CN205893830U - Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering - Google Patents

Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering Download PDF

Info

Publication number
CN205893830U
CN205893830U CN201620799589.0U CN201620799589U CN205893830U CN 205893830 U CN205893830 U CN 205893830U CN 201620799589 U CN201620799589 U CN 201620799589U CN 205893830 U CN205893830 U CN 205893830U
Authority
CN
China
Prior art keywords
armored concrete
solid beam
concrete solid
reinforced concrete
support rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620799589.0U
Other languages
Chinese (zh)
Inventor
郭建湖
李小和
赵新益
姜鹰
姚洪锡
李巍
王勇刚
杨辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201620799589.0U priority Critical patent/CN205893830U/en
Application granted granted Critical
Publication of CN205893830U publication Critical patent/CN205893830U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model belongs to support rail roof beam field to a low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering is disclosed, including reinforced concrete bottom plate, reinforced concrete solid beam, multirow sleeper pedestal, the section of track and water conservancy diversion rail support, the reinforced concrete solid beam integrated into one piece be in reinforced concrete bottom plate is last, and reinforced concrete solid beam direction merogenesis in way along the line is arranged, establishes the expansion joint between the adjacent reinforced concrete solid beam, the top of reinforced concrete solid beam sets up a plurality ofly the sleeper pedestal, the reinforced concrete solid beam left and right sides still evenly is provided with the roof beam upper groove respectively, the left and right sides of reinforced concrete solid beam still sets up a plurality ofly respectively water conservancy diversion rail support. The utility model discloses rigidity is big, and anti deformability is strong, can adopt cast -in -place or prefabrication and lifting, and structural style and construction process are simple, construction precision easily controls.

Description

A kind of middle low speed magnetic suspension traffic engineering is low to put circuit solid formula support rail girder construction
Technical field
This utility model belongs to support rail beam field, puts line more particularly, to a kind of middle low speed magnetic suspension traffic engineering is low Road solid support rail girder construction.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, and achievement in research both domestic and external is less, the whole world The circuit opening operation is even more minority.The middle low speed magnetic suspension railway business that only in March, 2005 Japan's construction at present is opened is transported The middle low speed magnetic suspension railway business operating line that line-the East Hillside Line and in June, 2014 Korea S will open.And in China Low speed magnetic suspension traffic only has National University of Defense technology's test wire, Green City Mountain test wire, Tangshan experiment line at present, there is no formal input The circuit of operation.
Middle low speed magnetcisuspension suspension traffic civil engineering partly mainly comprise bridge, low put circuit, station and rolling stock section, low put circuit It is made up of roadbed under the section of track, support rail beam and support rail beam, the support rail beam of supporting track is arranged on the roadbed being made up of earth structure On, the operation of middle low speed magnetic suspension train includes suspending, guiding, drive and braking is required for completing on support rail beam.Magnetic Aerotrain is very high to line construction deformation requirements, because the deformation of structure very little may affect comfortableness by bus or even prestige Side of body traffic safety, so the design of support rail beam is particularly significant.Existing bridge rail beam is to erect between two bridge piers, by freely-supported Beam or Continuous beam design, for meeting deformation and stability requirement, its physical dimension is typically very greatly hence it is evident that cannot be directly used to low Put on circuit.Existing bridge rail beam mostly is both sides and has the structures such as the box beam of complete web, u beam, I-beam, this several knot The track girder of structure, is respectively provided with good stability, the advantages of rigidity is big.Low circuit support rail beam of putting makes case also referring to bridge rail beam The structures such as beam, u beam, I-beam, are placed on the road bed of ground composition, then show outward appearance heavy also unsightly.
Existing buttress type support rail beam, sleeper pedestal is arranged on buttress top, bears track structure transmission by buttress Load, by longitudinal and transverse binder the stablizing come enhancing structure at its top.But there is also problems with:
(1) it is the ability with resistance to deformation for the rigidity increasing buttress, a socle is often provided with longitudinal and transverse binder, for saving work Cheng Liang, less than the sectional dimension of buttress more than the sectional dimension of these longitudinal and transverse binders, it is difficult to make integral mold plate in construction, Pier and longitudinal and transverse binder carry out one-piece casting, buttress of need to first constructing, more longitudinal and transverse binder of constructing, and working procedure is many.
(2) press the buttress type support rail beam of beam on elastic foundation design, top buttress is arranged on the armored concrete under it mostly On base plate, its integral rigidity is little, in lifting, transportation, the yielding cracking of structure, and should not be applied using prefabrication mode Work, can only be confined to field cast-in-place construction.
(3) Maglev Project track structure be located at support rail beam on, track structure can carry out small range be adapted to magnetic float The requirement of train, but its adjustment degree is with grade precision controlling, so requiring and track requirement for meeting line position, support rail beam Construction must controllable precise.But buttress type support rail beam is very many due to primary structural component, it is using cast-in-place form of construction work simultaneously, its Construction precision is difficult to control, the driving safety of this construction quality directly influencing track and train.
(4) upper track version is limited to the structure of buttress type support rail beam, section of track arrangement can not arbitrarily put it is necessary to Accurately arranged according to the position of buttress, structure transverse width.This increases difficulty for construction, especially in 3 in Curve Segment enforcement difficulty Bigger.
(5) upper track version does not consider the temperature impact that field colds and heat succeed each other under the conditions of environment etc., easily deforms With crack, there is potential safety hazard.
Utility model content
Disadvantages described above for prior art or Improvement requirement, this utility model provides a kind of middle low speed magnetic suspension traffic Engineering is low to put circuit solid support rail girder construction, and support rail girder construction rigidity is big, and non-deformability is strong, can be using cast-in-place or prefabricated hang Dress, version and working procedure are simple, construction precision is easily controllable.
For achieving the above object, according to this utility model, there is provided a kind of middle low speed magnetic suspension traffic engineering is low to put circuit Solid formula support rail girder construction is it is characterised in that include reinforced concrete floor, armored concrete solid beam, sleeper pedestal, the section of track With water conservancy diversion rail bearing, wherein,
Described armored concrete solid beam is integrally formed on described reinforced concrete floor, and described armored concrete Solid beam is arranged along line direction merogenesis, is provided with expansion joint between adjacent armored concrete solid beam;
The top of described armored concrete solid beam arranges multiple rows of described sleeper pedestal, and often row's sleeper pedestal along described Being longitudinally arranged of armored concrete solid beam, described armored concrete solid beam passes through these described sleeper pedestals and connects described rail Row;
The left and right sides of described armored concrete solid beam is respectively arranged with beam upper groove, for changing armored concrete Solid beam temperature field, reduce armored concrete solid beam in pouring forming process and field colds and heat succeed each other the temperature producing under environment Degree stress, and the beam upper groove in the left side of described armored concrete solid beam and the beam upper groove on the right side of it symmetrical set Put, additionally, beam upper groove being longitudinally arranged along described armored concrete solid beam of the every side of described armored concrete solid beam;
The left and right sides of described armored concrete solid beam also has multiple water conservancy diversion rail bearings respectively and these water conservancy diversion rails prop up Seat is symmetrical set.
Preferably, also include being arranged on the transponder on the top of described armored concrete solid beam, described transponder is located at Between described armored concrete solid beam and the described section of track.
Preferably, described armored concrete solid beam is in integrally rectangular shape.
Preferably, described sleeper pedestal is in integrally rectangular shape.
Preferably, align one by one in the expansion joint of described armored concrete solid beam and the expansion joint of the described section of track.
Preferably, the distance at adjacent two expansion joints in described armored concrete solid beam is two neighboring rail in the section of track The integral multiple of pillow distance.
Preferably, described reinforced concrete floor, armored concrete solid beam collectively form monolithic reinforced-concrete knot Structure.
In general, by the contemplated above technical scheme of this utility model compared with prior art, can obtain down Row beneficial effect:
(1) reinforced concrete floor of the present utility model and armored concrete solid beam be all using Reinforced Concrete Materials, Both are integrally formed, and the integral reinforced concrete rigidity of structure of formation is big, and resistance capacity to deformation is strong, disclosure satisfy that Maglev Project Structural stability, intensity, the requirement of deformation.
(2) this utility model is evenly arranged beam upper groove along the longitudinal direction of armored concrete solid beam, can change support rail beam Thermo parameters method, can reduce mass concrete component in pouring forming process and field colds and heat succeed each other and produces under the conditions of environment etc. Raw temperature stress, thus reducing component surface and the internal deformation occurring and crack, is conducive to improving the durable of support rail beam Property, the driving safety of the smooth-going and train that meet track requires.
(3) longitudinally adopt armored concrete solid beam along it on reinforced concrete floor, can be pre- using integral mold plate factory System, also can field cast-in-place construction, it is to avoid the loaded down with trivial details shortcoming of conventional support rail beam construction.
(4) sleeper pedestal is arranged in the solid top surface of the beam of armored concrete, unlike buttress type structure is tight to buttress position limitation Lattice, positioning control accuracy are high, reduce sleeper pedestal positioning difficulty, and Construction control is more convenient.
(5) adopt the armored concrete solid beam of rectangular shape, version and working procedure simple, be relatively suitable for length The arrangement of the sleeper pedestal of cube shape, can not be subject to sleeper pedestal size Control, also solve 3 in Curve Segment curved beam song simultaneously and do When, sleeper pedestal Positioning Precision Control difficulty problem.
Brief description
Fig. 1 is front view of the present utility model;
Fig. 2 is side view of the present utility model.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to this utility model.It should be appreciated that specific embodiment described herein is only in order to explain this Utility model, is not used to limit this utility model.Additionally, it is involved in each embodiment of this utility model disclosed below As long as and to technical characteristic each other do not constitute conflict just can be mutually combined.
With reference to Fig. 1, Fig. 2, a kind of middle low speed magnetic suspension traffic engineering is low to put circuit solid formula support rail girder construction, and its feature exists In, including reinforced concrete floor 1, armored concrete solid beam 2, sleeper pedestal 5, the section of track 7 and water conservancy diversion rail bearing 4, wherein,
Described armored concrete solid beam 2 is integrally formed on described reinforced concrete floor 1, and described reinforced concrete Native solid beam 2 is arranged along line direction merogenesis, is provided with expansion joint between adjacent armored concrete solid beam 2;
The top of described armored concrete solid beam 2 arranges multiple rows of described sleeper pedestal 5, and often arranges sleeper pedestal 5 edge Being longitudinally arranged of described armored concrete solid beam 2, described armored concrete solid beam 2 passes through these described sleeper pedestals 5 even Connect the described section of track 7;
The left and right sides of described armored concrete solid beam 2 is respectively arranged with beam upper groove 3, for changing reinforced concrete Native solid beam 2 temperature field, reduce armored concrete solid beam 2 in pouring forming process and field colds and heat succeed each other and produces under environment Temperature stress, and the beam upper groove 3 in the left side of described armored concrete solid beam 2 and the beam upper groove 3 about on the right side of it It is symmetrical arranged, additionally, the beam upper groove 3 of the every side of described armored concrete solid beam 2 is vertical along described armored concrete solid beam 2 To arrangement;
The left and right sides of described armored concrete solid beam 2 also has multiple water conservancy diversion rail bearings 4 and these water conservancy diversion rails respectively Bearing 4 is symmetrical set.
Further, also include being arranged on the transponder 6 on the top of described armored concrete solid beam 2, described transponder 6 Between described armored concrete solid beam 2 and the described section of track 7, described armored concrete solid beam 2 is overall to be in rectangular shape, Described sleeper pedestal 5 is overall to be in rectangular shape, the expansion joint of described armored concrete solid beam 2 and the described section of track 7 flexible Seam aligns one by one, and in described armored concrete solid beam 2, the distance at two adjacent expansion joints is two neighboring sleeper in the section of track 7 The integral multiple of distance, described reinforced concrete floor 2, armored concrete solid beam 2 collectively form monolithic reinforced-concrete knot Structure.
After the upper loads such as train, track reach reinforced concrete floor 1 by armored concrete solid beam 2, then reach Roadbed under beam, due to the integral reinforced concrete rigidity of structure of reinforced concrete floor 1 and armored concrete solid beam 2 formation Greatly, resistance capacity to deformation is strong, can meet magnetic suspension traffic engineering structure stability, intensity, rigidity, deformation and vehicle operation comfortable The requirement of property is it is ensured that the driving safety of construction quality and train.
This structure is longitudinally armored concrete solid beam 2, and beam upper groove 3 is evenly distributed in solid girder construction along longitudinal, Can change the thermo parameters method of support rail beam, reduce mass concrete component in pouring forming process and field colds and heat succeed each other ring The temperature stress producing under the conditions of border etc., thus reducing component surface and the internal deformation occurring and crack, is conducive to improving The durability of support rail beam, the driving safety of the smooth-going and train that meet track requires;Beam upper groove 3 groove body is along longitudinal length and horizontal stroke According to structure and requirement adjustment can be calculated to depth.
Using armored concrete solid beam 2 compared to buttress type structure, the arrangement of sleeper pedestal 5 is more convenient, Construction control More convenient, easily meet and limit requirement strict, that positioning control accuracy is high, meanwhile, this structure can adopt integral mold plate field cast-in-place Or place is prefabricated, working procedure is simple, construction precision is easily controllable.
This utility model main part is made up of armored concrete, and main part includes reinforced concrete floor 1, reinforcing bar mixes The longitudinal beam upper groove 3 being evenly distributed on solid girder construction both sides of solidifying soil solid beam 2 and edge forms, and can adopt cast-in-place or factory The technique of lifting after prefabricated;During using cast in place process, its specific implementation step is:
1) reinforcing bar, the reinforcing bar of armored concrete solid beam 2 of design requirement colligation good support rail beam steel concrete floor 1 are pressed And the reinforcing bar that armored concrete solid beam 2 is connected with sleeper pedestal 5, and make template, described template bag by design size requirement Include the first template and the second template;
2) reinforcing bar, the steel of armored concrete solid beam 2 of built-in fitting and support rail beam steel concrete floor 1 are carried out before pouring The positioning of muscle and installation, then recycle the first template to pour concrete and the reinforced concrete of support rail beam steel concrete floor 1 The concrete of native solid beam 2, by design requirement maintenance, wherein, described built-in fitting includes water conservancy diversion rail bearing 4 and transponder 6;
3) concrete of the concrete and reinforced concrete solid beam 2 of support rail beam steel concrete floor 1 reaches design by force The first template is removed, then the reinforcing bar of colligation sleeper pedestal 5 carry out secondary pouring sleeper pedestal 5 using the second template again after degree Concrete;
4) concrete curing of sleeper pedestal 55, to reaching after design strength, removes the second template;
5) water conservancy diversion rail bearing 4, transponder 6 and the section of track are installed, after installing, define middle low speed magnetic suspension traffic work Journey is low to put circuit solid formula support rail girder construction.
Preferably, step 1) in increase the embedded of lifting reinforcing bar, complete above-mentioned steps 4) when lifting reinforcing bar is lifted to setting Meter position, then carry out step 5) construction.
As it will be easily appreciated by one skilled in the art that the foregoing is only preferred embodiment of the present utility model, not In order to limit this utility model, all any modifications made within spirit of the present utility model and principle, equivalent and change Enter, should be included within protection domain of the present utility model.

Claims (7)

1. a kind of middle low speed magnetic suspension traffic engineering is low puts circuit solid formula support rail girder construction it is characterised in that inclusion reinforcing bar mixes Solidifying soil base plate (1), armored concrete solid beam (2), sleeper pedestal (5), the section of track (7) and water conservancy diversion rail bearing (4), wherein,
Described armored concrete solid beam (2) is integrally formed on described reinforced concrete floor (1), and described reinforced concrete Native solid beam (2) is arranged along line direction merogenesis, is provided with expansion joint between adjacent armored concrete solid beam (2);
The top of described armored concrete solid beam (2) arranges multiple rows of described sleeper pedestal (5), and often row's sleeper pedestal (5) Along being longitudinally arranged of described armored concrete solid beam (2), described armored concrete solid beam (2) passes through these described sleeper platforms Seat (5) connects the described section of track (7);
The left and right sides of described armored concrete solid beam (2) is respectively arranged with beam upper groove (3), for changing reinforced concrete Native solid beam (2) temperature field, reducing armored concrete solid beam, (2) in pouring forming process and field colds and heat succeed each other under environment The temperature stress producing, and the beam upper groove (3) in the left side of described armored concrete solid beam (2) and the beam fovea superior on the right side of it Groove (3) is symmetrical set, additionally, the beam upper groove (3) of the every side of described armored concrete solid beam (2) is along described reinforced concrete Being longitudinally arranged of native solid beam (2);
The left and right sides of described armored concrete solid beam (2) also has multiple water conservancy diversion rail bearing (4) and these water conservancy diversion rails respectively Bearing (4) is symmetrical set.
2. a kind of middle low speed magnetic suspension traffic engineering according to claim 1 is low puts circuit solid formula support rail girder construction, its It is characterised by, also include being arranged on the transponder (6) on the top of described armored concrete solid beam (2), described transponder (6) position Between described armored concrete solid beam (2) and the described section of track (7).
3. a kind of middle low speed magnetic suspension traffic engineering according to claim 1 is low puts circuit solid formula support rail girder construction, its It is characterised by, described armored concrete solid beam (2) is in integrally rectangular shape.
4. a kind of middle low speed magnetic suspension traffic engineering according to claim 1 is low puts circuit solid formula support rail girder construction, its It is characterised by, described sleeper pedestal (5) is in integrally rectangular shape.
5. a kind of middle low speed magnetic suspension traffic engineering according to claim 1 is low puts circuit solid formula support rail girder construction, its It is characterised by, align one by one in the expansion joint of described armored concrete solid beam (2) and the expansion joint of the described section of track (7).
6. a kind of middle low speed magnetic suspension traffic engineering according to claim 5 is low puts circuit solid formula support rail girder construction, its It is characterised by, in described armored concrete solid beam (2), the distance at two adjacent expansion joints is two neighboring rail in the section of track (7) The integral multiple of pillow distance.
7. a kind of middle low speed magnetic suspension traffic engineering according to claim 1 is low puts circuit solid formula support rail girder construction, its It is characterised by, described reinforced concrete floor (1), armored concrete solid beam (2) collectively form monolithic reinforced-concrete knot Structure.
CN201620799589.0U 2016-07-27 2016-07-27 Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering Active CN205893830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620799589.0U CN205893830U (en) 2016-07-27 2016-07-27 Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620799589.0U CN205893830U (en) 2016-07-27 2016-07-27 Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering

Publications (1)

Publication Number Publication Date
CN205893830U true CN205893830U (en) 2017-01-18

Family

ID=57785382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620799589.0U Active CN205893830U (en) 2016-07-27 2016-07-27 Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering

Country Status (1)

Country Link
CN (1) CN205893830U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049201A (en) * 2016-07-27 2016-10-26 中铁第四勘察设计院集团有限公司 Medium and low speed maglev traffic engineering low line solid bearing-trail beam structure and construction method thereof
CN109056432A (en) * 2018-10-12 2018-12-21 中铁二院工程集团有限责任公司 A kind of adjustable track beam structure of rigidity and magnetic-levitation test wire

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049201A (en) * 2016-07-27 2016-10-26 中铁第四勘察设计院集团有限公司 Medium and low speed maglev traffic engineering low line solid bearing-trail beam structure and construction method thereof
CN109056432A (en) * 2018-10-12 2018-12-21 中铁二院工程集团有限责任公司 A kind of adjustable track beam structure of rigidity and magnetic-levitation test wire
CN109056432B (en) * 2018-10-12 2023-09-22 中铁二院工程集团有限责任公司 Rigidity-adjustable track beam structure and magnetic levitation track test line

Similar Documents

Publication Publication Date Title
CN106049201A (en) Medium and low speed maglev traffic engineering low line solid bearing-trail beam structure and construction method thereof
CN105887586A (en) Low implantation line double-wire section terminal spine type bearing rail beam limiting structure in medium and low speed magnetic levitation transportation engineering
CN104480810A (en) Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method
CN204325821U (en) Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction
CN205893830U (en) Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN206157496U (en) Moderate -low speed magnetic levitation traffic engineering single line location pile foundation combined type support rail girder construction of filling
CN207793771U (en) Middle low speed magnetic suspension traffic engineering is low to set circuit support rail beam
CN205603974U (en) Low circuit single line location support rail girder segment limit structure within a definite time that puts of well low -speed maglev traffic engineering
CN106400615B (en) Medium-and low-speed maglev single line excavation location independence pier stud type support rail beam transition section structure
CN105442457A (en) Construction structure and method for extending bridge floor plate bridge filled with fine sand
CN206127736U (en) Moderate -low speed magnetic levitation double -line compound framing formula support rail roof beam transition section structure of location pile foundation that fills
CN106283952B (en) Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail girder construction
CN206157485U (en) Moderate -low speed magnetic levitation single line excavation location pile foundation combined type support rail roof beam transition section structure
CN206157495U (en) Moderate -low speed magnetic levitation double -line compound framing type support rail girder construction of location pile foundation of filling
CN106283957B (en) Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail beam transition section structure
CN205617160U (en) Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN205348002U (en) Adopt extension bridge floor slab bridge construction structures of fine sand packing
CN210507007U (en) Roadbed structure suitable for unilateral heavy-load transportation
CN206127741U (en) Moderate -low speed magnetic levitation single line excavation location detached pier column type support rail roof beam transition section structure
CN206127759U (en) Moderate -low speed magnetic levitation double -line location detached pier column type support rail roof beam transition section structure that fills
CN206127757U (en) Moderate -low speed magnetic levitation single line location detached pier column type support rail roof beam transition section structure that fills
CN206157480U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location pile foundation combined type support rail girder construction
CN106283938A (en) Medium-and low-speed maglev two-wire excavation location pile foundation is combined framing type support rail girder construction
CN205617164U (en) Low circuit single line location end thorn formula support rail girder segment limit structure within a definite time that puts of well low -speed maglev traffic engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant