CN205857869U - A kind of modularity large span storage canopy - Google Patents
A kind of modularity large span storage canopy Download PDFInfo
- Publication number
- CN205857869U CN205857869U CN201620789700.8U CN201620789700U CN205857869U CN 205857869 U CN205857869 U CN 205857869U CN 201620789700 U CN201620789700 U CN 201620789700U CN 205857869 U CN205857869 U CN 205857869U
- Authority
- CN
- China
- Prior art keywords
- storage canopy
- canopy
- modularity
- large span
- storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
This utility model provides a kind of modularity large span storage canopy, including: reinforced concrete foundation and storage canopy canopy body;Described reinforced concrete foundation has a pair spill slideway;The both sides of described storage canopy canopy body are fixing with described spill slideway to be connected, and it includes multiple storage canopy module being sequentially connected with;Each storage canopy module includes a curable encapsulant layer and the above and following outer housing being respectively coated by described curable encapsulant layer and an inner cover;Bury steel wire net rack in described curable packing material underground to support.Pass through modular construction, it is possible to quickly build the large span storage canopy meeting requirement of strength, and construction cost and material cost are greatly lowered.
Description
Technical field
This utility model relates to frame for movement technical field, particularly relates to storage structures, is specifically related to a kind of modularity big
Span storage canopy.
Background technology
Along with China's industrial development and increasingly stricter to environmental requirement, to the demand of large span storage canopy increasingly
Greatly, build guality and convenience for construction to storage canopy are had higher requirement.
Due to China's industrial development and increasingly stricter to environmental requirement, the demand to outdoor storage and storage is geometry
Formula increases, in the urgent need to a kind of with low cost, convenient construction and robust high-quality storage canopy.
In order to improve the build guality of large span storage canopy, and ensure the most durable in use, do not cave in, existing
More existing solutions in technology.The most existing large span storage canopy uses the netted design of monoblock type or dome to use rack
Formula structure, and support section uses armored concrete, the construction not only construction period of all this forms storage canopy is long, and steel are used
Measuring surprising, construction costs is expensive.Thus span can not be built the biggest.
Chinese invention patent (application number: 201410354181.8), discloses a kind of self-supporting bell-type storage canopy and builds
Make way.Wherein self-supporting bell-type storage canopy includes the parts such as base, outer housing, keel framework, steel wire network structure.Base is steel
Structure or xoncrete structure;Outer housing is inflatable and the thin-film template of the curable packing material of theainfusible liquid, and it includes outside
Face and medial surface, and outer housing is fixed on base;Keel framework is fixing with outer housing medial surface to be connected;Steel wire network structure is along outward
The coiling of cover lateral surface is also connected with base.The construction way of the self-supporting bell-type storage canopy of this utility model includes by inflation thin
The air inlet of film template injects pressure-air in inflating thin film template, is noted by the liquid injection port of the hollow pipe of keel framework
Enter liquid curable packing material and injected the steps such as liquid curable packing material by the liquid injection port of thin-film template.
This storage canopy and construction way thereof, possible in theory, actual construction cost is the highest, especially inflating thin film template and Os Draconis
Skeleton Present Domestic cannot produce, and the most also only having one can produce, and production capacity is limited, it is impossible to large-scale promotion application.
Utility model content
For the problems referred to above, the purpose of this utility model is to provide a kind of modularity large span storage canopy, passes through module
Change construction, it is possible to quickly build the large span storage canopy meeting requirement of strength, and construction cost and material are greatly lowered
Cost.
For reaching above-mentioned purpose, the concrete technical scheme that this utility model is taked is:
A kind of modularity large span storage canopy, including: reinforced concrete foundation and storage canopy canopy body;
Described reinforced concrete foundation has a pair spill slideway;
The both sides of described storage canopy canopy body are fixing with described spill slideway to be connected, and it includes multiple storage canopy being sequentially connected with
Module;
Each storage canopy module includes a curable encapsulant layer and is respectively coated by described curable encapsulant layer
Above and a following outer housing and an inner cover;
Bury steel wire net rack in described curable packing material underground to support.
Wherein steel wire net rack supports the steel wire using uniform weave, and steel wire diameter scope is 2.5 to 5.5mm, mesh face
Long-pending scope is 900 to 2500mm2。
Steel wire net rack supports and includes a waveform supporting network;
Described waveform supporting network has the most uniform multiple crest and trough, and described crest is both secured to outer housing, described
Trough is both secured to inner cover;
Two adjacent crests or trough draw in the net to connect by a reinforcement.
Distance range between adjacent two crests or trough is 0.65 to 2m.
Each storage canopy module all includes the vertical base unit of both sides, and its height is 3.5 to 5.5m;Thickness be 400 to
800mm;Connect the arc dome unit at vertical base unit top, both sides, its span scope 80 to 200m, height and span
Ratio is 0.1 to 0.3, and thickness is 250 to 480mm.
The width of each storage canopy module is 4 to 12m.
Further, two adjacent described storage canopy modules are connected by a Quick connection part, described Quick connection part
Including: a train wheel bridge, a lower plate and connect the intermediate supports at middle part of described train wheel bridge and lower plate;
Side below described train wheel bridge, side and the one side of intermediate supports above lower plate constitute receiving one storage
First holding tank of canopy module;
Opposite side below described train wheel bridge, opposite side and the another side of intermediate supports above lower plate constitute receiving
Second holding tank of another storage canopy module;
The both sides of described train wheel bridge and/or lower plate are provided with at least one pair of camlock device.
Further, described spill slideway has a chute, and the degree of depth of this chute is 0.8 to 1m, width be 0.4 to
0.8m。
Further, the material of described curable encapsulant layer is selected from polyurethane, polystyrene, polypropylene, polychlorostyrene second
Alkene or polyethylene, the elastic modelling quantity of material own is not less than 40GPA.
Further, described outer housing and inner cover are high-strength thin-film, and this high-strength thin-film material is PVDF or PVF, thick
Degree is 0.8 to 2.5mm.
The construction way of above-mentioned modularity large span storage canopy, comprises the steps:
1) basis of both sides is built, at top, described basis fixed spill slideway;
2) building mould in level on ground, mould includes inner mould, outer mold and single socket, inner mould
The die cavity corresponding with storage canopy modular shape with the formation between outer mold, i.e. spacing between inner mould and outer mold
Equal to the thickness of storage canopy module to be made, inner mould is identical with storage canopy module width to be made with outer mold;
Single socket is layed on ground, closes the side of die cavity;
3) steel wire net rack support is put in the mould put up, and put into the two sides of outer housing and inner cover, outer housing and inner cover
Being supported by mould and steel wire net rack and pave expansion completely, its edge is fixed on mould by the mode of stepping up, to outer housing and inner cover
Between irrigate liquid curable packing material;
4) after curable packing material solidifies, the demoulding, by the way of lifting, storage canopy module is revolved by horizontal direction
Go to vertical direction;
5) the spill slideway on the basis of the vertical base unit at two ends puts into described both sides;
6) by sliding type, storage canopy module is moved the one end to spill slideway along spill slideway, and with spill slideway
Fixing;
7) according to step 2) to 4) make multiple storage canopy module, and be sequentially connected with along spill slideway, simultaneously sliding with spill
Road is fixed.
Further, step 4) in when lifting the spacing of lifting point be 30 to 40m.
By using technique scheme, using mould to carry out modular construction in working site, steel wire net rack does muscles and bones,
Rack is internal injects liquid curable packing material, and inside and outside cover uses high-strength thin-film, makes storage canopy module have enough firm
Degree and intensity, meet the requirement of integral hoisting and adjustment.Storage canopy entirety span is big, sturdy and durable, have high intensity, slim and graceful and
Aging-resistant fine quality, can accomplish not avalanche, fully meets wind load, long-pending snow and ice load needs.And construction period is short, execute
Work is convenient, with low cost, it is adaptable to multiple storage or storage applications.
Accompanying drawing explanation
Fig. 1 is the concrete foundation in this utility model one embodiment and the structural representation of spill slideway.
Fig. 2 is the overall structure schematic diagram of the modularity large span storage canopy in this utility model one embodiment.
Fig. 3 is the partial structurtes schematic diagram of dome unit in this utility model one embodiment.
Fig. 4 is the structural representation of the storage canopy module in this utility model one embodiment with mold support structure.
Fig. 5 is the structural representation of the Quick connection part connecting storage canopy module in this utility model one embodiment.
Detailed description of the invention
For making features described above of the present utility model and advantage to become apparent, special embodiment below, and coordinate appended
Figure is described in detail below.It should be noted that, accompanying drawing be only used as storing in a warehouse booth structure and shape referring generally to, in order to clearly show that
Accompanying drawing each several part, has done suitable adjustment for structure in figure, and in figure, the quantity of each ingredient, dimensional parameters and proportionate relationship are equal
Should be as the criterion described in each embodiment.
As in figure 2 it is shown, provide a kind of modularity large span storage canopy in one embodiment, specifically include that armored concrete
Basis 101 and storage canopy canopy body, wherein, storage canopy canopy body includes multiple storage canopy module 103 being sequentially connected with.
As it is shown in figure 1, reinforced concrete foundation part to have enough width and thickness according to force analysis.Due to
The calculating of base component structural parameters is conventional project and calculates, and can not repeat them here directly with reference to Its Relevant Technology Standards.Its
In, uniquely, the spill slideway 102 of a steel is arranged at basic 101 tops, and spill slideway 102 has a chute, the degree of depth of this chute
Being 0.8 to 1m, width is 0.4 to 0.8m.The both sides of storage canopy canopy body are fixing with spill slideway to be connected, and it is sliding that spill slideway has one
Groove, the degree of depth of this chute is 0.8 to 1m, and width is 0.4 to 0.8m.It is a part for reinforced concrete foundation, is also with vertical
The vitals that formula base stock retaining wall 103 connects, is again at super-span storage canopy in building course, after modularity construction again
Slideway in anabolic process.Slideway organically to combine with concrete foundation, needs if desired to use pre-buried lower margin
Bolt 105 is reinforced.
In conjunction with Fig. 3, storage canopy module includes curable encapsulant layer 107 and is respectively coated by curable encapsulant layer
Above and following outer housing 106 and an inner cover 110 of 107;Bury steel wire net rack in curable packing material 107 underground to support.Can
The material of curing filler material layer is selected from polyurethane, polystyrene, polypropylene, polrvinyl chloride or polyethylene, and material itself is elastic
Modulus is not less than 40GPA.
Wherein steel wire net rack supports the steel wire using uniform weave, and steel wire diameter scope is 2.5 to 5.5mm, mesh face
Long-pending scope is 900 to 2500mm2。
Steel wire net rack supports and includes a waveform supporting network 108;Waveform supporting network 108 have the most uniform multiple crest and
Trough, described crest is both secured to outer housing 106, and described trough is both secured to inner cover 110;Two adjacent crests or trough pass through
Strengthen drawing in the net 109 connections.Distance range between adjacent two crests or trough is 0.65 to 2m.By the way and parameter
Arrange the structure of steel wire net rack, it is possible to rigidity and the intensity of storage canopy material are greatly improved, in the operating mode receiving all directions load
Under, storage canopy material, as overall stress, adds reinforcement between crest or trough and draws in the net, crest when can avoid deforming bigger
Between packing material be destroyed, and, use steel wire diameter to strengthen the bar construction of classes much smaller than other, weight is the lightest, keeps away
Exempt to increase extra from heavy load.
Outer housing 106 and inner cover 110 are high-strength thin-film, and this high-strength thin-film is HIRAOKA company or KOBOND company
The high-strength thin-film material produced, it is also possible to select the material with equality strength of domestic production.The concrete optional PVDF of material
Or PVF, thickness is 0.8 to 2.5mm.
Each storage canopy module is respectively provided with the vertical base unit of both sides, and its height is 3.5 to 5.5m;Thickness be 400 to
800mm;Connect the arc dome unit at vertical base unit top, both sides, its span scope 80 to 200m, height and span
Ratio is 0.1 to 0.3, and thickness is 250 to 480mm.
The width of each storage canopy module is 4 to 12m.
Two adjacent storage canopy modules are connected by a Quick connection part, as it is shown in figure 5, Quick connection part includes: one
Train wheel bridge, a lower plate and connect the intermediate supports at middle part of described train wheel bridge and lower plate;This three part constitutes connector
Matrix 114;
Side below described train wheel bridge, side and the one side of intermediate supports above lower plate constitute receiving one storage
First holding tank of canopy module 103;
Opposite side below described train wheel bridge, opposite side and the another side of intermediate supports above lower plate constitute receiving
Second holding tank of another storage canopy module 103;
The both sides of described train wheel bridge and/or lower plate are provided with at least one pair of camlock device.Camlock device bag
Include: cam 113, be formed at the one handle 112 of cam side;It is installed on cam both sides with described cam basic circle central coaxial
Camshaft, with the fixing seat of described camshaft pivot joint, described fixing seat is fixed in described train wheel bridge or lower plate.
Without upright supports in the middle of modularity large span of the present utility model storage canopy, maximum span is up to 200 meters.Due to canopy
Body portion material has high intensity, slim and graceful and aging resistance, can accomplish not avalanche, fully meets wind load, long-pending snow and ice load needs.
Ventilated mouth can be set as required on dome top.
According to actual needs, two sides can be closed or semiclosed.
The construction way of super-span of the present utility model storage canopy comprises the steps:
A () reinforced concrete foundation part, carries out conventional making according to force analysis so that it is have enough width and thickness
Degree.The steel spill slideway on top, basis, organically will combine with concrete foundation, needs if desired to use lower margin spiral shell
Bolt underpinning.
B () modularity large span storage canopy canopy body portion uses modularized design and construction, see accompanying drawing 4.At storage canopy
Mould 111, along the side of axis, is built in level in place on ground.Mould 111 is steel frame construction, split-type design so that
Make and transport.Mould includes inner mould, outer mold and single socket, the formation between inner mould and outer mold with
The die cavity that storage canopy modular shape is corresponding, i.e. spacing between inner mould and outer mold are equal to storage canopy module to be made
Thickness, inner mould is identical with storage canopy module width to be made with outer mold;Single socket is layed on ground, envelope
The side in mold closing chamber;Mould 111 whole height can select suitably as desired, with modularity large span storage each canopy of canopy
After module 103 is made, there are enough intensity and rigidity to meet and erect and translation is advisable.
C () mould has been built after, the most woven steel wire net rack is supported and the mould put up put into by outer housing, inner cover
In tool, inside and outside cover is connected effectively with steel wire net rack.To be prepared appropriate after, in mould irrigate liquid curable fill
Material (this material can be polyurethane, polystyrene, polypropylene, polrvinyl chloride or polyethylene).After certain time, fill material
Material solidification, in making mould (1), each thing becames one effectively, forms a canopy module.
D mould is removed by (), further according to span size, use several cranes, with the bottom of base as rotating shaft, lentamente will
Storage canopy canopy module is rotated to vertical direction by horizontal direction.Lifting point spacing is 30 to 40m.
E storage canopy canopy module after upright is pushed into required position along slideway by () after, and adjacent canopy module is carried out
Organic docking, and use high strength exploitation to get up in base and slideway in lower section.
According to actual needs, two sides can be closed or semiclosed.
Structural strength and Financial cost below in conjunction with the actual booth structure of storing in a warehouse previous embodiment description of engineering are carried out
It is analyzed as follows:
Structural strength analysis:
The strength and stiffness analysis of storage canopy module:
First, building the storage canopy module of width 12m, span 200m, the thickness at dome unit is set as 280mm, two
The vertical base thickness of side chooses 800mm, it is possible to ensureing enough rigidity, and be easy to construction, block mold is by length of side 4m
Finite element refines, two ends bound level displacement simultaneously and inside and outside rotation.
In vertical state, by the case of heavy load, middle cardioptosia 1.1 meters, gradient is 1.6%.Weight stress
26.4MPa, is far smaller than the allowable load of 520MPa, and the long-pending snow and ice of simulation carries, and applies the load of 0.45kN/ at top,
Big stress is 60MPa, is far smaller than the allowable load of 520MPa, meets requirement of strength;In the case of the stand under load of top, center is
Large deformation is 2.3 meters, and gradient is 2.1%, meets rigidity requirement.
Simulation wind load, applies downwards and lateral load 1.29kN/, and center radian maximum stress is 165MPa, is far smaller than
The allowable load of 520MPa, meets requirement of strength;Apply upwardly and laterally load 1.29kN/, owing to a part is offset in deadweight
Load, center radian maximum stress is 107MPa, is far smaller than the allowable load of 520MPa, meets requirement of strength;Two kinds of operating modes
Under, center maximum distortion 1.9 meters, gradient 2.2%, meet rigidity requirement.
After storage canopy block combiner is built into the storage canopy of entirety, overall rigidity and intensity all can improve further,
Build global finite element model and carry out loaded analysis, carry and in the case of wind load at same long-pending snow and ice, and consider deadweight
Load, stress concentrates on the vertical base stock retaining wall of both sides, and maximum stress is about 42MPa, and maximum distortion is the central term of dome
Portion, about 540mm, meet strength and stiffness requirement.
At present, the domestic exhausted rare span storage canopy more than 200m, actual according to engineering, use same material and knot
Structure, span is the least, then storage canopy is overall rigidity and intensity can correspondingly improve, and illustrate the most separately to less span
Storage booth structure is analyzed explanation.Certainly, in the case of span reduces, can calculate according to actual condition, reduce sheet material
Thickness and the breadth of sheet material, concrete analysis process repeats no more.
Economic cost analysis:
As a example by building a storage canopy, its specification is: span 180m, highly 50m, length 280m.
1. use integrated steel-structure mode, steel about 4000 tons, material cost about 60,000,000 yuan need to be consumed, build man-hour 2
About individual month, recruitment 50 people, add other supplementary costs, such as lifting cost, traffic expense etc., expenditure of construction is more than 80,000,000 altogether
Unit.
2. use inflated type in background technology to build way, need import thin film cost i.e. to reach 80,000,000 yuan, packing material
Expense needs 10,000,000 yuan, builds about 45 days man-hours, recruitment 50 people, adds other supplementary costs, such as lifting cost, and traffic expense etc.,
Expenditure of construction at least 12,000 ten thousand yuan altogether.
3. using the technical solution of the utility model, die cost about 10,000,000 yuan (reusable), packing material is about
10000000 yuan, other Master Cost about 10,000,000 yuan, thin film cost about 15,000,000 yuan, build 1 month man-hour, recruitment 50 people, then
Plus other supplementary costs, expenditure of construction is 60,000,000 yuan altogether.
It should be noted that this utility model, for preferable case study on implementation of the present utility model, is not made any by the above
Limit, every any simple modification, change and equivalence knot above example made according to this utility model technical spirit
Structure changes, and all still falls within the protection domain of technical solutions of the utility model.
Claims (10)
1. a modularity large span storage canopy, it is characterised in that including: basis and storage canopy canopy body;
Described basis has a pair spill slideway;
The both sides of described storage canopy canopy body are fixing with described spill slideway to be connected, and it includes multiple storage canopy mould being sequentially connected with
Block;
Each storage canopy module includes a curable encapsulant layer and is respectively coated by above described curable encapsulant layer
An outer housing below and and an inner cover;
Bury steel wire net rack in described curable packing material underground to support.
2. modularity large span storage canopy as claimed in claim 1, it is characterised in that steel wire net rack supports and uses uniform weave
Steel wire, steel wire diameter scope is 2.5 to 5.5mm, and screening area scope is 900 to 2500mm2。
3. modularity large span storage canopy as claimed in claim 1, it is characterised in that described steel wire net rack supports and includes a ripple
Shape supporting network;
Described waveform supporting network has the most uniform multiple crest and trough, and described crest is both secured to outer housing, described trough
It is both secured to inner cover;
Two adjacent crests or trough draw in the net to connect by a reinforcement.
4. modularity large span storage canopy as claimed in claim 3, it is characterised in that between adjacent two crests or trough
Distance range is 0.65 to 2m.
5. modularity large span storage canopy as claimed in claim 1, it is characterised in that described storage canopy module is respectively provided with both sides
Vertical base unit, its height be 3.5 to 5.5m;Thickness is 400 to 800mm;Connect vertical base unit top, both sides
Arc dome unit, its span scope 80 to 200m, height is 0.1 to 0.3 with the ratio of span, and thickness is 250 to 480mm.
6. modularity large span storage canopy as claimed in claim 1, it is characterised in that the width of described storage canopy module is 4
To 12m.
7. modularity large span storage canopy as claimed in claim 1, it is characterised in that two adjacent described storage canopy modules
By one Quick connection part connect, described Quick connection part includes: a train wheel bridge, a lower plate and connect described train wheel bridge and under
One intermediate supports at the middle part of clamping plate;
Side below described train wheel bridge, side and the one side of intermediate supports above lower plate constitute receiving one storage canopy mould
First holding tank of block;
Opposite side below described train wheel bridge, opposite side and the another side composition of intermediate supports above lower plate accommodate another
Second holding tank of storage canopy module;
The both sides of described train wheel bridge and/or lower plate are provided with at least one pair of camlock device.
8. modularity large span storage canopy as claimed in claim 1, it is characterised in that described spill slideway has a chute,
The degree of depth of this chute is 0.8 to 1m, and width is 0.4 to 0.8m.
9. modularity large span storage canopy as claimed in claim 1, it is characterised in that the material of described curable encapsulant layer
Matter is selected from polyurethane, polystyrene, polypropylene, polrvinyl chloride or polyethylene.
10. modularity large span storage canopy as claimed in claim 1, it is characterised in that described outer housing and inner cover are high-strength
Degree thin film, this high-strength thin-film material is PVDF or PVF, and thickness is 0.8 to 2.5mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620789700.8U CN205857869U (en) | 2016-07-25 | 2016-07-25 | A kind of modularity large span storage canopy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620789700.8U CN205857869U (en) | 2016-07-25 | 2016-07-25 | A kind of modularity large span storage canopy |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205857869U true CN205857869U (en) | 2017-01-04 |
Family
ID=57648484
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620789700.8U Withdrawn - After Issue CN205857869U (en) | 2016-07-25 | 2016-07-25 | A kind of modularity large span storage canopy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205857869U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106065731A (en) * | 2016-07-25 | 2016-11-02 | 大唐环境产业集团股份有限公司 | A kind of modularization large span storage canopy and method of construction thereof |
-
2016
- 2016-07-25 CN CN201620789700.8U patent/CN205857869U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106065731A (en) * | 2016-07-25 | 2016-11-02 | 大唐环境产业集团股份有限公司 | A kind of modularization large span storage canopy and method of construction thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106065665B (en) | A kind of super-span storage canopy and its method of construction | |
CN106065731B (en) | A kind of modularization large span storage canopy and its method of construction | |
CN103758147A (en) | Gravity type offshore wind turbine generator set foundation and towing and sinking method thereof | |
CN201377077Y (en) | Double-hoop bracket for single-column bent cap in bridge construction | |
CN101761090A (en) | Space truss multi-barrel base of offshore wind power unit | |
CN106760196B (en) | The construction method of cross box-type section steel column structure | |
CN105568854A (en) | Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder | |
CN205857869U (en) | A kind of modularity large span storage canopy | |
CN110387965A (en) | A kind of coal yard wide-span cylindrical reticulated shell structure gable starting construction method | |
CN206016041U (en) | A kind of modularity storage canopy construction material | |
CN207714155U (en) | A kind of bent cap holder | |
CN107269083B (en) | Composite material and steel structure mixed super-large-span storage shed and construction method thereof | |
CN201874306U (en) | Stable and reliable surrounding barrier quick to assemble and disassemble at construction site | |
CN205857386U (en) | A kind of super-span storage canopy | |
CN106065686B (en) | A kind of modularization storage canopy construction material and preparation method thereof | |
CN209114490U (en) | A kind of hydraulic template trolley pouring concrete suitable for side slope protection Vierendeel girder | |
CN204893900U (en) | Build total group bed -jig module on boats and ships | |
CN209082558U (en) | A kind of overlapping fabricated construction pipe gallery | |
CN205329996U (en) | Square steel post for building combined | |
CN205296206U (en) | Tower cane foundation | |
CN209796397U (en) | quick-mounting combined tank for fracturing | |
CN204365176U (en) | Fluid reservoir is joined in marriage to quick assembly disassembly formula | |
CN203878630U (en) | Inclination and straightness alternated pile group-bearing platform-upper structure similar model manufacturing template | |
CN208361880U (en) | A kind of offshore drilling platform chemicals dosing plant | |
CN209036723U (en) | Piping lane mold system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170104 Effective date of abandoning: 20180501 |
|
AV01 | Patent right actively abandoned |