CN205860574U - A kind of enamel stacked condenser buffering cooling base - Google Patents

A kind of enamel stacked condenser buffering cooling base Download PDF

Info

Publication number
CN205860574U
CN205860574U CN201620828766.3U CN201620828766U CN205860574U CN 205860574 U CN205860574 U CN 205860574U CN 201620828766 U CN201620828766 U CN 201620828766U CN 205860574 U CN205860574 U CN 205860574U
Authority
CN
China
Prior art keywords
plate
enamel
housing
condenser
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620828766.3U
Other languages
Chinese (zh)
Inventor
王子鲲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Wanli Pharmaceutical Co Ltd
Original Assignee
Jiangxi Wanli Pharmaceutical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Wanli Pharmaceutical Co Ltd filed Critical Jiangxi Wanli Pharmaceutical Co Ltd
Priority to CN201620828766.3U priority Critical patent/CN205860574U/en
Application granted granted Critical
Publication of CN205860574U publication Critical patent/CN205860574U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

This utility model relates to a kind of condenser buffering cooling base, particularly relates to a kind of enamel stacked condenser buffering cooling base.The technical problems to be solved in the utility model is to provide a kind of service life improving the stacked condenser of enamel and protects operator not by noise nuisance, and simple to operate, safe and reliable enamel stacked condenser buffering cooling base.In order to solve above-mentioned technical problem, this utility model provides such a enamel stacked condenser buffering cooling base, includes base plate, rubber frame, perpendicular pole, water pump, sleeve, buffer spring, placement plate, temperature sensing device, outlet pipe, water inlet pipe, circulating water pipe, pressure valve, fixed plate, T-shaped screw rod and fixed block.This utility model has reached to lower the temperature its electrical equipment and noise reduction at the stacked condenser of enamel when condensing.

Description

A kind of enamel stacked condenser buffering cooling base
Technical field
This utility model relates to a kind of condenser buffering cooling base, particularly relates to a kind of stacked condenser of enamel and delays Rush cooling base.
Background technology
Condenser is the equipment that gaseous material can condense into liquid, and the mode of cooling typically can be utilized to make material Condense.Condenser is also the parts of air conditioning system, can be by the heat in pipe, in the way of quickly, passes to the sky near pipe Gas, is transformed into gas or steam in the device of liquid.And the condenser on major part automobile is arranged on before water tank, in power plant The steam making turbine discharge with many condensers is condensed (in still-process, is transformed into steam in the device of liquid It is referred to as condenser), refrigeration plant comes the refrigeration steam of condensate ammonia and freon etc with condenser, with cold in petro chemical industry Condenser makes hydro carbons and the condensation of other chemical evapns.All of condenser is all the heat of gas or steam to be taken away and operates.
The stacked condenser of existing enamel is when condensing, and its electrical equipment can produce substantial amounts of heat and make an uproar Sound, long-time hot operation is easy to make some electrical equipments burn out, and causes economic loss and its safety also can drop therewith Low;It is in for a long time in the environment of noise, the health of operator is harmful to, therefore need research and development one badly and can fold at enamel Its electrical equipment, when condensing, is lowered the temperature and noise reduction by chip type condenser, improves the stacked condenser of enamel Service life and protection operator are not by noise nuisance, and simple to operate, the safe and reliable stacked condenser of enamel Buffering cooling base.
Utility model content
(1) to solve the technical problem that
This utility model in order to overcome the stacked condenser of existing enamel when condensing, long-time hot operation It is easy to make some electrical equipments burn out and produce noise, causes economic loss and its safety also can decrease, also The shortcoming of meeting health risk, the technical problems to be solved in the utility model is to provide one can be at the stacked condenser of enamel When condensing, its electrical equipment is lowered the temperature and noise reduction, improve the stacked condenser of enamel service life and Protection operator are not by noise nuisance, and simple to operate, the safe and reliable enamel stacked condenser buffering cooling end Seat.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model provides such a enamel stacked condenser buffering fall Temperature base, includes base plate, rubber frame, perpendicular pole, water pump, sleeve, buffer spring, placement plate, temperature sensing device, water outlet Pipe, water inlet pipe, circulating water pipe, pressure valve, fixed plate, T-shaped screw rod and fixed block, the left and right sides symmetry of base plate has installation Hole, is provided with rubber frame in the middle of base plate, the base plate of rubber frame both sides is all symmetrically connected with perpendicular pole, and pole and rubber frame are erected in left side Between base plate on water pump is installed, being connected between water pump with rubber frame left side wall has water inlet pipe, and perpendicular pole upper outside is all overlapped There is sleeve, between the top of sleeve inner top and perpendicular pole, be respectively connected with buffer spring, the outer top of sleeve and the top of rubber frame Portion is provided with placement plate, has water cavity, be provided with temperature sensing device, temperature sensing device bag in the middle of water cavity inner top in placing plate Having included the first housing, button and first piston, the outer top of the first housing is connected with placing plate, and the inner top of the first housing is installed There is button, between button and water pump, have connection, be provided with first piston, first piston and the first housing in the first housing and join Closing, placing to be connected between plate bottom left and water pump has outlet pipe, places and is connected between plate bottom right and the right side of rubber frame Have circulating water pipe, circulating water pipe to be provided with pressure valve, pressure valve include the second housing, the second piston, baffle plate, tension spring and Angle coupling, the top of the second housing is connected with circulating water pipe and connects, and is provided with the second piston, the second piston in the second housing Coordinate with the second housing, between the second piston base with the second housing inner bottom part, be connected tensioned spring, the top of the second piston Left side vertical connects baffle plate, and the left end of the second housing connects angle coupling, and the second housing connects with angle coupling, heading joint The lower end of head is connected with circulating water pipe and connects, and placing the most vertically symmetrical connection in the left and right sides, plate top has fixed plate, fixing The middle part of plate all has screwed hole, is equipped with T-shaped screw rod in screwed hole, a left side for the T-shaped screw rod of right-hand member and right side of the T-shaped screw rod in left side End is respectively connected with fixed block.
Preferably, also include support bar, place and evenly spaced in the water cavity in plate be provided with support bar.
Preferably, also including rubber blanket, connecting bottom base plate has rubber blanket.
Preferably, that erects pole is shaped as cuboid.
Preferably, the material of left side fixed plate and right side fixed plate is rubber.
Preferably, water cavity is in being horizontally set in placement plate, and the diameter of water cavity inner chamber is at least 90cm, and height is at least 6cm。
Operation principle: rubber frame is all filled water in water cavity by operator, and the liquid in temperature sensing device is hydrargyrum, Installing hole on base plate is used for fixing base plate.Stacked for enamel condenser is placed on placement plate by operator, and up time Pin turning T-type screw rod, under T-shaped screw rod coordinates with screwed hole, on the left of the promotion of T-shaped screw rod, fixed block moves right and promotes right side Stacked for enamel condenser, to left movement, is fixed by fixed block.During the stacked condenser working of enamel, its electricity consumption sets For operationally can just produce substantial amounts of heat, heat produced by the stacked condenser of enamel is delivered to water by placing plate The water of intracavity, the water in water cavity is by heat absorption, and when the coolant-temperature gage in water cavity raises, the hydrargyrum in temperature sensing device is heated Expanding, first piston can be promoted to move upward, when first piston touches button, can start water pump will store in rubber frame Water injects water cavity from water inlet pipe, and when the water in water cavity enters the second housing by circulating water pipe, the pressure of water promotes second Piston moves downward, and tension spring is compressed, and baffle plate moves downward therewith, baffle plate no longer block the second housing and angle coupling it Between connectivity part, hot water flows back to rubber frame by circulating water pipe, thus the electrical equipment of condenser stacked to enamel reaches The effect of circulation temperature lowering.Through changing water, the coolant-temperature gage in water cavity can decline, the hydrargyrum contract on cooling in temperature sensing device, the One piston moves downward under the effect of self gravitation, separates with button, and water pump stops pumping the most therewith.Enamel is stacked cold Can produce vibrations and noise during condenser work, enamel stacked condenser vibrations can drive placement plate vibrations, buffer spring energy Enough play the effect of damping.Rubber frame plays a supportive role to placing plate, and the material of rubber frame is rubber, it is possible to make rubber frame There are certain sound-absorbing, damping, the effect of noise reduction.When the stacked condenser of enamel quits work, operator turn counterclockwise Dynamic T-shaped screw rod, under the cooperation of screwed hole, T-shaped screw rod drive on the left of fixed block to left movement with on the right side of promoting, fixed block is to the right Motion, makes the stacked condenser of fixed block and enamel separate, and stacked for enamel condenser is moved by operator.
Because also including support bar, placing the evenly spaced support bar that is provided with in the water cavity in plate, support bar is to placement Plate is played a supporting role, and is possible to prevent to place plate fracture, and through hole can continue to make current lead to, it is ensured that normal work of the present utility model Make.
Because also including rubber blanket, connecting bottom base plate and having rubber blanket, rubber blanket that base plate is lifted away from ground, reached anti- The effect of tide, rubber blanket tool has good wearability, good water-resistance, it is possible to increase service life of the present utility model.
Because the material of left side fixed plate and right side fixed plate is rubber, the coefficient of friction of rubber is high, it is possible to preferably Allowing fixed block be fixed by stacked for enamel condenser, rubber has certain pliability, it is possible to prevent enamel stacked cold Condenser causes damage.
(3) beneficial effect
This utility model has reached to enter its electrical equipment at the stacked condenser of enamel when condensing Row cooling and noise reduction, improve the stacked condenser of enamel service life and protection operator not by noise nuisance, and Simple to operate, safe and reliable effect.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present utility model.
Fig. 2 is the main TV structure schematic diagram of this utility model temperature sensing device.
Fig. 3 is the main TV structure schematic diagram of this utility model pressure valve.
Fig. 4 is the second of the present utility model main TV structure schematic diagram.
Fig. 5 is the third main TV structure schematic diagram of the present utility model.
Being labeled as in accompanying drawing: 1-base plate, 2-installing hole, 3-rubber frame, 4-erects pole, 5-water pump, 6-sleeve, and 7-buffers Spring, 8-places plate, 9-water cavity, 10-temperature sensing device, 101-the first housing, 102-button, and 103-first piston, 11-goes out Water pipe, 12-water inlet pipe, 13-circulating water pipe, 14-pressure valve, 141-the second housing, 142-the second piston, 143-baffle plate, 144- Tension spring, 145-angle coupling, 15-fixed plate, 16-screwed hole, 17-T type screw rod, 18-fixed block, 19-support bar, 20- Rubber blanket.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Embodiment 1
A kind of enamel stacked condenser buffering cooling base, as Figure 1-5, includes base plate 1, rubber frame 3, erects Pole 4, water pump 5, sleeve 6, buffer spring 7, placement plate 8, temperature sensing device 10, outlet pipe 11, water inlet pipe 12, circulating water pipe 13, pressure valve 14, fixed plate 15, T-shaped screw rod 17 and fixed block 18, the left and right sides symmetry of base plate 1 has installing hole 2, base plate 1 Centre is provided with rubber frame 3, and the base plate 1 of rubber frame 3 both sides is all symmetrically connected with perpendicular pole 4, and pole 4 and rubber frame 3 are erected in left side Between base plate 1 on water pump 5 is installed, being connected between water pump 5 with rubber frame 3 left side wall has water inlet pipe 12, outside perpendicular pole 4 top Side is all cased with sleeve 6, is respectively connected with buffer spring 7 between the top of sleeve 6 inner top and perpendicular pole 4, the outer top of sleeve 6 and The top of rubber frame 3 is provided with placement plate 8, has water cavity 9, be provided with temperature sensing device in the middle of water cavity 9 inner top in placing plate 8 10, temperature sensing device 10 includes the first housing 101, button 102 and first piston 103, the outer top of the first housing 101 with Placing plate 8 to connect, the inner top of the first housing 101 is provided with button 102, has connection between button 102 and water pump 5, the Being provided with first piston 103 in one housing 101, first piston 103 coordinates with the first housing 101, places plate 8 bottom left and water pump Connecting between 5 and have outlet pipe 11, placing to be connected between plate 8 bottom right and the right side of rubber frame 3 has circulating water pipe 13, recirculated water Pipe 13 is provided with pressure valve 14, and pressure valve 14 includes second housing the 141, second piston 142, baffle plate 143, tension spring 144 With angle coupling 145, the top of the second housing 141 is connected with circulating water pipe 13 and connects, and is provided with second in the second housing 141 Piston 142, the second piston 142 coordinates with the second housing 141, connects bottom the second piston 142 and between the second housing 141 inner bottom part Being connected to tension spring 144, the top left side of the second piston 142 vertically connects baffle plate 143, and the left end of the second housing 141 connects Having angle coupling 145, the second housing 141 to connect with angle coupling 145, the lower end of angle coupling 145 is connected with circulating water pipe 13 Connecing and connect, placing the most vertically symmetrical connection in the left and right sides, plate 8 top has fixed plate 15, the middle part of fixed plate 15 all to have screw thread Hole 16, is equipped with T-shaped screw rod 17 in screwed hole 16, the left end of the T-shaped screw rod of right-hand member and right side 17 of the T-shaped screw rod in left side 17 is all connected with There is fixed block 18.
Also include support bar 19, place and evenly spaced in the water cavity 9 in plate 8 be provided with support bar 19.
Also including rubber blanket 20, connecting bottom base plate 1 has rubber blanket 20.
That erects pole 4 is shaped as cuboid.
The material of left side fixed plate 15 and right side fixed plate 15 is rubber.
Water cavity 9 is in being horizontally set in placement plate 8, and the diameter of water cavity 9 inner chamber is at least 90cm, height at least 6cm.
Operation principle: rubber frame 3 is all filled water in water cavity 9 by operator, and the liquid in temperature sensing device 10 is Hydrargyrum, the installing hole 2 on base plate 1 is used for fixing base plate 1.Stacked for enamel condenser is placed on placement plate 8 by operator, And rotate clockwise T-shaped screw rod 17, under T-shaped screw rod 17 coordinates with screwed hole 16, fixed block 18 on the left of the promotion of T-shaped screw rod 17 Move right and promote right side fixed block 18 to left movement, stacked for enamel condenser is fixed.Enamel is stacked cold During condenser work, its electrical equipment operationally can just produce substantial amounts of heat, produced by the stacked condenser of enamel Heat is delivered to the water in water cavity 9 by placing plate 8, and the water in water cavity 9 is by heat absorption, when the coolant-temperature gage in water cavity 9 raises Time, the hydrargyrum expanded by heating in temperature sensing device 10, first piston 103 can be promoted to move upward, when first piston 103 is touched During to button 102, water pump 5 can be started the water stored in rubber frame 3 is injected the water water cavity 9, in water cavity 9 from water inlet pipe 12 When entering the second housing 141 by circulating water pipe 13, the pressure of water promotes the second piston 142 to move downward, tension spring 144 quilt Compression, baffle plate 143 moves downward therewith, and baffle plate 143 no longer blocks the connectivity part between the second housing 141 and angle coupling 145, Hot water flows back to rubber frame 3 by circulating water pipe 13, thus the electrical equipment of condenser stacked to enamel reaches circulation temperature lowering Effect.Through changing water, the coolant-temperature gage in water cavity 9 can decline, the hydrargyrum contract on cooling in temperature sensing device 10, first piston 103 move downward under the effect of self gravitation, separate with button 102, and water pump 5 stops pumping the most therewith.Enamel is stacked Can produce vibrations and noise during condenser working, enamel stacked condenser vibrations can drive placement plate 8 to shake, buffer spring 7 effects that can play damping.Rubber frame 3 plays a supportive role to placing plate 8, and the material of rubber frame 3 is rubber, it is possible to make Rubber frame 3 has certain sound-absorbing, damping, the effect of noise reduction.When the stacked condenser of enamel quits work, operator are inverse Hour hands turning T-type screw rod 17, under the cooperation of screwed hole 16, on the left of the drive of T-shaped screw rod 17, fixed block 18 is to left movement and promotion Right side fixed block 18 moves right, and makes the stacked condenser of fixed block 18 and enamel separate, and operator are by enamel lamination Formula condenser is moved.
Because also including support bar 19, placing and evenly spaced in the water cavity 9 in plate 8 being provided with support bar 19, support bar Placing plate 8 for 19 pairs to play a supporting role, be possible to prevent to place plate 8 and rupture, through hole can continue to make current lead to, it is ensured that this practicality is new The normal work of type.
Because also including rubber blanket 20, connecting bottom base plate 1 and having rubber blanket 20, rubber blanket 20 that base plate 1 is lifted away from ground, Having reached moistureproof effect, rubber blanket 20 tool has good wearability, good water-resistance, it is possible to increase of the present utility model make Use the life-span.
Because the material of left side fixed plate 15 and right side fixed plate 15 is rubber, the coefficient of friction of rubber is high, it is possible to more Stacked for enamel condenser is fixed by the good fixed block 18 that allows, and rubber has certain pliability, it is possible to prevent from folding enamel Chip type condenser causes damage.
Embodiment described above only have expressed preferred implementation of the present utility model, and it describes more concrete and detailed, But therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, common for this area For technical staff, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be as the criterion with claims.

Claims (6)

1. enamel stacked condenser buffering cooling base, it is characterised in that include base plate (1), rubber frame (3), Perpendicular pole (4), water pump (5), sleeve (6), buffer spring (7), place plate (8), temperature sensing device (10), outlet pipe (11), Water inlet pipe (12), circulating water pipe (13), pressure valve (14), fixed plate (15), T-shaped screw rod (17) and fixed block (18), base plate (1) Left and right sides symmetry have an installing hole (2), is provided with rubber frame (3), on the base plate (1) of rubber frame (3) both sides in the middle of base plate (1) All being symmetrically connected with perpendicular pole (4), left side is erected and is provided with water pump (5), water on the base plate (1) between pole (4) and rubber frame (3) Being connected between pump (5) with rubber frame (3) left side wall and have water inlet pipe (12), perpendicular pole (4) upper outside is all cased with sleeve (6), set It is respectively connected with buffer spring (7), the outer top of sleeve (6) and rubber frame between cylinder (6) inner top and the top of perpendicular pole (4) (3) top is provided with placement plate (8), has water cavity (9), be provided with temperature sense in the middle of water cavity (9) inner top in placing plate (8) Device (10), temperature sensing device (10) includes the first housing (101), button (102) and first piston (103), the first shell The outer top of body (101) is connected with placing plate (8), and the inner top of the first housing (101) is provided with button (102), button (102) And water pump has connection between (5), in the first housing (101), it is provided with first piston (103), first piston (103) and first Housing (101) coordinates, and placing to be connected between plate (8) bottom left and water pump (5) has outlet pipe (11), places plate (8) bottom, right Being connected between side and the right side of rubber frame (3) and have circulating water pipe (13), circulating water pipe (13) is provided with pressure valve (14), pressure valve (14) the second housing (141), the second piston (142), baffle plate (143), tension spring (144) and angle coupling (145) are included, The top of the second housing (141) is connected with circulating water pipe (13) and connects, and the second housing is provided with the second piston in (141) (142), the second piston (142) coordinates with the second housing (141), the second piston (142) bottom and the second housing (141) inner bottom part Between connect tensioned spring (144), the top left side of the second piston (142) vertically connects baffle plate (143), the second housing (141) left end connects has angle coupling (145), the second housing (141) to connect with angle coupling (145), angle coupling (145) Lower end be connected with circulating water pipe (13) and connect, place the most vertically symmetrical connection in plate (8) left and right sides, top have fixed plate (15), the middle part of fixed plate (15) all has screwed hole (16), is equipped with T-shaped screw rod (17), the T-shaped spiral shell in left side in screwed hole (16) The left end of the right-hand member and right side T-shaped screw rod (17) of bar (17) is respectively connected with fixed block (18).
A kind of enamel stacked condenser buffering cooling base the most according to claim 1, it is characterised in that also include There is a support bar (19), place and evenly spaced in the water cavity (9) in plate (8) be provided with support bar (19).
A kind of enamel stacked condenser buffering cooling base the most according to claim 1, it is characterised in that also include Having rubber blanket (20), base plate (1) bottom connects rubber blanket (20).
A kind of enamel stacked condenser buffering cooling base the most according to claim 1, it is characterised in that perpendicular pole (4) be shaped as cuboid.
A kind of enamel stacked condenser buffering cooling base the most according to claim 1, it is characterised in that left side is solid The material determining plate (15) and right side fixed plate (15) is rubber.
A kind of enamel stacked condenser buffering cooling base the most according to claim 1, it is characterised in that water cavity (9) in being horizontally set in placement plate (8), and the diameter of water cavity (9) inner chamber is at least 90cm, height at least 6cm.
CN201620828766.3U 2016-08-03 2016-08-03 A kind of enamel stacked condenser buffering cooling base Expired - Fee Related CN205860574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620828766.3U CN205860574U (en) 2016-08-03 2016-08-03 A kind of enamel stacked condenser buffering cooling base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620828766.3U CN205860574U (en) 2016-08-03 2016-08-03 A kind of enamel stacked condenser buffering cooling base

Publications (1)

Publication Number Publication Date
CN205860574U true CN205860574U (en) 2017-01-04

Family

ID=57654302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620828766.3U Expired - Fee Related CN205860574U (en) 2016-08-03 2016-08-03 A kind of enamel stacked condenser buffering cooling base

Country Status (1)

Country Link
CN (1) CN205860574U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107576153A (en) * 2017-09-14 2018-01-12 合肥中辰轻工机械有限公司 A kind of environment-friendly engineering centrifugal dehydrator
CN111629545A (en) * 2020-06-01 2020-09-04 李克胜 Heat dissipation fixing device for communication engineering equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107576153A (en) * 2017-09-14 2018-01-12 合肥中辰轻工机械有限公司 A kind of environment-friendly engineering centrifugal dehydrator
CN111629545A (en) * 2020-06-01 2020-09-04 李克胜 Heat dissipation fixing device for communication engineering equipment
CN111629545B (en) * 2020-06-01 2024-06-04 深圳市天建通信有限公司 Heat dissipation fixing device for communication engineering equipment

Similar Documents

Publication Publication Date Title
CN205860574U (en) A kind of enamel stacked condenser buffering cooling base
CN207662015U (en) Water resource heat pump
CN2935026Y (en) Multifunctional cold-warm box device utilizing heat supplied by refrigerator residual heat and heat pump
CN103574898A (en) Integral air energy water heater
CN102997508A (en) Water direct-cooling double-effect condenser and refrigerator
CN206281199U (en) A kind of air source hot pump water heater
CN202734235U (en) Integral air energy water heater
CN109668352A (en) A kind of water resource heat pump reducing vibration
CN207716653U (en) A kind of Novel warming hydrophone using air source heat pump
CN206962305U (en) A kind of electrical engineering multifunctional heat dissipation electrical equipment rack
CN203964476U (en) Flash vessel and there is the air-conditioning system of this flash vessel
CN101881509A (en) Outdoor machine of split type heat pump water heater
CN206001734U (en) A kind of water-cooling vortex water tank cooling-water machine
CN205811373U (en) A kind of ventilation and heat structure of high-tension switch cabinet
CN204987466U (en) Circular heat pump air can water heater
CN103727006A (en) Shock-absorption and noise-reduction device of domestic oxygenerator
CN207635612U (en) A kind of environmental protection and energy saving Hot water units
CN206563445U (en) Heat pump with double-condenser
CN207813586U (en) A kind of oil extractor energy-saving cabinet
CN204963065U (en) Closed earth's surface water source heat pump is heat transfer device under water
CN208238318U (en) The energy conservation refrigeration ancillary equipment and its air-conditioning refrigeration system of one
CN201852274U (en) Outdoor machine for split type heat pump water heater
CN201733843U (en) Circulating device for preventing low-temperature cooling water from generating condensate water
CN204757483U (en) Gas -liquid backheat device
CN205957368U (en) Vertical water central air conditioning

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104

Termination date: 20200803