CN205875247U - Geological survey is with filling out hole device fast - Google Patents

Geological survey is with filling out hole device fast Download PDF

Info

Publication number
CN205875247U
CN205875247U CN201620587643.5U CN201620587643U CN205875247U CN 205875247 U CN205875247 U CN 205875247U CN 201620587643 U CN201620587643 U CN 201620587643U CN 205875247 U CN205875247 U CN 205875247U
Authority
CN
China
Prior art keywords
cylinder
motor
clamping plate
swing
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620587643.5U
Other languages
Chinese (zh)
Inventor
赵健仓
来光
张志敏
孙刚
方建峰
杨继东
韩桃明
唐建立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN WATER CONSERVANCY SURVEY CO Ltd
Original Assignee
HENAN WATER CONSERVANCY SURVEY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN WATER CONSERVANCY SURVEY CO Ltd filed Critical HENAN WATER CONSERVANCY SURVEY CO Ltd
Priority to CN201620587643.5U priority Critical patent/CN205875247U/en
Application granted granted Critical
Publication of CN205875247U publication Critical patent/CN205875247U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a fill out the hole device, especially relate to a geological survey is with filling out hole device fast. The to -be -solved technical problem of the utility model is to provide a geological survey is with filling out hole device fast of intensity of labour is little, work efficiency is high, convenient operation. In order to solve the technical problem, the utility model provides such geological survey is with filling out hole device fast which comprises there be shallow, electronic round, slide rail, slider, act as go -between, cylinder I, motor I, tup, swinging arms, swing span, swing seat, cylinder II, fixed plate, connecting rod, electric putter, press from both sides and get the device and the push pedal, the shallow top is equipped with the slide rail, and the both ends symmetry is equipped with electronic round about the positive front side of slide rail, and electronic taking turns to around acting as go -between is equipped with the slider on the slide rail, and the slider is connected with acting as go -between, and the slider top is connected with cylinder I, and I top in the cylinder is connected with motor I, and I top in the motor is connected with the swing span. The utility model discloses reached that intensity of labour is little, work efficiency is high, convenient operation's effect.

Description

A kind of geology detecting is with quickly filling out pit device
Technical field
This utility model relates to one and fills out pit device, particularly relates to a kind of geology detecting with quickly filling out pit device.
Background technology
Geology detecting, also known as geological prospecting, is to be reconnoitred geology by various means, method, detected, and it is suitable to determine Supporting course, according to the foundation bearing capacity of supporting course, determine type of foundation, calculate the enquiry-based activity of underlying parameter.Be To search for mineral deposit is found to have the mineral deposit of industrial significance, for finding out the quality and quantity of mineral products, and the technical conditions that exploitation utilizes, carry Supply the ore reserve required for mine construction designing and geologic information, to the rock in a given area, stratum, structure, mineral products, water The geological conditions such as literary composition, landforms carry out enquiry based work.
Geology detecting needs manually or mechanically mode to carry out excavating hole, groove, well, hole, in order to directly observe the sky of rock-soil layer So state and geologic structure on each stratum, and can take out close to actual original state structure soil sample.After having excavated hole, it is right to need Hole is filled up, and existing fill out hole mainly dependence and is accomplished manually.
Existing geology detecting exists that labor intensity is big, the shortcoming of inefficiency, inconvenient operation with filling out hole mode, because of This needs the research and development geology detecting that a kind of labor intensity is little, work efficiency is high, easy to operate badly with quickly filling out pit device.
Utility model content
(1) to solve the technical problem that
This utility model in order to overcome existing geology detecting with filling out that hole mode labor intensity is big, inefficiency, operation Inconvenient shortcoming, the technical problems to be solved in the utility model is to provide one, and labor intensity is little, work efficiency is high, operation side Just geology detecting is with quickly filling out pit device.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model provides such a geology detecting with quickly filling out pit device, Include go-cart, Electric Motor Wheel, slide rail, slide block, bracing wire, cylinder I, motor I, tup, swing arm, swing span, swing seat, cylinder II, fixed plate, connecting rod, electric pushrod, clamp device and push pedal;Go-cart top is provided with slide rail, two ends pair, left and right, slide rail positive front side Claiming to be provided with Electric Motor Wheel, Electric Motor Wheel is wound with bracing wire, slide rail is provided with slide block, and slide block is connected with bracing wire, and slider top connects gas Cylinder I, cylinder I top connects motor I, and motor I top connects has swing span, swing span bottom left to be provided with fixed plate, fixing Bottom plate, left end is provided with connecting rod, is provided with electric pushrod on the right side of connecting rod, and connecting rod bottom connects has clamp device, clamp device to include Clamping plate I, electric magnet I, pole, electric magnet II, clamping plate II and spring, be front and back respectively hinged to two sides clamping plate I bottom pole With clamping plate II, on front side of clamping plate I, right-hand member is provided with electric magnet I, and on rear side of clamping plate II, right-hand member is provided with electric magnet II, electric magnet I and electric magnet Connecting between II and have spring, be hingedly connected with push pedal bottom the fixed plate on the right side of clamp device, push pedal is cut with scissors with electric pushrod right-hand member Connecing in succession, be provided with swing seat below swing span top, swing seat is hingedly connected with cylinder II, cylinder II bottom is hingedly connected with Swing arm, is articulated and connected with swing span in the middle part of swing arm, and swing arm right-hand member is hingedly connected with tup.
Preferably, also including friction pad, on rear side of clamping plate I, on front side of left end and clamping plate II, left end is all arranged with friction pad.
Preferably, also include vibrating motor II, on the right side of push pedal, be provided with vibrating motor II.
Preferably, motor I is servomotor.
Operation principle: when needing the hole of geology detecting is filled, manually go-cart is pushed near mound, then Starting Electric Motor Wheel clockwise, band movable slider moves right, and band dynamic air cylinder I, motor I, swing span, swing arm and tup move right, When tup is positioned at the surface of mound, Electric Motor Wheel stops operating.Start cylinder I to shorten, drive motor I, swing span, swing Bar and tup move downward, and when tup moves downwardly to correct position directly over mound, cylinder I stops shortening, and then opens Dynamic air cylinder II does stretching motion, drives swing arm to swing, and drives tup to move up and down, so that mound is beaten by tup Beat, make the stone of bulk be crashed to pieces;When bulk stone smashes to a certain extent, cylinder II elongates or shortens certain length, drives Swing arm reset, drive tup reset, start cylinder I extend certain length, drive motor I, swing span, swing arm and tup to On move to reset.Now, start motor I and rotate 180 °, drive fixed plate, connecting rod, electric pushrod and clamp device to rotate 180°.Then startup Electric Motor Wheel is clockwise or reverses certain time, and band movable slider moves left and right, and drives band dynamic air cylinder I, motor I, pendulum Moving frame, fixed plate, connecting rod, electric pushrod and clamp device move left and right, when clamp device is positioned at suitable position directly over mound When putting, Electric Motor Wheel stops operating, and starts cylinder I and shortens, drive motor I, swing span, fixed plate, connecting rod, electric pushrod and gripping Device moves downward, and when ratchel is between clamping plate I and clamping plate II, cylinder I stops shortening, electric magnet I and electric magnet II Energising, makes electric magnet I and the upper contrary magnetic of electric magnet II energising band, so that clamping plate I and clamping plate II are drawn close, clamping plate to centre I and clamping plate II by ratchel clamp after, start Electric Motor Wheel clockwise, band movable slider moves right, band dynamic air cylinder I, motor I, swing Frame, fixed plate, connecting rod, electric pushrod, clamp device and ratchel move right, when clamp device and ratchel are just being positioned at hole During top, Electric Motor Wheel stops operating, electric magnet I and electric magnet II power-off, makes ratchel fall in hole, then starts Electric Motor Wheel inverse Turning, band movable slider moves to the left, and band dynamic air cylinder I, motor I, swing span, fixed plate, connecting rod, electric pushrod, clamp device are to the left Move to reset, repeat aforesaid operations, the ratchel in mound is all gripped in hole.When the ratchel in mound is complete When all gripping in hole, start Electric Motor Wheel clockwise, make slide block move right, band dynamic air cylinder I, motor I, swing span, fixed plate, company Bar, electric pushrod and connecting rod move right, and after connecting rod is positioned at the surface of mound, Electric Motor Wheel quits work, and start electronic pushing away Bar elongation certain length, drives push pedal upper direction to the left to correct position, starts cylinder I and shorten certain length, drive motor I, swing span, fixed plate, connecting rod, electric pushrod and connecting rod move downwardly to correct position, then start electric pushrod and shorten, band Dynamic push pedal is moved to the right, so that sandstone are pushed in hole by push pedal, repeats above action, is all pushed in hole by sandstone. After sandstone all push in hole, electric pushrod elongation certain length, make push pedal reset;Start motor I and rotate 180 °, drive band Dynamic fixed plate, connecting rod, electric pushrod, clamp device and push pedal rotate 180 ° to resetting;Starting Electric Motor Wheel reverse makes slide block to the left Motion, after cylinder I, motor I, swing span, fixed plate, connecting rod, electric pushrod and connecting rod move to reset to the left, Electric Motor Wheel stops Rotate.
Because also including friction pad, on rear side of clamping plate I, on front side of left end and clamping plate II, left end is all arranged with friction pad, works as folder When plate I and clamping plate II press from both sides ratchel, friction pad can increase the frictional force between clamping plate I and clamping plate II and ratchel, in case greatly The random landing of stone.
Because also including vibrating motor II, on the right side of push pedal, it is provided with vibrating motor II, when sandstone are all pushed hole by push pedal Time middle, Vibration on Start-up motor II works, thus the sandstone speckled with in push pedal and dust is shaken off down, makes push pedal cleaning dry Only.
Because motor I is servomotor, it is possible to more accurately control motor I rotating speed, operation is made to run more steady.
(3) beneficial effect
This utility model has reached the effect that labor intensity is little, work efficiency is high, easy to operate.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present utility model.
Fig. 2 is the first left view structural representation of this utility model clamp device.
Fig. 3 is the second left view structural representation of this utility model clamp device.
Fig. 4 is the second of the present utility model main TV structure schematic diagram.
Being labeled as in accompanying drawing: 1-go-cart, 2-Electric Motor Wheel, 3-slide rail, 4-slide block, 5-bracing wire, 6-mound, 7-cheats, 8- Ground, 9-cylinder I, 10-motor I, 11-tup, 12-swing arm, 13-swing span, 14-swing seat, 15-cylinder II, 16-fixes Plate, 17-connecting rod, 18-electric pushrod, 19-clamp device, 20-push pedal, 21-clamping plate I, 22-electric magnet I, 23-pole, 24-electricity Magnet II, 25-clamping plate II, 26-spring, 27-friction pad, 28-vibrating motor II.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Embodiment 1
A kind of geology detecting, with quickly filling out pit device, as Figure 1-4, includes go-cart 1, Electric Motor Wheel 2, slide rail 3, slide block 4, bracing wire 5, cylinder I 9, motor I 10, tup 11, swing arm 12, swing span 13, swing seat 14, cylinder II 15, fixed plate 16, company Bar 17, electric pushrod 18, clamp device 19 and push pedal 20;Go-cart 1 top is provided with slide rail 3, and two ends, left and right, slide rail 3 positive front side are symmetrical Being provided with Electric Motor Wheel 2, Electric Motor Wheel 2 is wound with bracing wire 5, slide rail 3 is provided with slide block 4, and slide block 4 is connected with bracing wire 5, and slide block 4 top is even Being connected to cylinder I 9, cylinder I 9 top connects motor I 10, and motor I 10 top connects swing span 13, swing span 13 bottom left Being provided with fixed plate 16, bottom fixed plate 16, left end is provided with connecting rod 17, is provided with electric pushrod 18 on the right side of connecting rod 17, and connecting rod 17 bottom is even Being connected to clamp device 19, clamp device 19 includes clamping plate I 21, electric magnet I 22, pole 23, electric magnet II 24, clamping plate II 25 and Spring 26, has front and back been respectively hinged to two sides clamping plate I 21 and clamping plate II 25 bottom pole 23, and on front side of clamping plate I 21, right-hand member is provided with Electric magnet I 22, on rear side of clamping plate II 25, right-hand member is provided with electric magnet II 24, and connecting between electric magnet I 22 and electric magnet II 24 has spring 26, it is hingedly connected with push pedal 20, push pedal 20 and the hinged company of electric pushrod 18 right-hand member bottom the fixed plate 16 on the right side of clamp device 19 Connecing, be provided with swing seat 14 below swing span 13 top, swing seat 14 is hingedly connected with cylinder II 15, cylinder II 15 bottom is hinged Connecting and have swing arm 12, be articulated and connected with swing span 13 in the middle part of swing arm 12, swing arm 12 right-hand member is hingedly connected with tup 11.
Also including friction pad 27, on rear side of clamping plate I 21, on front side of left end and clamping plate II 25, left end is all arranged with friction pad 27.
Also include vibrating motor II 28, on the right side of push pedal 20, be provided with vibrating motor II 28.
Motor I 10 is servomotor.
Operation principle: when needing the hole 7 of geology detecting is filled, manually go-cart 1 is pushed near mound 6, Then starting Electric Motor Wheel 2 clockwise, band movable slider 4 moves right, band dynamic air cylinder I 9, motor I 10, swing span 13, swing arm 12 and Tup 11 moves right, and when tup 11 is positioned at the surface of mound 6, Electric Motor Wheel 2 stops operating.Start cylinder I 9 to shorten, Drive motor I 10, swing span 13, swing arm 12 and tup 11 move downward, when tup 11 moves downwardly to directly over mound 6 During correct position, cylinder I 9 stops shortening, and then starts cylinder II 15 and does stretching motion, drives swing arm 12 to swing, drives hammer 11 move up and down, so that mound 6 is beaten by tup 11, make the stone of bulk be crashed to pieces;Bulk stone smashes Time to a certain extent, cylinder II 15 elongates or shortens certain length, drives swing arm 12 to reset, and drives tup 11 to reset, starts Cylinder I 9 extends certain length, and drive motor I 10, swing span 13, swing arm 12 and tup 11 move up to reset.Now, Start motor I 10 and rotate 180 °, drive fixed plate 16, connecting rod 17, electric pushrod 18 and clamp device 19 to rotate 180 °.Then open Galvanic electricity driving wheel 2 is clockwise or reverses certain time, and band movable slider 4 moves left and right, and drives band dynamic air cylinder I 9, motor I 10, swing span 13, fixed plate 16, connecting rod 17, electric pushrod 18 and clamp device 19 move left and right, and just go up when clamp device 19 is positioned at mound 6 During side's correct position, Electric Motor Wheel 2 stops operating, and starts cylinder I 9 and shortens, drive motor I 10, swing span 13, fixed plate 16, company Bar 17, electric pushrod 18 and clamp device 19 move downward, when ratchel is between clamping plate I 21 and clamping plate II 25, and cylinder I 9 stop shortening, electric magnet I 22 and electric magnet II 24 energising, make electric magnet I 22 and the upper contrary magnetic of electric magnet II 24 energising band Property, so that clamping plate I 21 and clamping plate II 25 are drawn close to centre, after ratchel is clamped by clamping plate I 21 and clamping plate II 25, start electronic Taking turns 2 clockwise, band movable slider 4 moves right, and band dynamic air cylinder I 9, motor I 10, swing span 13, fixed plate 16, connecting rod 17, electronic pushes away Bar 18, clamp device 19 and ratchel move right, when clamp device 19 and ratchel are positioned at the surface in hole 7, and Electric Motor Wheel 2 Stop operating, electric magnet I 22 and electric magnet II 24 power-off, make ratchel fall in hole 7, then start Electric Motor Wheel 2 and reverse, drive Slide block 4 is to left movement, band dynamic air cylinder I 9, motor I 10, swing span 13, fixed plate 16, connecting rod 17, electric pushrod 18, clamp device 19 move to reset to the left, repeat aforesaid operations, are all gripped in hole 7 by the ratchel in mound 6.When in mound 6 Ratchel all grip hole 7 in time, start Electric Motor Wheel 2 clockwise, make slide block 4 move right, band dynamic air cylinder I 9, motor I 10, Swing span 13, fixed plate 16, connecting rod 17, electric pushrod 18 and connecting rod 17 move right, and connecting rod 17 is positioned at the surface of mound 6 After, Electric Motor Wheel 2 quits work, and starts electric pushrod 18 and extends certain length, drives push pedal 20 upper direction to the left to suitable position Put, start cylinder I 9 and shorten certain length, drive motor I 10, swing span 13, fixed plate 16, connecting rod 17, electric pushrod 18 and company Bar 17 moves downwardly to correct position, then starts electric pushrod 18 and shortens, and drives push pedal 20 to move to the right, so that pushing away Sandstone are pushed in hole 7 by plate 20, repeat above action, are all pushed in hole 7 by sandstone.After sandstone all push in hole 7, electricity Dynamic push rod 18 extends certain length, makes push pedal 20 reset;Start motor I 10 and rotate 180 °, drive fixed plate 16, connecting rod 17, electric pushrod 18, clamp device 19 and push pedal 20 rotate 180 ° to resetting;Starting Electric Motor Wheel 2 reverse makes slide block 4 transport to the left Dynamic, cylinder I 9, motor I 10, swing span 13, fixed plate 16, connecting rod 17, electric pushrod 18 and connecting rod 17 move to reset to the left After, Electric Motor Wheel 2 stops operating.
Because also including friction pad 27, on rear side of clamping plate I 21, on front side of left end and clamping plate II 25, left end is all arranged with friction Pad 27, when clamping plate I 21 and clamping plate II 25 press from both sides ratchel, friction pad 27 can increase clamping plate I 21 and clamping plate II 25 and ratchel Between frictional force, in case the random landing of ratchel.
Because also including vibrating motor II 28, on the right side of push pedal 20, it is provided with vibrating motor II 28, when push pedal 20 is complete by sandstone When all pushing in hole 7, Vibration on Start-up motor II 28 works, thus the sandstone speckled with in push pedal 20 and dust is shaken off down, Push pedal 20 is made to clean totally.
Because motor I 10 is servomotor, it is possible to more accurately control motor I 10 rotating speed, operation is made to run more Steadily.
Embodiment described above only have expressed preferred implementation of the present utility model, and it describes more concrete and detailed, But therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, common for this area For technical staff, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be as the criterion with claims.

Claims (4)

1. a geology detecting is with quickly filling out pit device, it is characterised in that include go-cart (1), Electric Motor Wheel (2), slide rail (3), Slide block (4), bracing wire (5), cylinder I (9), motor I (10), tup (11), swing arm (12), swing span (13), swing seat (14), Cylinder II (15), fixed plate (16), connecting rod (17), electric pushrod (18), clamp device (19) and push pedal (20);Go-cart (1) is pushed up Portion is provided with slide rail (3), and two ends, left and right, slide rail (3) positive front side are arranged with Electric Motor Wheel (2), and Electric Motor Wheel (2) is wound with bracing wire (5), Slide rail (3) is provided with slide block (4), and slide block (4) is connected with bracing wire (5), and slide block (4) top connects cylinder I (9), cylinder I (9) Top connects motor I (10), and motor I (10) top connects swing span (13), and swing span (13) bottom left is provided with fixing Plate (16), fixed plate (16) bottom left end is provided with connecting rod (17), and connecting rod (17) right side is provided with electric pushrod (18), connecting rod (17) end End connection has clamp device (19), clamp device (19) to include clamping plate I (21), electric magnet I (22), pole (23), electric magnet II (24), clamping plate II (25) and spring (26), pole (23) has been respectively hinged to two sides clamping plate I (21) and clamping plate before and after bottom II (25), clamping plate I (21) front side right-hand member is provided with electric magnet I (22), and clamping plate II (25) rear side right-hand member is provided with electric magnet II (24), electricity Connect between Magnet I (22) and electric magnet II (24) and have spring (26), fixed plate (16) the bottom hinge on clamp device (19) right side Being connected to push pedal (20) in succession, push pedal (20) is articulated and connected with electric pushrod (18) right-hand member, is provided with pendulum below swing span (13) top Dynamic seat (14), swing seat (14) is hingedly connected with cylinder II (15), and cylinder II (15) bottom is hingedly connected with swing arm (12), Swing arm (12) middle part is articulated and connected with swing span (13), and swing arm (12) right-hand member is hingedly connected with tup (11).
A kind of geology detecting the most according to claim 1 is with quickly filling out pit device, it is characterised in that also include friction pad (27), clamping plate I (21) rear side left end and clamping plate II (25) front side left end are all arranged with friction pad (27).
A kind of geology detecting the most according to claim 1 is with quickly filling out pit device, it is characterised in that also include vibration electricity Machine II (28), push pedal (20) right side is provided with vibrating motor II (28).
A kind of geology detecting the most according to claim 1 is with quickly filling out pit device, it is characterised in that motor I (10) is for watching Take motor.
CN201620587643.5U 2016-06-17 2016-06-17 Geological survey is with filling out hole device fast Expired - Fee Related CN205875247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620587643.5U CN205875247U (en) 2016-06-17 2016-06-17 Geological survey is with filling out hole device fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620587643.5U CN205875247U (en) 2016-06-17 2016-06-17 Geological survey is with filling out hole device fast

Publications (1)

Publication Number Publication Date
CN205875247U true CN205875247U (en) 2017-01-11

Family

ID=57690688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620587643.5U Expired - Fee Related CN205875247U (en) 2016-06-17 2016-06-17 Geological survey is with filling out hole device fast

Country Status (1)

Country Link
CN (1) CN205875247U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112845454A (en) * 2021-01-10 2021-05-28 河北中科同创科技发展有限公司 Chemistry test tube cleaning device
CN116007705A (en) * 2023-03-24 2023-04-25 山东省物化探勘查院 Hydrogeological exploration groundwater level detection data acquisition device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112845454A (en) * 2021-01-10 2021-05-28 河北中科同创科技发展有限公司 Chemistry test tube cleaning device
CN116007705A (en) * 2023-03-24 2023-04-25 山东省物化探勘查院 Hydrogeological exploration groundwater level detection data acquisition device

Similar Documents

Publication Publication Date Title
CN206348169U (en) A kind of sampler used for geological prospecting
CN205875247U (en) Geological survey is with filling out hole device fast
CN106114580A (en) A kind of electric power electric pole work car
CN208350416U (en) A kind of portable sampling equipment used for geological prospecting
CN203791196U (en) Special gravel screening equipment for construction sites
CN114608868A (en) Portable sampling device for mineral exploration
CN205301312U (en) Simulation coal exploitation working face experimental apparatus
CN204804843U (en) Coal mining device
CN205822164U (en) A kind of geology detecting shoveling Handling device
CN109192035B (en) Stretching structure physical simulation experiment device and method for hypergravity environment
CN206129152U (en) Ore mining devices for geological survey
CN205743943U (en) Rockbolt installation device is used in a kind of mining
CN104832171A (en) Coal mining device
CN112880655A (en) Horizontal marker post for surveying instrument
CN211401752U (en) Sampling device for geological exploration
CN115165446A (en) Different-depth soil sampling device and sampling method for geological exploration
CN215718461U (en) Drilling equipment for mine exploration
CN213600455U (en) Geological survey equipment
CN204827279U (en) Pendulum pipe mechanism is moved to combined type
CN213210497U (en) Grabbing device of oil exploration wireless node
CN210829243U (en) Petroleum geology liquid state distribution domain detects a section of thick bamboo
CN205706928U (en) Adopt mud car
CN205718825U (en) A kind of geology detecting measurement distance means
CN205875117U (en) Convenient conversion static sounding device of hydrodrill
CN216899723U (en) Sampling equipment is used in geology mineral exploration

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111