CN205822207U - A kind of steel-pipe pile truss protecting side slope - Google Patents

A kind of steel-pipe pile truss protecting side slope Download PDF

Info

Publication number
CN205822207U
CN205822207U CN201620777105.2U CN201620777105U CN205822207U CN 205822207 U CN205822207 U CN 205822207U CN 201620777105 U CN201620777105 U CN 201620777105U CN 205822207 U CN205822207 U CN 205822207U
Authority
CN
China
Prior art keywords
steel
channel
pipe pile
section steel
side slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620777105.2U
Other languages
Chinese (zh)
Inventor
苗广营
刘宁
郝军洲
叶飞
陈凯
姚冠兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGHAI HIGHWAY CONSTRUCTION ADMINISTRATION
Qinghai transportation planning and Design Institute Co., Ltd
Original Assignee
Highway Scientific Research Surveying And Designing Institute Of Qinghai Province
Highway Construction In Qinghai Province Management Board
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Highway Scientific Research Surveying And Designing Institute Of Qinghai Province, Highway Construction In Qinghai Province Management Board filed Critical Highway Scientific Research Surveying And Designing Institute Of Qinghai Province
Priority to CN201620777105.2U priority Critical patent/CN205822207U/en
Application granted granted Critical
Publication of CN205822207U publication Critical patent/CN205822207U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A kind of steel-pipe pile truss protecting side slope, relate to side slope protection field, its structure is: steel-pipe pile A(1) and steel-pipe pile C(9) top and channel-section steel (4) fixing be connected, channel-section steel (4) is fixing is connected by slip casting ductule B(8), ductule B(8) vertical with channel-section steel (4) fix, channel-section steel (4) is along domatic laying, geotextiles (5) it is provided with on domatic (2), lay between channel-section steel (4) and grout rock layers (3), grout rock layers (3) geotextiles (5) to be compacted, the toe position of domatic (2) arranges concrete bed (7) and lays longitudinal drainage pipe (6).The beneficial effects of the utility model are: use truss type steel tube pilework, play the compressive property of structural member to greatest extent, avoid shearing and power of toppling that in friction pile, steel-pipe pile is produced by sliding force simultaneously, destruction to friction pile body, whole safeguard structure has construction convenience, reasonable stress science, the feature that construction costs is little.

Description

A kind of steel-pipe pile truss protecting side slope
One, technical field
This utility model relates to side slope protection field, particularly to a kind of steel-pipe pile truss protecting side slope.
Two, background technology
Civil engineering it is frequently necessary to carry out slope excavating.Some are weak or loose earth is after excavation, slope stability Very poor, easily unstability, form landslide or slope failure, need to take corresponding side slope protection technical measures.Side slope protection normal Have by technical measures: retaining wall method, friction pile method, back-pressure backfill method, Combining Support of Frame Beams of Prestressed Anchor Rope method, slope body grouting and reinforcing method etc..Various Method has its different suitabilitys and pluses and minuses.
Three, summary of the invention
Thering is provided a kind of steel-pipe pile truss protecting side slope for the problems referred to above this utility model, its structure is: steel-pipe pile A (1) and steel-pipe pile C(9) top and channel-section steel (4) fixing is connected, channel-section steel (4) is fixed and is connected by slip casting ductule B(8), slip casting Ductule B(8) vertical with channel-section steel (4) to fix, channel-section steel (4), along domatic laying, domatic (2) is provided with geotextiles (5), channel-section steel (4) laying between and grout rock layers (3), grout rock layers (3) and geotextiles (5) be compacted, the toe position of domatic (2) arranges concrete Drain pipe base (7) also lays longitudinal drainage pipe (6).
Construction method of the present utility model: before slope excavating, carries out vertical steel pile tube A(1 in advance along excavation line) construction, Form the side slope protection of first order diaphram wall form.
First order side slope longitudinally excavation five to ten meters, carries out second level steel-pipe pile C(9 immediately after) construction, Yi Jiyi The side slope protection of excavation.Channel-section steel (4) in two-stage steel-pipe pile and slope protection, forms the slope protection shape of similar truss structure Formula, to ensure the slope stability in construction.
Points for attention: 1), longitudinally after domatic excavation 5~10m, carry out immediately stopping excavation, carry out second level steel-pipe pile C(9) Construction.2), after this section of steel-pipe pile has been constructed, side slope protection construction is carried out immediately.3) side slope supports channel-section steel (4) and steel-pipe pile B (8) secure attachment, to prevent channel-section steel (4) under stress, bends up upward.4) according to rock mass water content and slope stability, the Diode stake C(9) row's steel-pipe pile can be optimized for.5) after this section of steel-pipe pile and slope protection have been constructed, Ji Kejin The excavation of next section of side slope at the same level of row, operation repeats working procedure above, so that slope excavating at the same level and protection are fully completed.
After first order slope excavating and protection complete construction, slope excavating and the construction of prevention work of next stage can be carried out. Ultimately form complete side slope protection system.
Technical characterstic: 1) stake is long, grade of side slope, and whether the setting of rotary churning pile to be, all can be actual according to slope soil stability Situation is adjusted.2) side slope protection skid resistance is reached down at bottom toe, with toe by truss type steel tube stake The drag of steel-pipe pile and the soil body balances each other.3) truss type steel tube stake side slope protection, it is to avoid the antidumping that vertical pile body uses is long Degree so that side slope protection system stress is more scientific and reasonable, easy construction is quick, and construction costs reduces, and working security is significantly Improve.4) this method can be used for saturated soft soil side slope, collapsible loess slope, broken upper side slope etc..
The beneficial effects of the utility model are: use truss type steel tube pilework, played structural poles to greatest extent The compressive property of part, avoids sliding force in friction pile to the shearing of steel-pipe pile and the power destruction to pile body of toppling simultaneously, whole Safeguard structure has construction convenience, reasonable stress science, the feature that construction costs is little;
Steel-pipe pile embeds slope soil without going through the degree of depth, produces anchorage, is greatly reduced difficulty of construction, adds Fast project progress;
In construction, take step excavation, step by step side slope protection construction, make side slope be in all the time in digging process stable State, it is ensured that construction equipment and the safety of personnel;
Avoid side slope unsure state when constructing again after antiskid retaining wall needs all to have excavated, multistage anti- The shortcoming of the sliding more difficult construction of barricade.Avoiding friction pile needs the degree of depth to embed supporting course, and the shortcoming that pile body shearing strength is bigger;
This side slope protection technology wide accommodation, structure stress science, can be according to reality such as slope stability, landslide sizes Situation flexible arrangement technical measures, are applicable to soil body high slope, fractured rock side slope, saturated soft soil side slope etc., have notable Science, economy, convenience,
This side slope protection technology is original technology.
When have employed the protection that steel-pipe pile truss carries out weak slope body, form the mechanics rock-steady structure of reasonable science, Avoid the unfavorable factor of the methods such as friction pile, Gravity Retaining Wall, the reinforcing of slope body, Vierendeel girder, back-pressure backfill, easy construction, make Valency is reasonable.The method is effectively to protect during slope excavating, so working security is higher.
Four, accompanying drawing explanation
Fig. 1 is this utility model structural representation;
In figure: 1, steel-pipe pile A, 2, domatic, 3, grout rock layers, 4, channel-section steel, 5, geotextiles, 6, drain pipe, 7, concrete row Water pipe base, 8, slip casting ductule, 9, steel-pipe pile C.
Five, detailed description of the invention
Embodiment 1, a kind of truss protecting side slope, its structure is: steel-pipe pile A(1) and steel-pipe pile C(9) top and groove Steel (4) is fixing to be connected, and channel-section steel (4) is fixing is connected by slip casting ductule B(8), slip casting ductule B(8) vertical with channel-section steel (4) solid Fixed, channel-section steel (4), along domatic laying, domatic (2) is provided with geotextiles (5), lays and grouts rock layers (3), grout between channel-section steel (4) Geotextiles (5) is compacted by rock layers (3), and the toe position of domatic (2) arranges concrete drain tile base (7) and lays longitudinal drainage Pipe (6).

Claims (1)

1. the steel-pipe pile truss protecting side slope, it is characterised in that: steel-pipe pile A(1) and steel-pipe pile C(9) top and channel-section steel (4) fixing connection, channel-section steel (4) is fixing is connected by slip casting ductule B(8), slip casting ductule B(8) vertical with channel-section steel (4) solid Fixed, channel-section steel (4), along domatic laying, domatic (2) is provided with geotextiles (5), lays and grouts rock layers (3), grout between channel-section steel (4) Geotextiles (5) is compacted by rock layers (3), and the toe position of domatic (2) arranges concrete drain tile base (7) and lays longitudinal drainage Pipe (6).
CN201620777105.2U 2016-07-22 2016-07-22 A kind of steel-pipe pile truss protecting side slope Active CN205822207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620777105.2U CN205822207U (en) 2016-07-22 2016-07-22 A kind of steel-pipe pile truss protecting side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620777105.2U CN205822207U (en) 2016-07-22 2016-07-22 A kind of steel-pipe pile truss protecting side slope

Publications (1)

Publication Number Publication Date
CN205822207U true CN205822207U (en) 2016-12-21

Family

ID=57560188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620777105.2U Active CN205822207U (en) 2016-07-22 2016-07-22 A kind of steel-pipe pile truss protecting side slope

Country Status (1)

Country Link
CN (1) CN205822207U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411802A (en) * 2021-12-24 2022-04-29 湖北省交通规划设计院股份有限公司 Combined pile-joist retaining wall and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114411802A (en) * 2021-12-24 2022-04-29 湖北省交通规划设计院股份有限公司 Combined pile-joist retaining wall and construction method
CN114411802B (en) * 2021-12-24 2024-04-26 湖北省交通规划设计院股份有限公司 Combined pile joist retaining wall and construction method

Similar Documents

Publication Publication Date Title
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN106638673B (en) A kind of construction method of compound retaining structure
CN205742213U (en) Foundation pit supporting construction
CN104452784B (en) Composite bolt pile used for slope strengthening and construction technique of composite bolt pile
CN105239586A (en) Support structure for supporting foundation pit and method for supporting foundation pit
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN203334300U (en) Root pile supporting structure
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN103352477A (en) Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof
WO2014013508A2 (en) Stepwise repeated de-stabilisation and stabilisation of highly collapsible soil mass by 'soil nailing technique' used for construction of railway/road underpass
CN104727324B (en) Irregular basement construction method for supporting
KR20140013497A (en) Method for constructing block type reinforced retaining wall in cut site
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
CN205502063U (en) Combined type retaining structure
CN207017299U (en) A kind of broken Rock And Soil cut slope flexible shoring ruggedized construction
CN203741848U (en) Steel tube plate type retaining structure
CN212077981U (en) Combined slope supporting structure
CN101368388B (en) Anchor pipe skeleton support method
CN205822207U (en) A kind of steel-pipe pile truss protecting side slope
CN106640117A (en) Underground cavern top arc structure, underground cavern and construction method of underground cavern
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge
CN105696701A (en) Along-slope shear wall building development platform and construction method thereof
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
KR101297679B1 (en) Self-supporting Temporary Structure Using Steel Wire And Method Of The Same

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Miao Guangying

Inventor after: Liu Ning

Inventor after: Hao Junzhou

Inventor after: Ye Fei

Inventor after: Xin Haisheng

Inventor after: Chen Kai

Inventor after: Yao Guanbing

Inventor before: Miao Guangying

Inventor before: Liu Ning

Inventor before: Hao Junzhou

Inventor before: Ye Fei

Inventor before: Chen Kai

Inventor before: Yao Guanbing

COR Change of bibliographic data
CP01 Change in the name or title of a patent holder

Address after: 810001 No. 72, 54 Avenue, Chengxi District, Qinghai City, Xining Province

Co-patentee after: Qinghai transportation planning and Design Institute Co., Ltd

Patentee after: QINGHAI HIGHWAY CONSTRUCTION ADMINISTRATION

Address before: 810001 No. 72, 54 Avenue, Chengxi District, Qinghai City, Xining Province

Co-patentee before: HIGHWAY SURVEY AND DESIGN INSTITUTE OF QINGHAI PROVINCE

Patentee before: QINGHAI HIGHWAY CONSTRUCTION ADMINISTRATION

CP01 Change in the name or title of a patent holder