 12m.
During practice of construction, can according to specific needs, to upper falsework 14-1's and two described sidepiece scaffold 14-2 Length adjusts accordingly.
In the present embodiment, tiling on described follow-up excavation region 6 has the upper support that upper falsework 14-1 is supported Plate 17, described upper backup pad 17 is provided with multiple top translation tracks 4 laid along tunnel longitudinal extension direction from left to right; Described top running gear includes multigroup carrying out movable top road wheel 5 in top translation track 4 respectively, described in every group Top road wheel 5 all includes multiple being arranged on upper falsework 14-1 bottom from the front to the back and being mounted on same described top Top road wheel 5 on translation track 4.
The quantity that described arch springing section inverted arch backfills structure 12 is two, and two described arch springing section inverted arch backfill structures 12 are respectively It is located at the follow-up left and right sides excavating region 6;It is respectively arranged with left and right two along tunnel in each described arch springing section inverted arch backfill structure 12 The bottom translation track 11 that road longitudinal extension direction is laid;Described lower running system includes two groups of left and right respectively described in two Bottom translation track 11 carries out movable lower running wheel 18, lower running wheel 18 described in every group all include multiple by backward Before be arranged on sidepiece scaffold 14-2 bottom and be mounted on the lower running wheel 18 on same described bottom translation track 11.
Meanwhile, two described arch springing section inverted arch backfill to be provided with structures 12 and are supported for sidepiece scaffold 14-2 Lower supporting plate 19, left and right two described bottom translation track 11 is installed on lower supporting plate 19.
In the present embodiment, described upper backup pad 17 is provided with 4 described top translation tracks 4 from left to right.Described in 4 Top translation track 4 is in uniform laying.
During practice of construction, can according to specific needs, to the quantity of set top translation track 4 on upper backup pad 17 and The installation position of each top translation track 4 adjusts accordingly respectively.
As shown in figure 4, described top translation track 4 and bottom translation track 11 are shaped steel track, described shaped steel track Including described channel-section steel together and the angle steel, described top road wheel 5 and the lower running wheel 18 that are laid in described channel-section steel middle inside It is and can carry out movable steel wheel along described angle steel.
During practice of construction, first along tunnel longitudinal extension direction from the front to the back to the described left side wall pilot tunnel of Tunnel 9-1, institute State right side wall pilot tunnel and arch pilot tunnel 7 excavated respectively, excavate complete described left side wall pilot tunnel, described right side wall pilot tunnel and Arch pilot tunnel 7 forms described preliminary excavation hole body;From the front to the back the preliminary hole body that excavates is carried out along tunnel longitudinal extension direction again Preliminary bracing is constructed, and obtains the Tunnel structure 10 that construction completes;Afterwards, arch springing lining cutting 13-1 is constructed, And backfilled in the arch to arch springing section inverted arch lining cutting described in arch springing lining cutting 13-1 and formed arch springing section inverted arch backfill structure 12; Then, then using this utility model and along tunnel longitudinal extension direction from the front to the back described arch wall lining cutting is constructed.Treat institute After the completion of stating arch wall lining construction, from the front to the back excavation construction is carried out to follow-up region 6 of excavating along tunnel longitudinal extension direction, and Tunnel bottom inverted arch lining cutting 13-2 is constructed.
The above, be only preferred embodiment of the present utility model, not this utility model imposed any restrictions, every Any simple modification, change and equivalent structure change above example made according to this utility model technical spirit, all still Belong in the protection domain of technical solutions of the utility model.

Claims (9)

1. a kind of lining construction device based on portable full hall scaffold it is characterised in that:Including can be in Tunnel (9- 1) carry out movable portable full hall scaffold in preliminary excavation hole body and the arch wall lining cutting to Tunnel (9-1) is carried out The template assembly of molding construction, described template assembly is arranged on described movable type full hall scaffold;
Described Tunnel (9-1) includes left side wall pilot tunnel, right side wall pilot tunnel, top Core Soil region pilot tunnel and is located at described top Excavation pilot tunnel (9) of getting out of a predicament or an embarrassing situation immediately below the pilot tunnel of Core Soil region, described left side wall pilot tunnel is with described right side wall pilot tunnel symmetrically Lay, described top Core Soil region pilot tunnel and excavation pilot tunnel (9) of getting out of a predicament or an embarrassing situation are respectively positioned on described left side wall pilot tunnel and are led with right side wall Between hole;Described top Core Soil region pilot tunnel is divided into arch pilot tunnel (7) and is located at the middle part pilot tunnel immediately below arch pilot tunnel (7) (8);Described left side wall pilot tunnel, described right side wall pilot tunnel and arch pilot tunnel (7) form described preliminary excavation hole body, Tunnel (9- 1) region being located at side in the body of described preliminary excavation hole in is follow-up excavation region (6);The secondary lining of described Tunnel (9-1) Structure is that Tunnel (9-1) is carried out with the concrete lining of tunneling boring supporting, and described secondary liner structure is included to Tunnel (9- 1) arch wall carries out the described arch wall lining cutting of supporting, Tunnel (9-1) bottom is carried out with the tunnel bottom inverted arch lining cutting of supporting (13-2) and left and right two is connected to the arch springing lining cutting between described arch wall lining cutting and tunnel bottom inverted arch lining cutting (13-2) (13-1), two described arch springing lining cutting (13-1) are symmetrically laid in the left and right sides of tunnel bottom inverted arch lining cutting (13-2);Described Arch wall lining cutting includes Tunnel (9-1) arch is carried out the Arch lining (13-3) of supporting and two respectively to Tunnel (9-1) Left and right sides abutment wall carry out the side wall lining of supporting, two described side wall linings are symmetrically laid in a left side of Arch lining (13-3) Right down either side;Described arch springing lining cutting (13-1) includes the side wall bottom lining cutting positioned at described arch wall lining cutting bottom and is located at tunnel Arch springing section inverted arch lining cutting outside bottom inverted arch lining cutting (13-2), is provided with arch springing section in the arch of described arch springing section inverted arch lining cutting and faces upward Arch backfill structure (12);
Described movable type full hall scaffold include the upper falsework (14-1) that is erected in arch pilot tunnel (7) and two take respectively Sidepiece scaffold (14-2) in described left side wall pilot tunnel with described right side wall pilot tunnel, described upper falsework (14-1) bottom Portion is equipped with the top running gear that can be translated on follow-up excavation region (6), each described sidepiece scaffold (14-2) bottom Portion is respectively arranged with and can backfill, in arch springing section inverted arch, the lower running system being translated in structure (12);Described template assembly includes Arch lining (13-3) is carried out with the arch forming panel (15-1) of molding construction and two respectively to two described side wall linings Carry out the abutment wall forming panel of molding construction, two described abutment wall forming panels are symmetrically laid in arch forming panel (15-1) Below the left and right sides;Described arch forming panel (15-1) is supported in above upper falsework (14-1), and two described abutment walls become Pattern plate is respectively supported at outside two described sidepiece scaffolds (14-2).
2. according to the lining construction device based on portable full hall scaffold described in claim 1 it is characterised in that:Institute Stating arch springing section inverted arch backfill structure (12) is xoncrete structure.
3., according to the lining construction device based on portable full hall scaffold described in claim 1 or 2, its feature exists In:Described upper falsework (14-1) and two described sidepiece scaffolds (14-2) are all to be set up the scaffold being formed by steel pipe.
4., according to the lining construction device based on portable full hall scaffold described in claim 1 or 2, its feature exists In:Two described sidepiece scaffolds (14-2) are symmetrically laid;The left and right sides of described upper falsework (14-1) and two institutes State and be all fastenedly connected by transverse connection structure between sidepiece scaffold (14-2) top, described transverse connection structure includes Multiple lateral connection framves (14-3) laid from the front to the back.
5. according to the lining construction device based on portable full hall scaffold described in claim 4 it is characterised in that:Institute State and the upper mould bracing frame (16-1) that arch forming panel (15-1) is supported be provided with upper falsework (14-1), The outside of two described sidepiece scaffolds (14-2) is provided with the side template that described abutment wall forming panel is supported and props up Support.
6. according to the lining construction device based on portable full hall scaffold described in claim 5 it is characterised in that:Institute Stating left side wall pilot tunnel is all from top to bottom divided into upper lateral part pilot tunnel (1), middle sidepiece pilot tunnel (2) and following side to lead with right side wall pilot tunnel Hole (3);
Described side wall lining is divided into lower side wall lining (13-4) and is located at the upper side wall lining above lower side wall lining (13-4) (13-5), the junction between described lower side wall lining (13-4) and upper side wall lining (13-5) is located in middle sidepiece pilot tunnel (2);
Described abutment wall forming panel includes lower side wall lining (13-4) is carried out with the lower abutment wall forming panel (15-2) of molding construction With the upper abutment wall forming panel (15-3) that upper side wall lining (13-5) is carried out with molding construction, described upper abutment wall forming panel (15- 3) it is located above lower abutment wall forming panel (15-2);
Described side template bracing frame includes the lower sidewall template bracing frame that lower abutment wall forming panel (15-2) is supported (16-2) the upper sidewall template bracing frame (16-3) and to upper abutment wall forming panel (15-3) being supported.
7., according to the lining construction device based on portable full hall scaffold described in claim 1 or 2, its feature exists In:The length of described upper falsework (14-1) and two described sidepiece scaffolds (14-2) is 9m~12m.
8., according to the lining construction device based on portable full hall scaffold described in claim 1 or 2, its feature exists In:The upper tiling of described follow-up excavation region (6) has a upper backup pad (17) that upper falsework (14-1) is supported, described on Multiple top translation tracks (4) laid along tunnel longitudinal extension direction are provided with from left to right on gripper shoe (17);On described Portion's running gear include multigroup carry out movable top road wheel (5) in top translation track (4) respectively, described in every group on Portion's road wheel (5) all include multiple be arranged on from the front to the back upper falsework (14-1) bottom and be mounted on same described on Top road wheel (5) on portion's translation track (4);
The quantity that described arch springing section inverted arch backfills structure (12) is two, and two described arch springing section inverted arch backfill structure (12) are respectively It is located at the follow-up left and right sides excavating region (6);It is respectively arranged with left and right two on each described arch springing section inverted arch backfill structure (12) The bottom translation track (11) laid along tunnel longitudinal extension direction;Described lower running system includes two groups of left and right respectively two Individual described bottom translation track (11) carries out movable lower running wheel (18), and lower running wheel (18) described in every group is all It is arranged on sidepiece scaffold (14-2) bottom from the front to the back and is mounted on same described bottom translation track including multiple (11) the lower running wheel (18) on.
9. according to the lining construction device based on portable full hall scaffold described in claim 8 it is characterised in that:Institute State top translation track (4) and bottom translation track (11) is shaped steel track, described shaped steel track includes one channel-section steel and cloth It is located at the angle steel of described channel-section steel middle inside, described top road wheel (5) and lower running wheel (18) are can be along described angle steel Carry out movable steel wheel.
CN201620876752.9U 2016-08-12 2016-08-12 Tunnel lining construction device based on portable full hall scaffold frame Expired - Fee Related CN205936635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620876752.9U CN205936635U (en) 2016-08-12 2016-08-12 Tunnel lining construction device based on portable full hall scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620876752.9U CN205936635U (en) 2016-08-12 2016-08-12 Tunnel lining construction device based on portable full hall scaffold frame

Publications (1)

Publication Number Publication Date
CN205936635U true CN205936635U (en) 2017-02-08

Family

ID=57921089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620876752.9U Expired - Fee Related CN205936635U (en) 2016-08-12 2016-08-12 Tunnel lining construction device based on portable full hall scaffold frame

Country Status (1)

Country Link
CN (1) CN205936635U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112458936A (en) * 2020-11-30 2021-03-09 中铁十六局集团地铁工程有限公司 Construction method for integrally translating box culvert full-hall support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112458936A (en) * 2020-11-30 2021-03-09 中铁十六局集团地铁工程有限公司 Construction method for integrally translating box culvert full-hall support

Similar Documents

Publication Publication Date Title
CN205936644U (en) Tunnel lining construction structure based on two side wall drift methods
CN101440708B (en) PBA shallow buried underground excavating close range large section three-hole separated island type structure construction method
CN107605490B (en) Single hole large cross-section tunnel double side wall construction conversion process
CN103375170B (en) Underground excavation construction deformation control method for three-hole small clear distance tunnel underpass trunk railway
CN101864959B (en) Method for tunneling construction of main structure of underground station
CN104653187B (en) Method for excavating geological large-section tunnel with water-rich sand layer
CN106246190B (en) A kind of nine base tunnel construction methods of tunnel and Double side wall
CN103075163B (en) Support change process of second liner construction of large-cross-section tunnel
CN106837357B (en) A kind of no-dig technique pipe-roof method using curve pipe canopy
CN106050245A (en) Supporting structure for zero distance underneath pass of existing station of rectangular tunnel section and construction method
CN211038657U (en) Cover encircles based deeply buries loess tunnel deformation control construction structures
CN101864963A (en) Large-section loess tunnel construction method
CN106979021B (en) Large-section loess tunnel excavates and preliminary bracing quick closure cyclization method
CN110656959B (en) Large-section loess tunnel primary support limit-invasion arch-changing construction method
CN110439571A (en) Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel
CN106437741B (en) A kind of New Austrian Tunneling Method rock tunnel(ling) machine
CN110700841B (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN105201516A (en) Subway station body structure and four-joint-arch PBA underground excavation construction method thereof
CN112502721B (en) Arc-shaped bifurcation stepping construction method for positioning double TBMs based on double-line separate repair
CN110761808A (en) Large-section loess tunnel supporting system and supporting construction method
CN104632227A (en) Subway station excavation technology of single-layer beam arch structure
CN108361036B (en) A kind of construction method that subway station accessory structure is plug-in
CN205876360U (en) Interim support system is used in tunnel two side wall drift method excavation construction
CN107120119B (en) The construction method of Underground Subway Station
CN106121660B (en) Two side-wall pilot tunnel lining construction technique based on portable full hall scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208