CN205917547U - Rail foundation subsides back direction of height adjustment system - Google Patents

Rail foundation subsides back direction of height adjustment system Download PDF

Info

Publication number
CN205917547U
CN205917547U CN201620491885.4U CN201620491885U CN205917547U CN 205917547 U CN205917547 U CN 205917547U CN 201620491885 U CN201620491885 U CN 201620491885U CN 205917547 U CN205917547 U CN 205917547U
Authority
CN
China
Prior art keywords
rail
base plate
plate
adjustment
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620491885.4U
Other languages
Chinese (zh)
Inventor
于俭海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Lino Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620491885.4U priority Critical patent/CN205917547U/en
Application granted granted Critical
Publication of CN205917547U publication Critical patent/CN205917547U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model discloses a rail foundation subsides back direction of height adjustment system and method of adjustment, this system include preburied bottom plate, buried sleeve, adapter sleeve and fixing system, and fixing system includes bottom plate, clamp plate, rail corner pad board, clamp plate fastener, cushion board, lock washers, sleeve pipe bolt. The back appears subsiding on the basis of rail, the track that will subside through this system lifts by crane together with fixing system together to be adjusted, according to the difference of settling amount, can adopt height -adjusting cushion plate or heighten two kinds of methods on the basis and carry out the adjustment of direction of height, has reduced dismouting fixing system's process like this, labour saving and time saving. Rail foundation increases the system can guarantee stability and the reliability of track in long -term the use after the completion. Use this rail foundation to increase the system and can solve current track and standardize the scheduling problem because of subside by a wide margin inadequately increaseing in -process construction complicacy, increase the material, saved a large amount of manpowers, material resources for the customer.

Description

Short transverse adjustment system after a kind of track foundation sedimentation
Technical field
This utility model is related to short transverse adjustment system after a kind of track foundation sedimentation.
Background technology
The equipment such as port and pier stacker-reclaimer and gantry crane causes track irregularity or even steel when there is sedimentation on basis Rail fracture, the situation of track foundation local collapse and affect track equipment run well.Traditional track occurs significantly to settle Method be the bolt of rail fixed system is unclamped after be filled with.What this method can only temporarily solve to settle by a small margin asks Topic, the two large problems for significantly sedimentation and durability have no idea to solve.
Utility model content
This utility model causes when being and on basis, sedimentation occurring for equipment such as port and pier stacker-reclaimer and gantry cranes Track irregularity or even rail fracture, the situation of track foundation local collapse and affect the situation of track equipment normal operation and set Meter.
The technical solution of the utility model is achieved in that short transverse adjustment system after a kind of track foundation sedimentation, Including pre-buried base plate, service sleeve, connection sleeve pipe and fixed system, fixed system includes base plate, pressing plate, rail knee plate, pressing plate Securing member, rubber cushion plate, lock washer, sleeve bolt, described pre-buried base plate is arranged in concrete foundation, with service sleeve and company Female connector pipe adjusts embedded board level height, fixes pre-buried base plate with clay, mounting base, rubber cushion plate, steel successively on pre-buried base plate Rail;Top board is fixed on described base plate and top board is symmetrical arranged to block rail in rail both sides, top board is provided with glue nose, Top board is provided with follower bolt hole, and follower bolt makes the glue nose of top board and rail knee plate links closely, and that rail realizes rail is solid Fixed, described lock washer is combined with base plate by pre-embedded bolt, can fix base plate with lateral attitude.
Further, described base plate is provided with strip hole, and the strip hole on base plate can laterally adjust position base.
Further, adjustment backing plate is arranged between pre-buried base plate and base plate.It is spacing that the side of adjustment backing plate is provided with bolt Mouthful.
Further, this system also lengthens sleeve pipe, connects extension pipe for the adjustment height that significantly rail settles.Plus Long sleeve pipe has external screw thread and female thread, and the screw-internal thread fit of its external screw thread and former connection sleeve pipe simultaneously couples together, its female thread with The screw thread cooperation of sleeve bolt, fixed sleeving bolt uses;Lengthening connecting tube has the female thread lengthening sleeve kit, by adjustment Lengthen connecting tube and lengthen the threaded length of sleeve pipe to ensure the height adjusting, the external diameter lengthening connecting tube has major diameter Outer, can by reverse lengthen connecting tube adjust embedded board height.
When track is deposited within 100mm, its short transverse method of adjustment is:
1) measure settling height;
2) sleeve bolt is turned on, lift by crane together with rail and fixed system simultaneously, raising height is less than settling height One times;
3) select the adjustment backing plate of respective thickness, adjustment backing plate straight trough is directly sticked into unilateral foundation bolt, then rotates 90 degree, adjustment backing plate is made to align with bolt and pre-buried base plate and block two sleeve bolt;
4) put down rail and overall fixing base plate, tighten sleeve bolt, adjustment completes.
When track foundation settling height more than 100, its method of adjustment is:
1) measure the settling amount of each several part rail, prepare the concrete needed for heightened foundation or clay, pre- buried end in advance Plate, lengthening sleeve pipe and connection extension pipe;
2) sleeve bolt of the rail fixed system of settling height 100mm scope and its periphery is unclamped, by rail together with Fixed system lifts by crane together, and sling height is 200mm;
3) rail is occurred height adjusting cushion plate used during micro- sedimentation to withdraw from, can give over to and use during secondary settlement;
4) by the pre-buried base plate newly increasing, lengthen sleeve pipe and connect the embedded board in extension pipe and original system and service sleeve It is attached, then pass through to connect extension pipe adjustment embedded board absolute altitude;
5) prop up baffle plate, prepare concrete perfusion or clay;
6) first sleeve bolt is screwed on the lengthening sleeve pipe adjusted of both sides, tightens rear concrete perfusion or clay;
7) concrete or clay solidification after, template of dismantling, put down rail, rail be finely adjusted, then use sleeve pipe spiral shell Bolt firm banking, adjustment completes.
The beneficial effects of the utility model are: rail basis occur sedimentation after, by this system will settle track Lift by crane together with fixed system and be adjusted, according to the difference of settling amount, using height adjusting cushion plate or basis two can be heightened The method of kind, to carry out the adjustment of short transverse, which reduces the process of fixed disassembly system, time saving and energy saving.Track foundation is heightened System ensure that Stability and dependability in life-time service for the track in the finished.Can using this track foundation height-adjusting system With solve existing track because be significantly deposited in heighten during construction complexity, heighten material inadequate specification the problems such as, be client Save substantial amounts of human and material resources.
Brief description
Fig. 1 adjusts the sectional view of system.
Fig. 2 adjusts the perspective view of system.
Fig. 3 top board structural representation.
Fig. 4 base arrangement schematic diagram.
Fig. 5 local settles 100mm schematic diagram.
Fig. 6 local settles differing heights schematic diagram.
Fig. 7 local settles 100mm and raises rail schematic diagram.
Fig. 8 local settles differing heights and raises rail schematic diagram.
Fig. 9 local settles 100mm and increases embedded board and adjustment schematic diagram newly.
Figure 10 local settles 100mm perfusion clay schematic diagram.
Figure 11 local settles 100mm adjustment and completes schematic diagram.
In figure: 1, pre-buried base plate;2nd, service sleeve;3rd, base plate;4th, top board;5th, rubber cushion plate;6th, lock washer;7th, sleeve pipe Bolt;8th, basis;9th, rail;10th, straight trough;11st, glue nose;12nd, pressing plate securing member;13rd, connect extension pipe;14th, strip hole;15、 Adjustment backing plate;16th, limited mouth;17th, lengthen sleeve pipe;18th, rail knee plate;19th, connection sleeve pipe.
20th, increase embedded board newly;21st, baffle plate.
Specific embodiment
With reference to specific embodiment, explanation is further explained to this utility model.
As shown in figs. 1-11, short transverse adjustment system after a kind of track foundation sedimentation, including pre-buried base plate 1, pre-buried set Pipe 2, connection sleeve pipe 19 and fixed system, fixed system includes base plate 3, top board 4, rail knee plate 18, pressing plate securing member 12, glue Backing plate 5, lock washer 6, sleeve bolt 7, described pre-buried base plate is arranged in concrete foundation 8, and pre-buried base plate is installed successively Base plate, rubber cushion plate, rail 9;Top board is fixed on described base plate and top board is symmetrical arranged to block rail in rail both sides, on Rail knee plate 18 between pressing plate and rail, top board is provided with glue nose 11, and top board is provided with follower bolt hole, follower bolt The 12 glue noses making top board and rail knee plate 18 rail that links closely is realized rail and is fixed, and described lock washer 6 passes through pre-embedded bolt Be combined with base plate, base plate is fixed in lateral attitude.Described base plate is provided with strip hole 14, and the strip hole on base plate can laterally adjust Position base.Adjustment backing plate 15 is arranged between pre-buried base plate and base plate.The side of adjustment backing plate is provided with bolt limited mouth 16.Should System also has lengthening sleeve pipe 17, connects extension pipe 13 for adjusting the height of significantly rail sedimentation.
Wherein, lengthening sleeve pipe 17 has external screw thread and female thread, and the screw-internal thread fit of its external screw thread and former connection sleeve pipe 19 is simultaneously Couple together, its female thread is coordinated with the screw thread of sleeve bolt, and fixed sleeving bolt uses;Lengthening connecting tube has lengthening sleeve pipe to join The female thread of set, ensures the height adjusting, the company of lengthening by the threaded length of adjustment connection extension pipe and lengthening sleeve pipe The outer of major diameter is had on the external diameter of adapter, connecting tube adjustment embedded board height can be lengthened by reversing.
When a, track are deposited within 100mm, its short transverse method of adjustment is:
1) measure settling height;
2) sleeve bolt is turned on, lift by crane together with rail and fixed system simultaneously, raising height is less than settling height One times;
3) select the adjustment backing plate of respective thickness, adjustment backing plate straight trough 10 is directly sticked into unilateral foundation bolt, Ran Houxuan It turn 90 degrees, so that adjustment backing plate is alignd with bolt and pre-buried base plate and block two sleeve bolt;
4) put down rail and overall fixing base plate, tighten sleeve bolt, adjustment completes.
When b, track are deposited in more than 100mm, its short transverse method of adjustment is:
1) measure the settling amount of each several part rail, prepare the concrete needed for heightened foundation or clay in advance, increase newly in advance Buried plate 20, lengthening sleeve pipe 17 and connection extension pipe 13;
2) sleeve bolt of the rail fixed system of settling height 100mm scope and its periphery is unclamped, by rail together with Fixed system lifts by crane together, and sling height is 200mm;
3) rail is occurred height adjusting cushion plate used during micro- sedimentation to withdraw from;
4) by the pre-buried base plate newly increasing, lengthen sleeve pipe and connect the embedded board in extension pipe and original system and service sleeve It is attached, then pass through to connect extension pipe adjustment embedded board absolute altitude;
5) prop up baffle plate 21, prepare concrete perfusion or clay;
6) first sleeve bolt is screwed on the lengthening sleeve pipe adjusted of both sides, tightens rear concrete perfusion or clay;
7) concrete or clay solidification after, template of dismantling, put down rail, rail be finely adjusted, then use sleeve pipe spiral shell Bolt firm banking, adjustment completes.
The above, only this utility model preferably specific embodiment, but protection domain of the present utility model is not Be confined to this, any those familiar with the art in the technical scope that this utility model discloses, according to this practicality New technical scheme and its utility model design in addition equivalent or change, all should cover in protection model of the present utility model Within enclosing.

Claims (5)

1. after a kind of track foundation sedimentation, short transverse adjusts system it is characterised in that including pre-buried base plate (1), service sleeve (2), connection sleeve pipe (19) and fixed system, it is tight that fixed system includes base plate (3), top board (4), rail knee plate (18), pressing plate Firmware (12), rubber cushion plate (5), lock washer (6), sleeve bolt (7), described pre-buried base plate is arranged in concrete foundation (8), Mounting base, rubber cushion plate, rail (9) successively on pre-buried base plate;Top board is fixed on described base plate and top board is in rail both sides It is symmetrical arranged to block rail, rail knee plate (18) between top board and rail, top board is provided with glue nose (11), top board It is provided with follower bolt hole, pressing plate securing member (12) makes the glue nose of top board and rail knee plate links closely, and that rail realizes rail is solid Fixed, described lock washer (6) is combined with base plate by sleeve bolt, and base plate is fixed in lateral attitude, and this system also lengthens sleeve pipe (17), connect extension pipe (13) and be used for the adjustment height that significantly rail settles.
2. after track foundation according to claim 1 sedimentation short transverse adjustment system it is characterised in that on described base plate It is provided with strip hole (14), the strip hole on base plate can laterally adjust position base.
3. after track foundation sedimentation according to claim 1, short transverse adjusts system it is characterised in that adjusting backing plate (15) it is arranged between pre-buried base plate and base plate.
4. after track foundation sedimentation according to claim 3, short transverse adjusts system it is characterised in that adjusting backing plate Side is provided with bolt limited mouth (16).
5. after track foundation sedimentation according to claim 1, short transverse adjustment system has it is characterised in that lengthening sleeve pipe External screw thread and female thread, the screw-internal thread fit of its external screw thread and former connection sleeve pipe simultaneously couples together, its female thread and sleeve bolt Screw thread cooperation, fixed sleeving bolt use;Lengthening connecting tube has the female thread lengthening sleeve kit, is lengthened by adjustment and connects The threaded length of pipe and lengthening sleeve pipe, to ensure the height adjusting, the external diameter lengthening connecting tube has the outer of major diameter, Connecting tube adjustment embedded board height can be lengthened by reversing.
CN201620491885.4U 2016-05-26 2016-05-26 Rail foundation subsides back direction of height adjustment system Active CN205917547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620491885.4U CN205917547U (en) 2016-05-26 2016-05-26 Rail foundation subsides back direction of height adjustment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620491885.4U CN205917547U (en) 2016-05-26 2016-05-26 Rail foundation subsides back direction of height adjustment system

Publications (1)

Publication Number Publication Date
CN205917547U true CN205917547U (en) 2017-02-01

Family

ID=57876338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620491885.4U Active CN205917547U (en) 2016-05-26 2016-05-26 Rail foundation subsides back direction of height adjustment system

Country Status (1)

Country Link
CN (1) CN205917547U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887590A (en) * 2016-05-26 2016-08-24 于俭海 Height direction adjusting system and method after railway foundation subsidence
CN111118982A (en) * 2019-12-20 2020-05-08 中国华冶科工集团有限公司 Nondestructive renovation method for inclined shaft track bed

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887590A (en) * 2016-05-26 2016-08-24 于俭海 Height direction adjusting system and method after railway foundation subsidence
WO2017202062A1 (en) * 2016-05-26 2017-11-30 于俭海 System and method for adjusting height and direction after railway foundation subsidence
CN111118982A (en) * 2019-12-20 2020-05-08 中国华冶科工集团有限公司 Nondestructive renovation method for inclined shaft track bed

Similar Documents

Publication Publication Date Title
CN105887590A (en) Height direction adjusting system and method after railway foundation subsidence
CN205917547U (en) Rail foundation subsides back direction of height adjustment system
CN109778612A (en) Ballastless track structure method for correcting error in railway tunnel
CN213710393U (en) Municipal administration road bridge construction is with novel template fastening device
CN210289148U (en) Be used for building aluminium template bracing piece iron pipe
CN204151675U (en) The bogie of earth anchored suspension bridge cat road track cable
CN203270608U (en) Prefabricated combined pipe rack
CN207672995U (en) A kind of In Great Basement late poured band support template
CN206903221U (en) A kind of civil engineering pours fixture with multi-purpose
CN203795854U (en) Preformed hole formwork fixing device for bare concrete floor
CN209670329U (en) A kind of multifunctional wall body formwork root positioning system
CN211201997U (en) Split-type spliced model structure for pouring inverted arch and filling of highway tunnel
CN209603399U (en) Assembled staircase structure
CN107100063A (en) A kind of precast prestressed truss-like reinforcing bar concrete case
CN208441492U (en) At the fixation device of bar casing tube in a kind of application of aluminum alloy pattern plate
CN209620634U (en) A kind of fixed device of embedded iron parts
CN206359149U (en) Derrick crane attachment support
CN203008363U (en) Device for fixing root part of outer wall template
CN205712168U (en) A kind of highway bridge consolidation of pile device
CN206722396U (en) Fiberglass in Round Column Formwork system
CN204826220U (en) Location built -in fitting with U type groove
CN108589966A (en) Connection component and its application method are born for connecting the vertical of concrete panel
CN206438408U (en) A kind of bridge concrete construction formwork
CN204982568U (en) Ballastless track self -compaction concrete closing device
CN206418407U (en) Lower structure formwork structure in bridge water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180718

Address after: Room 401, 110 Huanghe Road, Xigang District, Dalian City, Liaoning Province

Patentee after: Dalian Lino Group Co., Ltd.

Address before: 116000 Tsinghua Yuan 12, Zhongshan Bay Bridge, Zhongshan, Dalian, Liaoning.

Patentee before: Yu Jianhai

TR01 Transfer of patent right