CN205804433U - 地铁深基坑止水结构渗漏缺陷声纳渗流检测装置 - Google Patents
地铁深基坑止水结构渗漏缺陷声纳渗流检测装置 Download PDFInfo
- Publication number
- CN205804433U CN205804433U CN201620755194.0U CN201620755194U CN205804433U CN 205804433 U CN205804433 U CN 205804433U CN 201620755194 U CN201620755194 U CN 201620755194U CN 205804433 U CN205804433 U CN 205804433U
- Authority
- CN
- China
- Prior art keywords
- sonar
- probe
- seepage
- measure
- sealing structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Examining Or Testing Airtightness (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620755194.0U CN205804433U (zh) | 2016-07-19 | 2016-07-19 | 地铁深基坑止水结构渗漏缺陷声纳渗流检测装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620755194.0U CN205804433U (zh) | 2016-07-19 | 2016-07-19 | 地铁深基坑止水结构渗漏缺陷声纳渗流检测装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205804433U true CN205804433U (zh) | 2016-12-14 |
Family
ID=57508407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620755194.0U Active CN205804433U (zh) | 2016-07-19 | 2016-07-19 | 地铁深基坑止水结构渗漏缺陷声纳渗流检测装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205804433U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108489680A (zh) * | 2018-04-26 | 2018-09-04 | 中铁十局集团第二工程有限公司 | 带房心土地下室基础面渗漏检测方法以及*** |
CN110258658A (zh) * | 2019-06-03 | 2019-09-20 | 中国建筑第八工程局有限公司 | 地下连续墙的渗漏预判及处理的施工方法 |
CN115094958A (zh) * | 2022-06-02 | 2022-09-23 | 北京建工集团有限责任公司 | 超深大直径高压旋喷封底效果分层抽水检测方法 |
CN117628362A (zh) * | 2023-12-04 | 2024-03-01 | 北京工业大学 | 一种地下空间工程渗漏声呐检测装置及使用方法 |
-
2016
- 2016-07-19 CN CN201620755194.0U patent/CN205804433U/zh active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108489680A (zh) * | 2018-04-26 | 2018-09-04 | 中铁十局集团第二工程有限公司 | 带房心土地下室基础面渗漏检测方法以及*** |
CN110258658A (zh) * | 2019-06-03 | 2019-09-20 | 中国建筑第八工程局有限公司 | 地下连续墙的渗漏预判及处理的施工方法 |
CN115094958A (zh) * | 2022-06-02 | 2022-09-23 | 北京建工集团有限责任公司 | 超深大直径高压旋喷封底效果分层抽水检测方法 |
CN115094958B (zh) * | 2022-06-02 | 2023-05-16 | 北京建工集团有限责任公司 | 超深大直径高压旋喷封底效果分层抽水检测方法 |
CN117628362A (zh) * | 2023-12-04 | 2024-03-01 | 北京工业大学 | 一种地下空间工程渗漏声呐检测装置及使用方法 |
CN117628362B (zh) * | 2023-12-04 | 2024-05-28 | 北京工业大学 | 一种地下空间工程渗漏声呐检测装置及使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107067333B (zh) | 一种高寒高海拔高陡边坡稳定性监控方法 | |
Wang et al. | Field experiment and numerical simulation of coupling non-Darcy flow caused by curtain and pumping well in foundation pit dewatering | |
Fan et al. | Hazards and treatment of karst tunneling in Qinling-Daba mountainous area: overview and lessons learnt from Yichang–Wanzhou railway system | |
Hencher | Preferential flow paths through soil and rock and their association with landslides | |
Corsini et al. | Field monitoring of the Corvara landslide (Dolomites, Italy) and its relevance for hazard assessment | |
Cui et al. | Mitigation of geohazards during deep excavations in karst regions with caverns: a case study | |
CN110221357A (zh) | 一种大跨度浅埋灰岩采空区综合勘察方法 | |
CN205804433U (zh) | 地铁深基坑止水结构渗漏缺陷声纳渗流检测装置 | |
CN105629309B (zh) | 钻孔注浆浆液空间扩散范围及路径描述方法 | |
CN106593526B (zh) | 一种基于模糊判断的隧道地质岩溶风险评估方法 | |
CN105137488B (zh) | 基于人工注液的地下水流场描述方法 | |
Li et al. | Ground movements caused by deep underground mining in Guan-Zhuang iron mine, Luzhong, China | |
Dong et al. | Delineation of leakage pathways in an earth and rockfill dam using multi-tracer tests | |
Ismail et al. | Geological assessment for tunnel excavation under river with shallow overburden using surface site investigation data and electrical resistivity tomography | |
Wang et al. | Dewatering of a 32.55 m deep foundation pit in MAMA under leakage risk conditions | |
Styles et al. | Microgravity as a tool for the detection, characterization and prediction of geohazard posed by abandoned mining cavities | |
Tuckwell et al. | The use of microgravity to detect small distributed voids and low-density ground | |
CN105386430A (zh) | 一种止水帷幕作用下止水帷幕两侧水位差的确定方法 | |
Wang et al. | Height measurement of the water-conducting fracture zone based on stress monitoring | |
CN108492030B (zh) | 一种估算深埋隧道掌子面爆发突涌灾害危险程度的方法 | |
CN106600437A (zh) | 一种现场采动底板断层活化程度综合预警与分析方法 | |
Zhang et al. | Detection and evaluation of crack development near the fault zone under the influence of coal mining | |
Zhang et al. | Review of tunnels and tunnelling under unfavourable geological conditions | |
Wu et al. | Response analysis of excavation of deep foundation pit in metro station of soft soil | |
Marchese et al. | A 3D numerical model for the evaluation of the tunneling water inflow: The Fortezza–Ponte Gardena case study |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Pang Zhenyong Inventor after: Gao Tao Inventor after: Song Xiaofeng Inventor after: Du Guoping Inventor after: Zhang Jie Inventor after: Zhang Ge Inventor after: Xi Shengqiang Inventor after: Zhao Huaxin Inventor after: Gao Fenghuai Inventor after: Tan Lihua Inventor after: Du Jiajia Inventor after: Wang Wei Inventor before: Pang Zhenyong Inventor before: Gao Bo Inventor before: Song Xiaofeng Inventor before: Du Guoping Inventor before: Zhang Jie Inventor before: Zhang Ge Inventor before: Xi Shengqiang Inventor before: Zhao Huaxin Inventor before: Gao Fenghuai Inventor before: Tan Lihua Inventor before: Du Jiajia Inventor before: Wang Wei |