CN205776411U - A kind of insulation safeguard structure of cold district side slope pipeline laying - Google Patents

A kind of insulation safeguard structure of cold district side slope pipeline laying Download PDF

Info

Publication number
CN205776411U
CN205776411U CN201620340947.1U CN201620340947U CN205776411U CN 205776411 U CN205776411 U CN 205776411U CN 201620340947 U CN201620340947 U CN 201620340947U CN 205776411 U CN205776411 U CN 205776411U
Authority
CN
China
Prior art keywords
side slope
pvc
water tank
safeguard structure
cold district
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620340947.1U
Other languages
Chinese (zh)
Inventor
刘佳祥
马晓成
胡谋鹏
陈文备
李金玲
刘思萌
陈雪见
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Bureau Co Ltd
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Bureau Co Ltd filed Critical China National Petroleum Corp
Priority to CN201620340947.1U priority Critical patent/CN205776411U/en
Application granted granted Critical
Publication of CN205776411U publication Critical patent/CN205776411U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses the insulation safeguard structure of a kind of cold district side slope pipeline laying, belong to oil and gas pipes laying technology field, cold district.Described insulation safeguard structure includes multiple closing PVC water tank being layed in and being sequentially distributed bottom excavation pipe trench and along pipe trench longitudinal length;PVC water tank is between the stone masonry bank protection that pipe trench both sides are laid.The insulation safeguard structure that this utility model provides; by laying PVC water tank bottom pipe trench; the 10% concentration sodium-chloride water solution stored in PVC water tank is utilized to intercept or alleviate the heat of oil and gas pipes; slow down oil and gas pipes heat and import in side slope frozen soil; maintain the original thermodynamic status of ever-frozen ground side slope, thus reach to protect the purpose of ever-frozen ground slope stability.

Description

A kind of insulation safeguard structure of cold district side slope pipeline laying
Technical field
This utility model relates to oil and gas pipes laying technology field, cold district, particularly to the oil and gas pipes horizontal wall inscription of a kind of Han Qu Or side slope insulation safeguard structure when laying along slope.
Background technology
Exploitation along with cold district petroleum resources so that the buried pipeline passing through Permafrost Area gets more and more, and it is the most normal The safety problem seen is geological disaster.Lattice draw oil pipeline, Sino-Russian gas pipeline Deng Shi China to build in Permafrost Area Oil and gas pipes engineering, ever-frozen ground along the line, mainly in large stretch of continuous distribution, uses buried-pipe laying mode, many places pipeline horizontal wall inscription completely Or be laid in ever-frozen ground side slope along slope.Since self-operating, the problem ratio such as earth surface of side slope frost heave, thaw collapse landslide is more prominent, Causing repeatedly " dew pipe ", " pipe thoroughly " accident, frozen soil side slope destroys serious, and this is by the oil and gas pipes work directly to Permafrost Area Journey brings more frozen soil engineering geological hazards.Lay oil and gas pipes in Permafrost Area, the most domestic there is no maturation Experience and technology.Pipeline horizontal wall inscription or suitable slope are laid on frozen soil side slope, can change side slope form, destroy the thermal balance of frozen soil side slope Condition, produces heat interference to ever-frozen ground, and this interference, by causing the heat flowing in frozen soil to increase, causes ever-frozen ground side slope Thawing and the upper limit decline, be the main cause causing the side slope of Frozen Ground Area to be destroyed.The foundation of new thermal equilibrium state Recovery with ever-frozen ground state of temperature needs the long period.When side slope segment pipe upstream and downstream stopping transportation is overhauled, pipe temperature is rapid So reduce, cause cold district side slope thermal balance to be destroyed.In the process, ever-frozen ground engineering geological condition will occur a series of Change, the complexity of actual ground frozen soil geological conditon, pipeline engineering will be caused to produce various disease after being completed. In order to be controlled by the slide slope disease of Permafrost Area within the scope of operation of engineering projects allows, home and abroad is to Permafrost Area Subgrade engineering be substantially and use built on stilts or buried system of laying, wherein make somebody a mere figurehead system of laying and be mainly used in high ice content ground Section, buried-pipe laying mode is mainly used in low ice content location.Hot pin is generally inserted in the steel-pipe pile of built on stilts system of laying, individual Other buried-pipe laying location also uses hot pin or refrigeration machine, is used for reducing ever-frozen ground temperature, keeps the steady of side slope ever-frozen ground Fixed.Although these measures serve certain effect to solving Permafrost Area slide slope disease, but insert in steel-pipe pile Hot pin, the high cost of its engineering, it is generally only and just uses in special side slope, be unsuitable for universal side slope and use;And freeze at some In soil side slope, oil and gas pipes operation temperature is higher, and frozen soil side slope keeps the effect freezed not ideal enough, and increases engineering This, especially under the main trend that global environment gradual warms up, life-time service can face the biggest challenge.Therefore, how to prevent many The geological hazards that oil and gas pipes brings is laid in year tundra, remains an insoluble global problem so far.
Utility model content
In order to solve the geological disaster brought when existing ever-frozen ground side slope oil and gas pipes lays, and engineering cost is high, The problems such as general applicability difference, this utility model provides the insulation safeguard structure of a kind of cold district side slope pipeline laying, including many Individual being layed in excavates the closing PVC water tank being sequentially distributed bottom pipe trench and along described pipe trench longitudinal length;Described PVC water tank Between the stone masonry bank protection that described pipe trench both sides are laid.
Described PVC water tank includes PVC casing and PVC cover plate;Multiple equally spaced laterally add it is provided with in described PVC casing Strong rib and longitudinal reinforced rib;Described PVC cover plate is arranged on described PVC casing, horizontal ribs and longitudinal reinforced rib, and with Described PVC box sealing;The side of described PVC casing is provided with water injection pipe, and described water injection pipe elevates above the soil and connects valve.
The inner surface of described PVC casing is provided with application of anti-leakage layers, and the outer surface of described PVC casing is provided with anticorrosive coat.
It is provided with electrode type water level sensor in described PVC casing.
When the gradient of cold district side slope is 5~30 °, multiple PVC water tanks are layed at the bottom of excavation pipe trench along side slope is stepped Portion, and adjacent PVC water tank dislocation overlap.
The insulation safeguard structure of the cold district side slope pipeline laying that this utility model provides, by laying PVC bottom pipe trench Water tank, utilizes the sodium-chloride water solution in PVC water tank to intercept or alleviates pipeline heat and be transferred to frozen soil side slope, it is achieved to frozen soil The thermal balance regulation of side slope, prevents the thaw collapse of frozen soil side slope, eliminates the disease bringing cold district frozen soil.This utility model provides The insulation safeguard structure of cold district's side slope pipeline laying, has the advantages such as simple in construction, construction cost are low, it is possible to suppression is frozen effectively The diseases such as the thaw collapse formula landslide of soil side slope, lay oil and gas pipes all have higher warp to horizontal wall inscriptions in ever-frozen ground side slope or suitable slope Ji meaning.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the insulation safeguard structure of horizontal wall inscription pipeline laying on the present embodiment frozen soil side slope;
Fig. 2 is the schematic diagram of the insulation safeguard structure on the present embodiment frozen soil side slope along slope pipeline laying;
Fig. 3 is the close-up schematic view of insulation safeguard structure shown in Fig. 1;
Fig. 4 is the sectional view of PVC water tank in the present embodiment insulation safeguard structure;
Fig. 5 is the PVC box house planar structure schematic diagram of PVC water tank shown in Fig. 4;
Fig. 6 is the present embodiment insulation safeguard structure schematic diagram of suitable slope pipe trench buried depth in 30 ° of side slopes.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, technical solutions of the utility model are further described.
Seeing Fig. 1 to Fig. 3, this utility model embodiment provides the insulation protection knot of a kind of cold district side slope pipeline laying Structure, including multiple closing PVC water tanks 3 being layed in and being sequentially distributed bottom excavation pipe trench and along pipe trench longitudinal length;PVC water Case 3 is between the stone masonry bank protection 2 that pipe trench both sides are laid, and the top of PVC water tank 3 and bottom are all equipped with gravelly soil 5.Its In, PVC water tank 3 includes PVC casing 7 and PVC cover plate 8, as shown in Figures 3 to 5;It is provided with multiple equally spaced in PVC casing 7 Laterally ribs 10 and longitudinal reinforced rib 12, so that PVC water tank 3 strength and stiffness during bearing load bottom pipe trench;PVC covers Plate 8 is arranged on PVC casing 7, horizontal ribs 10 and longitudinal reinforced rib 12, and seals with PVC casing 7;PVC casing 7 Side is provided with water injection pipe 6.Fig. 1 shows the schematic diagram of the insulation safeguard structure that on frozen soil side slope 1, pipeline 4 horizontal wall inscription lays;Its In, PVC water tank is laid on bottom the pipe trench on frozen soil side slope 1, and stone masonry bank protection has been laid in pipe trench both sides, and PVC water tank is positioned at two Between the stone masonry bank protection of side.
In work progress, 200cm thickness gravelly soil is laid at the top of PVC water tank, and it is thick that 200cm is laid in the bottom of PVC water tank Gravelly soil, utilizes the gap space between gravelly soil at random, it is possible to reach the effect of insulation.The interior outage degree of PVC water tank can Being designed as 0.2~0.4m, PVC water tank excavates pipe trench longitudinal length in side slope and lays, and usual selectable lengths is 8~15m to be One group.The distance from bottom frozen soil side slope upper limit at least 0.2m of each PVC water tank, PVC water tank is along the length of excavation pipe trench transverse section The pipe trench width of height and position residing for water tank.As shown in Figure 4, in each PVC water tank, splendid attire accounts for water tank capacity 90%-95%'s The sodium-chloride water solution 14 of 10% concentration;The expansion rate that sodium-chloride water solution congeals into ice is about 5%, swollen when making water-setting build-up ice Swollen volume is approximately less than the volume of water tank, it is to avoid cause the damage to water tank because water-setting build-ups ice.Sodium chloride in PVC water tank Aqueous solution can regulate the thermal balance in frozen soil side slope, intercepts or alleviates heat and transmit to frozen soil, prevents the thaw collapse of frozen soil side slope, Eliminate the disease that cold district frozen soil is brought.The inner surface of PVC casing 7 is provided with application of anti-leakage layers 11, is used for preventing sodium-chloride water solution Seepage;The outer surface of PVC casing 7 is provided with anticorrosive coat 9, for slowing down the soil corrosion to PVC casing 7.At PVC casing 7 Inside it is provided with electrode type water level sensor 13, as shown in Figure 4 and Figure 5;Electrode type water level sensor 13 is used for detecting sodium chloride water The liquid level of solution.Water injection pipe 6 elevates above the soil after passing gravelly soil 5 and stone masonry bank protection 2, and connection has valve (not shown).PVC Sodium-chloride water solution in casing can freezing repeatedly, melt cyclic process formed loss, cause sodium-chloride water solution to reduce;When When sodium-chloride water solution reduces, in PVC casing, supplement sodium-chloride water solution by water injection pipe 6, so that having in PVC casing enough Sodium-chloride water solution regulate thermal balance.In mild frozen soil side slope 1, multiple PVC water tanks are long along the longitudinal direction of pipe trench successively Degree direction arranged, two adjacent PVC water tank joints can arrange shrinkage joint with gravelly soil.
Fig. 6 shows the present embodiment insulation safeguard structure showing along slope pipe trench buried depth on the frozen soil side slope 1 that the gradient is 30 ° It is intended to.Wherein, multiple PVC water tanks 3 are layed in bottom excavation pipe trench along side slope is stepped, and adjacent PVC water tank dislocation Overlapping.In figure 6, the adjacent distance between two PVC water tanks is 100cm, between two adjacent PVC water tank dislocation overlaps Height gap fill gravelly soil 5.Under normal circumstances, when the gradient of frozen soil side slope is 5~30 °, in order to prevent adjacent PVC water The destruction that case causes because being moved by vertical direction sliding force, needs to arrange stone masonry bank protection 2 between PVC water tank, such as may be used One stone masonry bank protection is set every 15m, to prevent the position of before and after's PVC water tank from moving.
The insulation safeguard structure of the cold district side slope pipeline laying of this utility model embodiment, by being laid on bottom pipe trench PVC water tank, carries out heat partition by the Upper Limit of Permafrost of side slope and pipeline, and making pipeline operation dispel the heat need to be through PVC water tank ability Transmission downwards.In the PVC water tank of this utility model embodiment the sodium-chloride water solution of 10% concentration have bigger thermal capacitance and- In the case of 15 DEG C covert during absorb heat, the feature of heat release, in the winter time, the chlorine during the heat of pipeline enters PVC water tank during operation Changing sodium water solution, sodium-chloride water solution in a disguised form absorbs heat, thus prevents amount of heat to be transferred to frozen soil, it is to avoid side slope original heat Poised state is destroyed, and effectively prevent frozen soil side slope and overall thaw collapse formula landslide occurs;At warm season, extraneous and pipeline heat enters Entering PVC water tank, the ice heat absorption in PVC water tank is gradually melted, and absorbs amount of heat and makes side slope frozen soil slowly melt, is effectively prevented The thaw collapse landslide that side slope frozen soil causes because of rapid, high volume heat absorption is destroyed.This utility model embodiment store aqueous sodium chloride The PVC water tank of liquid constitutes the thermally equilibrated structure sheaf of regulation in roadbed, it is possible to absorbs heat in the phase transition process of heat exchange and puts Heat, reaches storage and the transduction of energy, can effectively suppress Permafrost Area side slope to cause because laying oil and gas pipes The disease such as thaw collapse formula landslide.
The insulation safeguard structure of the cold district side slope pipeline laying that this utility model embodiment provides, by being laid at the bottom of pipe trench Sodium-chloride water solution in the PVC water tank in portion regulates the thermal balance of permafrost region side slope, its building cost as heat exchange medium It is below using the cost of hot pin technology with use cost, and the effect suppressing thaw collapse formula to come down is better than existing frozen soil side slope Any measure taked, simple in construction, the oil and gas pipes horizontal wall inscription being particularly well-suited to Han Qu area or the frozen soil limit laid along slope Slope, has universal Practical significance.
Particular embodiments described above, has carried out entering one to the purpose of this utility model, technical scheme and beneficial effect Step describes in detail, be it should be understood that and the foregoing is only specific embodiment of the utility model, is not limited to this Utility model, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. done, all should wrap Within being contained in protection domain of the present utility model.

Claims (5)

1. the insulation safeguard structure of Zhong Han district side slope pipeline laying, it is characterised in that include multiple being layed at the bottom of excavation pipe trench Portion and the closing PVC water tank being sequentially distributed along described pipe trench longitudinal length;Described PVC water tank is positioned at described pipe trench both sides paving If stone masonry bank protection between.
2. the insulation safeguard structure of cold district's side slope pipeline laying as claimed in claim 1, it is characterised in that described PVC water tank Including PVC casing and PVC cover plate;Multiple equally spaced horizontal ribs and longitudinal reinforced rib it is provided with in described PVC casing;Institute State PVC cover plate to be arranged on described PVC casing, horizontal ribs and longitudinal reinforced rib, and with described PVC box sealing;Institute The side stating PVC casing is provided with water injection pipe, and described water injection pipe elevates above the soil and connects valve.
3. the insulation safeguard structure of cold district's side slope pipeline laying as claimed in claim 2, it is characterised in that described PVC casing Inner surface be provided with application of anti-leakage layers, the outer surface of described PVC casing is provided with anticorrosive coat.
4. the insulation safeguard structure of cold district's side slope pipeline laying as claimed in claim 2, it is characterised in that described PVC casing Inside it is provided with electrode type water level sensor.
5. the insulation safeguard structure of cold district's side slope pipeline laying as claimed in claim 1, it is characterised in that when cold district side slope When the gradient is 5~30 °, multiple PVC water tanks are layed in bottom excavation pipe trench along side slope is stepped, and adjacent PVC water tank Dislocation overlap.
CN201620340947.1U 2016-04-21 2016-04-21 A kind of insulation safeguard structure of cold district side slope pipeline laying Active CN205776411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620340947.1U CN205776411U (en) 2016-04-21 2016-04-21 A kind of insulation safeguard structure of cold district side slope pipeline laying

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620340947.1U CN205776411U (en) 2016-04-21 2016-04-21 A kind of insulation safeguard structure of cold district side slope pipeline laying

Publications (1)

Publication Number Publication Date
CN205776411U true CN205776411U (en) 2016-12-07

Family

ID=57411976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620340947.1U Active CN205776411U (en) 2016-04-21 2016-04-21 A kind of insulation safeguard structure of cold district side slope pipeline laying

Country Status (1)

Country Link
CN (1) CN205776411U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004911A (en) * 2019-03-29 2019-07-12 中国科学院寒区旱区环境与工程研究所 Protect the cold mattress system and its construction method of embedded object in a kind of Permafrost Area
CN110714474A (en) * 2019-10-24 2020-01-21 广西大学 Pile foundation structure and method for quick refreezing and automatic refrigerating by using same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004911A (en) * 2019-03-29 2019-07-12 中国科学院寒区旱区环境与工程研究所 Protect the cold mattress system and its construction method of embedded object in a kind of Permafrost Area
CN110004911B (en) * 2019-03-29 2024-02-13 中国科学院西北生态环境资源研究院 Cold pad system for protecting buried object in permafrost region and construction method thereof
CN110714474A (en) * 2019-10-24 2020-01-21 广西大学 Pile foundation structure and method for quick refreezing and automatic refrigerating by using same

Similar Documents

Publication Publication Date Title
JP2021534337A (en) Freezing method and freezing system for connecting passages
CN103147453B (en) Permafrost tunnel face-upward slope and cut slope cut drainage system and construction method thereof
CN108316952A (en) Extremely frigid zones tunnel insulation waterproof and water drainage system
CN102322276A (en) Tunneling engineering freeze-proofing structure in seasonally frozen ground region
CN108952806B (en) Tunnel drainage anti-freezing integrated system in severe cold region
CN102678174A (en) Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof
CN103205932A (en) Pile-type anti-freezing system for bridge
CA2502173C (en) Method of preventing frost heave stress concentrations in chilled buried pipelines
CN102733405A (en) Method for reducing temperature of frozen earth and preventing water catchment in pit for permafrost region
CN101289830A (en) Duct-ventilated embankment with chimney
CN205776411U (en) A kind of insulation safeguard structure of cold district side slope pipeline laying
CN202690131U (en) Tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas
CN111501659A (en) Anti-freezing structure of reservoir dam in cold region and construction method thereof
CN203082445U (en) Device for preventing thawing and sinking of buried pipe body in frozen soil area by hot rod support frame
US9593868B2 (en) Horizontal ground-coupled heat exchanger for geothermal systems
CN205557219U (en) Full wall ventilation formula frozen soil ventilation embankment structure
Plotnikov Stabilizing the temperature regime of a frozen foundation bed using thermal insulation and cooling mechanisms
CN205557218U (en) Full wall ventilation formula frozen soil ventilation embankment structure of convection current regulation and control
CN202250107U (en) Tunneling anti-freezing structure in seasonally frozen ground district
CN201232149Y (en) Traffic road bed structure for cold area
CN106089263A (en) Tunnel based on phase-changing and temperature-regulating gunite concrete anti-freezing and heat-insulating structure and construction method
CN203657582U (en) PHC tubular pile phase-change energy storage system
CN105863685A (en) Phase change temperature-adjusting plate based anti-freezing thermal-insulation structure for tunnel and construction method of phase change temperature-adjusting plate based anti-freezing thermal-insulation structure for tunnel
CN114032938B (en) Deep foundation pit horizontal freezing back cover construction method
CN206174966U (en) Diversion tunnel's freeze proof bloated structure of heat preservation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant