CN205917858U - Height disjunctor house differential settlement reply structure - Google Patents

Height disjunctor house differential settlement reply structure Download PDF

Info

Publication number
CN205917858U
CN205917858U CN201620301099.3U CN201620301099U CN205917858U CN 205917858 U CN205917858 U CN 205917858U CN 201620301099 U CN201620301099 U CN 201620301099U CN 205917858 U CN205917858 U CN 205917858U
Authority
CN
China
Prior art keywords
low
reinforced concrete
building
cross
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620301099.3U
Other languages
Chinese (zh)
Inventor
姚攀峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620301099.3U priority Critical patent/CN205917858U/en
Application granted granted Critical
Publication of CN205917858U publication Critical patent/CN205917858U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a height disjunctor house differential settlement reply structure, is including low building, high building and horizontally connect component, the both ends of horizontally connect component respectively with low building atress component and high building atress structrual joint, the horizontally connect component includes the reinforced concrete main part and supports the girder steel, the support girder steel is buried underground in the inside of reinforced concrete main part and the corresponding twice that set up at least, the reinforced concrete main part is located the within range that supports the girder steel and stays and be equipped with at least twice construction hinge, the atress reinforcing bar of reinforced concrete main part is in the logical length of construction hinge department. The utility model discloses be favorable to promoting the lower part space, later stage fitment also need not to consider that it is convenient be under construction, can effectively transmit horizontal pressure simultaneously, and the beam -ends shears the bearing capacity and is being shown and improve, is favorable to realizing the strong shear capacity and weak bending capacity's of major structure performance, and then the improvement shock resistance.

Description

A kind of high-low connected house relative settlement reply structure
Technical field
This utility model is related to a kind of structure of reply high-low connected house relative settlement.
Background technology
Constantly increase the requirement with anti-seismic technology with City Building scale, increasing height building is linked to be One entirety, the larger building of difference in height has differences the problem of sedimentation, is likely to result in structural cracks and even destroys, there is peace Full hidden danger.In order to solve the above problems, at present generally adopt post-cast strip, span centre stay 1m about post-cast strip, treat the height of both sides Concrete on the stable after-pouring of low building settlement, this technology is there is problems in that before closure post-cast strip, need to use foot Hand cradle is supported beam and the plate of post-cast strip both sides, and this will have influence on the low-level portion that can start a business in early days, and settles Stable and foundation soil has relation it is difficult to accurate control the time blocking post-cast strip.
How to find one kind and can solve height relative settlement, can not affect to fit up again, the technology of normal business is to solve The difficult problem that high-low connected building relative settlement is faced.The immediate prior art solving problems is patent Cn201110125443, discloses a kind of high-low connected building barrier-free decoration structure and its construction method, this patent after pour Bottom surface with position, existing contignation is additionally arranged support beam, and support beam is located on the downside of contignation.And this kind of structure is passed through Find after scene is actually used, this structural beam slab lower space strongly reduces, and is highly detrimental to later stage decoration construction, pours afterwards simultaneously At band position, support beam only plays supporting role, and node power transmission stressing conditions do not occur big improvement, at post-cast strip still It is subject to the weak link of load.
Utility model content
The purpose of this utility model is to provide a kind of high-low connected house relative settlement reply structure, solve existing no to hinder Hinder beam slab lower space present in fitting structure to strongly reduce, at the position of post-cast strip power transmission stressing conditions do not occur big Improve the technical problem of the weak link being still bearing load.
For achieving the above object, this utility model adopts the following technical scheme that
A kind of high-low connected house relative settlement reply structure, including low building, high building and level connection joint component, level The two ends of connecting elements are connected with low building primary structure member and high building primary structure member respectively, and described level connection joint component includes steel Reinforced concrete main body and support steel beam, described support steel beam be embedded in adjacent reinforced concrete bodies inside and corresponding at least provided with Two, described adjacent reinforced concrete bodies are located in the range of support steel beam and are installed with least twice construction hinge, described reinforced concrete The steel bar stress of native main body is elongated at construction hinge.
Described low building primary structure member and high building primary structure member are beam, post or wall.
Described level connection joint component is beam.
Described support steel beam is the combination beam that single cross-brace beam or cross-brace beam are connected with longitudinal support beam, institute State longitudinal support beam two ends be connected to adjacent across cross-brace beam on.
Described support steel beam is steel I-beam, H type girder steel, steel channel beam or rectangular steel pipe beam, production method be welding or Rolling.
In described whole embedment adjacent reinforced concrete bodies of cross-brace beam, or whole embedment reinforced concrete of cross-brace beam While in native main body, its one end extends in embedment low building primary structure member and high building primary structure member.
Described cross-brace beam is imbedded with low building primary structure member and high building primary structure member and is all provided with the contact surface at position There is peg, this embedment position also has concrete trickling hole or first and wears muscle hole.
Described longitudinal support beam is fixedly connected with cross-brace beam by connecting plate, and connected mode is welding or bolts, institute State and have second on connecting plate and wear muscle hole.
The width of described construction hinge is 10~1500mm.
Compared with prior art this utility model has the characteristics that and beneficial effect:
First, support steel beam being imbedded in advance level connection joint component is in beam, before beam slab thickness and applying support steel beam Identical, lower space will not be compressed, later stage finishing is convenient without consideration construction.
Secondly, in underground particularly basement construction, at post-cast strip, only has the steel bar stress of level connection joint component Bear the horizontal pressure force from both sides, horizontal pressure force cannot effectively transmit herein, support steel beam embedment of the present utility model In level connection joint component, particularly can also imbed in post further, preferably transmit horizontal pressure force.
Further, it is still the more weak link of bearing load at post-cast strip, this utility model support steel beam imbeds level In connecting elements, ultimate bearing capacity of joints is significantly improved.
This utility model passes through improvements over the prior art, beneficial to height building free settling, reduces settlement stress, keeps away Exempt from security risk, be conducive to low area building to fit up in advance and normal operation, advantageously reduce crack.This utility model is conducive to Lifting lower space, without consideration, it is convenient to construct, and can effectively transmit horizontal pressure force, beam-ends shearing resistance is held simultaneously for later stage finishing Load power is significantly improved, and is advantageously implemented the performance of the strong shear capacity and weak bending capacity of agent structure, and then improves shock resistance.
Brief description
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is this utility model embodiment one schematic diagram.
Fig. 2 is the structural representation of a-a section in Fig. 1.
Fig. 3 is the structural representation of connecting plate in Fig. 2.
Fig. 4 is the peg of support beam and the structural representation wearing muscle hole.
Fig. 5 is this utility model embodiment two schematic diagram.
Fig. 6 is this utility model embodiment three schematic diagram.
Fig. 7 is that the construction procedure one of this utility model embodiment three completes schematic diagram.
Fig. 8 is that the construction procedure two of this utility model embodiment three completes schematic diagram.
Fig. 9 is that the construction procedure four of this utility model embodiment three completes schematic diagram.
Figure 10 is that the construction procedure five of this utility model embodiment three completes schematic diagram.
Figure 11 is that the construction procedure six of this utility model embodiment three completes schematic diagram.
Figure 12 is that the construction procedure eight of this utility model embodiment three completes schematic diagram.
Figure 13 is that the construction procedure ten of this utility model embodiment three completes schematic diagram.
Reference: 1- low building primary structure member, 2- high building primary structure member, 3- level connection joint component, 3.1- steel Reinforced concrete main body, 3.2- support steel beam, 3.2a- cross-brace beam, 3.2b- longitudinal support beam, 4- construction hinge, 5- gold Belong to net, 6- steel bar stress, 7- connecting plate, 8- peg, muscle hole is worn in hole or first to the trickling of 9- concrete, 10- second wears muscle Hole, 11- scaffold, 12- level connection joint component template, 13- first supplement template, 14- elder generation pouring concrete, pour after 15- mixed Solidifying soil, 16- bolt, 17- second supplement template.
Specific embodiment
Embodiment one is shown in Figure 1, and structure is tackled in a kind of relative settlement of high-low connected house, including low building, Gao Jian Build and level connection joint component 3, the two ends of level connection joint component 3 are connected with low building primary structure member 1 and high building primary structure member 2 respectively Connect, described level connection joint component 3 includes adjacent reinforced concrete bodies 3.1 and support steel beam 3.2, described support steel beam 3.2 is embedded in The inside of adjacent reinforced concrete bodies 3.1 and corresponding at least provided with twice, described adjacent reinforced concrete bodies 3.1 are located at support steel beam It is installed with least twice construction hinge 4, the both sides of construction hinge are provided with wire netting 5, described adjacent reinforced concrete bodies in the range of 3.2 Steel bar stress 6 construction hinge 4 at elongated.
Described low building primary structure member 1 and high building primary structure member 2 are post, and described level connection joint component 3 is crossbeam.Crossbeam Top is provided with plate, and steel bar stress 6 is the principal rod of plate.
Shown in Figure 2, the group that described support steel beam 3.2 is connected with longitudinal support beam 3.2b for cross-brace beam 3.2a Close, the connection end of described cross-brace beam 3.2a extends directly to be imbedded in low building primary structure member 1 and high building primary structure member 2, The two ends of described longitudinal support beam 3.2b be connected to adjacent on crossbeam.Described longitudinal support beam 3.2b passes through on connecting plate 7 Bolt 16 and cross-brace beam 3.2a bolt, connecting plate 7 and longitudinal support beam 3.2b welding.Second is had on described connecting plate 7 Wear muscle hole 10.Shown in Figure 3.
Described cross-brace beam 3.2a imbeds the contact surface at position with low building primary structure member 1 and high building primary structure member 2 On be equipped with peg 8, the embedment position of cross-brace beam 3.2a also has concrete trickling hole or first and wears muscle hole 9.Referring to Fig. 4 Shown.
Embodiment two is shown in Figure 5, and from unlike embodiment one, described low building primary structure member 1 and high building are subject to Power component 2 is post, and described level connection joint component 3 is crossbeam, and steel bar stress 6 is the principal rod of crossbeam.
Embodiment three is shown in Figure 6, and unlike embodiment one, described whole embedment reinforcing bar of cross-brace beam 3.2a In concrete main body 3.1, and one end is connected with the surface of low building primary structure member 1 and high building primary structure member 2.
Support steel beam 3.2 in all embodiments is steel I-beam, H type girder steel, steel channel beam or rectangular steel pipe beam, making side Formula is welding or rolls.
The width of described construction hinge is 10~1500mm.
Referring to shown in Fig. 7-13, the construction method of structure, step are tackled in the high-low connected house relative settlement of embodiment three As follows:
Step one, construct respectively low building primary structure member 1 and high building primary structure member 2.
Step 2, sets up scaffold 11 between low building primary structure member 1 and high building primary structure member 2, and installs level Connecting elements template 12, design confirms that construction hinge is stayed and sets region.
Step 3, buries in level connection joint component position to be onstructed and connects support steel beam;Support steel beam 3.2 is cross-brace The combination beam that beam 3.2a is connected with longitudinal support beam 3.2b, connection end and low building primary structure member 1 and high building primary structure member 2 Surface connects respectively.
Step 4, the steel bar stress of colligation level connection joint component it is ensured that reinforcing bar at construction hinge for elongated.
Described step 3 and step 4 can exchange sequence of construction.Ensure that installing support steel beam is not received mutually with steel bar stress Impact.
Step 5, stays in construction hinge and sets the first supplementary template 13 that region installs construction hinge, it is possible to use exempt from the gold torn open Belong to net 5.
Step 6, pours the first pouring concrete 14 of level connection joint component in the outside of the first supplementary template 13 or wire netting 5, And maintenance is to predetermined strength.
Step 7, removes scaffold 11 and level connection joint component template 12.First supplements template 13 can also tear open herein Remove, or remove in step 9, retain herein.
Cross-brace of simultaneously constructing in described step 3 beam 3.2a and longitudinal support beam 3.2b, or complete in step 7 Afterwards, construct before step 8 longitudinal support beam 3.2b.
Step 8, continues the other parts of high building and low building of constructing respectively, and continuous observation high building and low building Sedimentation and deformation.
Step 9, treat most of load of high building and low building apply and sedimentation and deformation stably after, stay in construction hinge If setting up scaffold again on the downside of the supplementary template 17 of the second of region.
Step 10, supplements second and pours the rear pouring concrete 15 of level connection joint component in template 17, and maintenance is arrived and made a reservation for Intensity.
Step 11, removes scaffold and second and supplements template 17.

Claims (6)

1. a kind of high-low connected house relative settlement reply structure, including low building, high building and level connection joint component (3), water The two ends of flushconnection component (3) respectively with low building primary structure member (1) and high building primary structure member (2) be connected it is characterised in that: Described level connection joint component (3) includes adjacent reinforced concrete bodies (3.1) and support steel beam (3.2), and described support steel beam (3.2) is buried Located at the inside of adjacent reinforced concrete bodies (3.1) and corresponding at least provided with two, described adjacent reinforced concrete bodies (3.1) are located at It is installed with least twice construction hinge (4), the steel bar stress (6) of described adjacent reinforced concrete bodies in the range of support steel beam (3.2) Elongated at construction hinge (4) place;
Described level connection joint component (3) is beam;
Described support steel beam (3.2) is single cross-brace beam (3.2a) or cross-brace beam (3.2a) and longitudinal support beam (3.2b) combination beam connecting, the two ends of described longitudinal support beam (3.2b) be connected to adjacent across cross-brace beam (3.2a) On;
In described whole embedment adjacent reinforced concrete bodies (3.1) of cross-brace beam (3.2a), or cross-brace beam (3.2a) is whole While root embedment adjacent reinforced concrete bodies (3.1) is interior, its one end extends embedment low building primary structure member (1) and high building stress In component (2).
2. high-low connected house according to claim 1 relative settlement reply structure it is characterised in that: described low building is subject to Power component (1) and high building primary structure member (2) are beam, post or wall.
3. high-low connected house according to claim 1 relative settlement reply structure it is characterised in that: described support steel beam (3.2) it is steel I-beam, H type girder steel, steel channel beam or rectangular steel pipe beam, production method is welding or rolls.
4. high-low connected house according to claim 1 relative settlement reply structure it is characterised in that: described cross-brace Beam (3.2a) is imbedded with low building primary structure member (1) and high building primary structure member (2) and is equipped with peg on the contact surface at position (8), this embedment position also has concrete trickling hole or first and wears muscle hole (9).
5. high-low connected house according to claim 1 relative settlement reply structure it is characterised in that: described longitudinal bracing Beam (3.2b) is fixedly connected with cross-brace beam (3.2a) by connecting plate (7), and connected mode is welding or bolts, described connection Have second on plate (7) and wear muscle hole (10).
6. high-low connected house according to claim 1 relative settlement tackle structure it is characterised in that: described construction hinge Width is 10~1500mm.
CN201620301099.3U 2016-04-12 2016-04-12 Height disjunctor house differential settlement reply structure Expired - Fee Related CN205917858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620301099.3U CN205917858U (en) 2016-04-12 2016-04-12 Height disjunctor house differential settlement reply structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620301099.3U CN205917858U (en) 2016-04-12 2016-04-12 Height disjunctor house differential settlement reply structure

Publications (1)

Publication Number Publication Date
CN205917858U true CN205917858U (en) 2017-02-01

Family

ID=57876415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620301099.3U Expired - Fee Related CN205917858U (en) 2016-04-12 2016-04-12 Height disjunctor house differential settlement reply structure

Country Status (1)

Country Link
CN (1) CN205917858U (en)

Similar Documents

Publication Publication Date Title
CN101570961B (en) Fastening method for fractured girder of bridge
CN105113389A (en) Assembled type bridge pier column member with steel-concrete composite structure
CN102086677A (en) Prefabricated reinforced concrete beam and connection joint of reinforced concrete column and beam
CN207130606U (en) Flexing suppress round end type concrete pier of steel tube and with cushion cap attachment structure
CN108867310A (en) The short rib T beam bridge of pretensioning prestressed concrete and its construction method
CN205024882U (en) Prefabricated assembled shaped steel concrete shear force wall
WO2017185905A1 (en) Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line
CN209493826U (en) The interim splicing structure of concrete segment precast bridge
CN107190635A (en) Concrete-filled steel tube with dumbbell sections assembled pier and the connection structure and method with cushion cap
CN109440623A (en) The interim splicing structure of concrete segment precast bridge
CN209555787U (en) A kind of road and bridge construction pier column bracing means
CN109057148A (en) Ultra-high performance concrete is without regular reinforcement Prestressed U type beam and its construction method
CN210395128U (en) Hollow core plate beam connection structure in bridge widening
CN107386098A (en) Flexing suppress round end type concrete pier of steel tube and with cushion cap connection structure and method
CN205501843U (en) Consolidate rigid framed arch bridge
CN208293400U (en) A kind of ultra-high performance concrete-part girder steel combination bent cap
CN207331426U (en) A kind of double box steel concrete binder bowstring arch bridges of railway
CN105735483B (en) A kind of high-low connected house relative settlement reply structure and its construction method
CN106320192A (en) Beam section replacement reinforcement method for large-span concrete continuous beam bridge
CN106087692A (en) A kind of Simply supported non-uniform T negative moment of girder section structure and construction method
CN106087782B (en) A kind of remodeling method of bridge floor floating bowstring arch bridge
CN106284097B (en) The installation method that pier K is supportted on a kind of tubular arch bridge arch
CN205917858U (en) Height disjunctor house differential settlement reply structure
CN208250889U (en) A kind of arch bridge suspender structure
CN206941372U (en) Concrete-filled steel tube with dumbbell sections assembled pier and the attachment structure with cushion cap

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201

Termination date: 20200412