CN205934847U - Riverbed and sea bed scour prevention quilt - Google Patents

Riverbed and sea bed scour prevention quilt Download PDF

Info

Publication number
CN205934847U
CN205934847U CN201620828810.0U CN201620828810U CN205934847U CN 205934847 U CN205934847 U CN 205934847U CN 201620828810 U CN201620828810 U CN 201620828810U CN 205934847 U CN205934847 U CN 205934847U
Authority
CN
China
Prior art keywords
gizzard
square
water pocket
strip
protection against
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620828810.0U
Other languages
Chinese (zh)
Inventor
刘金龙
刘洁群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University
Hefei College
Original Assignee
Hefei College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei College filed Critical Hefei College
Priority to CN201620828810.0U priority Critical patent/CN205934847U/en
Application granted granted Critical
Publication of CN205934847U publication Critical patent/CN205934847U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a riverbed and sea bed scour prevention quilt, including a plurality of square water pocket, the rectangular shape gizzard of a plurality of, a plurality of square gizzard, all be provided with the suture zone around square water pocket, rectangular shape gizzard, the square gizzard, that evenly arranges interval distribution on the suture zone central line sews up hole, spud pile jack, square water pocket, rectangular shape gizzard, square gizzard suture zone all around correspond the overlapping suture, pass through the stylolite that to sew up the jogged joint fixed, sew up the equipment according to required size and become band. The utility model discloses mode flexible and diverse is assembled each other to square water pocket, rectangular shape gizzard, square gizzard in the work progress, fills mud grouting water in the square water pocket, makes it can self -immersing in the water, construction convenience, economy, required less with the sand volume, weight is less, and the installation need not the large -scale equipment that lifts by crane, the water pocket is simple with the gizzard configuration, carries and convenient to use, can realize standardized, large -scale production.

Description

A kind of riverbed and sea bed protection against erosion quilt
Technical field:
This utility model is related to hydraulic engineering technical field, more particularly, to a kind of riverbed and sea bed protection against erosion quilt.
Background technology:
Wash away the erosion scour process referring to current to riverbed, sea bed.The sediment carrying capacity of all current is more than the next husky of upstream During amount, riverbed all washes away.Wash away and be divided into the general scour more generally occurring on riverbed and occurred by Effects on Engineering Local scour.Riverbed silt, under flow action, is downstream moved and causes riverbed to reduce or water front retrogressing, cause riverbank to collapse Collapse and breach a dyke, bridge collapse, Coastal erosion, hydraulic structure are scrapped etc..
It is current scour riverbank, a process of bank slope avalanche alternating action iterative cycles that bank slope destroys.Bank slope toe soil After body is washed out, remainder collapses into korneforos, and current continue the temporary bank slope of destruction makes bank slope successively retreat, and then causes riverbank Avalanche.Neigh in the Jiujiang of China middle and lower reach of Yangtze River and exit of a lake section, Anhui Guan Zhou section, Jiangsu Yangzhou Liu Xu section and Jiangdu Horse section, to eastern abutment section, the River Mouth that oozes, Jinan section etc., all extremely serious collapse on the bank in Lower Reaches of The Yellow River Zhengzhou Dangerous situation.Hekou District mankind's activity is more complicated, and harbour, bridge, dyke and mistake river (extra large) tunnel etc. are waterborne or underwater structure is many Many, these buildings are once destroyed, and to society, economic impact greatly, and river mouth washes away, and is to lead to building to damage One of important factor.
In addition, the development & construction of minimizing recently as sediment discharge and coastal region, sea bed experiencings various Change, original balance is destroyed, and corrosion function is strengthened.In ocean engineering, due to wave, the effect of current and cause sea Foreign works and its sediment movement of neighbouring sea bed, i.e. seafloor scour phenomenon.Wash away and be because that the flow intensity of locality is too big, water What the quantity of sand and mud that stream brings was local less than current washes away external shift quantity.Usually, the appearance of marine structure changes the fortune of current Dynamic direction, is allowed to generation and streams and local ratio chi vortex greatly, accelerate the souring in seabed.
Typically can stop, slow down the souring of current using bank-protection works.Bank-protection works is in flood fighting over the years and maintenance Important function has been played during river gesture is stable.Existing underwater slope protection engineering groynes, jackstone, throwing slag, mattress sinking, heavy cage etc.;Water Upper bank protection using cutting slope stone-laying, place mat concrete precast block, casting concrete etc., all to a certain extent have protection bank slope, Maintain the stable effect in river course.
These bank-protection works can strengthen the impact resistance on bank slope top layer, improve the stability of bank slope, but quantities is big, cost Higher, long construction period.The construction and installation that require study are easy, protection against erosion ability is strong, the new riverbank of economic and reliable and seashore are prevented Flushing device.
Utility model content:
In order to make up the deficiency of prior art problem, the purpose of this utility model is to provide a kind of riverbed and sea bed protection against erosion Quilt, its structure is simple, easy construction, good in economic efficiency it is adaptable to scour protection to riverbank and seashore.
The technical solution of the utility model is as follows:
Riverbed and sea bed protection against erosion by it is characterised in that include several square water pockets, several strip gizzards, Several square gizzards,
Described square water pocket includes crisscross barrier, and barrier is divided into multiple not connected grid spaces, It is placed with little square water pocket, little square water pocket charges slime water structure by square utricule and utricule inner chamber in grid spaces Become;
Described strip gizzard is made up of filling sand body in rectangle utricule and utricule inner chamber;
Described square gizzard is constituted by being filled with sand body in square utricule and utricule inner chamber;
Described square water pocket, strip gizzard, square gizzard surrounding are provided with suture zone, suture zone centrage On be evenly arranged sewing hole spaced apart, spud pile jack;
Described square water pocket, strip gizzard, square gizzard surrounding suture zone correspond to overlapping suture, by suture Line is connected through sewing hole, selects appropriate number of square water pocket, strip gizzard, square sand according to required size Capsule carries out suture assembling and becomes band.
Described riverbed and sea bed protection against erosion by it is characterised in that described square water pocket center position arrange into/ Apopore.
Described riverbed and sea bed protection against erosion are by it is characterised in that described strip gizzard length and square water pocket The length of side is equal, and sand cuff is filled in the setting of its center position.
Described riverbed and sea bed protection against erosion are by it is characterised in that described its length of side of square gizzard and strip sand The width of capsule is equal, and sand cuff is filled in the setting of its center position.
Described riverbed and sea bed protection against erosion are by it is characterised in that described square water pocket, strip gizzard and pros The thickness of shape gizzard is identical, and slime water, sand body fill the upper and lower surface of latter three at grade.
The utility model has the advantages that:
1), this utility model a number of square water pocket, strip gizzard, the mutually arranged assembling of square gizzard and Become, flexibly, assembling profile variation is various for assembling mode, adapting to the riverbed under the conditions of varying environment is needed with the protection against erosion of sea bed Will;
2), charge slime water so as to can drown oneself in water body in this utility model square water pocket.Slime water is just being applied Work is prepared in situ, easy construction, economy;
3), this utility model strip gizzard, square gizzard filling sand body, plays effect that is fixing, holding protection against erosion quilt, Protection against erosion after assembling is less by middle gizzard occupied area ratio, therefore required sand using amount is less, and weight is less, and installation need not be large-scale Lifting appliance, cost of transportation is low;
4), this utility model square water pocket, strip gizzard, square gizzard configuration are simple, product can crispatura bundled, Small volume, carries and easy to use, achievable standardization, large-scale production.
Brief description:
Fig. 1 is square water pocket structural representation of the present utility model.
Fig. 2 is strip gizzard structural representation of the present utility model.
Fig. 3 is square gizzard structural representation of the present utility model.
Fig. 4 is that water pocket of the present utility model sutures schematic diagram with gizzard.
Fig. 5 is combination embodiment one structural representation of the present utility model.
Fig. 6 is the A-A sectional view of Fig. 5.
Fig. 7 is combination embodiment two structural representation of the present utility model.
Fig. 8 is the B-B sectional view of Fig. 7.
Fig. 9 applies to the schematic diagram in slopes mud face under water for this utility model.
Description of reference numerals:1st, water pocket;2nd, entry/exit water hole;3rd, barrier;4th, suture zone;5th, sewing hole;6th, spud pile is inserted Hole;7th, strip gizzard;8th, fill sand cuff;9th, square gizzard;10th, spud pile;11st, stitching thread.
Specific embodiment:
Referring to accompanying drawing:
Riverbed and sea bed protection against erosion quilt, by several square water pockets, several strip gizzards 7, several squares Gizzard 9 is mutually assembled.Water pocket can be spliced by terylene geotextiles with the main body cover of gizzard;Terylene geotextiles right and wrong Weaving and industrial cloth one kind, using terylene crimped staple be raw material, by the shredding of nonwoven production equipment, combing, The flow process of the production technology such as (chopped fiber is interweaved together), lapping (normalization entanglement set), acupuncture makes cloth-like in a jumble, There is the functions such as isolation, filtration, draining, reinforcement, protection.
The utricule of square water pocket is made up of macromolecular material, have airtight, do not seep water, the spy such as elastic deformation is big Levy;Utricule is separated into several not connected little square water pockets 1 by barrier 3 laterally and longitudinally, in little square water pocket 1 Charge the slime water of job site preparation, the density ratio water body density of slime water is big, and the square water pocket charging slime water is certainly Recast is laid on riverbed or the sea bed of intending protection against erosion with lower can drowning oneself, favourable to the monolithic stability of protection against erosion quilt.
Little square water pocket 1 between not connected, be the independence in order to keep each water pocket, when individually little square water Capsule 1 is punctured in extreme condition and during leak, it does not affect other adjacent little square water pockets 1, thus impact is reduced to Minimum;Envelop materialses need to possess the big feature of elastic deformation, is its energy in order that water pocket is under being acted on by larger water impact Occur corresponding elastic deformation to be unlikely to produce destruction, can substantially recover former state when stress is less.
Little square water pocket 1 length is equal with width, and its center position arranges entry/exit water hole 2, existing in construction during use Field charges slime water to entry/exit water hole 2, closes entry/exit water hole 2, so that internal slime water cannot be exosmosed after filling.
Its length of strip gizzard 7 is equal with the length of side of square water pocket, filling sand body in it;Square its side of gizzard 9 Length is equal with the width of strip gizzard 7, filling sand body in it;The advantage of these size relationships is:The length of strip gizzard 7 Side can be with square water pocket arbitrarily while be connected, and square gizzard 9 can be connected with the minor face of strip gizzard 7, thus up to Arrive square water pocket, strip gizzard 7, the mutual assembling of square gizzard 9, as shown in Fig. 5 and Fig. 7.
Strip gizzard 7 and square gizzard 9, sand cuff 8 is filled in center position setting, can be on the coast or on ship during use Pour into sand body to filling sand cuff 8, gizzard is tied up after being full of sand body and firmly filled sand cuff 8.
Square water pocket, strip gizzard 7, square gizzard 9 surrounding are respectively provided with suture zone 4, on suture zone 4 centrage all Even arrangement sewing hole 5 and spud pile jack 6.Align square water pocket, strip gizzard 7, square gizzard 9 four using stitching thread 11 Sewing hole 5 on all suture zones 4 carries out corresponding to overlapping suture, as shown in Figure 4.
The banding polypropylene reinforcement material that suture zone 4 can be composited by high tensile steel wire outer wrapping macromolecular material is made.High Strong steel wire is main tension elements, and macromolecular material with steel wire co-ordination and protects steel wire to exempt from corrosion, and polypropylene has intensity High, wear-resisting the features such as.
Its centrage of suture zone 4 is provided with a fairly large number of sewing hole 5.The diameter of sewing hole 5 is less, can allow stitching thread 11 convenient through therefore current are difficult to by the small holes of sewing hole 5 to sea bed generation souring.After suture zone suture Intensity, should be sufficient for construction hoisting needs and the rare percussion meeting current of opposing.Stitching thread 11 should, bullet higher using intensity Larger, the uncorruptible material of property is made.
Square water pocket, strip gizzard 7 are identical with the thickness of square gizzard 9, after filler (slime water, sand body) The upper and lower surface of three is at grade.
A number of spud pile jack 6 is also set up on its centrage of suture zone 4, spud pile jack 6 is worn for spud pile 10 More, spud pile jack 6 adjacent material performance should meet stress concentration needs.
Riverbed and sea bed protection against erosion quilt, using spud pile 10 pass through each spud pile jack 6 insert riverbed, in seabed soil, Reach the purpose of fixing protection against erosion quilt;Spud pile 10 can be timber, piling bar or reinforced concrete pile, should be according to different current Its material of environmental selection and size it is ensured that protection against erosion by rare meet spud pile 10 under flow action and be not pulled out lost efficacy.
Preferably, the length of side of little square water pocket 1 is between 0.5m~1.0m.
Preferably, the density of little square the charged slime water of water pocket 1 is in 1.10g/cm3~1.20g/cm3Between.
Preferably, the length of side of square water pocket is between 1.5m~4.0m.
Preferably, the bond length of strip gizzard 7 is the 1/3~1/5 of its long edge lengths.
Preferably, little square water pocket 1, the thickness after strip gizzard 7 and the filling of square gizzard 9 200mm~ Between 400mm.
Preferably, if intending, protection against erosion area water velocity is larger, it is more serious to wash away, and each square water pocket surrounding is all and strip Shape gizzard 7 is connected, as shown in Figure 5;The protection against erosion that so assembling is formed is by gross weight is relatively large, stability is relatively preferable;If Intend that protection against erosion area water velocity is general, it is serious to wash away, each square water pocket surrounding not necessarily all with strip gizzard 7 phase Even, as shown in Figure 7;The protection against erosion that so assembling is formed is less by sand using amount.
Riverbed and sea bed protection against erosion quilt, no matter how phase between square water pocket, strip gizzard 7 and square gizzard 9 Mutually assemble, protection against erosion is both needed to arrange gizzard, as shown in Fig. 5 and Fig. 7, it is fixed, the effect of flanging by outermost four side.
Riverbed and sea bed protection against erosion quilt, all spud pile jacks 6 on suture zone 4 outside four side gizzards, are both needed to about Pass through fixation with spud pile 10, prevent protection against erosion under larger flow action from being started, distorting, turning up by overall.And erosion control Brush, by internal spud pile jack 6, can pass through fixation with spud pile 10 on demand;Get final product symmetrical selected section spud pile jack 6 Pass through fixation with spud pile 10, save the consumption of spud pile 10.
Riverbed and sea bed protection against erosion quilt, can protect to the mud of the slopes under water face of certain slope, as shown in Figure 9;Application When domatic, the quantity of spud pile 10 should be prevented from preventing enough to maintain protection against erosion by the homeostasis under bad working environments with intensity Wash away and produced destruction, lost efficacy in deadweight and the domatic slide downward of flow action lower edge.
Riverbed is as follows by Specific construction process with sea bed protection against erosion:
1), according to flow condition, the pretective acreage intending protection against erosion region, determine protection against erosion by required square water pocket, length The particular number of bar shaped gizzard 7 and square gizzard 9 and connected mode;On the coast or on ship to all strip gizzards 7 with just Square gizzard 9 filling sand body, ties up after being full of and firmly fills sand cuff 8, be transported to job site;
2), according to layout, based on stitching thread 11 to adjacent square water pocket, strip gizzard 7 and square gizzard 9 Sewing hole 5 in same position on suture zone 4 is sutured, and is mutually assembled into required design configuration;
3), prepare required slime water at the construction field (site).Can aboard ship or in water, to assemble the protection against erosion of formation by institute Have in water pocket 1 and charge slime water, after filling, close entry/exit water hole 2, so that the pulp-water of the internal mud of water pocket 1 cannot be leaked outside;
4), the protection against erosion quilt of full slime water and sand body will be had been filled with, be laid in plan protection against erosion region, protection against erosion should be put down Smooth, no rugosity is laid on mud face;
5), utilize spud pile 10 to pass through each spud pile jack 6 to insert in riverbed or seabed soil, after reaching fixing assembling The purpose of protection against erosion quilt, periphery that is equably fixing, holding protection against erosion quilt and middle part, check that each construction link quality meets setting After requirement, construction finishes.
In implementation process, the volume of filling slime water accounts for 60%~80% to this utility model, and the volume of filling sand body accounts for 20%~40% it is seen then that the method sand using amount is less, alleviates overall weight, and difficulty of construction reduces, good in economic efficiency.
This utility model is not limited to above-mentioned specific embodiment, according to the above, according to the ordinary skill of this area Knowledge and customary means, under the premise of without departing from this utility model above-mentioned basic fundamental thought, this utility model can also be made The equivalent modifications of other various ways, replacement or change, all fall within protection domain of the present utility model.

Claims (5)

1. a kind of riverbed and sea bed protection against erosion are by it is characterised in that include several square water pockets, several strip sand Capsule, several square gizzards,
Described square water pocket includes crisscross barrier, and barrier is divided into multiple not connected grid spaces, grid It is placed with little square water pocket, little square water pocket is constituted by charging slime water in square utricule and utricule inner chamber in region;
Described strip gizzard is made up of filling sand body in rectangle utricule and utricule inner chamber;
Described square gizzard is constituted by being filled with sand body in square utricule and utricule inner chamber;
Described square water pocket, strip gizzard, square gizzard surrounding are provided with suture zone, on suture zone centrage all Even it is disposed with sewing hole spaced apart, spud pile jack;
Described square water pocket, strip gizzard, square gizzard surrounding suture zone correspond to overlapping suture, are worn by stitching thread Cross sewing hole to be connected, select appropriate number of square water pocket, strip gizzard, square gizzard to enter according to required size Row suture assembling becomes band.
2. riverbed according to claim 1 and sea bed protection against erosion are by it is characterised in that described square water pocket centre bit Put place setting entry/exit water hole.
3. riverbed according to claim 1 and sea bed protection against erosion by it is characterised in that described strip gizzard length with The square water pocket length of side is equal, and sand cuff is filled in the setting of its center position.
4. riverbed according to claim 1 and sea bed protection against erosion are by it is characterised in that described its length of side of square gizzard Equal with the width of strip gizzard, sand cuff is filled in the setting of its center position.
5. riverbed according to claim 1 and sea bed protection against erosion are by it is characterised in that described square water pocket, strip Shape gizzard is identical with the thickness of square gizzard, and slime water, sand body fill the upper and lower surface of latter three at grade.
CN201620828810.0U 2016-08-02 2016-08-02 Riverbed and sea bed scour prevention quilt Expired - Fee Related CN205934847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620828810.0U CN205934847U (en) 2016-08-02 2016-08-02 Riverbed and sea bed scour prevention quilt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620828810.0U CN205934847U (en) 2016-08-02 2016-08-02 Riverbed and sea bed scour prevention quilt

Publications (1)

Publication Number Publication Date
CN205934847U true CN205934847U (en) 2017-02-08

Family

ID=57924045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620828810.0U Expired - Fee Related CN205934847U (en) 2016-08-02 2016-08-02 Riverbed and sea bed scour prevention quilt

Country Status (1)

Country Link
CN (1) CN205934847U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049361A (en) * 2016-08-02 2016-10-26 合肥学院 Anti-scouring quilt of riverbed and seabed and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049361A (en) * 2016-08-02 2016-10-26 合肥学院 Anti-scouring quilt of riverbed and seabed and construction method thereof

Similar Documents

Publication Publication Date Title
CN104164851B (en) The construction method of the ecological flexible mud-rock flow blocking dam of gabion arch
CN106013054B (en) A kind of Ecotype Concrete sheet pile and its construction method
Oumeraci et al. Geotextile sand containers for shore protection
CN103422470B (en) Earthworking reinforced bar protection filtration material
CN206015737U (en) A kind of marine large-diameter pile foundation Anti-scouring device
CN204238174U (en) A kind of constitutive element dam of shutoff flood dyke breaking
CN106400744A (en) Comprehensive side-slope treatment structure for preventing river channel erosion and construction method thereof
CN110219281B (en) Dyke foot anti-impact flexible protection pad structure
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN205934847U (en) Riverbed and sea bed scour prevention quilt
CN103614988A (en) Flexible scour-preventing protective cushion and construction method thereof
CN212477620U (en) Structure for building gravity dam on deep and thick covering layer
CN108316236B (en) Dykes and dams suitable for large tidal range in reclamation engineering and multi-closure method thereof
CN205711966U (en) A kind of Multi-purpose soft row
CN201495521U (en) Hinged large earth bags for river emergency and flood prevention
CN203821306U (en) Flexible anti-scour protection pad
CN215052630U (en) Lead wire mesh and geotextile composite earth-rock overlong pillow root fixing structure for yellow river emergency
CN106049556B (en) Pile foundation protection against erosion denudes structure
CN106049361A (en) Anti-scouring quilt of riverbed and seabed and construction method thereof
CN105256763A (en) Diking method based on bamboo raft frame structure
CN101514554A (en) Flexible structure cofferdam
CN210561970U (en) Flexible protection pad structure for protecting dike feet against impact
CN211898208U (en) Impact-resistant deep tooth wall of river damming weir
CN203569528U (en) Geotexile reinforcement protection filtering material
CN106836130A (en) Dam break and blockage construction method based on waste tires

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20170802

CF01 Termination of patent right due to non-payment of annual fee