CN205894681U - Closed staircase template - Google Patents

Closed staircase template Download PDF

Info

Publication number
CN205894681U
CN205894681U CN201620880960.6U CN201620880960U CN205894681U CN 205894681 U CN205894681 U CN 205894681U CN 201620880960 U CN201620880960 U CN 201620880960U CN 205894681 U CN205894681 U CN 205894681U
Authority
CN
China
Prior art keywords
template
steel pipe
stair
marking time
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620880960.6U
Other languages
Chinese (zh)
Inventor
徐子武
易忠东
徐恰皮
陈佳烽
雷攀
苏承翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Construction Building Iv Ltd LLC
Original Assignee
Jiangxi Construction Building Iv Ltd LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Construction Building Iv Ltd LLC filed Critical Jiangxi Construction Building Iv Ltd LLC
Priority to CN201620880960.6U priority Critical patent/CN205894681U/en
Application granted granted Critical
Publication of CN205894681U publication Critical patent/CN205894681U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to a closed staircase template belongs to the building field to be applicable to that standard layer is more, high level and super high -rise building in 3 meters floor heights. The concrete layer's of this stair template lower extreme is provided with the bottom template, and concrete layer's upper end is provided with the template of marking time, the bottom template is through bottom steel pipe and stupefied the fixing of wood, the template of marking time divide into level mark time template and the perpendicular template of marking time, and in mark time template or mark time the surface of template perpendicularly and laid the flitch of level, the template top is provided with the upper portion steel pipe marking time, pass through split bolt fixed connection between bottom steel pipe and the upper portion steel pipe. Protected the stair negative reinforcement not stepped on effectively, save the manual work, it is interior hard outer real after the concrete stairway shaping, save material and manual cleaning expense have improved the efficiency of construction simultaneously, protected the stair finished product effectively, made stair concrete elegant appearance.

Description

A kind of enclosed type staircase template
Technical field
This utility model is related to a kind of enclosed type staircase template, belongs to building field, and is applied to that index bed is more, layer High level in high 3 meters and high-rise building.
Background technology
Stair are the components in building as floor gap vertical transportation, for the friendship between floor and when the discrepancy in elevation is larger Communications and liaison system.In modern architecture, most stair use reinforced concrete stairs.Geomery according to design makes building Terraced template, then casting concrete, form removal after solidification, form the stairway form needing.
Traditional stair template is not install tread template on surface of marking time, and in work progress, aspect personnel do not pass through; During casting concrete, concrete is easily excessive;After concrete setting form removal, directly trample during workman's work is current Stair concrete, causes losing fangle of marking time.It is unable to effective protection stair end product quality.
Content of the invention
This utility model, in order to overcome drawbacks described above, its object is to provide a kind of enclosed type staircase template, solve Technical problem as follows:
This utility model to achieve these goals, adopts the following technical scheme that
A kind of enclosed type staircase template, the lower end of the concrete layer of this stair template is provided with bottom template, concrete layer Upper end be provided with template of marking time;
Described bottom template is fixed by bottom steel pipe and wood stupefied;
Described template of marking time is divided into level to mark time template and vertical template of marking time, and marks time template or/and vertically step in level The surface of step template is equipped with flitch, is provided with top steel pipe above template of marking time;
It is fixedly connected by split bolt between bottom steel pipe and top steel pipe.
Further, the top of diagonal brace steel pipe and the bottom steel pipe of upper strata stair template are connected, the bottom of diagonal brace steel pipe Portion is fixed at lower floor's stair step inner corner trim.
Further, it is provided with reinforcing bar stirrup in concrete layer, for supporting template of marking time.
Further, the bottom of stair bench template is provided with garbage-cleaning preformed hole.
Further, it is provided with described garbage-cleaning preformed hole and the reserved of pull can build slag cleaning mouth template.
Further, the side in concrete layer is provided with stair side form and reinforces preformed hole.
Further, it is provided with embedded bar ring in the lower section of stair template and positioned at the bottom of top steel pipe.
Installation operation flow process
Laying gangboard, reinforcing → colligation gangboard reinforcing bar, the terraced beam rubbish of cleaning, bullet stair side loft → making are marked time Plate, reserved dentation shear wall formwork → installation shear wall side form, installation step plate, preliminary reinforcing → integral reinforcing, the row of staying Rubbish → closing garbage-cleaning preformed hole around pore → cleaning.
The beneficial effects of the utility model:
1st, stair step side of the present utility model, upper surface are all closed using clad can wood plywood.As long as reinforcing bar binding Finish, model sheetinstallat, reinforce put in place can above people, facilitate the movement of persons, be effectively protected stair negative reinforcement not by Step on;
2nd, stair concrete of the present utility model can be with continuous placing, one-shot forming.It is no longer necessary to people after concrete jolt ramming Work is rubbed with the hands and is smeared levelling, saves artificial, interior heavily fortified point exterior-excess after concrete staircase molding;
3rd, in concreting process of the present utility model, closed template prevents the excessive of concrete, material-saving With labor cleaning's expense, improve efficiency of construction simultaneously;
4th, enclosed type staircase template of the present utility model, in concrete setting early stage, stair concrete is closed template bag Live, it is to avoid workman pass through during directly treading staircase concrete cause losing fangle of marking time, be effectively protected stair Product, make stair concrete elegant in appearance.
Brief description
Fig. 1 is facade structures schematic diagram of the present utility model;
Fig. 2 is floor map of the present utility model;
Fig. 3 is cross-sectional view of the present utility model;
Fig. 4 is garbage-cleaning preformed hole full-page proof schematic diagram of the present utility model;
Fig. 5 is template flitch arrangement schematic diagram of marking time of the present utility model;
Fig. 6 is the structural representation of template bottom of the present utility model.
Specific embodiment
1 ~ 6 pair of this utility model is described in detail below in conjunction with the accompanying drawings:
A kind of enclosed type staircase template, the lower end of the concrete layer 1 of this stair template is provided with bottom template 2, concrete The upper end of layer 1 is provided with template 3 of marking time;
Described bottom template 2 passes through bottom steel pipe 4 and wood stupefied 5 is fixed;
Described template 3 of marking time is divided into level to mark time template 31 and vertical template 32 of marking time, level mark time template 31 or/and The surface of template of vertically marking time 32 is equipped with flitch 6, is provided with top steel pipe 7 above template 3 of marking time;
It is fixedly connected by split bolt 8 between bottom steel pipe 4 and top steel pipe 7.
The top of diagonal brace steel pipe 9 is connected with the bottom steel pipe 4 of upper strata stair template, and the bottom of diagonal brace steel pipe 9 is fixed At lower floor's stair step inner corner trim.
It is provided with reinforcing bar stirrup 14 in concrete layer 1, for supporting template 3 of marking time.
The bottom of stair bench template is provided with garbage-cleaning preformed hole 10.
It is provided with described garbage-cleaning preformed hole 10 and the reserved of pull can build slag cleaning mouth template 11.
The side of concrete layer 1 is provided with stair side form and reinforces preformed hole 12.
It is provided with embedded bar ring 13 in the lower section of stair template and positioned at the bottom of top steel pipe 7.
Enumerate enforcement construction method
(1) laying gangboard, reinforcing
Require to determine plagioclase and the width of stair according to design drawing, further according to on-site actual situations, plank sheathing is cut out Cut, process.Should be required according to scheme before laying gangboard, during to stair template integral reinforcing, the split bolt using be carried Front preformed hole, preformed hole lengthwise position is to contact every 700mm arrangement one mouth along gangboard plagioclase direction with gangboard from terraced beam Road, per pass is 2 holes.2 preformed hole lateral attitudes are respectively at stair each edge 300mm.
Start should first gangboard support system be reinforced when laying gangboard template, its reinforcing mode adopts flitch as secondary The additional steel pipe of Os Draconis, the combination of jacking carry out diagonal brace, and flitch (secondary joist) is flapped toward along gangboard plagioclase direction, and from gangboard edge Play every spacing 250mm and arrange a flitch, arrangement principle is to ensure that gangboard two ends are respectively mounted flitch and middle span flitch spacing not More than 250mm(note: overlapping mode can be adopted when wall scroll flitch length is inadequate, and lap-joint must have diagonal brace steel pipe to withstand, two ends Flitch each stretches out diagonal brace length of steel pipe and is not less than 150mm).Diagonal brace steel pipe support angle preferably becomes 90 degree, and steel with gangboard bottom surface Bottom of the tube need to fall in lower floor's stair step inner corner trim joint (the inner corner trim position that the level that is supported on is marked time with vertical handing-over of marking time). The supporting steel pipe contacting with jacking adopts 2 steel pipes to merge, and supports main joist as the integral reinforcing of stair.Diagonal brace steel pipe adds Gu when, supporting steel pipe first across arranging together at mouth 700mm for contacting along the terraced beam of gangboard plagioclase direction distance with gangboard, afterwards And spacing 1400mm arrangement is together, and last is across cannot be greater than 700mm, and per pass joins 2 jackings, steel pipe transverse for 2 steel pipes Position is to be arranged at respective gangboard edge 250mm respectively.
(2) colligation gangboard reinforcing bar, the terraced beam rubbish of cleaning, bullet stair side loft
Start gangboard reinforcing bar binding after the completion of gangboard model sheetinstallat, reinforcing operation, should clear up immediately after the completion of reinforcing bar binding The rubbish of lower mouth ladder beam bottom, then requires to carry out unwrapping wire to stair gangboard according to design drawing, then carries out taut line with cotton thread, with Control the error causing when marking time model sheetinstallat.
(3) step plate, reserved dentation shear wall formwork are made
Required to horizontal step plate, vertical step plate, shear wall (Vierendeel girder) and stair side form sawtooth according to design drawing Shape preformed plate carries out blanking in advance, processing.When operating this step, it should be specifically noted that deduction template thickness, determine horizontal step plate It is connected with each other the connected mode of mode and step plate and shear wall zigzag template edge with vertical step plate.The suggestion of this link is adopted Use following connected mode: 1, horizontal step plate end replaces vertical step plate top;2nd, vertical step plate bottom substitution level is stepped on Step plate root;3rd, the left and right end of vertical step plate replaces shear wall (Vierendeel girder) and stair side form zigzag reserves template end; 4th, the left and right end of horizontal step plate replaces shear wall (Vierendeel girder) and stair side form zigzag reserves template end.
(4) shear wall side form is installed, step plate, preliminary reinforcing are installed
Install shear wall side form when need to according to the relative space position of the position adjustment zigzag template of position line, ready after Shear wall side form is reinforced, reinforcement means is identical with common shear-wall strengthening method.After the completion of shear wall side form is reinforced, just Proceed by the installation of step plate, install and should first vertical step plate of mouth start to install first from stair during step plate, First horizontal step plate is installed again, step plate is supported with reinforcing bar stirrup, to ensure the thickness of gangboard and the position of step plate.As This analogizes, and tentatively should be fixed using iron nail during installation, and iron nail consumption will not arbitrarily be swung with ensureing that step plate hand push is pushed violently For principle.
(5) integral reinforcing, stay steam vent
Integral reinforcing should be carried out after the completion of step plate installation, reinforcing operation, should be first according to difference before carrying out integral reinforcing The gangboard slope of stair requires to place flitch in every ladder level plate face of marking time, and flitch needs horizontal positioned and flitch Edge Distance is marked time Depending on edge relative position need to be according to stair slope, its principle is: flitch height (mm)/Edge Distance flitch outer ledge of marking time Distance (mm)=gangboard slope.After flitch is fixing, using electric drill, step plate is holed, in view of operation before has been entered Go the boring at staircase boards bottom, therefore using this hole, from the bottom up step plate can have been carried out with perforate, drill bit direction should be vertical In stair swash plate direction, aperture is 16mm, after the completion of drilling operating, split bolt is inserted in preformed hole, then 4 length are 6 meters of steel pipe is integrally reinforced to stair along split bolt both sides along stair swash plate direction.Should after the completion of integral reinforcing Steam vent is reserved to step plate, steam vent is arranged on horizontal step plate, each setting 3-5 of marking time is advisable.
(6) rubbish around cleaning
Treat above-mentioned all process steps all complete and check errorless after, (include on Bars In Poured Concrete Slab) in the range of 2 meters around reply Rubbish is processed in time, and by rubbish, the garbage-cleaning preformed hole from stair swash plate bottom surface is discharged with the mode of bath.
(7) close garbage-cleaning preformed hole
Just the garbage-cleaning preformed hole that stair swash plate can be reserved after the completion of garbage-cleaning is closed, if necessary visually Additional two steel pipes of concrete condition are individually reinforced to the template of closing portion.
(8) casting concrete
Need before casting concrete to moisten template with water, the slump of concrete controls in 180mm, and concrete is from rest Platform is continuously poured into stair seam, and uses vibrating head vibration compacting.When vibrating, the vibrating head of selection of small is vibrated, and Vibrated in template surface of marking time with another vibrating head while gangboard concrete vibrating, make all in the holes of giving vent to anger whole Till flowing out concrete grout.

Claims (7)

1. a kind of enclosed type staircase template it is characterised in that: the lower end of the concrete layer (1) of this stair template is provided with bottom mould Plate (2), the upper end of concrete layer (1) is provided with template of marking time (3);
Bottom steel pipe (4) is passed through in described bottom template (2) and wood stupefied (5) is fixed;
Described template of marking time (3) is divided into level to mark time template (31) and vertical template of marking time (32), marks time template (31) in level Or/and the surface of template (32) of vertically marking time is equipped with flitch (6), it is provided with top steel pipe (7) above template of marking time (3);
It is fixedly connected by split bolt (8) between bottom steel pipe (4) and top steel pipe (7).
2. enclosed type staircase template according to claim 1 it is characterised in that: the top of diagonal brace steel pipe (9) and upper floor The bottom steel pipe (4) of terraced template is connected, and the bottom of diagonal brace steel pipe (9) is fixed at lower floor's stair step inner corner trim.
3. enclosed type staircase template according to claim 1 it is characterised in that: be provided with reinforcing bar in concrete layer (1) Stirrup (14), for supporting template (3) of marking time.
4. enclosed type staircase template according to claim 1 it is characterised in that: be provided with the bottom of stair bench template Garbage-cleaning preformed hole (10).
5. enclosed type staircase template according to claim 4 it is characterised in that: described garbage-cleaning preformed hole (10) place sets It is equipped with and the reserved of pull can build slag cleaning mouth template (11).
6. enclosed type staircase template according to claim 1 it is characterised in that: be provided with the side of concrete layer (1) Stair side form reinforces preformed hole (12).
7. enclosed type staircase template according to claim 1 it is characterised in that: in the lower section of stair template and be located at The bottom of portion's steel pipe (7) is provided with embedded bar ring (13).
CN201620880960.6U 2016-08-16 2016-08-16 Closed staircase template Active CN205894681U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620880960.6U CN205894681U (en) 2016-08-16 2016-08-16 Closed staircase template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620880960.6U CN205894681U (en) 2016-08-16 2016-08-16 Closed staircase template

Publications (1)

Publication Number Publication Date
CN205894681U true CN205894681U (en) 2017-01-18

Family

ID=57781410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620880960.6U Active CN205894681U (en) 2016-08-16 2016-08-16 Closed staircase template

Country Status (1)

Country Link
CN (1) CN205894681U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035548A (en) * 2017-11-24 2018-05-15 常州第建筑集团有限公司 The closed template construction method of cast-in-place concrete stair
CN109518897A (en) * 2019-01-03 2019-03-26 中国建筑第五工程局有限公司 Lightweight assembled folded plate and Cantilever Beams combined staircase
CN110259118A (en) * 2019-06-13 2019-09-20 中国建筑第八工程局有限公司 Stair ramp type Stadium formwork reinforcement system and its construction method
CN110565949A (en) * 2019-09-30 2019-12-13 融兴建设集团有限公司 Stair step directional steel template and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035548A (en) * 2017-11-24 2018-05-15 常州第建筑集团有限公司 The closed template construction method of cast-in-place concrete stair
CN109518897A (en) * 2019-01-03 2019-03-26 中国建筑第五工程局有限公司 Lightweight assembled folded plate and Cantilever Beams combined staircase
CN110259118A (en) * 2019-06-13 2019-09-20 中国建筑第八工程局有限公司 Stair ramp type Stadium formwork reinforcement system and its construction method
CN110565949A (en) * 2019-09-30 2019-12-13 融兴建设集团有限公司 Stair step directional steel template and construction method

Similar Documents

Publication Publication Date Title
CN106677069B (en) A kind of construction method of bridge pier integral formwork support one-shot forming structure
CN205894681U (en) Closed staircase template
CN102493341A (en) Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN109811878A (en) The shell integrated structure of the cast-in-place coinsiding die of assembled architecture and construction method
CN109339220A (en) Between integrally assembling staircase and its production and construction method
CN105863253B (en) Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN106223516B (en) ALC steam-pressing aero-concrete batten tilts curtain wall structure and construction method
CN105507476B (en) A kind of construction method of even arch covering
CN104264920B (en) Construction method of ultrahigh large-curvature circular spiral as-cast-finish stair
CN213710348U (en) Underground station side wall formwork supporting system combined with full support
CN111576856A (en) Aluminum alloy template assembling system and assembling method
CN205976167U (en) Based on cast -in -place floor structures of detachable positioning control spare
CN205976215U (en) Compound box roof beam of assembled concrete
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN209620240U (en) Between integrally assembling staircase
CN105442737B (en) A kind of complex heat-preservation floorboard and its construction method
CN111851827A (en) Assembly type prefabricated steel bar truss disassembly-free template system and manufacturing method thereof
CN1032690A (en) Superposed hollow building roof and construction method thereof
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN110080299A (en) A kind of shallow embedding mountain tunnel open-cut engineering method
CN109235871A (en) Variable section structure aluminum alloy mould plate construction method
CN108316652A (en) Steel construction main building construction bracket and construction method based on the bracket
CN108098978A (en) A kind of assembled underground pipe gallery epimere producing device and production method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant