CN205791244U - Overhead transmission line take-up device - Google Patents

Overhead transmission line take-up device Download PDF

Info

Publication number
CN205791244U
CN205791244U CN201620522221.XU CN201620522221U CN205791244U CN 205791244 U CN205791244 U CN 205791244U CN 201620522221 U CN201620522221 U CN 201620522221U CN 205791244 U CN205791244 U CN 205791244U
Authority
CN
China
Prior art keywords
interim
electric pole
tightener
arm
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620522221.XU
Other languages
Chinese (zh)
Inventor
王恒岐
王时强
王集锋
张德胜
刘继波
周广超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201620522221.XU priority Critical patent/CN205791244U/en
Application granted granted Critical
Publication of CN205791244U publication Critical patent/CN205791244U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

This utility model provides a kind of overhead transmission line take-up device, solves prior art installation duration, the technical problem that operation is complicated.This overhead transmission line take-up device, including the first earth anchor being positioned at around initial electric pole, the first interim tightener, gage turnbuckle, the first temporary guy, the leading block being positioned on the first cross-arm of initial electric pole, the second earth anchor being positioned at around target electric pole, the second interim tightener and the second temporary guy;First interim tightener and gage turnbuckle are connected with the first earth anchorage respectively, and one end of the first temporary guy is connected with the first interim tightener, and the other end of the first temporary guy is connected with the first cross-arm of initial electric pole;Second interim tightener one end is connected with the second earth anchorage, and one end of the second temporary guy is connected with the second interim tightener, and the other end of the second temporary guy is connected with the second cross-arm of target electric pole;This utility model used time is short, it is easy for installation to operate, cost-effective.

Description

Overhead transmission line take-up device
Technical field
This utility model belongs to field of electricity construction, is specifically related to overhead transmission line take-up device.
Background technology
The tension of conventional overhead circuit suffers from the drawback that
1, tightener is hung on terminal pole cross-arm, workmen operates on bar, with duration, it has not been convenient to;
2, both sides wire must be strained simultaneously, and otherwise cross-arm is owing to by force unbalance, cross-arm rotates, and causes cross-arm askew Tiltedly, cement electric pole head is impaired;
3, due to construction a drum unwrapping wire is typically used, after first wire is put into position, it is necessary to first cut off, treat second time After root wire is put into position, two limit wires are strained simultaneously, waste 15-20 rice and lead after thus causing first wire tensioning Line.
Utility model content
This utility model is in order to solve the problem in background technology, it is provided that a kind of overhead transmission line take-up device.
Technical solution of the present utility model is:
Overhead transmission line take-up device, it is characterised in that: include the first earth anchor 1, first being positioned at around initial electric pole 13 Interim tightener 2, gage turnbuckle the 3, first temporary guy 4, the guiding that is positioned on the first cross-arm 121 of initial electric pole 13 are sliding Wheel 5, the second interim tightener of earth anchor 6, second 7 and the second temporary guy 9 being positioned at around target electric pole 14;
Described first interim tightener 2 and gage turnbuckle 3 are fixing with the first earth anchor 1 respectively to be connected, described first interim One end of bracing wire 4 is connected with the first interim tightener 2, the of the other end of described first temporary guy 4 and initial electric pole 13 One cross-arm 121 connects;
Described second interim tightener 7 one end is fixing with the second earth anchor 6 to be connected, one end of described second temporary guy 9 and Second interim tightener 7 connects, and the other end of described second temporary guy 9 is connected with the second cross-arm 122 of target electric pole 14;
Being placed with wire 11 on described leading block 5, wire 11 one end is connected with gage turnbuckle 3, wire 11 other end It is fixed on the second cross-arm 122 of target electric pole 14 by suspension type strain clamp.
The other end of above-mentioned first temporary guy 4 removably connects with the first cross-arm 121 of initial electric pole 13;Described The other end of two temporary guys 9 removably connects with the second cross-arm 122 of target electric pole 14.
The utility model has the advantages that:
(1) gage turnbuckle is hung on the first earth anchor, when utilizing unwrapping wire, hang over leading on initial electric pole the first cross-arm To pulley, workmen under bar operating stringing, the used time is short, it is easy for installation to operate, and on bar, personnel only need to check sag, installs outstanding Formula strain clamp;
(2) before stringing, first fix the second of bracing wire and target electric pole fix bracing wire beat the first of initial electric pole Good, then beat temporary guy, thus can realize often putting stringing of a wire and complete.Save because two wires are the tightest There is the phenomenon of waste in line and first wire, cost-effective.
Accompanying drawing explanation
Fig. 1 is the use view of overhead transmission line take-up device.
Wherein: 1-the first earth anchor, the interim tightener of 2-first, 3-gage turnbuckle, 4-the first temporary guy, 5-guide sliding Wheel, 6-the second earth anchor, the interim tightener of 7-second, 8-UT wire clamp, 9-the second temporary guy, 101-first fix bracing wire, 102- Second fix bracing wire, 11-wire, 121-the first cross-arm, 122-the second cross-arm, 13-initiate electric pole, 14-target electric pole, 151-the first anchor ears, 152-the second anchor ear.
Detailed description of the invention
Overhead transmission line take-up device, including the first interim tightener 2 of earth anchor 1, first being positioned at around initial electric pole 13, Gage turnbuckle the 3, first temporary guy 4, the leading block 5 being positioned on initial electric pole 13 first cross-arm 121, be positioned at target electricity The the second interim tightener of earth anchor 6, second 7 and the second temporary guy 9 around line bar 14;
Described first interim tightener 2 and gage turnbuckle 3 are fixing with the first earth anchor 1 respectively to be connected, described first interim One end of bracing wire 4 is connected with the first interim tightener 2, the of the other end of described first temporary guy 4 and initial electric pole 13 One cross-arm 121 removably connects;
Described second interim tightener 7 one end the second earth anchor 6 is fixing to be connected, one end of described second temporary guy 9 and the Two interim tighteners 7 connect, and the other end of described second temporary guy 9 is detachable with the second cross-arm 122 of target electric pole 14 Connect;
Being placed with wire 11 on described leading block 5, wire 11 one end is connected with gage turnbuckle 3, wire 11 other end It is fixed on the second cross-arm 122 of target electric pole 14 by suspension type strain clamp.
Overhead transmission line tension method, comprises the following steps,
1] around initial electric pole 13, the first earth anchor 1 is fixed, by first interim one end of tightener 2, gage turnbuckle 3 One end, first one end fixing bracing wire 101 be each attached on the first earth anchor 1, fix the other end of bracing wire 101 by first and rise The first anchor ear 151 on beginning electric pole 13 connects, by the other end of the first interim tightener 2 by the first temporary guy 4 with First cross-arm 121 of initial electric pole 13 removably connects, and installs leading block on the first cross-arm 121 of initial electric pole 13 5;
2] around target electric pole 14, fix the second earth anchor 6, by second interim tightener 7 one end, second fix bracing wire 102 one end are each attached on the second earth anchor 6, fix bracing wire 102 other end and the second anchor ear on target electric pole 14 by second 152 connect, can by the second cross-arm 122 of the second temporary guy 9 with target electric pole 14 by second interim tightener 7 other end Dismounting connects;
3] being connected with gage turnbuckle 3 wire 11 one end, on bar, wire 11 is hung on leading block 5 by personnel, drags On second cross-arm 122 of wire 11 to target electric pole 14, with suspension type strain clamp, wire 11 is fixed target electric pole 14 On second cross-arm 122, under bar, workmen regulates sag by gage turnbuckle 3, and on bar, personnel check sag, at initial electric wire Suspension type strain clamp is installed on the first cross-arm 121 of bar 13, wire 11 is fixed on the first cross-arm 121 of initial electric pole 13 On.
4] the first temporary guy 4 is disassembled from the first cross-arm 121, by the second temporary guy 9 from the second cross-arm 122 On disassemble.
Concrete, first one end fixing bracing wire 101 is fixed on the first earth anchor 1 by UT wire clamp 8, and second fixes bracing wire One end of 102 is fixed on the second earth anchor 6 by UT wire clamp 8.

Claims (2)

1. overhead transmission line take-up device, it is characterised in that: include being positioned at initial electric pole (13) the first earth anchor (1) around, the One interim tightener (2), gage turnbuckle (3), the first temporary guy (4), it is positioned at the first cross-arm of initial electric pole (13) (121) leading block (5) on, be positioned at target electric pole (14) the second earth anchor (6) around, the second interim tightener (7) with And second temporary guy (9);
Described first interim tightener (2) and gage turnbuckle (3) are fixing with the first earth anchor (1) respectively to be connected, and described first faces Time bracing wire (4) one end be connected with the first interim tightener (2), the other end of described first temporary guy (4) and initial electric wire First cross-arm (121) of bar (13) connects;
Described second interim tightener (7) one end is fixing with the second earth anchor (6) to be connected, one end of described second temporary guy (9) It is connected with the second interim tightener (7), the other end of described second temporary guy (9) and the second cross-arm of target electric pole (14) (122) connect;
Being placed with wire (11) on described leading block (5), wire (11) one end is connected with gage turnbuckle (3), wire (11) The other end is fixed on second cross-arm (122) of target electric pole (14) by suspension type strain clamp.
Overhead transmission line take-up device the most according to claim 1, it is characterised in that: described first temporary guy (4) another One end removably connects with first cross-arm (121) of initial electric pole (13);The other end of described second temporary guy (9) and mesh Second cross-arm (122) of mark electric pole (14) removably connects.
CN201620522221.XU 2016-06-01 2016-06-01 Overhead transmission line take-up device Expired - Fee Related CN205791244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620522221.XU CN205791244U (en) 2016-06-01 2016-06-01 Overhead transmission line take-up device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620522221.XU CN205791244U (en) 2016-06-01 2016-06-01 Overhead transmission line take-up device

Publications (1)

Publication Number Publication Date
CN205791244U true CN205791244U (en) 2016-12-07

Family

ID=58137183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620522221.XU Expired - Fee Related CN205791244U (en) 2016-06-01 2016-06-01 Overhead transmission line take-up device

Country Status (1)

Country Link
CN (1) CN205791244U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896382A (en) * 2016-06-01 2016-08-24 国网山东省电力公司龙口市供电公司 Overhead line tension device and method
CN114825232A (en) * 2022-04-29 2022-07-29 国网山东省电力公司招远市供电公司 Emergent controlling means that ends dance of transmission line

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105896382A (en) * 2016-06-01 2016-08-24 国网山东省电力公司龙口市供电公司 Overhead line tension device and method
CN114825232A (en) * 2022-04-29 2022-07-29 国网山东省电力公司招远市供电公司 Emergent controlling means that ends dance of transmission line
CN114825232B (en) * 2022-04-29 2024-02-09 国网山东省电力公司招远市供电公司 Emergency anti-galloping control device for power transmission line

Similar Documents

Publication Publication Date Title
CN105896382A (en) Overhead line tension device and method
CN205791244U (en) Overhead transmission line take-up device
CN104533132B (en) A kind of windproof guy structure of 10kV electric poles circuit
CN204573525U (en) A kind of fastening-connecting device for fixed object on cylinder
CN105262003A (en) Wire tension method for high-voltage wire in power transmission circuit
CN104092144A (en) Insulator replacement tool
CN103618245B (en) Electrified strain opening operation method on distribution network
CN105507149A (en) Arrangement method for cable-hanging of single parallel steel strand wires
KR101314638B1 (en) Electric wire tension method using portable winch
CN202461363U (en) Disc steel bar straightening machine for building
CN109167302B (en) Wire end traction method for power transmission line fastening and hanging line construction
CN206928739U (en) A kind of electric power laying wire bar oblique pull thread tensioner
CN106586714A (en) Steel wire rope winding device
CN203747345U (en) Elastic inclined pulling line reinforcing device
CN203422397U (en) Lead wire joint fixing grounding tool for high voltage test
CN102611057A (en) Crossing mesh
CN106195579A (en) A kind of fastening method for object is fixed on cylinder and fastening-connecting device
CN104184096B (en) Automatic locking shockproof hammer
CN106329394A (en) Line-tightening apparatus used in electric power installation
CN204118374U (en) The earth lead point protection device in succession of earth connection
CN209562017U (en) A kind of snatch block group device
CN204575310U (en) Presstressed reinforcing steel porous anchor assembly static test pre-tightening apparatus
CN107190544A (en) The insertion method of steel wire rope
CN204538563U (en) A kind of conductor clamp boost motor
CN215115549U (en) Static load anchoring testing machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20190601

CF01 Termination of patent right due to non-payment of annual fee