CN205929464U - A tub welding set is moulded to water conservancy construction heavy -calibre - Google Patents

A tub welding set is moulded to water conservancy construction heavy -calibre Download PDF

Info

Publication number
CN205929464U
CN205929464U CN201620804613.5U CN201620804613U CN205929464U CN 205929464 U CN205929464 U CN 205929464U CN 201620804613 U CN201620804613 U CN 201620804613U CN 205929464 U CN205929464 U CN 205929464U
Authority
CN
China
Prior art keywords
ring
main
semi
auxiliary
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620804613.5U
Other languages
Chinese (zh)
Inventor
王文鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620804613.5U priority Critical patent/CN205929464U/en
Application granted granted Critical
Publication of CN205929464U publication Critical patent/CN205929464U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The utility model relates to a tub welding set is moulded to water conservancy construction heavy -calibre discloses the mouth of pipe location of being convenient for, can effectively improve the device of moulding sealing of tube efficiency, the fixed semi -ring one end overhead of its characterized in that owner has solid fixed pressing plate, and on main fixed semi -ring was arranged in to main fixed plate, it had solid fixed pressing plate to assist fixed semi -ring one end overhead, and corresponding with the solid fixed pressing plate on the main fixed semi -ring. Main fixed semi -ring and the other end of assisting fixed semi -ring be through the round pin hub connection, assist the fixed plate arrange in assist fixed semi -ring on, and with main fixed plate on same water flat line. The main semi -ring one end overhead of connecting has a solid fixed pressing plate, main connecting plate arrange in main connect the semi -ring on, assist and connect semi -ring one end overhead and have solid fixed pressing plate, and corresponding with the main solid fixed pressing plate who connects on the semi -ring. Main connect the semi -ring and assist the other end of connecting the semi -ring through the round pin hub connection, assist the connecting plate arrange in assist connect the semi -ring on, and with main connecting plate on same water flat line.

Description

A kind of water conservancy construction heavy caliber moulds pipe welder
Technical field
A kind of the utility model water conservancy construction heavy caliber moulds pipe welder, be related to a kind of water pipeline laying when Wait, the heavy caliber of use is moulded pipe welder, belonged to the realm of building construction.It is easy to mouth of pipe positioning, Neng Gouyou particularly to one kind Effect improves the device moulding pipe welding efficiency.
Background technology
Plastic conduit because having the features such as corrosion-resistant, light weight, convenient to install and maintain, resistance to compression, long service life, in water conservancy pipe Be widely used in road laying, PE manages, HDPE manages, the plastic tube such as PC pipe when using, due to length not, be required for into Row welding, existing method plastic conduit welded using hot gas welding although this welding equipment is lightly easily carried, But this welding method is higher to the welding skill set requirements of operator, operator in long welding job, unavoidably Make a fault, make the docking of plastic conduit not accurate, the use of impact plastic conduit, existing employing butt welding machine is to plastic conduit The method welded is although welding precision is high, and productivity ratio is also higher, but because build is larger, carries inconvenience.
Content of the invention
In order to improve above-mentioned situation, a kind of the utility model water conservancy construction heavy caliber is moulded pipe welder and is provided one kind just In mouth of pipe positioning, the device moulding pipe welding efficiency can be effectively improved.Structure is simple, convenient use.
A kind of the utility model water conservancy construction heavy caliber moulds what pipe welder was realized in:A kind of water of the utility model Profit construction heavy caliber is moulded pipe welder and is made up of agent set and heater, and agent set is by main stationary half, main fixation Plate, main connecting shaft, the first oil cylinder, main connection semi-ring, main connecting plate, fixation clip, auxiliary connection semi-ring, auxiliary connecting plate, oil inlet pipe, Oil return pipe, the second oil cylinder, auxiliary connecting shaft, auxiliary fixed plate and auxiliary stationary half composition, main stationary half one end is equipped with fixing pressure Plate, main fixed plate is placed in main stationary half, and auxiliary stationary half one end is equipped with fixation clip, and and main stationary half on consolidate Fixed pressuring plate is corresponding.The other end of main stationary half and auxiliary stationary half is connected by bearing pin, and auxiliary fixed plate is placed in auxiliary fixation half On ring, and with main fixed plate in the same horizontal line.It is equipped with fixation clip, main connecting plate is placed in main company on main connection semi-ring one end Connect on semi-ring, auxiliary connection semi-ring one end is equipped with fixation clip, and corresponding with the main fixation clip connecting on semi-ring.Main connection The other end of semi-ring and auxiliary connection semi-ring is connected by bearing pin, and auxiliary connecting plate is placed on auxiliary connection semi-ring, and exists with main connecting plate In same horizontal line.First oil cylinder one end is placed on main connecting plate, and the other end is placed in main fixed plate by main connecting shaft, and second Oil cylinder one end is placed on auxiliary connecting plate, and the other end is placed in auxiliary fixed plate by auxiliary connecting shaft, oil inlet pipe respectively with the first oil cylinder Connect with the second oil cylinder, oil return pipe respectively with the first oil cylinder and the second oil cylinder connect, heater is by main heating semi-ring, power line Form with additional hot semi-ring, main heating semi-ring is placed on the first oil cylinder, and additional hot semi-ring is placed on the second oil cylinder, and and main heating Semi-ring is corresponding, and power line is connected with additional hot semi-ring with main heating semi-ring respectively.
During use, find a groove on the ground first, or dig a groove on the ground, main stationary half and auxiliary First pipeline is entangled by stationary half, then passes through bolt by consolidating on the fixation clip in main stationary half and auxiliary stationary half Fixed pressuring plate is connected, and so that the first pipeline is fixed between main stationary half and auxiliary stationary half, and one end of the first pipeline is put Between main heating semi-ring and additional hot semi-ring, second pipe is entangled by main connection semi-ring and auxiliary connection semi-ring, then passes through spiral shell Fixation clip on main connection semi-ring is connected by bolt with the fixation clip on auxiliary connection semi-ring.Second pipe is made to be fixed on main company Connect between semi-ring and auxiliary connection semi-ring, and one end of second pipe is placed between main heating semi-ring and additional hot semi-ring, then Oil inlet pipe and oil return pipe are connected with oil pump respectively.After having adjusted, to main heating semi-ring and additional hot semi-ring energising, electrified regulation After 30s, first pipeline one end between main heating semi-ring and additional hot semi-ring starts melting, main heating semi-ring and additional hot semi-ring Between second pipe one end also begin to melt, start oil pump rapidly, hydraulic oil makes two oil cylinders start working by oil inlet pipe, Make the first pipeline and second pipe to middle extruding, the portion extrusion of melting is combined, after again solidifying, is put by oil return pipe Oil.Then main stationary half and auxiliary stationary half are pulled down from the first pipeline, will by main connection semi-ring and auxiliary connection semi-ring Pull down on second pipe, now pipeline welding finishes, the design of described main heating semi-ring and additional hot semi-ring, be convenient for the mouth of pipe Positioning heating, and can heat more uniform.Reach and be easy to mouth of pipe positioning, improve the purpose moulding pipe welding efficiency.
Beneficial effect.
First, structure is simple, convenient and practical.
2nd, with low cost it is easy to promote.
3rd, can be easy to carry, improve the efficiency moulding pipe welding.
Brief description
Accompanying drawing 1 moulds the three-dimensional structure diagram of pipe welder for a kind of the utility model water conservancy construction heavy caliber.
In accompanying drawing
Wherein part is:First pipeline(1), main stationary half(2), main fixed plate(3), main connecting shaft(4), main heating half Ring(5), the first oil cylinder(6), main connection semi-ring(7), main connecting plate(8), second pipe(9), fixation clip(10), auxiliary connection half Ring(11), auxiliary connecting plate(12), oil inlet pipe(13), oil return pipe(14), power line(15), the second oil cylinder(16), additional hot semi-ring (17), auxiliary connecting shaft(18), auxiliary fixed plate(19), auxiliary stationary half(20).
Specific embodiment:
When a kind of the utility model water conservancy construction heavy caliber is moulded pipe welder and is achieved in that use, first on ground Find a groove on face, or dig a groove, main stationary half on the ground(2)With auxiliary stationary half(20)By first pipe Road(1)Entangle, then pass through bolt by main stationary half(2)On fixation clip(10)With auxiliary stationary half(20)On fixation Pressing plate(10)It is connected, make the first pipeline(1)It is fixed on main stationary half(2)With auxiliary stationary half(20)Between, and by first Pipeline(1)One end be placed in main heating semi-ring(5)With additional hot semi-ring(17)Between, main connection semi-ring(7)With auxiliary connection semi-ring (11)By second pipe(9)Entangle, then pass through bolt by main connection semi-ring(7)On fixation clip(10)With auxiliary connection semi-ring (11)On fixation clip(10)It is connected.Make second pipe(9)It is fixed on main connection semi-ring(7)With auxiliary connection semi-ring(11)It Between, and by second pipe(9)One end be placed in main heating semi-ring(5)With additional hot semi-ring(17)Between, then by oil inlet pipe (13)And oil return pipe(14)Connect with oil pump respectively.After having adjusted, to main heating semi-ring(5)With additional hot semi-ring(17)Energising, After electrified regulation 30s, main heating semi-ring(5)With additional hot semi-ring(17)Between the first pipeline(1)One end starts to melt, and master adds Hot semi-ring(5)With additional hot semi-ring(17)Between second pipe(9)One end also begins to melt, and starts rapidly oil pump, hydraulic oil By oil inlet pipe(13)So that two oil cylinders is started working, make the first pipeline(1)And second pipe(9)To middle extruding, will melt Portion extrusion combine, after again solidifying, by oil return pipe(14)Drain the oil.Then main stationary half(2)With auxiliary fixation Semi-ring(20)From the first pipeline(1)On pull down, by main connection semi-ring(7)With auxiliary connection semi-ring(11)By second pipe(9)On tear open Under, now pipeline welding finishes, described main heating semi-ring(5)With additional hot semi-ring(17)Design, be convenient for the mouth of pipe positioning Heating, and can heat more uniform.Reach and be easy to mouth of pipe positioning, improve the purpose moulding pipe welding efficiency.

Claims (1)

1. a kind of water conservancy construction heavy caliber moulds pipe welder, it is characterized in that:It is made up of agent set and heater, main body fills Put by main stationary half, main fixed plate, main connecting shaft, the first oil cylinder, main connection semi-ring, main connecting plate, fixation clip, auxiliary connection Semi-ring, auxiliary connecting plate, oil inlet pipe, oil return pipe, the second oil cylinder, auxiliary connecting shaft, auxiliary fixed plate and auxiliary stationary half composition, main fixation Semi-ring is equipped with fixation clip on one end, and main fixed plate is placed in main stationary half, and auxiliary stationary half one end is equipped with fixation clip, And corresponding with the fixation clip in main stationary half, the other end of main stationary half and auxiliary stationary half is connected by bearing pin, Auxiliary fixed plate is placed in auxiliary stationary half, and with main fixed plate in the same horizontal line, main connection semi-ring one end is equipped with fixation Pressing plate, main connecting plate is placed on main connection semi-ring, auxiliary connection semi-ring one end is equipped with fixation clip, and connects on semi-ring with main Fixation clip is corresponding, and the other end of main connection semi-ring and auxiliary connection semi-ring is connected by bearing pin, and auxiliary connecting plate is placed in auxiliary connection On semi-ring, and with main connecting plate in the same horizontal line, first oil cylinder one end is placed on main connecting plate, and the other end is by main connection Axle is placed in main fixed plate, and second oil cylinder one end is placed on auxiliary connecting plate, and the other end is placed in auxiliary fixed plate by auxiliary connecting shaft, Oil inlet pipe respectively with the first oil cylinder and the second oil cylinder connect, and oil return pipe respectively with the first oil cylinder and the second oil cylinder connect, heating dress Put and be made up of main heating semi-ring, power line and additional hot semi-ring, main heating semi-ring is placed on the first oil cylinder, and additional hot semi-ring is placed in On second oil cylinder and corresponding with main heating semi-ring, power line is connected with additional hot semi-ring with main heating semi-ring respectively.
CN201620804613.5U 2016-07-29 2016-07-29 A tub welding set is moulded to water conservancy construction heavy -calibre Expired - Fee Related CN205929464U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620804613.5U CN205929464U (en) 2016-07-29 2016-07-29 A tub welding set is moulded to water conservancy construction heavy -calibre

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620804613.5U CN205929464U (en) 2016-07-29 2016-07-29 A tub welding set is moulded to water conservancy construction heavy -calibre

Publications (1)

Publication Number Publication Date
CN205929464U true CN205929464U (en) 2017-02-08

Family

ID=57927524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620804613.5U Expired - Fee Related CN205929464U (en) 2016-07-29 2016-07-29 A tub welding set is moulded to water conservancy construction heavy -calibre

Country Status (1)

Country Link
CN (1) CN205929464U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107599419A (en) * 2017-11-02 2018-01-19 江苏华淼电子科技有限公司 A kind of water pipeline welding fixing device
CN110107759A (en) * 2019-05-14 2019-08-09 云南联塑科技发展有限公司 A kind of ultrahigh molecular weight polyethylene tubing heat-melting butt-joint method
CN112571806A (en) * 2021-03-01 2021-03-30 烟台华港能源科技有限公司 Butt joint fixing device for gas pipeline machining

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107599419A (en) * 2017-11-02 2018-01-19 江苏华淼电子科技有限公司 A kind of water pipeline welding fixing device
CN107599419B (en) * 2017-11-02 2020-06-05 江苏佳润管业有限公司 Water conservancy pipeline butt fusion fixing device
CN110107759A (en) * 2019-05-14 2019-08-09 云南联塑科技发展有限公司 A kind of ultrahigh molecular weight polyethylene tubing heat-melting butt-joint method
CN112571806A (en) * 2021-03-01 2021-03-30 烟台华港能源科技有限公司 Butt joint fixing device for gas pipeline machining
CN112571806B (en) * 2021-03-01 2021-05-07 烟台华港能源科技有限公司 Butt joint fixing device for gas pipeline machining

Similar Documents

Publication Publication Date Title
CN205929464U (en) A tub welding set is moulded to water conservancy construction heavy -calibre
CN204685603U (en) A kind of pipe cleaning device
CN205414793U (en) Steel reinforcement cage welding frock
CN102672063A (en) Fastening device
CN103278394A (en) Comprehensive test device for joint sealing and hydraulic circulating of pipe body
CN207669779U (en) A kind of overlength hose depoling device
CN201529680U (en) Intermediate reel device on wire drawing machine
CN201953473U (en) Connection mode of a hydraulic pump and a diesel engine
CN207697040U (en) A kind of pipe end enlarging machine
CN103963295B (en) Pneumatic type plastic pipe butt welder and welding method
CN202442032U (en) Tapered plastic flange
CN208578266U (en) Multifunctional water-proof coiled material construction compactor
CN206983208U (en) A kind of pvc pipe production hauling machine
CN206478348U (en) Spigot-and-socket steel pipe anticreep mouthful device
CN206158200U (en) Rebar mechanical connection crush inhury
CN203172028U (en) Pneumatic-type plastic pipe butt-welding machine
CN205153034U (en) Negative pressure -free water supply equipment
CN105041242A (en) Drilling fluid circulating manifold
CN202915031U (en) Winding plate strip with steel strip
CN214941360U (en) Firm mounting structure in glass partition wall top
CN205064010U (en) Take turbo charger of adiabatic volute of air gap
CN205231818U (en) Wind power generation assembly for hot water cleaning machine
CN203571306U (en) Large-pipe-diameter bent pipe joint device
CN215330829U (en) Prefabricated composite floor slab structure with sleeve
CN207621017U (en) A kind of novel atomizing pump machinery oil cooler structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20170729