CN205934931U - Lid is in same direction as foundation ditch structure of digging way of doing things construction - Google Patents

Lid is in same direction as foundation ditch structure of digging way of doing things construction Download PDF

Info

Publication number
CN205934931U
CN205934931U CN201620551268.9U CN201620551268U CN205934931U CN 205934931 U CN205934931 U CN 205934931U CN 201620551268 U CN201620551268 U CN 201620551268U CN 205934931 U CN205934931 U CN 205934931U
Authority
CN
China
Prior art keywords
foundation ditch
grooving
prefabricated
cover plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620551268.9U
Other languages
Chinese (zh)
Inventor
金威
彭加强
邹金杰
沈碧辉
熊松
林志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201620551268.9U priority Critical patent/CN205934931U/en
Application granted granted Critical
Publication of CN205934931U publication Critical patent/CN205934931U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a lid is in same direction as foundation ditch structure of digging way of doing things construction, the soil body, structural floor and apron in the hole, foundation ditch week is inclined and is equipped with underground continuous wall, structural floor with every keep (shenglvehao)at a certain distance away erects the steel shotcrete in the foundation ditch between the apron, set up grooving in advance in the hole in the soil body, the steel shotcrete sets up in advance in the grooving, the prefabricated lifting hook component of apron bottom fixedly connected with, prefabricated lifting hook component is followed the length direction of steel shotcrete arranges. The utility model discloses a structure can be in the lid digs the foundation ditch engineering in the same direction as way of doing things construction, through grooving pre -embedded steel pipe's method, utilizes prefabricated lifting hook member and hoisting equipment to carry out horizontal steel shotcrete in the hoist and mount of arbitrary elevation, and the system is reliable, the simple operation, and having overcome the lid, to dig the steel shotcrete hoist and mount that lead to the fact because the space is narrow and small in the construction of method foundation ditch difficult.

Description

A kind of Gai Shun digs the foundation pit structure of practice construction
Technical field
The utility model is related to a kind of foundation pit structure of cover and cut method, and main inclusion bracing members are pre-buried, and cover plate bottom is pre- Hook member processed, and lifted on the spot using hoisting equipment.
Background technology
At present, generally hanging of Horizontal steelwork bracing is carried out using straddle truck or lifting machinery along in practice Excavation Process Dress.When cover and cut method is constructed, cover plate applies and excavates prior to foundation ditch main body, and straddle truck and lifting machinery cannot be carried out lifting and make Industry, the lifting therefore generally carrying out Horizontal steelwork bracing in cover plate bottom hung electric block is installed, and implements more difficult, and operation Time is long.
Content of the invention
Technical problem to be solved in the utility model is the foundation pit structure providing a kind of Gai Shun to dig practice construction, Neng Gouli Carry out the bracing members lifting operation of any absolute altitude with small space, and easy to operate, operating efficiency is high.
The utility model solves technical problem and be employed technical scheme comprise that:A kind of Gai Shun digs the foundation ditch knot of practice construction Structure, including the soil body, structure base slab and cover plate in hole, described foundation ditch the week side of boss is provided with diaphram wall, described structure base slab and described Set up bracing members at interval of certain distance in foundation ditch between cover plate, in the soil body in described hole, open up pre- grooving, described bracing members It is arranged in described pre- grooving, described cover plate bottom is fixedly connected with prefabricated hook member, described prefabricated hook member is along described The length direction arrangement of bracing members.
While using technique scheme, the utility model can also adopt or combination is using further below Technical scheme:
The top of described foundation ditch sets up reinforced concrete support, and described reinforced concrete support is arranged on described pre- grooving Interior, described cover plate is erected on described reinforced concrete support.
When reaching bracing members installation site, the bracing members in pre- grooving are lifted to by steel strand wires using hoisting equipment Designed elevation, and installed.
Described prefabricated hook member includes reinforcing bar crotch, prefabricated steel and suspension hook, and described reinforcing bar crotch hangs and is welded on In the cage bar of cover plate, described prefabricated steel is fixedly connected on reinforcing bar crotch lower end, and described suspension hook is fixedly connected on described pre-manufactured steel On plate.
After the completion of prefabricated hook member welded and installed, using cover plate concrete, cover plate is poured.
The beneficial effects of the utility model are:Structure of the present utility model can be in the base pit engineering of cover and cut method construction In, by the method for grooving embedded steel tube, carry out Horizontal steelwork bracing in any absolute altitude using prefabricated hook member and hoisting equipment Lifting, system is reliable, simple operation, overcomes the bracing members lifting causing in cap excavation method foundation pit construction due to narrow space Difficult.
Brief description
Fig. 1 is overall structure diagram of the present utility model.
Fig. 2 is cross sectional view of the present utility model.
Fig. 3 is the cross sectional view of work progress of the present utility model.
Fig. 4 is profilograph of the present utility model.
Fig. 5 is prefabricated components profile of the present utility model.
Specific embodiment
Referring to the drawings.
Gai Shun of the present utility model digs the foundation pit structure of practice construction, including the soil body 1, structure base slab 6 and cover plate 4 in hole, Described foundation ditch the week side of boss is provided with diaphram wall 3, at interval of a spacing in the foundation ditch between described structure base slab 6 and described cover plate 4 From setting up bracing members 5, open up pre- grooving 7 in the soil body 1 in described hole, described bracing members 5 are arranged in described pre- grooving 7, described Cover plate 4 bottom is fixedly connected with prefabricated hook member 8, and prefabricated hook member 8 is by reinforcing bar crotch 14, prefabricated steel 15 and suspension hook 16 It is welded, reinforcing bar crotch 14 should be welded in cover plate cage bar 13.
Described prefabricated hook member 8 is along the length direction arrangement of described bracing members 5.
The top of described foundation ditch sets up reinforced concrete support 11, the structure of reinforced concrete support 11 and bracing members 5 phase Same, it also is provided with the pre- grooving 7 supporting with reinforced concrete support 11 in the soil body 1 in hole, described reinforced concrete support 11 is arranged In described pre- grooving 7, described cover plate 4 is erected on described reinforced concrete support 11.
Described prefabricated hook member 8 includes reinforcing bar crotch 14, prefabricated steel 15 and suspension hook 16, and described reinforcing bar crotch 14 hangs And be welded in the cage bar 13 of cover plate 4, described prefabricated steel 15 is fixedly connected on reinforcing bar crotch 14 lower end, and described suspension hook 16 is fixing It is connected in described prefabricated steel 15.After the completion of prefabricated hook member 6 welded and installed, using cover plate concrete 12, cover plate is carried out Pour.
When foundation pit construction is carried out using cover and cut method, as shown in figure 1, carry out first levelling of the land, hole in external reinforcement and Diaphram wall 3 is constructed, and starts grooving and pour first Guan Liang, support and cover plate 4 after diaphragm wall reaches design strength requirement, Recover floor traffic 2, subsequently progressively excavate the soil body 1 in hole below 4 in cover plate and to each road bracing members absolute altitude and apply, excavation of foundation pit Complete after-pouring bed course and structure base slab 6, finally carry out the construction of structure from bottom to top.
The installation of steel bracket as shown in Fig. 2 first according to bracing members design and installation position in the soil body 1 in hole in advance Grooving 7, the bracing members 5 that need to set up at this are entirely within, and make prefabricated hook member 8 according to Fig. 5, and are welded and cover plate 4 bottoms corresponding position, carry out pouring of cover plate concrete 12, prefabricated suspension hook structure after the completion of prefabricated hook member 8 welded and installed Part 8 and cover plate 4 should be adjusted according to bracing members deadweight, from suitable reinforcing bar label and plate size.
Pre- grooving 7 should be able to accommodate all bracing members 5 and prefabricated hook member 8 it is considered to first support of foundation ditch may be adopted With concrete support, prefabricated hook member 8 can avoid concrete support arrangement.
As shown in figure 3, with the excavation of the soil body 1 in hole, when reaching first bracing members installation site, being set using elevator Bracing members 5 in pre- grooving 7 are lifted to designed elevation by steel strand wires 10 by standby 9, and are installed.In the diagram, prefabricated suspension hook Component 8 should be arranged symmetrically along bracing members 5 length direction to guarantee that during lifting, bracing members 5 keep balance.

Claims (3)

1. a kind of Gai Shun digs the foundation pit structure of practice construction, and including the soil body, structure base slab and cover plate in hole, described foundation ditch the week side of boss sets Have diaphram wall it is characterised in that:Set up at interval of certain distance in foundation ditch between described structure base slab and described cover plate Bracing members, open up pre- grooving in the soil body in described hole, described bracing members are arranged in described pre- grooving, and described cover plate bottom is fixed It is connected with prefabricated hook member, described prefabricated hook member is along the length direction arrangement of described bracing members.
2. as claimed in claim 1 a kind of Gai Shun dig the practice construction foundation pit structure it is characterised in that:The top of described foundation ditch Reinforcement placing concrete support, described reinforced concrete support is arranged in described pre- grooving, and described cover plate is erected at described steel On reinforced concrete supports.
3. as claimed in claim 1 a kind of Gai Shun dig the practice construction foundation pit structure it is characterised in that:Described prefabricated suspension hook structure Part includes reinforcing bar crotch, prefabricated steel and suspension hook, and described reinforcing bar crotch hangs and is welded in the cage bar of cover plate, described pre-manufactured steel Plate is fixedly connected on reinforcing bar crotch lower end, and described suspension hook is fixedly connected in described prefabricated steel.
CN201620551268.9U 2016-06-08 2016-06-08 Lid is in same direction as foundation ditch structure of digging way of doing things construction Active CN205934931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620551268.9U CN205934931U (en) 2016-06-08 2016-06-08 Lid is in same direction as foundation ditch structure of digging way of doing things construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620551268.9U CN205934931U (en) 2016-06-08 2016-06-08 Lid is in same direction as foundation ditch structure of digging way of doing things construction

Publications (1)

Publication Number Publication Date
CN205934931U true CN205934931U (en) 2017-02-08

Family

ID=57932002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620551268.9U Active CN205934931U (en) 2016-06-08 2016-06-08 Lid is in same direction as foundation ditch structure of digging way of doing things construction

Country Status (1)

Country Link
CN (1) CN205934931U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108203981A (en) * 2018-01-18 2018-06-26 上海隧道工程有限公司 It is used to install the system and method for bracing members in cap excavation method
CN109944250A (en) * 2019-03-07 2019-06-28 上海建工集团股份有限公司 The foundation pit of impermanent vertical support system is along inverse combining construction method
CN113235951A (en) * 2021-06-16 2021-08-10 浙江吉通地空建筑科技有限公司 Installation method and connection structure of section steel support

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108203981A (en) * 2018-01-18 2018-06-26 上海隧道工程有限公司 It is used to install the system and method for bracing members in cap excavation method
CN109944250A (en) * 2019-03-07 2019-06-28 上海建工集团股份有限公司 The foundation pit of impermanent vertical support system is along inverse combining construction method
CN109944250B (en) * 2019-03-07 2020-11-27 上海建工集团股份有限公司 Foundation pit forward and backward combined construction method of non-permanent vertical supporting system
CN113235951A (en) * 2021-06-16 2021-08-10 浙江吉通地空建筑科技有限公司 Installation method and connection structure of section steel support

Similar Documents

Publication Publication Date Title
CN108086340B (en) Open caisson construction structure and construction method thereof
CN104947654B (en) Complicated water area inclined rock face large-diameter cast-in-place pile construction method
CN102230313B (en) Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
CN106013053B (en) A kind of steel sheet pile construction method for supporting for being used to build underground garage open caisson
CN102953373B (en) Quicksand condition For Artificial Excavation Caisson Pile construction
CN205934931U (en) Lid is in same direction as foundation ditch structure of digging way of doing things construction
CN105926672B (en) A kind of Underground Subway Station steel pipe column construction method
CN105133575B (en) Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method
WO2023066325A1 (en) Sunken frame foundation and ground prefabricating equipment and sinking device thereof
CN107476337A (en) The prefabricated side wall assembling and construction method in open cut subway assembled station
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN109183812B (en) Construction method of combined deep foundation pit supporting structure
CN107620311A (en) A kind of mud off pore-creating filling pile prevents the method that aperture casing sinks
CN104564091A (en) Method and device for removing anchor rods from shield crossing area
CN110904956B (en) Cast-in-place pile construction process
CN109629576A (en) Cross foundation pit feed pipe suspension protection system and construction method
CN106498951B (en) A kind of shaft excavation construction method
CN105178356B (en) Setting-up construction method for vertical joint bars of columns in reverse building method
CN207828995U (en) Open caisson construction structure
CN108118728B (en) Efficient soil excavating device and method for special-shaped deep foundation pit
CN206941596U (en) A kind of shoulder pole boom device for lifting steel reinforcement cage
CN105064333A (en) Large-diameter cast-in-place concrete pile lengthened template support system
CN104404923A (en) Arch dam bracket template device and construction method based on arch dam bracket template device
CN105274984A (en) Double-casing-pipe full-circle-swinging erect column pile construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant