CN205809058U - Shale gas gassiness testing stand - Google Patents

Shale gas gassiness testing stand Download PDF

Info

Publication number
CN205809058U
CN205809058U CN201620514514.3U CN201620514514U CN205809058U CN 205809058 U CN205809058 U CN 205809058U CN 201620514514 U CN201620514514 U CN 201620514514U CN 205809058 U CN205809058 U CN 205809058U
Authority
CN
China
Prior art keywords
experimental cabin
supply tank
water supply
gassiness
shale gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620514514.3U
Other languages
Chinese (zh)
Inventor
明晓峰
王泰强
刘嗥
王磊
刘显亮
黄代
蔡峰
陈立强
李中兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Sinopec Shengli Petroleum Engineering Corp
Geological Logging Co of Sinopec Shengli Petroleum Engineering Corp
Original Assignee
Sinopec Oilfield Service Corp
Sinopec Shengli Petroleum Engineering Corp
Geological Logging Co of Sinopec Shengli Petroleum Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Service Corp, Sinopec Shengli Petroleum Engineering Corp, Geological Logging Co of Sinopec Shengli Petroleum Engineering Corp filed Critical Sinopec Oilfield Service Corp
Priority to CN201620514514.3U priority Critical patent/CN205809058U/en
Application granted granted Critical
Publication of CN205809058U publication Critical patent/CN205809058U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

This utility model provides a kind of shale gas gassiness testing stand, belong to oil exploration technology field, its structure includes experimental cabin and water supply tank, experimental cabin uses drum type transparent toughened glass cylinder body, experimental cabin upper portion side wall is provided with filling pipe, the bottom of water supply tank is provided with water supply tank support, and the side of water supply tank is provided with downcomer, and downcomer is connected with filling pipe by flexible pipe;Sealing lid uses transparent toughened glass matter to seal lid, and sealing covers to be provided with and takes air valve and balance gas bleeder valve;The bottom of experimental cabin is provided with experimental cabin support, encloses and be provided with a water collector in the lower section of experimental cabin and experimental cabin support, discharging valve connection water collector.The entire body design of this shale gas gassiness testing stand meets the requirement of the rock core sample gassiness test in shale gas exploration and development; possesses gas production function in integrated design; the design of experimental cabin transparent column type meets the observation of each angle of periphery; selective waterdrainage amount has saved water resource, protects construction environment.

Description

Shale gas gassiness testing stand
Technical field
This utility model relates to oil exploration technology field, specifically a kind of shale gas gassiness testing stand.
Background technology
Shale gas is to compose to be stored in rich organic mud shale and interlayer thereof, to adsorb with free state for being primarily present mode Unconventional forage, composition, based on methane, belongs to a class together with " coal bed gas ", " tight gas ".The formation of shale gas and enrichment There is the feature of self uniqueness, be often distributed in basin in thickness shale hydrocarbon source rock formation bigger, widespread.Shale gas is very The most by people cognition, but gather ratio conventional natural gas difficulty, along with energy resource is the deficientest, as tradition natural The useful supplement of gas, people gradually recognize the importance of shale gas.Shale gas main body is positioned at dark-coloured mud shale or high-carbon mud page In rock, shale gas is to be present in mud stone, high-carbon mud stone, shale and aleuritic texture rock class interlayer with absorption or free state in main body Natural gas, it can be created in the various stage natural gas main bodys of organic origin and be present in free phase (about 50%) Crack, hole and other reservoir space.It is present in kerogen, clay particle and pore surface with adsorbed state (about 50%), Very small amount is stored in natural gas in kerogen, asphalitine and oil with dissolved state and exists in the siltstone of sandwich-like, flour sand After generating for natural gas in matter mud stone, argillaceous siltstoue, even sandstone formation, the gathering nearby in source bed shows as allusion quotation The original place Reservoir model of type is bigger with difference such as oil shale, oil-sand, asphalt.
In the exploration and development of shale gas well, petroleum geology worker is except packet-by-packet to analyze boring the lithology met Outward, also suspicious formation rock the most likely is cored confirmation.After rock core is fetched into ground, first have to rock core Simply arranging arrangement, major tasks to be done just are by gassiness experiment.Gassiness experiment is exactly by one section Rock core is put in water, has then seen whether that bubble is emerged from rock core, thus judges whether contain gas (hydro carbons) in rock. At present, geological logging working site carries out gassiness experiment does not also have the specific professional facility, gassiness experimental tool used to be nothing but Common bucket or washbowl, it is impossible to meet fine condition and the requirement of gassiness experiment.
After subsurface rock rock core is fetched to ground, geologist to carry out preliminary arrangement to rock core immediately.Typically Way be, first by core sample along the arrangement of certain direction to stubble, i.e. recover upper in subsurface formations of rock rock core Lower order, can not overturn, and otherwise will result in the heavy losses in work, because once destroying its suitable in subsurface formations Sequence will have a strong impact on the analysis work of lower step.After rock core sample tentatively arranges, geologist will be immediately with clear Water cleans the drilling fluid adhered on core surface gently so that it is exposes rock true qualities, wants carefully during cleaning meanwhile See whether, at rock surface, bubble occurs, if it find that certain block rock core sample occurs that bubble is accomplished by immediately to this block sample Product carry out gassiness test, sometimes, gassiness test to be carried out to suspicious specimen.When carrying out gassiness test, it is desirable to have specialty prepares Clear water, is subsequently poured in washbowl or another bucket with bucket water lift, may find a fish if condition possesses sometimes Cylinder is tested.Rock rock core is put in water, if having gas (hydro carbons or non-hydrocarbons) in rock, then under the effect of pressure reduction just From rock, diafiltration presents bubble in water, then floats along the water surface, at this moment with regard to observable out.Bubble has size discrimination, has Speed is distinguished, and has shape different, all these content situations all showing gas in rock.After one piece of rock test is complete, then take Another block is put into continuation and is observed, and water is dirty rear does not such as see that bubble will be replaced with clear water immediately, the most repeatedly, until this examination The rock rock core tested all has been tested, here it is basic program.The rock core sample having obvious bubble to be sealed up for safekeeping immediately, with Just collection takes gas therein and carries out proximate analysis in chromatograph.Whole gassiness process of the test need numerous personnel to join With, some water lifts, the pouring having, the replacing filthy water etc. that has, whole work scene highlights busy.Although this is conventional work journey Sequence, but, really there is all many problems in this intrinsic method:
(1) rinse dosage is very big, and the filthy water toppled over pollutes environment;
(2) frequently change clear water, delay gassiness test period;
(3) observing bubble in washbowl or bucket, the limitation of observing effect is big;
(4) simple glass fish jar is observed, and changes water process loaded down with trivial details;
(5) gas spills into water from rock and is then diffused in air, it is impossible to judge the real content of gas in rock;
(6) on-the-spot without effective gas collecting facility, have impact on the timeliness of gas analysis;
(7) work on the spot of integration cannot realize, and can not play the overall function of geological logging work.
Summary of the invention
Technical assignment of the present utility model is to solve the deficiencies in the prior art, it is provided that a kind of shale gas gassiness testing stand.
The technical solution of the utility model realizes in the following manner, and this shale gas gassiness testing stand, its structure includes Experimental cabin and water supply tank,
Experimental cabin uses drum type water white transparency cylinder body, preferably water white transparency safety glass cylinder body,
The bottom centre of experimental cabin is provided with discharging valve, and discharging valve is provided with ball type switch,
Experimental cabin upper portion side wall is provided with filling pipe, the mouth of pipe abduction of filling pipe updip 45 degree,
The bottom of water supply tank is provided with water supply tank support, and the side of water supply tank is provided with downcomer, and water supply tank support supports The level height of water supply tank and downcomer is connected with filling pipe by flexible pipe higher than the level height of filling pipe, downcomer;
Sealing lid uses transparent toughened glass matter to seal lid, seals lid and passes through snap lock with experimental cabin cylinder body periphery suitable for reading Connect;, seal lid and experimental cabin cylinder body suitable for reading between be provided with sealing ring;
Sealing covers to be provided with and takes air valve and balance gas bleeder valve;
The bottom of experimental cabin is provided with experimental cabin support, encloses and be provided with one and connect in the lower section of experimental cabin and experimental cabin support Hydrophone, discharging valve connection water collector.
The left and right sides of experimental cabin is respectively arranged with experimental cabin handle.
Seal lid center and be provided with sealing lid handle.
Water supply tank is provided with can open upper cover.
Ball type switch it is provided with on discharging valve.
The mouth of pipe abduction of filling pipe updip 45 degree.
This utility model compared with prior art produced by provide the benefit that:
It is existing in exploration that this shale gas gassiness testing stand can be widely applied to geologist in oil and gas exploration construction Gassiness in rock core sample analysis is tested by field, meanwhile, is also applied for the rock gassiness experimental work that geological experiment is indoor, It it is the important device of petroleum geology work.
This shale gas gassiness testing stand can fully eliminate various unfavorable factor in applying at the scene, it is ensured that oil-gas exploration In on-the-spot integration gassiness test to rock core sample, improve follow-up work efficiency, ensured oil-gas exploration benefit, had Help fine Efficient Exploration.Reasonably arrange and protect the healthy of operator, maintain construction operation environment, reduce labor Fatigue resistance, improves work quality, it is ensured that exploration timeliness.This shale gas gassiness testing stand is not only able at oil-gas exploration rock The test of stone core sample obtains efficient application, and can be applicable to other field needing gassiness to test.
The entire body design of this shale gas gassiness testing stand meets the rock core sample gassiness examination in shale gas exploration and development The requirement tested, has possessed gas production function and has met the sight of each angle of periphery in integrated design, the design of experimental cabin transparent column type Examining, selective waterdrainage amount has saved water resource, protects construction environment.
This shale gas gassiness testing stand creates following functions and advantage:
(1) reduce rinse dosage, concentrated filthy water process, protected working environment;
(2) need not frequently change whole clear water, ensured gassiness test period;
(3) in stereo transparent environment, observe bubble to emerge, improve observing effect;
(4) filthy water waste water can swap out from base section, reduces and changes water process;
(5) by syringe collecting gas, actual gas content is collected in time;
(6) specification gas collecting facility, it is ensured that the timeliness of gas analysis;
(7) define the work on the spot of integration, give play to the overall function of geological logging work.
This shale gas gassiness Test-bed Design rationally, simple in construction, safe and reliable, easy to use, be easily maintained, have very Good popularizing value.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present utility model.
Labelling in accompanying drawing represents respectively:
1, experimental cabin, 2, discharging valve, 3, ball type switch, 4, filling pipe,
5, water supply tank, 6, water supply tank support, 7, downcomer, 8, flexible pipe,
9, lid is sealed, 10, buckle, 11, sealing ring, 12, take air valve, 13, balance gas bleeder valve,
14, experimental cabin support, 15, water collector,
16, experimental cabin handle, 17, seal lid handle, 18, upper cover can be opened.
Detailed description of the invention
Below in conjunction with the accompanying drawings shale gas gassiness testing stand of the present utility model is described in detail below.
As shown in drawings, shale gas gassiness testing stand of the present utility model, its structure includes experimental cabin and water supply tank,
Experimental cabin 1 uses drum type water white transparency cylinder body, preferably water white transparency safety glass cylinder body,
The bottom centre of experimental cabin 1 is provided with discharging valve 2, and discharging valve 2 is provided with ball type switch 3,
Experimental cabin 1 upper portion side wall is provided with filling pipe 4, the mouth of pipe abduction of filling pipe 4 updip 45 degree,
The bottom of water supply tank 5 is provided with water supply tank support 6, and the side of water supply tank 5 is provided with downcomer 7, water supply tank support 6 Supporting the level height 4 level heights higher than filling pipe of water supply tank 5 and downcomer 7, downcomer 7 is by flexible pipe 8 and filling pipe 4 Connect;
Seal lid 9 employing transparent toughened glass matter and seal lid, seal lid 9 with experimental cabin cylinder body periphery suitable for reading by buckle 10 Locking connects;, seal lid and experimental cabin cylinder body suitable for reading between be provided with sealing ring 11;
Seal to be provided with on lid 9 and take air valve 12 and balance gas bleeder valve 13;
The bottom of experimental cabin 1 is provided with experimental cabin support 14, encloses and be provided with in the lower section of experimental cabin 1 and experimental cabin support One water collector 15, discharging valve 2 connects water collector 15.
The left and right sides of experimental cabin 1 is respectively arranged with experimental cabin handle 16.
Seal lid 9 centers and be provided with sealing lid handle 17.
Water supply tank 5 is provided with can open upper cover 18.
Ball type switch it is provided with on discharging valve.
The mouth of pipe abduction of filling pipe updip 45 degree.
The main body facility of this shale gas gassiness testing stand is Laboratory Module, and facility associated therewith also includes water supply tank and connects Hydrophone.
Experimental cabin: experimental cabin generally transparent toughened glass matter cylinder body, cylinder type, high 450mm, diameter 400mm, wall thickness 10mm.The bottom centre position of experimental cabin sets discharging valve, and ball type switch controls, opening diameter 50mm, valve body and experimental cabin acid Property glass cement is tightly connected.
Set filling pipe one at the upper limb 80mm of distance test (DT) cabin, be used for moisturizing from water supply tank;Filling pipe updip angle 45 °, diameter 20mm, long 100mm, and experimental cabin one, when needing moisturizing, flexible pipe and water supply tank connect.
Setting two, portable hands at experimental cabin distance upper limb 80mm, opposite is separately.The upper limb of experimental cabin sets four buckles, averagely Distribution, is used for and seals lid realizing sealing;Upper limb lay a colloid seal circle, play leakage test cabin and seal lid between close Envelope, sealing ring and the gluing fixed of experimental cabin acidic glass are fixed.
Seal lid: transparent toughened glass matter, middle middle position is provided with sealing lid handle one.Seal the thick 50mm of lid, Diameter 400mm, wall thickness 10mm.Sealing covers to set and takes air valve and each one of gas bleeder valve of balance, and ball type switch controls opening and closing, and mesopore is straight Footpath is 10mm.
Take air valve: rotary valve, the gas of accumulation after opening, can be extracted with 100ml syringe, close and then seal experimental cabin up for safekeeping Interior gas, when taking gas, sebific duct and syringe connect.
Balance gas bleeder valve: rotary valve, gas remaining in being used for releasing experimental cabin, in order to open sealing lid.
Experimental cabin support.Rack leg is that three feet are opened, and tray deck is circular flat, diameter 350mm.Support height 800mm. Frame bottom space is used for placing water collector, switches the waste water released in experimental cabin.
Water supply tank: deposit clear water, stainless steel or irony, cuboid-type, long 800mm, wide 500mm, height in water supply tank 500mm, wall thickness 5mm.At water supply tank lower box distance placed in the middle source, end 30mm, one, valve opening door connects downcomer, is used for discharging water The filling pipe of experimental cabin.The whole upper cover of water supply tank can be opened, in order to supplements clear water.The bottom of water supply tank arranges four leg supports, Support height 1200mm, detachably.

Claims (6)

1. shale gas gassiness testing stand, it is characterised in that include experimental cabin and water supply tank,
Experimental cabin uses drum type water white transparency cylinder body,
The bottom centre of experimental cabin is provided with discharging valve,
Experimental cabin upper portion side wall is provided with filling pipe,
The bottom of water supply tank is provided with water supply tank support, and the side of water supply tank is provided with downcomer, and water supply tank support supports moisturizing The level height of case and downcomer is connected with filling pipe by flexible pipe higher than the level height of filling pipe, downcomer;
Sealing to cover uses transparent toughened glass matter to seal lid, seals lid periphery suitable for reading with experimental cabin cylinder body and is close to by snap lock Connect;Seal lid and experimental cabin cylinder body suitable for reading between be provided with sealing ring;
Sealing covers to be provided with and takes air valve and balance gas bleeder valve;
The bottom of experimental cabin is provided with experimental cabin support, encloses and be provided with a water receiving in the lower section of experimental cabin and experimental cabin support Device, discharging valve connection water collector.
Shale gas gassiness testing stand the most according to claim 1, it is characterised in that: the left and right sides of experimental cabin is respectively provided with There is experimental cabin handle.
Shale gas gassiness testing stand the most according to claim 1, it is characterised in that: seal lid center and be provided with sealing lid Handle.
Shale gas gassiness testing stand the most according to claim 1, it is characterised in that: water supply tank is provided with can open upper cover.
Shale gas gassiness testing stand the most according to claim 1, it is characterised in that: it is provided with ball type switch on discharging valve.
Shale gas gassiness testing stand the most according to claim 1, it is characterised in that: the mouth of pipe abduction of filling pipe updip 45 Degree.
CN201620514514.3U 2016-05-31 2016-05-31 Shale gas gassiness testing stand Expired - Fee Related CN205809058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620514514.3U CN205809058U (en) 2016-05-31 2016-05-31 Shale gas gassiness testing stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620514514.3U CN205809058U (en) 2016-05-31 2016-05-31 Shale gas gassiness testing stand

Publications (1)

Publication Number Publication Date
CN205809058U true CN205809058U (en) 2016-12-14

Family

ID=57501044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620514514.3U Expired - Fee Related CN205809058U (en) 2016-05-31 2016-05-31 Shale gas gassiness testing stand

Country Status (1)

Country Link
CN (1) CN205809058U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107144625A (en) * 2017-06-23 2017-09-08 国家地质实验测试中心 Gas hydrates drill core light hydrocarbon gas content parses test system and method
CN108872529A (en) * 2018-04-12 2018-11-23 中国石油大学(北京) For measuring shale rupture methane lost imitative experimental appliance and its method
CN109946118A (en) * 2019-03-22 2019-06-28 夸克能源工程实验室(深圳)有限公司 A kind of Portable oil-gas water-sampling device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107144625A (en) * 2017-06-23 2017-09-08 国家地质实验测试中心 Gas hydrates drill core light hydrocarbon gas content parses test system and method
CN108872529A (en) * 2018-04-12 2018-11-23 中国石油大学(北京) For measuring shale rupture methane lost imitative experimental appliance and its method
CN109946118A (en) * 2019-03-22 2019-06-28 夸克能源工程实验室(深圳)有限公司 A kind of Portable oil-gas water-sampling device
CN109946118B (en) * 2019-03-22 2023-11-10 夸克能源工程实验室(深圳)有限公司 Portable oil-gas-water sampling device

Similar Documents

Publication Publication Date Title
CN205809058U (en) Shale gas gassiness testing stand
Jin et al. Pore structures evaluation of low permeability clastic reservoirs based on petrophysical facies: A case study on Chang 8 reservoir in the Jiyuan region, Ordos Basin
CN103868799B (en) Rock mechanical characteristic analyzer for non-conventional oil-gas reservoir stratum
CN103411848B (en) Method used for evaluating shale gas adsorption capacity of shale
CN102589927B (en) Portable fidelity cylindrical bottom mud sampler
CN105954464A (en) Method for constructing soil gas and underground water monitoring wells
CN106528707A (en) Coal seam roof sandstone aquifer water-abundance evaluation method
CN203869959U (en) Analysis meter for rock mechanics characteristics of unconventional oil and gas reservoir
CN209264347U (en) A kind of water sampling in situ probe for shallow-layer gas-bearing formation
CN108979632B (en) Simple gas sample collection device and method in exploration hole of stratum containing shallow gas
CN106053130A (en) Device for collecting underwater deep columnar sediments in shoal water
CN205719627U (en) A kind of phytal zone Underwater Deep Silt columnar deposition matter collection device
CN201521288U (en) Simple integrated logging instrument
Dahan et al. A measurement system to determine water flux and solute transport through fractures in the unsaturated zone
CN103726841A (en) Portable geological prospecting sampling drill
Lunjie et al. Application of industrial computed tomography (ICT) to research of fractured tight sandstone gas reservoirs
McCulloh et al. Diagenetic baselines for interpretive reconstructions of maximum burial depths and paleotemperatures in clastic sedimentary rocks
CN209117386U (en) A kind of geological prospecting sampler
Paterson et al. Day 5: Mesozoic volcanic rocks of the central Sierra Nevada Arc
Liu et al. Origin, migration, and accumulation of carbon dioxide in the East Changde Gas Field, Songliao Basin, northeastern China
CN202611633U (en) Geological logging rock debris automatic acquisition washing device
CN117368245A (en) Gate valve device for instant detection
CN202140085U (en) Well drilling sampling device
CN202882905U (en) Portable geological exploration sampling drill
Wang et al. An evaluation workflow for shale oil and gas in the Jiyang Depression, Bohai Bay Basin, China: A case study from the Luojia area in the Zhanhua Sag

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

Termination date: 20170531