CN205907685U - Bury pull box prefabricatedly - Google Patents
Bury pull box prefabricatedly Download PDFInfo
- Publication number
- CN205907685U CN205907685U CN201620793660.4U CN201620793660U CN205907685U CN 205907685 U CN205907685 U CN 205907685U CN 201620793660 U CN201620793660 U CN 201620793660U CN 205907685 U CN205907685 U CN 205907685U
- Authority
- CN
- China
- Prior art keywords
- pull box
- case lid
- box
- securing member
- prefabricatedly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to a bury pull box prefabricatedly especially relates to a bury pull box prefabricatedly who is used for the engineering, including box, case lid and fastener, the case lid setting be in the upper end of box, the fastener will case lid fastening be in the box on. Engineering time and expense are saved in the preceding prefabrication of dispatching from the factory, the environmental protection, dig on a wide area when having reduced on -the -spot step system, but the cost is low after the reuse batch production, can make various colours and mark, and is more pleasing to the eye, more fuses with the environment.
Description
Technical field
The utility model is related to a kind of prefabricated buried pull box, more particularly, to a kind of prefabricated buried bracing wire for engineering
Case.
Background technology
Current bracing wire hand well, Ren Jing, are formed using cement, yellow sand, brick scene block system, have following Railway Project: week
Phase is long.After scene is built into shape, needs to wait it could use after being dried, often affect project progress;Cost is high.Whether great or small, many
Few, it is required for specially purchasing building materials, special bricklayer construction molding;Can not reuse.Once without these materials can only be worked as
Building waste is processed;Not environmentally.Because system is built at scene, often to excavate the larger area of ratio, many zero angle particles can be left.Abandon
Must be processed with brick cement afterwards, not environmentally.
Utility model content
Technical problem to be solved in the utility model is to overcome the deficiencies in the prior art, proposes a kind of prefabricated buried bracing wire
Case, prefabricated before dispatching from the factory, save engineering time and expense;Environmental protection, decreases large area when scene builds processed and excavates;Repeatable utilization
Low cost after batch production, can make shades of colour and mark, more attractive, more merge with environment.
A kind of prefabricated buried pull box, including casing, case lid and securing member, described case lid is arranged on described casing
Upper end, described case lid is fastened on described casing described securing member.
Further, described securing member is individual, and described securing member is diagonally arranged.
Further, described casing is pre-formed.
Further, described casing is macromolecule mixture material, and described securing member is hardware fastening.
Further, described casing is macromolecule concrete.
The beneficial effects of the utility model are: form using macromolecule mixture is prefabricated, compression strength is high, can be used for
The various position such as road, greenbelt;All size can meet live various sizes demand.Various face can be made as requested
Color and mark;Prefabricated before dispatching from the factory, time-consuming and expense.
Brief description
In conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is a kind of positive structure schematic of prefabricated buried pull box of the utility model.
Fig. 2 is a kind of top surface structure schematic diagram of prefabricated buried pull box of the utility model.
Fig. 3 is a kind of side structure cross-sectional schematic of prefabricated buried pull box of the utility model.
Fig. 4 is a kind of body structure schematic diagram of prefabricated buried pull box of the utility model.
1st, casing;2nd, case lid;3rd, securing member.
Specific embodiment
Below by preferred embodiment shown with reference to the accompanying drawings, the utility model is explained in detail, but this practicality is new
Type is not limited to this embodiment.Below by embodiment, and combine accompanying drawing, the technical solution of the utility model is made concrete further
Explanation.
Embodiment
A kind of prefabricated buried pull box, including casing 1, case lid 2 and securing member 3, described case lid 2 is arranged on described case
The upper end of body 1, described case lid 2 is fastened on described casing 1 described securing member 3.Described securing member 3 is 2,
Described securing member 3 is diagonally arranged.Described casing 1 is pre-formed.Described casing 1 is macromolecule mixture material, institute
The securing member 3 stated is hardware fastening.Described casing 1 is macromolecule concrete.
Above specific embodiment only in order to the technical solution of the utility model to be described and unrestricted, although with reference to example pair
The utility model has been described in detail, it will be understood by those within the art that, can be to technology of the present utility model
Scheme is modified or equivalent, and without deviating from the spirit and scope of technical solutions of the utility model, it all should be covered
In the middle of right of the present utility model.
Claims (5)
1. a kind of prefabricated buried pull box, including casing (1), case lid (2) and securing member (3) it is characterised in that: described case lid
(2) it is arranged on the upper end of described casing (1), described case lid (2) is fastened on described casing by described securing member (3)
(1) on.
2. as claimed in claim 1 a kind of prefabricated buried pull box it is characterised in that described securing member (3) is 2, institute
The diagonal setting of securing member (3) stated.
3. as claimed in claim 2 a kind of prefabricated buried pull box it is characterised in that described casing (1) is pre-formed.
4. as claimed in claim 3 a kind of prefabricated buried pull box it is characterised in that described casing (1) mixes for macromolecule
Compound material, described securing member (3) is hardware fastening.
5. as claimed in claim 4 a kind of prefabricated buried pull box it is characterised in that described casing (1) mixes for macromolecule
Solidifying soil.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620793660.4U CN205907685U (en) | 2016-07-21 | 2016-07-21 | Bury pull box prefabricatedly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620793660.4U CN205907685U (en) | 2016-07-21 | 2016-07-21 | Bury pull box prefabricatedly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205907685U true CN205907685U (en) | 2017-01-25 |
Family
ID=57802888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620793660.4U Active CN205907685U (en) | 2016-07-21 | 2016-07-21 | Bury pull box prefabricatedly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205907685U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107642086A (en) * | 2016-07-21 | 2018-01-30 | 上海零迈防护电器有限公司 | A kind of prefabricated buried pull box |
-
2016
- 2016-07-21 CN CN201620793660.4U patent/CN205907685U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107642086A (en) * | 2016-07-21 | 2018-01-30 | 上海零迈防护电器有限公司 | A kind of prefabricated buried pull box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206233403U (en) | Wall transverse direction dry type attachment structure based on assembled architecture wall | |
CN207700438U (en) | A kind of fabricated shear wall cross connected structure | |
CN204098253U (en) | A kind of modified air-entrained concrete building block exterior wall insulated structure | |
CN206245157U (en) | A kind of pavior brick | |
CN205907685U (en) | Bury pull box prefabricatedly | |
CN203961099U (en) | A kind of high strength hollow constructional column template brick and the constructional column of building thereof | |
CN106760173A (en) | Prefabricated board at a kind of poured band of outer wall of basement | |
CN206245465U (en) | Suitable for the wall transverse direction dry type attachment structure of assembled architecture | |
CN206448438U (en) | Prefabricated board at a kind of poured band of outer wall of basement | |
CN103243913B (en) | The method for blocking of fabricated shear wall architectural lower floor junction grout blanket | |
CN105201278A (en) | Assembly type fence wall made of construction waste | |
CN205576671U (en) | Combined type PC stone material structure | |
CN107642086A (en) | A kind of prefabricated buried pull box | |
CN203247750U (en) | Assembled type cement brick | |
CN208294159U (en) | A kind of assembled swimming pool | |
CN207846841U (en) | Green building first pours gelling decorative cover and is integrally formed assembly concrete wallboard | |
CN203429919U (en) | Assembled-type antique looking pagoda top | |
CN204876191U (en) | Hollow brick wall body that can cut | |
CN106193428B (en) | A kind of waterproof thermal-insulated exterior wall building block with water discharging structure | |
CN104018614B (en) | The preparation of precast concrete assembled plate and monolithic architecture constructive method | |
CN105110724A (en) | Regenerated earth-retaining brick | |
CN206090817U (en) | Steel construction assemblyization house | |
CN204001337U (en) | Close rib building roof is poured into a mould built-in mould | |
CN203924434U (en) | Close rib building roof is poured into a mould external mould | |
CN215978024U (en) | Environment-friendly brick prepared from construction waste |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
DD01 | Delivery of document by public notice |
Addressee: Luo Shui Document name: Notification of Acceptance of Patent Application |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: Luo Shui Document name: payment instructions |