CN205934940U - Anchoring structure of rock slope - Google Patents

Anchoring structure of rock slope Download PDF

Info

Publication number
CN205934940U
CN205934940U CN201620876063.8U CN201620876063U CN205934940U CN 205934940 U CN205934940 U CN 205934940U CN 201620876063 U CN201620876063 U CN 201620876063U CN 205934940 U CN205934940 U CN 205934940U
Authority
CN
China
Prior art keywords
anchor
hole
side slope
anchoring
rock side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620876063.8U
Other languages
Chinese (zh)
Inventor
郝鹏
张合作
程瑞林
申显柱
陈仁宏
邱焕峰
王蒙
唐腾飞
林金城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201620876063.8U priority Critical patent/CN205934940U/en
Application granted granted Critical
Publication of CN205934940U publication Critical patent/CN205934940U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an anchoring structure of a rock slope, which comprises a rock slope (1), wherein a soft layer (2) is arranged on the surface of the rock slope (1); an anchoring hole (3) arranged along the length direction of the rock slope (1) is arranged in the rock slope (1), and the anchoring hole (3) penetrates through the weak layer (2) through a construction branch hole (4) and leads to the outside of the rock slope (1); a series of anchoring holes (9) are formed in the inner wall of the anchoring hole (3), and opposite-penetrating anchor cables (5) are arranged in the anchoring holes (9); and two ends of the opposite-penetrating anchor cable (5) are provided with anchoring ends (6). The utility model discloses can be located the one end in the anchor hole at the anchor rope and set up the anchor end, hold the pulling force that improves the anchor rope through the anchor. The anchor cable has the advantages of convenience in maintenance, high guarantee rate, small prestress loss and short anchor cable length. The anchoring hole and the construction branch hole can be used as a drainage hole, so that the underground water level of the side slope is effectively reduced, and the infiltration rainwater is quickly drained away. Is suitable for the rocky slope treated by adopting the anchor cable.

Description

A kind of anchor structure of rock side slope
Technical field
This utility model is related to a kind of anchor structure of rock side slope, belongs to reinforcing side slope technique field.
Background technology
The method of existing reinforcing rock slope is to beat a series of anchor hole on side slope surface, then by anchor cable one by one In insertion anchor hole, then in anchor cable with anchor hole, pour into binding agent, using the cohesive force side slope of interior anchor hole anchoring section Anchored.Existing this anchor structure is affected very greatly by anchoring section concreting or grouting effect, and failure probability is big, and Grouted part is relied on to be anchored, anchor cable Len req is longer.
Utility model content
The purpose of this utility model is, provides that a kind of loss of prestress is less, anchor cable length is shorter, failure of cable probability The anchor structure of little rock side slope, with the cohesive force that relies on anchored end in anchor caverns and anchoring section, side slope carries out anchor simultaneously Gu, thus overcoming the deficiencies in the prior art.
The technical solution of the utility model is realized in:
A kind of anchor structure of rock side slope of the present utility model is that this structure includes rock side slope, the table of rock side slope There is soft layer in face;It is provided with the anchor caverns along rock side slope length direction arrangement, anchor caverns run through through working tunnel in rock side slope Soft layer leads to outside rock side slope;The inwall of anchor caverns is provided with a series of anchor holes, and anchoring in the hole is provided with two-ended cables;To wearing Anchor cable two ends are provided with anchored end.
In aforementioned structure, described two-ended cables include a branch of steel strand wires, a branch of steel strand wires midfeather be provided with isolating frame, The part that anchor hole is exposed at two-ended cables two ends is provided with anchored end, and the part that two-ended cables are located at anchor hole has poured binding agent.
In aforementioned structure, described anchored end includes being located at the positioning pipe in anchor hole aperture, is provided with flange outside positioning pipe;Turn over Side is provided with connecting bolt, and connecting bolt is connected with the anchor plate on work anchor, and work anchor is through intermediate plate and the steel through work anchor Twisted wire is fixedly connected.
Due to employing technique scheme, compared with prior art, this utility model can be in anchor cable position for this utility model One end setting anchored end in anchor caverns, improves the pulling force of anchor cable by anchored end.Have that easy to maintenance, fraction is high, pre- The advantage that stress loss is less, anchor cable length is short.Anchor caverns and working tunnel can double as scupper, effectively reduce slope underground water Bit line, and quickly drain and infiltrate rainwater.This utility model is particularly adapted to the rock side slope administered using anchor cable.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is two-ended cables structural representation.
In figure is labeled as:1- rock side slope, 2- soft layer, 3- anchor caverns, 4- working tunnel, 5- two-ended cables, 6- anchoring End, the former phreatic line of 7-, 8- improve after phreatic line, 9- anchor hole, 10- steel strand wires, 11- isolating frame, 12- binding agent, 13- positioning pipe, 14- flange, 15- connecting bolt, 16- work anchor, 17- anchor plate, 18- intermediate plate.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples, but not as new to this practicality Any restriction of type.
This utility model is constructed by the anchoring process according to a kind of following rock side slopes, as described in Figure 1:The method It is that a series of working tunnel extending within rock side slope are beaten on rock side slope, then open to both sides in the bottom of working tunnel Dig the anchor caverns extending along length of slope direction;Then beat a series of between the soft layer of anchor caverns and rock side slope outer surface Anchor hole, and in anchoring in the hole, two-ended cables are installed, two-ended cables two ends are respectively provided with anchored end;By two-ended cables two ends Anchored end improves the pulling force of two-ended cables.A series of described anchor hole is in fan-shaped distribution in vertical direction, and anchoring in the hole has poured Binding agent, the quantity of anchor hole not can exceed that limited number in the range of anchor caverns rock mass ultimate bearing capacity.In described working tunnel High outer low outward-dipping i=0.003~0.005;Anchor caverns and the highly minimum two ends in working tunnel junction are to intermediate, inclined i= 0.003~0.005;Anchor caverns and working tunnel double as scupper, infiltrate rainwater for quickly draining, and effectively reduce side slope underground Waterline.Excavating in described side slope has at least one working tunnel, and each working tunnel bottom has all been excavated along length of slope side To anchor caverns;The quantity of working tunnel depends on length and the height of side slope.
The anchor structure of the of the present utility model a kind of rock side slope constituting as stated above, as depicted in figs. 1 and 2, should Structure includes rock side slope 1, and there is soft layer 2 on the surface of rock side slope 1;It is provided with rock side slope 1 along rock side slope 1 length direction The anchor caverns 3 of arrangement, anchor caverns 3 run through soft layer 2 through working tunnel 4 and lead to outside rock side slope 1;Set on the inwall of anchor caverns 3 There are a series of anchor holes 9, in anchor hole 9, be provided with two-ended cables 5;Two-ended cables 5 two ends are provided with anchored end 6.Described two-ended cables 5 As shown in Fig. 2 including a branch of steel strand wires 10, a branch of steel strand wires 10 midfeather be provided with isolating frame 11, two-ended cables 5 two ends are revealed The part going out anchor hole 9 is provided with anchored end 6, and the part that two-ended cables 5 are located at anchor hole 9 has poured binding agent 12.Described anchoring End 6 includes being located at the positioning pipe 13 in anchor hole 9 aperture, is provided with flange 14 outside positioning pipe 13;Flange 14 is provided with connecting bolt 15, connecting bolt 15 is connected with the anchor plate 17 on work anchor 16, and work anchor 16 is twisted with the steel through work anchor 16 through intermediate plate 18 Line 10 is fixedly connected.
Embodiment
This example is propped up hole 4 by excavation construction and is entered inside rock side slope 1, then excavates out anchor caverns 3 to both sides again, in anchor Gu anchored end 6 is arranged on abutment wall in hole 3.Multiple rows of two-ended cables 5 are set on rock side slope 1 is domatic, and two-ended cables 5 are in fan-shaped point Cloth, two-ended cables 5 arrangement quantity not can exceed that limited number in the range of anchor caverns 3 rock mass ultimate bearing capacity.Anchor caverns 3 quantity can To be arranged as required to.Anchor caverns 3 and working tunnel 4 can double as scupper, effectively reduce slope underground water bit line, and quickly arrange Walk to infiltrate rainwater.As seen from Figure 1, the phreatic line 8 apparently higher than after improve for original phreatic line 7.
This utility model, compared with existing rock side slope prestress anchorage cable, has that easy to maintenance, fraction is high, prestressing force damages Lose the advantage less, anchor cable length is short, be adapted to the rock side slope administered using anchor cable.

Claims (3)

1. a kind of anchor structure of rock side slope, including rock side slope (1), there is soft layer (2) on the surface of rock side slope (1);Its It is characterised by:It is provided with the anchor caverns (3) along rock side slope (1) length direction arrangement, anchor caverns (3) warp in rock side slope (1) Working tunnel (4) runs through soft layer (2) and leads to rock side slope (1) outward;The inwall of anchor caverns (3) is provided with a series of anchor holes (9), it is provided with two-ended cables (5) in anchor hole (9);Two-ended cables (5) two ends are provided with anchored end (6).
2. according to claim 1 rock side slope anchor structure it is characterised in that:Described two-ended cables (5) include a branch of Steel strand wires (10), a branch of steel strand wires (10) midfeather be provided with isolating frame (11), anchor hole is exposed at two-ended cables (5) two ends (9) part is provided with anchored end (6), and the part that two-ended cables (5) are located at anchor hole (9) has poured binding agent (12).
3. according to claim 1 rock side slope anchor structure it is characterised in that:Described anchored end (6) includes being located at anchor The positioning pipe (13) in solid hole (9) aperture, is provided with flange (14) outside positioning pipe (13);Flange (14) is provided with connecting bolt (15), connecting bolt (15) is connected with the anchor plate (17) on work anchor (16), and work anchor (16) is through intermediate plate (18) and through work The steel strand wires (10) making anchor (16) are fixedly connected.
CN201620876063.8U 2016-08-14 2016-08-14 Anchoring structure of rock slope Withdrawn - After Issue CN205934940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620876063.8U CN205934940U (en) 2016-08-14 2016-08-14 Anchoring structure of rock slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620876063.8U CN205934940U (en) 2016-08-14 2016-08-14 Anchoring structure of rock slope

Publications (1)

Publication Number Publication Date
CN205934940U true CN205934940U (en) 2017-02-08

Family

ID=57920021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620876063.8U Withdrawn - After Issue CN205934940U (en) 2016-08-14 2016-08-14 Anchoring structure of rock slope

Country Status (1)

Country Link
CN (1) CN205934940U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120820A (en) * 2016-08-14 2016-11-16 中国电建集团贵阳勘测设计研究院有限公司 Anchoring method and structure of rock slope
CN109184761A (en) * 2018-10-29 2019-01-11 河南大有能源股份有限公司耿村煤矿 A method of solving two sides rock mass deformation enhances country rock globality
CN110453693A (en) * 2019-03-02 2019-11-15 华北水利水电大学 It is a kind of using adit formula to the treatment schemes of anchor

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120820A (en) * 2016-08-14 2016-11-16 中国电建集团贵阳勘测设计研究院有限公司 Anchoring method and structure of rock slope
CN106120820B (en) * 2016-08-14 2018-06-12 中国电建集团贵阳勘测设计研究院有限公司 Anchoring method and structure of rock slope
CN109184761A (en) * 2018-10-29 2019-01-11 河南大有能源股份有限公司耿村煤矿 A method of solving two sides rock mass deformation enhances country rock globality
CN109184761B (en) * 2018-10-29 2020-03-17 河南大有能源股份有限公司耿村煤矿 Method for solving problem of reinforcing integrity of surrounding rock by deformation of two rock masses
CN110453693A (en) * 2019-03-02 2019-11-15 华北水利水电大学 It is a kind of using adit formula to the treatment schemes of anchor

Similar Documents

Publication Publication Date Title
CN107313431B (en) Close on not contour foundation pit method for synchronously constructing
CN106120820B (en) Anchoring method and structure of rock slope
CN201746840U (en) Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling
CN206233951U (en) Depressurize drainage system in a kind of high-speed railway double track tunnel base
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN205934940U (en) Anchoring structure of rock slope
CN110439008A (en) A kind of composite reinforcement method suitable for Soft Rock Slope landslide control
CN112431213B (en) Ecological comprehensive treatment structure for semi-rigid support of artificial slope and construction method thereof
CN104674863A (en) Method for reinforcing existing municipal pipe gallery within deep foundation pit excavation range
CN103306283B (en) Method for improving shear strength of non-metal anti-floating anchor rod
CN102304927B (en) Prestress anchor cable buttress-type parapet suitable for rock substrate
CN207452895U (en) A kind of high slope anchored pile supporting
CN207111103U (en) A kind of benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three
CN100513705C (en) Underground Beam-Pile Frame Structure for Slope Reinforcement
CN107012791A (en) Tunnel-Type Anchorage of Suspension Bridge waterproof and water drainage system is with building construction method
CN204491683U (en) A kind of ruggedized construction to municipal piping lane existing within the scope of deep pit digging
CN107587476B (en) Wave-blocking wall with prefabricated reverse arc olecranon structure and design and construction method thereof
CN206233950U (en) Depressurize drainage system in a kind of high-speed railway single-track tunnel base
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN112127910B (en) Tunnel construction extra-front supporting sheath arch structure
CN103306293A (en) Reinforcement structure and construction method for water-rich landslide
CN210140832U (en) Prestressed occlusion type double-row pile foundation pit supporting structure
CN211312528U (en) Anti-floating waterproof system applied to deep foundation pit in karst water-rich area
CN209430248U (en) A kind of buried Central drain discharge structure of novel tunnel
CN104632246B (en) A kind of UNDERGROUND STRUCTURES

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20180612

AV01 Patent right actively abandoned