CN205861806U - The low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device - Google Patents

The low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device Download PDF

Info

Publication number
CN205861806U
CN205861806U CN201620847822.8U CN201620847822U CN205861806U CN 205861806 U CN205861806 U CN 205861806U CN 201620847822 U CN201620847822 U CN 201620847822U CN 205861806 U CN205861806 U CN 205861806U
Authority
CN
China
Prior art keywords
voltage
arc
clearance distance
electrode
spheric electrode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620847822.8U
Other languages
Chinese (zh)
Inventor
陆佳政
王博闻
蒋正龙
方针
胡建平
吴伟
徐勋建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Disaster Prevention and Mitigation Center of State Grid Hunan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620847822.8U priority Critical patent/CN205861806U/en
Application granted granted Critical
Publication of CN205861806U publication Critical patent/CN205861806U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

This utility model relates to a kind of low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device, including impulse voltage generator system, voltage measurement system, Luo-coil, suspension insulator, spark gap gapless section, upper spheric electrode, lower spheric electrode, striking fuse, industrial frequency experiment power-supply system.The air gap between upper and lower spheric electrode adds striking fuse, and power frequency side power-supply device is affected by Impulse Voltage to be remarkably decreased.Upper and lower spheric electrode is fixed on suspension insulator by anchor ear gold utensil, it is achieved that freely regulating of clearance distance.Use the concrete test method of this device: gap between upper and lower spheric electrode is adjusted, striking fuse is installed, export power-frequency voltage, output surge voltage, carries out 5 testing experiments, changes clearance distance, evaluation test result, determines that optimal clearance distance designs.Assay device and method shorten the test period, improve test efficiency, enhance test rigor, are effectively guaranteed the accuracy of test.

Description

The low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device
Technical field
This utility model belongs to electrical engineering technical field, is specifically related to a kind of low pressure starting the arc and the adjustable work of clearance distance Frequently operating duty cycle test device.
Background technology
Leakage conductor mostly is arrester with gaps, it is advantageous that under working voltage, and voltage, spark gap valve are born in gap In the case of sheet life, and lightning arrester body damage, circuit can be properly functioning.But under lightning current effect, gap is hit Wear, space electric arc can be formed.Lightning current is short for action time, and spark gap is quickly introduced into the earth, and arc channel is in power frequency simultaneously Power frequency continued flow can be formed under voltage effect.If the energy that the energy that electric arc dissipates injects more than gap, power frequency continued flow is at electric current Extinguish before zero crossing, but the temperature of arc gap is higher, there is the thermal ionization process of local, still there is between arc gap certain conducting Road, is likely to occur under exchange recovers the effect of voltage and restrikes.Arc reignition can cause spark gap to absorb, and energy increases, valve block is sent out Heat aggravation, causes the faults such as valve block infringement, line-to-ground tripping operation further.It is thus desirable to the power frequency continued flow to arrester with gaps Situation carries out analysis of experiments.
At present in the power frequency continued flow test of arrester with gaps, pressuring method is surge voltage superposition power-frequency voltage, generally Need relatively HI high impact voltage effect just can make gap breakdown, form electric arc.When power frequency side is transformator, protective loop requires height, When power frequency side is electric capacity, inductor oscillating loop, and equipment needed thereby is various, parameter collocation is difficult, and the triggered time is difficult to control to.Survey at present Whether extinguish simply by electric arc during examination and judge that lightning arrester gap setting is the most reasonable, it is judged that according to single, test device Cannot freely regulate clearance distance, test crash then needs spark gap redesign to test again, test period length, work effect Rate is low.
Utility model content
The purpose of this utility model is big for the power frequency continued flow difficulty of test of arrester with gaps, test equipment electric pressure Require that high, conclusion (of pressure testing) analyzes the shortcomings such as simple, test period length, it is provided that a kind of low pressure starting the arc and the adjustable work of clearance distance Frequently operating duty cycle test device and test method.
For solve above-mentioned technical problem, this utility model by the following technical solutions:
A kind of low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device, including impulse voltage generator system, Voltage measurement system, Luo-coil, suspension insulator, spark gap gapless section, upper spheric electrode, lower spheric electrode, striking are melted Silk, industrial frequency experiment power-supply system, described voltage measurement system includes that electrode voltage measures system and bottom electrode voltage measurement system System.Impulse voltage generator system is used for exporting surge voltage, and industrial frequency experiment power-supply system is used for exporting power-frequency voltage, Roche line Circle is used for measuring arc current, and upper electrode voltage measures system and bottom electrode voltage measurement system is respectively used to measure upper and lower electricity The current potential of pole.Spark gap gapless section is connected to below suspension insulator, and upper spheric electrode and lower spheric electrode are arranged on suspension type On insulator, being welded with striking fuse in upper spheric electrode, striking fuse is positioned between spheric electrode and lower spheric electrode In gap.
As improving further and supplementing for technique scheme, this utility model uses following measure.
Described impulse voltage generator system is made up of control system, charge power supply loop, sphere gap and protection system.
Described voltage measurement system is capacitive partial pressure device, measures system including upper electrode voltage and bottom electrode voltage is surveyed Amount system, the waveform of measurement is kept to arc voltage waveform on the same time mutually.
Described suspension insulator is composite sheath insulator, a length of 1 ~ 5m of insulator, and described upper and lower spheric electrode is passed through Anchor ear gold utensil is fixed on suspension insulator, and described spark gap gapless section is by aluminum wire and described suspension insulator lower end Gold utensil is connected with lower spheric electrode.
Described anchor ear gold utensil includes right anchor ear, left anchor ear, bolt, nut and stainless steel substrates, and described stainless steel substrates is welded on On right anchor ear, described stainless steel substrates having a manhole, described manhole is away from right anchor ear end.
Described upper and lower spheric electrode is that stainless steel ball is welded on screw rod, is fixed on described rustless steel by traveling nut The manhole position of sheet, the distance between described upper and lower spheric electrode is freely adjustable.
Described striking fuse is the metal copper wire of 10 μm ~ 1mm, and under small area analysis, fusing forms electric arc.Described striking fuse contracts Short clearance distance, in the case of power-frequency voltage does not punctures, surge voltage declines to a great extent, and needed for power frequency side, protection device is obvious Reducing, starting the arc ability in the air gap rises, and success of the test rate rises.
Described industrial frequency experiment power-supply system is made up of control system, input power, transformator and protection system, described power frequency The control system of experiment power supply system and the control system of described impulse voltage generator system are same set of system.
Using said apparatus to test the power frequency continued flow characteristic of spark gap, concrete method of testing is as follows:
Step 1: complete wiring;
Step 2: design according to spark gap external series gap, upper and lower spheric electrode clearance distance is adjusted.Installation striking is melted Silk, between control striking fuse and lower spheric electrode, the frequency breakdown voltage of the air gap is more than power frequency output voltage;
Step 3: open all test systems, opens industrial frequency experiment power-supply system, controls the output of industrial frequency experiment power-supply system Spark gap declared working condition working voltage;
Step 4: determine surge voltage size according to the distance between striking fuse and lower spheric electrode, obtains according to test Empirical equation: surge voltage sizeU=30.09l 0.6043KV, in formulalFor the distance between striking fuse and lower spheric electrode, cm.When power-frequency voltage reaches peak value, make impulse voltage generator system output cathode lightning impulse by control system Voltage;
Step 5: carrying out several times (preferably 5 times) testing experiment, record test every time is measured by Luo-coil respectively Arc currentiSystematic survey voltage is measured with upper electrode voltageU 1 , bottom electrode voltage measurement system measure voltageU 2
Step 6: change clearance distance and test, repeat the measurement of step 2 ~ 5;
Step 7: evaluation test result., there is electric arc at power current the in 5 tests in basis for estimation: under identical gap During zero passage, not blow-out then thinks that clearance distance setting is unsatisfactory for requirement;
Step 8: arrange, by arc current, voltage test under different gap for meeting the clearance distance of test requirements document The relative analysis of result determines that optimal clearance distance designs.
Compared with prior art, the utility model has the advantage of:
1) this utility model is a kind of low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device and test method, The air gap between upper and lower spheric electrode adds striking fuse, effectively reduces the surge voltage of the air gap starting the arc Level, power frequency side protection device parameter level declines, and protection equipment design is the simplest, and power frequency side power-supply device is by impact electricity The impact of pressure effect is remarkably decreased.And starting the arc ability in the air gap rises, success of the test rate rises;
2) upper and lower spheric electrode is fixed on suspension insulator by anchor ear gold utensil, easy for installation, simple to operate, it is achieved Freely regulating of clearance distance, can carry out the contrast test of different gap;
3) except being measured the arc current under the conditions of power frequency continued flow by Luo-coil in process of the test, measure simultaneously Upper and lower spheric electrode voltage, to obtain arc voltage, obtains while arc voltage and electric current and is conducive to further analytical gap Distance is for the impact of power frequency continued flow, and test method is the most reasonable;
4) process of the test has carried out the experimental test under 5 kinds of different gap, has enhanced test rigor, effectively ensure The accuracy of test, improves the cogency of test.
Accompanying drawing explanation
Fig. 1 is this utility model assay device electrical block diagram.
Fig. 2 is anchor ear hardware fitting structure schematic diagram.
Fig. 3 is the structural representation that anchor ear gold utensil is fixed on suspension insulator.
Fig. 4 is clearance distance adjustable power frequency continued flow test method flow chart.
Marginal data: 1, impulse voltage generator system;2, voltage measurement system;21, upper electrode voltage measures system; 22, bottom electrode voltage measurement system;3, Luo-coil;4, suspension insulator;5, spark gap gapless section;6, upper spheric electrode; 7, lower spheric electrode;8, striking fuse;9, industrial frequency experiment power-supply system;10, right anchor ear;11, left anchor ear;12, screw rod;13, spiral shell Cap;14, stainless steel substrates;141, manhole;15, movable nut.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, this utility model is described in further detail.
As it is shown in figure 1, this utility model is a kind of low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device, bag Include impulse voltage generator system 1, voltage measurement system 2, Luo-coil 3, suspension insulator 4, spark gap gapless section 5, on Spheric electrode 6, lower spheric electrode 7, striking fuse 8, industrial frequency experiment power-supply system 9.
Described voltage measurement system 2 includes that electrode voltage measures system 21 and bottom electrode voltage measurement system 22, described Voltage measurement system 2 uses capacitive partial pressure device, is quick on the draw impact and power-frequency voltage.
Described striking fuse 8 is welded in spheric electrode, and described striking fuse 8 is the metallic copper of diameter 10 μm ~ 1mm Silk, under small area analysis, fusing forms electric arc.Described striking fuse 8 shortens clearance distance, in the power frequency of power frequency supply system output In the case of voltage does not punctures, the surge voltage of the air gap starting the arc declines to a great extent, and power frequency side protection device parameter declines, protection Equipment design is the simplest, and power frequency side power-supply device is affected by Impulse Voltage to be remarkably decreased.And the air gap is risen Arc ability rises, and success of the test rate rises.
As shown in Figure 2,3, described upper spheric electrode 6 and lower spheric electrode 7 pass through anchor ear installation at suspension insulator 4 On.
Described anchor ear gold utensil includes right anchor ear 10, left anchor ear 11, screw rod 12, nut 13, stainless steel substrates 14, affiliated right anchor ear 10 and left anchor ear 11 use stainless steel, described stainless steel substrates 14 to be connected on right anchor ear 10 by welding procedure.Described stainless Steel disc 14 has a manhole 141 for fixed electrode away from right anchor ear 10 end.
Described upper spheric electrode 6 and lower spheric electrode 7 are fixed on the manhole of stainless steel substrates 14 by traveling nut 15 On 141, clearance distance can be realized and freely regulate.
Use this utility model one low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device, specifically test step The most as shown in Figure 4:
Step 1: complete wiring;
Step 2: be adjusted gap between upper and lower spheric electrode, installs striking fuse;
Step 3: open all test systems, opens industrial frequency experiment power-supply system, exports power-frequency voltage;
Step 4: control impulse voltage generator system output surge voltage;
Step 5: carrying out 5 testing experiments, the arc current measured by Luo-coil tested in record every time respectivelyiWith upper Electrode voltage measures systematic survey voltageU 1 , bottom electrode voltage measurement system measure voltageU 2
Step 6: change clearance distance, repeats step 2 ~ step 5;
Step 7: evaluation test result;
Step 8: determine that optimal clearance distance designs.
In described step 2, design according to spark gap external series gap, upper and lower spheric electrode gap is adjusted.Striking is installed During fuse, between control striking fuse and lower spheric electrode, the frequency breakdown voltage of the air gap is more than power frequency output voltage.
In described step 3, control industrial frequency experiment power-supply system output spark gap declared working condition working voltage.
In described step 4, when power-frequency voltage reaches peak value, make impulse voltage generator system defeated by control system Go out positive polarity surge voltage.The empirical equation obtained according to test: surge voltage sizeU=30.09l 0.6043KV, in formulalFor drawing Distance between arc fuse and lower spheric electrode, cm.
In described step 6, respectively under the clearance distance differing-5mm ,-10mm ,+5mm ,+10mm with design gaps distance Test.
In described step 7, it is judged that foundation: under identical gap, 5 tests occur power frequency arc in electric current zero passage for the first time Time not blow-out then think clearance distance arrange be unsatisfactory for requirement.
In described step 8, arrange, by arc current, electricity under different gap for meeting the clearance distance of test requirements document The relative analysis of pressure result of the test determines that optimal clearance distance designs.
Lightning impulse voltage under air gap distance determines its clearance distance upper limit.After spark gap lost efficacy, clearance gap From to bear 1.2 times of power frequency highest operating voltage, thereby determine that its clearance distance lower limit, be expressed as follows respectively:
U MLG50 U 1mA +U d50 ,U d 1.2U n ,
WhereinU d50 It is struck by lightning 50% discharge voltage for gap,U MLG50 It is struck by lightning 50% discharge voltage design load for spark gap,U 1mA For Spark gap 1mA reference voltage,U n For the highest power-frequency voltage of operation of power networks,U d Power-frequency voltage value is born for spark gap inefficacy post gap.
Meet above-mentioned in the case of, judge clearance distance by the blow-out time, and adopt according to arc voltage and current parameters Arc motion emulation is carried out, reason with Mayr model (referring to document " study mechanism of novel injection air-flow lightning protection gap in arcing chamber ") Opinion analyzes arc reignition and electric arc blow-out time situation, finally considers the blow-out time of experimental and theoretical analysis, takes the shortest The air gap of blow-out time is ideal gap distance.
The above is only preferred implementation of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment.To those of ordinary skill in the art, gained under without departing from this utility model technology concept thereof To modifications and variations also should be regarded as protection domain of the present utility model.

Claims (5)

1. a low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device, it is characterised in that include for exporting impact The impulse voltage generator system of voltage, for exporting the industrial frequency experiment power-supply system of power-frequency voltage, for measuring arc current Luo-coil, voltage measurement system and suspension insulator, spark gap gapless section is connected to below suspension insulator, upper spherical Electrode and lower spheric electrode are arranged on suspension insulator, are welded with striking fuse in upper spheric electrode, and striking fuse is positioned at In the gap of upper spheric electrode and lower spheric electrode, described voltage measurement system includes that electrode voltage measures system and bottom electrode Voltage measurement system, is respectively used to measure the current potential of upper and lower electrode.
The low pressure starting the arc the most according to claim 1 and clearance distance adjustable power frequency continued flow assay device, it is characterised in that: Described suspension insulator is composite sheath insulator, and described upper and lower spheric electrode is fixed on suspension insulator by anchor ear gold utensil On, described spark gap gapless section is connected with described suspension insulator lower end gold utensil and described lower spheric electrode by wire.
The low pressure starting the arc the most according to claim 2 and clearance distance adjustable power frequency continued flow assay device, it is characterised in that: Described anchor ear gold utensil includes right anchor ear, left anchor ear and stainless steel substrates, and described stainless steel substrates is welded on right anchor ear, described rustless steel A manhole is being had away from right anchor ear end on sheet.
The low pressure starting the arc the most according to claim 3 and clearance distance adjustable power frequency continued flow assay device, it is characterised in that: Described upper and lower spheric electrode is that stainless steel ball is welded on screw rod, is fixed on the circle of described stainless steel substrates by traveling nut Lead to the hole site.
5., according to the low pressure starting the arc one of claim 1 ~ 4 Suo Shu and clearance distance adjustable power frequency continued flow assay device, it is special Levy and be: described striking fuse is the metal copper wire of diameter 10 μm ~ 1mm.
CN201620847822.8U 2016-08-08 2016-08-08 The low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device Withdrawn - After Issue CN205861806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620847822.8U CN205861806U (en) 2016-08-08 2016-08-08 The low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620847822.8U CN205861806U (en) 2016-08-08 2016-08-08 The low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device

Publications (1)

Publication Number Publication Date
CN205861806U true CN205861806U (en) 2017-01-04

Family

ID=57657490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620847822.8U Withdrawn - After Issue CN205861806U (en) 2016-08-08 2016-08-08 The low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device

Country Status (1)

Country Link
CN (1) CN205861806U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106054006A (en) * 2016-08-08 2016-10-26 国网湖南省电力公司 Low-voltage arc starting and gap distance adjustable power-frequency freewheeling test apparatus and method
CN109444687A (en) * 2018-11-15 2019-03-08 国网山西省电力公司大同供电公司 A kind of 10kV power distribution network insulated conductor breakage caused by lightning stroke analogue test platform
CN112951831A (en) * 2019-11-26 2021-06-11 补丁科技股份有限公司 Anti-fuse one-time programmable memory cell and related array structure
WO2023077887A1 (en) * 2021-11-05 2023-05-11 国网辽宁省电力有限公司电力科学研究院 Power distribution network single-phase grounding fault arc self-extinguishing characteristic simulation apparatus and test method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106054006A (en) * 2016-08-08 2016-10-26 国网湖南省电力公司 Low-voltage arc starting and gap distance adjustable power-frequency freewheeling test apparatus and method
CN106054006B (en) * 2016-08-08 2019-04-05 国网湖南省电力公司 The low pressure starting the arc and the adjustable power frequency continued flow experimental rig of clearance distance and test method
CN109444687A (en) * 2018-11-15 2019-03-08 国网山西省电力公司大同供电公司 A kind of 10kV power distribution network insulated conductor breakage caused by lightning stroke analogue test platform
CN109444687B (en) * 2018-11-15 2020-11-06 国网山西省电力公司大同供电公司 10kV distribution network insulated conductor lightning stroke broken string simulation test platform
CN112951831A (en) * 2019-11-26 2021-06-11 补丁科技股份有限公司 Anti-fuse one-time programmable memory cell and related array structure
US11393547B2 (en) * 2019-11-26 2022-07-19 Piecemakers Technology, Inc. Anti-fuse one-time programmable memory cell and related array structure
CN112951831B (en) * 2019-11-26 2024-02-02 补丁科技股份有限公司 Antifuse one-time programmable memory cell and related array structure
WO2023077887A1 (en) * 2021-11-05 2023-05-11 国网辽宁省电力有限公司电力科学研究院 Power distribution network single-phase grounding fault arc self-extinguishing characteristic simulation apparatus and test method

Similar Documents

Publication Publication Date Title
CN106054006B (en) The low pressure starting the arc and the adjustable power frequency continued flow experimental rig of clearance distance and test method
CN205861806U (en) The low pressure starting the arc and clearance distance adjustable power frequency continued flow assay device
CN101598757B (en) Residual voltage test circuit of controllable metal oxide arrester and method thereof
CN103441427B (en) Multichannel gas spark switch applying plasma synthesis jet trigger technology
CN102486954B (en) Multi-interspace self-expanding strong-airflow arc extinguishing lightning protection device
CN105118588A (en) Design method for parallel gap of composite insulator of 500kV power transmission line
CN108680777A (en) A kind of surge voltage generating means
CN203337697U (en) Fault arc generator
CN201497774U (en) Lightning-stroke protection and monitoring device with discharge electrode and discharge counter for ten-kilovolt circuit
CN105513724A (en) Stationary type follow current-free anti-thunder over-voltage protector for AC (Alternating Current) line
CN203481622U (en) Rod-shaped outer-gap lightning arrester for 10kV system insulating overhead line linear rod
CN104299732B (en) A kind of gravity-driven changes the arc-control device of bullet
CN203734137U (en) Air gap based on laser trigger
CN112909740A (en) Multi-chamber parallel gap device adopting spiral series connection
CN208721764U (en) A kind of point discharge shelf depreciation simulator
CN202057763U (en) Experimental device of simulating high voltage transmission line flashover discharge triggered by forest fire
CN102931954A (en) Steep front pulse peaking and front reshaping device
CN204144931U (en) A kind of lightning arrester
CN208209240U (en) A kind of plural serial stage multi-chamber lightning protection device for 110kV high voltage transmission line
CN103752558B (en) High-power high-voltage electric pulse strong magnetic discharge descaling device
CN109638650A (en) One kind being based on multi-chamber line thunder protection device
CN208752167U (en) A kind of insulation defect shelf depreciation simulator
CN114825051A (en) 10kV joins in marriage net with quick arc extinguishing device of overlap formula multiple fracture
WO2020011040A1 (en) Self-energy-consuming type circuit integrated lightning protection apparatus
CN203983729U (en) A kind of gas spark switch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170104

Effective date of abandoning: 20190405

AV01 Patent right actively abandoned