CN205894530U - Assembled stair of marking time of encorbelmenting - Google Patents
Assembled stair of marking time of encorbelmenting Download PDFInfo
- Publication number
- CN205894530U CN205894530U CN201620780570.1U CN201620780570U CN205894530U CN 205894530 U CN205894530 U CN 205894530U CN 201620780570 U CN201620780570 U CN 201620780570U CN 205894530 U CN205894530 U CN 205894530U
- Authority
- CN
- China
- Prior art keywords
- marking time
- component
- time
- stair
- encorbelmenting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
Assembled stair of marking time of encorbelmenting, it relates to building technical field, it contains a plurality of components of marking time, the front of the component of marking time be provided with the structrual joint hole, pre -buried stiffener in the component of marking time adopts the connecting elements lock joint between of the adjacent component of marking time, one side of the component of marking time be provided with the railing mounting hole, adjacent marking time through structrual joint hole and connecting piece fixed connection between the component in a plurality of components of marking time, forming the stair body of marking time of encorbelmenting behind a plurality of component fixed connection that mark time, encorbelmenting and mark time the upper end of stair body and be provided with the floor topping, the below of floor topping is provided with the landing slab. Assembled stair of marking time of encorbelmenting, the efficiency of construction is high, hoist and mount and convenient assembling, intensity height, be difficult for bumping bad, the utility model has the advantages of simple structure, set up reasonable, the cost of manufacture low.
Description
Technical field
This utility model is related to technical field of buildings and in particular to assembled overhanging is marked time stair.
Background technology
With the development of modern industrial technology, building house can be produced like that with machine, manufacture in batch completely.As long as
Prefabricated house component, transport to assemble in site and get up just to become.
Assembled architecture began to arouse people's interest in 20 beginnings of the century, finally realized to the sixties.English, method, Soviet Union
Lian Deng state has made to attempt first.
The assembled architecture profile of early stage is more stiff, stereotyped.People improved in design later, increased
Motility and multiformity, make assembled architecture can not only build in batch, and pattern enriches.There is a kind of mobile caravan in the U.S.,
It is more advanced assembled architecture, each housing unit similarly is a large-scale trailer, as long as with special automobile it
Move scene to, then connected with pre-buried good water channel, power supply, telephone system by crane hanging component to floor board cushion block, just can use.
The facilities such as heating installation, bathroom, kitchen, dining room, bedroom are had inside mobile caravan.Mobile caravan can alone become a unit, also can be mutual
It is connected together.
The feature of assembled architecture: substantial amounts of building subassembly is machined by Workshop Production, component species mainly has: exterior wall
Plate, lining, superimposed sheet, balcony, air-conditioning plate, stair, precast beam, prefabricated post etc.;The substantial amounts of assembling work in scene, and original existing
Pour operation to greatly reduce;Using building, finishing integrated design, construction, perfect condition is that finishing can be with the same stepping of main body construction
OK;The standardization of design and the informationization of management, standard got over by component, and production efficiency is higher, and corresponding component cost will decline,
The digital management of cooperation factory, the cost performance of whole assembled architecture can more and more higher.
Current assembled stair adopt prefabricated components, there is heaviness, lifting and assembling inconvenience, low intensity, easily break
The shortcomings of, it is difficult to construct, have impact on efficiency of construction.
Utility model content
The purpose of this utility model is the defect and deficiency for prior art, provides that a kind of structure is simple, design is closed
Reason, assembled overhanging easy to use are marked time stair.
For achieving the above object, the technical solution adopted in the utility model is: it comprises some components of marking time;Described steps on
The front of step component is provided with component connecting hole, pre-buried stiffener in component of marking time, the stiffener of adjacent component of marking time
Between adopt connecting elements snapping;The side of described component of marking time is provided with railing installing hole;Adjacent in some components of marking time
Mark time and be fixedly connected with connector by component connecting hole between component;Some components of marking time form to encorbelment after being fixedly connected and step on
Step stair body, the mark time upper end of stair body of encorbelmenting is provided with floor topping, and the lower section of floor topping is provided with landing slab.
Preferably, in the hole installed by described railing is provided with railing, and railing is by pre-buried connection in component of marking time
Block is linked together with component of marking time.
Preferably, being additionally provided with positioning framework on described component of marking time.
During this utility model operation, described component connecting hole is used for being connected with wall or body of wall or floor, makes this practicality
The new stair of marking time of encorbelmenting really are realized quick assembled type with railing, body of wall, landing slab, floor topping and are connected;Described positioning
Framework can realize horizontal and vertical positioning when assembling between component of marking time.
After said structure, what this utility model produced has the beneficial effect that assembled overhanging described in the utility model
Mark time stair, efficiency of construction is high, lifting and easy to assembly, intensity is high, be difficult to break, this utility model has that structure is simple, sets
Put rationally, low manufacture cost the advantages of.
Brief description
Fig. 1 is structure chart of the present utility model;
Fig. 2 is that this utility model is marked time the structure chart of component.
Description of reference numerals:
Mark time component 1, stiffener 2, component connecting hole 3, railing installing hole 4, stair body 5, the floor face of marking time of encorbelmenting
Layer 6, landing slab 7, positioning framework 8.
Specific embodiment
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or in description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, drawings in the following description are only
It is some embodiments of the present utility model, for those of ordinary skill in the art, before not paying creative labor
Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Referring to as shown in Fig. 1 Fig. 2, this specific embodiment adopts the following technical scheme that it comprises some structures of marking time
Part 1;The front of described component 1 of marking time is provided with component connecting hole 3, pre-buried stiffener 2 in component 1 of marking time, and adjacent steps on
Connecting elements snapping is adopted between the stiffener 2 of step component 1;The side of described component 1 of marking time is provided with railing installing hole
4;Adjacent marking time in some components 1 of marking time is fixedly connected with connector by component connecting hole 3 between component 1;Some mark time
Component 1 is formed after being fixedly connected encorbelments stair body 5 of marking time, and the mark time upper end of stair body 5 of encorbelmenting is provided with floor topping 6,
The lower section of floor topping 6 is provided with landing slab 7.
Preferably, be provided with railing in described railing installing hole 4, and railing is by pre-buried company in component 1 of marking time
Connect block and link together with component 1 of marking time.
Preferably, being additionally provided with positioning framework 8 on described component 1 of marking time.
During the operation of this specific embodiment, described component connecting hole 3 is used for being connected with wall or body of wall or floor, makes this
Encorbelment stair of marking time of specific embodiment are really realized quick assembled type with railing, body of wall, landing slab 7, floor topping 6 and are connected;
Described positioning framework 8 can realize horizontal and vertical positioning when assembling between component 1 of marking time.
After said structure, the dress having the beneficial effect that described in this specific embodiment that this specific embodiment produces
Join formula to encorbelment stair of marking time, efficiency of construction is high, lifting and easy to assembly, intensity is high, be difficult to break, this specific embodiment has
Structure is simple, setting rationally, low manufacture cost the advantages of.
Of the present utility model ultimate principle and principal character and of the present utility model advantage have been shown and described above.This
The technical staff of industry, it should be appreciated that this utility model is not restricted to the described embodiments, retouches in above-described embodiment and description
That states simply illustrates principle of the present utility model, on the premise of without departing from this utility model spirit and scope, this utility model
Also have various changes and modifications, these changes and improvements both fall within the range of claimed this utility model.This practicality is new
Type claims scope by appending claims and its equivalent thereof.
Claims (3)
1. assembled overhanging mark time stair it is characterised in that: it comprises some components of marking time;The front of described component of marking time sets
It is equipped with component connecting hole, pre-buried stiffener in component of marking time, using connection structure between the adjacent stiffener of component of marking time
Part snapping;The side of described component of marking time is provided with railing installing hole;Adjacent marking time between component in some components of marking time
It is fixedly connected with connector by component connecting hole;Some components of marking time form, after being fixedly connected, stair body of marking time of encorbelmenting, and hang
The upper end choosing stair body of marking time is provided with floor topping, and the lower section of floor topping is provided with landing slab.
2. assembled overhanging according to claim 1 mark time stair it is characterised in that: described railing is installed in the hole and is installed
There is railing, and railing is linked together by pre-buried contiguous block in component of marking time and component of marking time.
3. assembled overhanging according to claim 1 mark time stair it is characterised in that: also set up on described component of marking time
There is positioning framework.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620780570.1U CN205894530U (en) | 2016-07-25 | 2016-07-25 | Assembled stair of marking time of encorbelmenting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620780570.1U CN205894530U (en) | 2016-07-25 | 2016-07-25 | Assembled stair of marking time of encorbelmenting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205894530U true CN205894530U (en) | 2017-01-18 |
Family
ID=57774374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620780570.1U Expired - Fee Related CN205894530U (en) | 2016-07-25 | 2016-07-25 | Assembled stair of marking time of encorbelmenting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205894530U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113073799A (en) * | 2021-04-22 | 2021-07-06 | 苏州金螳螂建筑装饰股份有限公司 | Suspension is marked time spiral stair assembled design structure |
-
2016
- 2016-07-25 CN CN201620780570.1U patent/CN205894530U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113073799A (en) * | 2021-04-22 | 2021-07-06 | 苏州金螳螂建筑装饰股份有限公司 | Suspension is marked time spiral stair assembled design structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205894530U (en) | Assembled stair of marking time of encorbelmenting | |
CN205894532U (en) | Fabricated stair | |
CN207776274U (en) | Water-proof roofing harden structure and building | |
CN205276504U (en) | Beam -column connecting joint of activity board house | |
CN108204131A (en) | A kind of prefabricated partition wall construction method | |
CN205894353U (en) | Assembled concrete shear force wall | |
CN215105453U (en) | Pin-connected panel cushion cap concrete prefabricated formwork | |
CN208803570U (en) | A kind of intelligence snap connector, assembled wallboard connection structure | |
CN212026594U (en) | Horseshoe-shaped node | |
CN205894354U (en) | Assembled coincide wallboard | |
CN209145011U (en) | For the assembling type steel structure module faced and built of constructing | |
CN208870194U (en) | Space module house | |
CN209099576U (en) | The metope structure of lightweight steel construction assembly building | |
CN206917072U (en) | A kind of overall spinning bolt-type integrates inner partition plate | |
CN207812479U (en) | A kind of prefabricated case change basis | |
CN205875383U (en) | Novel multi -functional assembled board house | |
CN205000567U (en) | Thoughtlessly take steel structural grouping formula stair | |
CN206737358U (en) | A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure | |
CN213868549U (en) | Multifunctional assembled component | |
CN205918178U (en) | Energy -efficient pin -connected panel basic station room | |
CN205329998U (en) | Strenghthened type square steel post assembled fitting spare | |
CN205713231U (en) | A kind of environmental protection ticketing building of modular assembling integration | |
CN210104974U (en) | Integrated module assembly type building structure | |
CN205894336U (en) | Assembled thermal -insulation exterior wall board | |
CN211257488U (en) | Large-scale aluminum alloy profile produced by small extruder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170118 Termination date: 20200725 |