CN205776355U - There is the underground transfer passage of line holder - Google Patents

There is the underground transfer passage of line holder Download PDF

Info

Publication number
CN205776355U
CN205776355U CN201620666995.XU CN201620666995U CN205776355U CN 205776355 U CN205776355 U CN 205776355U CN 201620666995 U CN201620666995 U CN 201620666995U CN 205776355 U CN205776355 U CN 205776355U
Authority
CN
China
Prior art keywords
trailing arm
upright post
bracket upright
fixing hole
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620666995.XU
Other languages
Chinese (zh)
Inventor
唐振
冯先德
许名志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongye Changtian International Engineering Co Ltd
Original Assignee
Zhongye Changtian International Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongye Changtian International Engineering Co Ltd filed Critical Zhongye Changtian International Engineering Co Ltd
Priority to CN201620666995.XU priority Critical patent/CN205776355U/en
Application granted granted Critical
Publication of CN205776355U publication Critical patent/CN205776355U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of underground transfer passage with line holder, it is characterized in that: passage is double chamber structures or many chamber structures, passage includes underground haulage vestibule (1), urban operating mechanism pipe gallery (2), conduit wall (3) and compartment wall (4), it is provided with line holder (M) in underground haulage vestibule (1) and urban operating mechanism pipe gallery (2), line holder (M) includes bracket upright post (M1), pipeline trailing arm (M2), resin anchor (M3), bracket upright post (M1) is fixed on underground haulage vestibule (1) and urban operating mechanism pipe gallery (2) inwall by resin anchor (M3), pipeline trailing arm (M2) is arranged in bracket upright post (M1).Underground of the present utility model transfer passage investment is little, low cost, underground space utilization rate high and avoids the problem that soil excavates repeatedly.Underground transfer passage be provided with a kind of easy for installation, do not affect construction, and anticorrosive, floor height adjustable piping lane support.

Description

There is the underground transfer passage of line holder
Technical field
This utility model relates to city underground engineering field, is specifically related to the underground transfer passage of a kind of cut and cover tunneling, A kind of underground transfer passage and line holder device.
Background technology
Along with the continuous expansion in city, the scope in urban district has been incorporated in a lot of industrial undertakings being originally not belonging to urban district. Industrial undertaking builds special transport channel in order to Ore or other raw-material transports generally require, and traditional solution is Enterprise oneself builds transport channel, but when built environment becomes urban district, a series of new problems thus produce.
1) tradition is positioned at transport channel on the ground, and often outward appearance does not meets the requirement that the city outward appearance in urban district is planned;
2) for meeting the requirement of city outward appearance planning, transport channel is gone underground, the most often brings the big of early investment The big problem increased, business burden is overweight.And underground transfer passage is built in urban district, conventional method is cut and cover method, this Method, when implementing, often relates to the removal of more resident, expropriation of land and the excavation to existing road.Industry is looked forward to For industry, the co-ordination amount of this respect is also greatly increased.Meanwhile, other municipal pipeline in urban district, as electric power, telecommunications, Tap waters etc. are also required to excavate road when laying, and so can cause the feelings repeating to excavate, repeat to affect road traffic Condition, easily causes social security problem to increase, and improves the cost maintained public order.
3) underground haulage vestibule is according to the demand keeped in repair and the demand of fire-fighting, often leaves larger space, and this part is empty Between be not effectively utilized.
Generally, the underground haulage vestibule of industrial undertaking is executed respectively with the pipe gallery as urban operating mechanism Work, it is big to there is excavated volume in existing form of construction work, and soil repeats excavation, affects the problems such as traffic.Invest into for alleviating industrial undertaking This, the most effectively utilize the space of underground haulage vestibule, reduce the engineering construction excavation repeatedly to soil simultaneously, need wearing The industrial undertaking's underground haulage vestibule crossing urban district is integrated with urban operating mechanism pipe gallery and optimizes.
Meanwhile, pipe gallery is exactly the comprehensive corridor of underground urban duct.I.e. build a tunnel space at Urban Underground, will Electric power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one.The pipeline that pipe gallery accommodates is of a great variety, Arranging intensive, in order to meet unified planning, Uniting, the unified needs built and manage, pipeline typically uses classification, layering Lay.Therefore support of pipelines design, construction are ingredients important during pipe gallery is built.
Existing pipe gallery line holder is installed typically two types: 1) use expansion bolt to fix 2 at piping lane inwall) In concrete, pre-embedded steel slab (shaped steel) is fixed.
Existing support of pipelines has the disadvantage that
1) expansion bolt is used to fix
Expansion bolt easily causes stress to concentrate, and destroys xoncrete structure, affects the water resistance of underground pipe gallery, easily draw Play seepage.And expansion bolt is typically made up of sleeve pipe, nut slider and bolt, between component, gap is big, easily corrodes.
2) pre-embedded steel slab (shaped steel) is fixed
Pre-embedded steel slab adds the difficulty of template pouring construction.Pre-embedded steel slab is susceptible to skew, finally lays to pipeline Bring inconvenience.And pre-embedded steel slab arranges dumb, once construct and can not change.
Both the above support of pipelines scheme, each layer horizontal pipe trailing arm, bracket floor height can not regulate, and arrange dumb.
Utility model content
The purpose of this utility model is to provide the underpass of the city underground engineering of a kind of efficient utilization, to solve mesh The investment of front industrial undertaking underground haulage vestibule is big, cost is high, and soil low to business burden weight, underground space utilization rate repeatedly The problem of excavation.
Another purpose of this utility model offer one is easy for installation, do not affect construction, and anticorrosive, the adjustable pipe of floor height Corridor support.Solve the deficiencies in the prior art, reduce piping lane destroying concrete structure.
According to embodiment of the present utility model, it is provided that a kind of underground transfer passage:
Having a kind of underground transfer passage of line holder, passage is (side by side) double chamber structure or three chamber structures.Passage Including underground haulage vestibule, urban operating mechanism pipe gallery, conduit wall and compartment wall.Underground haulage vestibule and urban operating mechanism integrated pipe Sidewall in corridor is provided with line holder.Line holder includes bracket upright post, multiple pipeline trailing arm, multiple resin anchor.Support Column is fixed on underground haulage vestibule and the respective inwall of urban operating mechanism pipe gallery by resin anchor.Pipeline trailing arm is arranged In bracket upright post.
In this utility model, bracket upright post is provided with 1-50 column fixing hole, preferably 2-30 column fixing hole, more It is preferably 3-20 column fixing hole, the most preferably 4-10 column fixing hole.Resin anchor passes column fixing hole Bracket upright post is fixed on underground haulage vestibule and urban operating mechanism pipe gallery inwall.
In this utility model, bracket upright post is provided with 2-100 trailing arm fixing hole, preferably 5-80 trailing arm fixing hole, More preferably 10-50 trailing arm fixing hole.Pipeline trailing arm is connected with bracket upright post by trailing arm fixing hole.
In this utility model, in bracket upright post, the distance between adjacent trailing arm fixing hole is 20-500mm, preferably 30- 300mm, more preferably 50-200mm.
As preferably, one end that pipeline trailing arm is connected with bracket upright post is provided with trailing arm installed part.Trailing arm installed part connecting tube Line trailing arm and bracket upright post.
As preferably, trailing arm installed part is angle steel.Trailing arm installed part and pipeline trailing arm are by being welded to connect.Trailing arm installed part It is connected by trailing arm bolt with the trailing arm fixing hole of bracket upright post.
As preferably, the cross section of described bracket upright post is " L " type.Bracket upright post has two limits, and a limit is provided with Trailing arm fixing hole, another limit arranges column fixing hole.
As preferably, the cross section of described bracket upright post is " Jiong " type.Bracket upright post has three limits, and middle limit sets It is equipped with column fixing hole, the limit of both sides is provided with trailing arm fixing hole.
In this utility model, in underground haulage vestibule, it is provided with feed pipe, and feed pipe is placed on the pipe of line holder On line trailing arm.
In this utility model, in urban operating mechanism pipe gallery, it is provided with telecommunication line and/or power pipeline, and telecommunications pipe Line and/or power pipeline are placed on the pipeline trailing arm of line holder.It addition, be additionally provided with sealing-tape machine in underground haulage vestibule.Ground The width of lower transport vestibule is 4-8 rice.It is sufficient for tool car the most current.When being simultaneously provided with electricity in urban operating mechanism pipe gallery When fuse tube line and power pipeline, both pipelines are arranged in the pipeline trailing arm of the different lateral in urban operating mechanism pipe gallery On.
In this utility model, the top of underground haulage vestibule is provided with telecommunication line.
In this utility model, in urban operating mechanism pipe gallery, it is provided with soil pipe.
In this utility model, in urban operating mechanism pipe gallery, it is provided with access path.
In this utility model, a kind of underground transfer passage, passage is double chamber structure or three chamber structures.Passage includes underground Transport vestibule, urban operating mechanism pipe gallery, conduit wall and compartment wall.
In this utility model, in underground haulage vestibule, it is provided with feed pipe.It addition, be additionally provided with adhesive tape in underground haulage vestibule Machine.The width of underground haulage vestibule is 4-8 rice.It is sufficient for tool car the most current.
In this utility model, feed pipe is arranged on the compartment wall of underground haulage vestibule.
In this utility model, being provided with telecommunication line in underground haulage vestibule, telecommunication line is preferably disposed to underground haulage and leads to Corridor inner top.
In this utility model, in urban operating mechanism pipe gallery, it is provided with soil pipe.
In this utility model, in urban operating mechanism pipe gallery, it is provided with power pipeline.
In this utility model, in urban operating mechanism pipe gallery, it is provided with access path.
Industrial undertaking's underground haulage vestibule is integrated, to the underground space by this utility model with urban operating mechanism pipe gallery Redistribute and utilize:
1) industrial undertaking's underground haulage vestibule is combined with urban operating mechanism pipe gallery so that it is by two independent knots Structure becomes overall double chamber structures or many chamber structures.In this utility model, underground transfer passage can be double storehouses knots Structure, three chamber structures or many chamber structures.Double chamber structures refer to that underground transfer passage has two storehouses, and usually, two storehouses are the most also Row is arranged.As required, two storehouses of double chamber structures can also be arranged by vertical setting of types.
2) feed pipe of urban operating mechanism pipe gallery is merged with the feed pipe of underground haulage vestibule, be arranged in underground Point storehouse of transport vestibule.
3) arrange telecommunication line in underground haulage vestibule, preferably crane span structure is set at lower transport vestibule inner top, arranges telecommunications Pipeline.
4) telecommunication line and the distribution of power pipeline in municipal administration complex piping lane are adjusted.Former urban operating mechanism pipe gallery Feed pipe position arranges electric power crane span structure, arranges power pipeline.Former municipal administration complex piping lane internal power pipeline position, can basis Need to arrange power pipeline or telecommunication line.
In this utility model, underground transfer passage can be double chamber structure, three chamber structures or many chamber structures.Double chamber structures Referring to that underground transfer passage has two storehouses, usually, two storehouses are for arrange laterally side by side.As required, two of double chamber structures Storehouse can also be arranged by vertical setting of types.
In this utility model, a kind of pipe gallery line holder, line holder includes bracket upright post, pipeline trailing arm, tree Fat anchor pole.Bracket upright post is fixed on underground haulage vestibule and urban operating mechanism pipe gallery inwall (or passage) by resin anchor On.Pipeline trailing arm is arranged in bracket upright post.
In this utility model, bracket upright post is provided with column fixing hole.Resin anchor will an erection through column fixing hole Post is fixed on underground haulage vestibule and urban operating mechanism pipe gallery inwall (or passage).
As preferably, bracket upright post is provided with 1-50 column fixing hole, preferably 2-30 column fixing hole, is more preferably 3-20 column fixing hole, the most preferably 4-10 column fixing hole.
In this utility model, bracket upright post is provided with trailing arm fixing hole.Pipeline trailing arm is by trailing arm fixing hole and an erection Post connects.
As preferably, bracket upright post is provided with 2-100 trailing arm fixing hole, and preferably 5-80 trailing arm fixing hole is more excellent Elect 10-50 trailing arm fixing hole as.
As preferably, in bracket upright post, the distance between adjacent trailing arm fixing hole is 20-500mm, preferably 30-300mm, more It is preferably 50-200mm.
In this utility model, one end that pipeline trailing arm is connected with bracket upright post is provided with trailing arm installed part.Trailing arm installed part Connect pipeline trailing arm and bracket upright post.
As preferably, trailing arm installed part is angle steel.Trailing arm installed part and pipeline trailing arm are by being welded to connect.Trailing arm installed part It is connected by trailing arm bolt with the trailing arm fixing hole of bracket upright post.
As preferably, described bracket upright post is " L " type.Bracket upright post has two limits, and a limit is provided with trailing arm and fixes Hole, another limit arranges column fixing hole.
As preferably, described bracket upright post is " Jiong " type.Bracket upright post has three limits, and middle limit is provided with column Fixing hole, the limit of both sides is provided with trailing arm fixing hole.
In this utility model, resin anchor is used to replace existing expansion bolt.Resin anchor employing resin anchoring agent is Anchoring medium, has the advantage that a) carrying is fast, and anchor force is big;B) easy for installation, improve speed of application;C) anchor force can Leaning on, endurance is good.Resin anchoring agent at building strengthening, highway repairing, constructing tunnel, basis are taken root, equipment Foundations and The fields such as member anchoring are all widely used.The resin anchoring agent that this utility model uses can effectively ruggedized construction be holed to pipe Corridor structural damage, waterproof effect is excellent, effectively keeps away and solves owing to support installs the subsoil water seepage caused, bolt corrosion etc. Problem.
In this utility model, adjustable support column is set.The line holder later stage installs, and does not affect piping lane construction, peace Can carry out by multistage during dress simultaneously, be greatly accelerated installation progress.The arranging of adjustable support column improve greatly each layer trailing arm, The motility of bracket arrangement and the suitability.Each layer trailing arm, bracket are fixed in bracket upright post, are employed to bolt compared to every layer It is fixed on the existing way of piping lane inwall, greatly reduces the quantity in inwall perforate, farthest decrease and piping lane is tied The destruction of structure.
In this utility model, pipeline trailing arm can being arranged in bracket upright post of level, it is also possible to be slightly tilted sets Put in bracket upright post.General pipeline trailing arm is vertically arranged with bracket upright post.As required, pipeline trailing arm can be with an erection Post is angled, generally 10-90 °, preferably 30-85 °, more preferably 45-80 °.
In this utility model, resin anchor embedment underground haulage vestibule and urban operating mechanism pipe gallery inwall (or passage Wall) if length reach can fixed pipelines support, and enable line holder bear install spool weight.One As, resin anchor embedment underground haulage vestibule and a length of 10-of urban operating mechanism pipe gallery inwall (or conduit wall) 400mm, preferably 20-300mm, more preferably 30-200mm.
In this utility model, bracket upright post can arrange multiple column fixing hole so that line holder is transported in underground On defeated vestibule and urban operating mechanism pipe gallery inwall (or conduit wall) more firm.The number of bracket upright post upper pillar stand fixing hole is not Restricted, set according to actual needs.
In this utility model, the trailing arm fixing hole in bracket upright post is unrestricted, sets according to actual needs.General root Trailing arm is determined according to the thickness (the namely diameter of pipeline or size) of pipeline, the size in space, the factor such as quantity of installing pipeline The quantity of fixing hole.Distance between adjacent trailing arm fixing hole is the most unrestricted, sets according to actual needs.It is typically based on pipeline Thickness (the namely diameter of pipeline or size), the size in space, the factor such as quantity of installing pipeline determine trailing arm fixing hole Quantity.
In this utility model, trailing arm installed part is for movable being fixed in bracket upright post by pipeline trailing arm.Permissible Adjust the distance between adjacent trailing arm fixing hole as required.Make the more motility of whole device.
In this utility model, the shape of bracket upright post is unrestricted, as long as underground haulage vestibule and city can be fixed on Political affairs facility pipe gallery inwall (or conduit wall) are upper and can connect pipeline trailing arm.Preferably scheme is: bracket upright post For " L " type or " Jiong " type.
Compared with prior art, this utility model has a following Advantageous Effects:
1) excavated volume is reduced.After integration, during construction, the section of excavation is as it is shown on figure 3, the engineering that relates to this utility model As a example by, excavated volume decreases 33.7%.Estimating in the utilization of other similar projects, excavated volume can reduce 20%~40%.
2) concrete amount is reduced.As a example by the engineering that this utility model relates to, concrete amount decreases 13.6%.In advance Meter is in the utilization of other similar projects, and concrete amount can reduce 10%~20%.
3) improve the utilization rate of the underground space.As a example by the engineering that this utility model relates to, power pipeline carrying capacity Adding 40%, telecommunication line capacity adds 140%.
5) in urban operating mechanism pipe gallery, it is provided with access path.Underground haulage vestibule arranges the glue of industrial undertaking's transport The things such as band machine, and leave the passage of tool car, it is simple to maintenance.
6) resin anchor is used to replace existing expansion bolt: resin anchor uses resin anchoring agent to be anchoring medium, has The advantage that carrying is fast, anchor force is big, easy for installation, endurance is good.The resin anchoring agent that this utility model uses can effectively be reinforced The structure boring destruction to Pipe rack, waterproof effect is excellent, effectively keeps away to solve and installs, due to support, the subsoil water caused and ooze Leakage, the problem such as bolt corrosion.
7) adjustable support column is set: arranging of adjustable support column improves each layer trailing arm, bracket arrangement greatly Motility and the suitability.The most each layer trailing arm, bracket are fixed in bracket upright post, are employed to bolt compared to every layer and fix In the existing way of piping lane inwall, greatly reduce the quantity in inwall perforate, farthest decrease Pipe rack Destroy.
8) the line holder later stage installs, and does not affect piping lane construction, can carry out by multistage simultaneously, be greatly accelerated installation during installation Progress.
Accompanying drawing explanation
Fig. 1 is this utility model underground transfer passage structure chart;
Fig. 2 is this utility model layout structure schematic diagram;
Fig. 3 be this utility model underground transfer passage be the structure chart in three storehouses.
Fig. 4 is that this utility model line holder arranges schematic diagram;
Fig. 5 is this utility model line holder connection diagram;
Fig. 6 is that this utility model pipeline corridor support connects schematic top plan view;
Fig. 7 is this utility model pipeline trailing arm schematic diagram;
Fig. 8 is " L " type bracket upright post schematic diagram of this utility model pipeline corridor support;
Fig. 9 is that " Jiong " type bracket upright post both sides of this utility model line holder arrange trailing arm fixing hole schematic diagram;
Figure 10 is that " Jiong " type bracket upright post of this utility model line holder is while arranging trailing arm fixing hole schematic diagram;
The sectional schematic diagram of excavation when Figure 11 is this utility model construction;
Reference: 1: underground haulage vestibule;2: urban operating mechanism pipe gallery;3: conduit wall;4: compartment wall;5: feedwater Pipe;6: telecommunication line;7: soil pipe;8: power pipeline;9: access path;M: line holder;M1: bracket upright post;M2: pipeline torr Arm;M3: resin anchor;M101: column fixing hole;M102: trailing arm fixing hole;M201: trailing arm installed part;M202: trailing arm bolt. 10: sealing-tape machine;11: tool car.
Detailed description of the invention
According to embodiment of the present utility model, it is provided that a kind of underground transfer passage:
Having a kind of underground transfer passage of line holder, passage is double chamber structure or three chamber structures.Passage includes underground Transport vestibule 1, urban operating mechanism pipe gallery 2, conduit wall 3 and compartment wall 4.Underground haulage vestibule 1 and urban operating mechanism pipe gallery 2 Interior sidewall is provided with line holder M.Line holder M includes bracket upright post M1, multiple pipeline trailing arm M2, multiple resin anchor M3.Bracket upright post M1 is fixed on underground haulage vestibule 1 and urban operating mechanism pipe gallery 2 inwall by resin anchor M3.Pipeline Trailing arm M2 is arranged in bracket upright post M1.
In this utility model, bracket upright post M1 is provided with 1-50 column fixing hole M101, and preferably 2-30 column is solid Determine hole M101, more preferably 3-20 column fixing hole M101, the most preferably 4-10 column fixing hole M101.Resin Bracket upright post M1 is fixed in underground haulage vestibule 1 and urban operating mechanism pipe gallery 2 by anchor pole M3 through column fixing hole M101 On wall.
In this utility model, bracket upright post M1 is provided with 2-100 trailing arm fixing hole hole M102, preferably 5-80 trailing arm Fixing hole M102, more preferably 10-50 trailing arm fixing hole M102.Pipeline trailing arm M2 is by trailing arm fixing hole M102 and an erection Post M1 connects.
In this utility model, in bracket upright post M1, the distance between adjacent trailing arm fixing hole M102 is 20-500mm, preferably For 30-300mm, more preferably 50-200mm.
As preferably, one end that pipeline trailing arm M2 is connected with bracket upright post M1 is provided with trailing arm installed part M201.Trailing arm is installed Part M201 connects pipeline trailing arm M2 and bracket upright post M1.
As preferably, trailing arm installed part M201 is angle steel.Trailing arm installed part M201 and pipeline trailing arm M2 is by being welded to connect. Trailing arm installed part M201 is connected by trailing arm bolt M202 with the trailing arm fixing hole M102 of bracket upright post M1.
As preferably, the cross section of described bracket upright post M1 is " L " type.Bracket upright post M1 has two limits, and a limit sets Being equipped with trailing arm fixing hole M102, another limit arranges column fixing hole M101.
As preferably, the cross section of described bracket upright post M1 is " Jiong " type.Bracket upright post M1 has three limits, middle limit On be provided with column fixing hole M101, the limit of both sides is provided with trailing arm fixing hole M102.
In this utility model, in underground haulage vestibule 1, it is provided with feed pipe 5, and feed pipe 5 is placed on line holder M Pipeline trailing arm M2 on.
In this utility model, in urban operating mechanism pipe gallery 2, it is provided with telecommunication line 6 and/or power pipeline 8, and electricity Fuse tube line 6 and/or power pipeline 8 are placed on the pipeline trailing arm M2 of line holder M.It addition, be additionally provided with in underground haulage vestibule 1 Sealing-tape machine 10.The width of underground haulage vestibule 1 is 4-8 rice.It is sufficient for tool car 11 the most current.When urban operating mechanism integrated pipe When being simultaneously provided with telecommunication line 6 and power pipeline 8 in corridor, both pipelines are arranged in urban operating mechanism pipe gallery 2 On the pipeline trailing arm M2 of different lateral.
In this utility model, the top of underground haulage vestibule 1 is provided with telecommunication line 6.
In this utility model, in urban operating mechanism pipe gallery 2, it is provided with soil pipe 7.
In this utility model, in urban operating mechanism pipe gallery 2, it is provided with access path 9.
Embodiment 1
A kind of underground transfer passage, passage is double chamber structures or many chamber structures.Passage includes underground haulage vestibule 1, municipal administration Facility pipe gallery 2, conduit wall 3 and compartment wall 4.It is provided with line holder in underground haulage vestibule 1 and urban operating mechanism pipe gallery 2 M.Line holder M includes bracket upright post M1, pipeline trailing arm M2, resin anchor M3.Bracket upright post M1 is fixed by resin anchor M3 On underground haulage vestibule 1 and urban operating mechanism pipe gallery 2 inwall.Pipeline trailing arm M2 is arranged in bracket upright post M1.Prop up and erect Post M1 is provided with 4 fixing hole M101.Bracket upright post M1 is fixed on underground haulage through column fixing hole M101 by resin anchor M3 On vestibule 1 and urban operating mechanism pipe gallery 2 inwall (or on conduit wall 3).Bracket upright post M1 is provided with 5 trailing arm fixing hole M102. Pipeline trailing arm M2 is connected with bracket upright post M1 by trailing arm fixing hole M102.In bracket upright post M1 between adjacent trailing arm fixing hole M102 Distance be 400mm.One end that pipeline trailing arm M2 is connected with bracket upright post M1 is provided with trailing arm installed part M201.Trailing arm installed part M201 connects pipeline trailing arm M2 and bracket upright post M1.Trailing arm installed part M201 is angle steel.Trailing arm installed part M201 and pipeline trailing arm M2 is by being welded to connect.Trailing arm installed part M201 is connected by trailing arm bolt M202 with the trailing arm fixing hole M102 of bracket upright post M1 Connect.The cross section of described bracket upright post M1 is " L " type.Bracket upright post M1 has two limits, and a limit is provided with trailing arm fixing hole M102, another limit arranges column fixing hole M101.
Feed pipe 5 it is provided with in underground haulage vestibule 1.Feed pipe 5 is placed on the pipeline trailing arm M2 of line holder M.Telecommunications Underground haulage vestibule 1 inner top is located at by pipeline 6.Soil pipe 7 it is provided with in urban operating mechanism pipe gallery 2.Urban operating mechanism pipe gallery 2 Inside it is provided with telecommunication line 6 and power pipeline 8.
Embodiment 2
Repeating embodiment 1, simply the cross section of bracket upright post M1 is " Jiong " type.Bracket upright post M1 has three limits, middle Limit on be provided with column fixing hole M101, a limit in the limit of both sides is provided with trailing arm fixing hole M102.
Embodiment 3
Repeating embodiment 1, simply the cross section of bracket upright post M1 is " Jiong " type.Bracket upright post M1 has three limits, middle Limit on be provided with column fixing hole M101, the limit of both sides is provided with trailing arm fixing hole M102.
Embodiment 4
Repeating embodiment 1, simply bracket upright post M1 is provided with 20 column fixing hole M101.
Embodiment 5
Repeating embodiment 1, simply bracket upright post M1 is provided with 30 column fixing hole M101.
Embodiment 6
Repeating embodiment 1, simply bracket upright post M1 is provided with 40 trailing arm fixing hole M102.Adjacent torr in bracket upright post M1 Distance between arm fixing hole M102 is 30mm.
Embodiment 7
Repeating embodiment 1, simply bracket upright post M1 is provided with 80 trailing arm fixing hole M102.Adjacent torr in bracket upright post M1 Distance between arm fixing hole M102 is 20mm.
Embodiment 8
Repeat embodiment 1, be simply provided with access path 9 in urban operating mechanism pipe gallery 2.
Embodiment 9
Repeating embodiment 1, simply passage is three chamber structures.
Embodiment 10
A kind of underground transfer passage, passage is double chamber structures or many chamber structures.Passage includes underground haulage vestibule 1, municipal administration Facility pipe gallery 2, conduit wall 3 and compartment wall 4.It is provided with line holder in underground haulage vestibule 1 and urban operating mechanism pipe gallery 2 M.Line holder M includes: bracket upright post M1, pipeline trailing arm M2, resin anchor M3.Described bracket upright post M1 is made has L-type horizontal stroke The structural member in cross section, arranges multiple column fixing hole M101, and resin anchor M3 will prop up erection through column fixing hole M101 Post M1 is fixed on underground haulage vestibule 1 and urban operating mechanism pipe gallery 2 inwall (or on conduit wall 3), and resin anchor M3 imbeds Underground haulage vestibule 1 and a length of 150mm of urban operating mechanism pipe gallery 2 inwall (or conduit wall 3).Described bracket upright post M1 is another While arranging multiple trailing arm fixing hole M102, spacing 50mm.
Pipeline trailing arm M2 is horizontally disposed with, and is one end welding trailing arm installed part M201 that bracket upright post M1 is connected, trailing arm Installed part M201 is connected and fixed in bracket upright post M1 by trailing arm bolt M202.

Claims (12)

1. there is the underground transfer passage of line holder, it is characterised in that: passage is double chamber structure or three chamber structures, and passage includes Underground haulage vestibule (1), urban operating mechanism pipe gallery (2), conduit wall (3) and compartment wall (4), underground haulage vestibule (1) and city Sidewall in political affairs facility pipe gallery (2) is provided with line holder (M), and line holder (M) includes bracket upright post (M1), Duo Geguan Line trailing arm (M2), multiple resin anchor (M3), bracket upright post (M1) is fixed on underground haulage vestibule (1) by resin anchor (M3) With on urban operating mechanism pipe gallery (2) inwall, pipeline trailing arm (M2) is arranged in bracket upright post (M1).
Passage the most according to claim 1, it is characterised in that: bracket upright post (M1) is provided with 1-50 column fixing hole (M101), resin anchor (M3) through column fixing hole (M101) bracket upright post (M1) is fixed on underground haulage vestibule (1) and On urban operating mechanism pipe gallery (2) inwall.
Passage the most according to claim 1 and 2, it is characterised in that: bracket upright post (M1) is provided with 2-100 trailing arm fixing hole (M102), pipeline trailing arm (M2) is connected with bracket upright post (M1) by trailing arm fixing hole (M102).
Passage the most according to claim 3, it is characterised in that: between the upper adjacent trailing arm fixing hole (M102) of bracket upright post (M1) Distance be 20-500mm.
5. according to the passage according to any one of claim 1,2 or 4, it is characterised in that: pipeline trailing arm (M2) and bracket upright post (M1) one end connected is provided with trailing arm installed part (M201), and trailing arm installed part (M201) connects pipeline trailing arm (M2) and bracket upright post (M1)。
Passage the most according to claim 5, it is characterised in that: trailing arm installed part (M201) is angle steel, trailing arm installed part (M201) with pipeline trailing arm (M2) by being welded to connect, trailing arm installed part (M201) and the trailing arm fixing hole of bracket upright post (M1) (M102) connected by trailing arm bolt (M202).
7. according to the passage according to any one of claim 1,2,4 or 6, it is characterised in that: the horizontal stroke of described bracket upright post (M1) Cross section is " L " type, and bracket upright post (M1) has two limits, and a limit is provided with trailing arm fixing hole (M102), and another limit is arranged Column fixing hole (M101), or
The cross section of described bracket upright post (M1) is " Jiong " type, and bracket upright post (M1) has three limits, and middle limit is provided with Column fixing hole (M101), the limit of both sides is provided with trailing arm fixing hole (M102).
Passage the most according to claim 1, it is characterised in that: it is provided with feed pipe (5) in underground haulage vestibule (1), and Feed pipe (5) is placed on the pipeline trailing arm (M2) of line holder (M).
Passage the most according to claim 1, it is characterised in that: it is provided with telecommunication line (6) in urban operating mechanism pipe gallery (2) And/or power pipeline (8), and telecommunication line (6) and/or power pipeline (8) be placed on the pipeline trailing arm of line holder (M) (M2) on.
Passage the most according to claim 1, it is characterised in that: the top of underground haulage vestibule (1) is provided with telecommunication line (6)。
11. passages according to claim 1, it is characterised in that: it is provided with soil pipe (7) in urban operating mechanism pipe gallery (2).
12. passages according to claim 1, it is characterised in that: urban operating mechanism pipe gallery is provided with access path in (2) (9)。
CN201620666995.XU 2016-06-29 2016-06-29 There is the underground transfer passage of line holder Active CN205776355U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620666995.XU CN205776355U (en) 2016-06-29 2016-06-29 There is the underground transfer passage of line holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620666995.XU CN205776355U (en) 2016-06-29 2016-06-29 There is the underground transfer passage of line holder

Publications (1)

Publication Number Publication Date
CN205776355U true CN205776355U (en) 2016-12-07

Family

ID=58129341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620666995.XU Active CN205776355U (en) 2016-06-29 2016-06-29 There is the underground transfer passage of line holder

Country Status (1)

Country Link
CN (1) CN205776355U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558491A (en) * 2017-07-13 2018-01-09 浙江永联建设工程股份有限公司 A kind of underground pipe gallery and its construction method
CN109083645A (en) * 2018-08-01 2018-12-25 南宁轨道交通集团有限责任公司 Shield tunnel and service channel method for synchronously constructing under the conditions of rich water round gravel stratum
CN110994526A (en) * 2019-12-16 2020-04-10 湖州扬清环境科技有限公司 Underground comprehensive pipe gallery and internal communication cable pipe supporting mechanism thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558491A (en) * 2017-07-13 2018-01-09 浙江永联建设工程股份有限公司 A kind of underground pipe gallery and its construction method
CN107558491B (en) * 2017-07-13 2019-09-17 浙江永联建设工程股份有限公司 A kind of underground pipe gallery and its construction method
CN109083645A (en) * 2018-08-01 2018-12-25 南宁轨道交通集团有限责任公司 Shield tunnel and service channel method for synchronously constructing under the conditions of rich water round gravel stratum
CN110994526A (en) * 2019-12-16 2020-04-10 湖州扬清环境科技有限公司 Underground comprehensive pipe gallery and internal communication cable pipe supporting mechanism thereof
CN110994526B (en) * 2019-12-16 2021-02-09 湖州扬清环境科技有限公司 Underground comprehensive pipe gallery and internal communication cable pipe supporting mechanism thereof

Similar Documents

Publication Publication Date Title
CN103614970B (en) Steel truss girder assembling construction longitudinal pull and lateral pushing sliding system
CN205062838U (en) Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN204898721U (en) Steel construction city utility tunnel
CN205776355U (en) There is the underground transfer passage of line holder
CN106120801B (en) Pipeline crosses the construction method at foundation ditch in water-rich sand layer
CN205954798U (en) Large -traffic, height falls poor drainage drop well
CN104790419A (en) Dewatering construction method applicable to tunnel in water-rich quicksand stratum
CN104632234A (en) Rectangular pipe jacking construction method for multi-pipe-spacing cross section
CN103016842B (en) Mud soft soil foundation earth source heat pump direct-burried heat exchanger reverse construction engineering method
CN107769141A (en) Overhead type comprehensive wiring piping lane
CN104184097B (en) Non-migration suspension protection system and method for communication pipes and cables
CN105350503A (en) Hydropower station underground powerhouse plant-to-traffic-hole structure and construction method thereof
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN205894100U (en) Underground transfer passage
CN206478303U (en) The supporting structure of heat distribution pipeline in pipe gallery
CN103161162A (en) Anti-floating anchor rod capable of collecting ground source heat energy and construction method
Huang et al. China Highway Canyon Bridges
CN206396792U (en) A kind of three-way sewage pipe crosses pipe gallery crossover node structure
CN205781429U (en) A kind of pipe gallery line holder
CN205805546U (en) A kind of drift-sand stratum highway tunnel structure
CN208039269U (en) A kind of three-layer pipe corridor section foundation pit supporting construction
CN208235578U (en) A kind of reserved bridge zone assembled barricade for reinforcing hole slot
CN205911724U (en) Interval strong and weak magnetron line arrangement structure in tram engineering ground
CN204570718U (en) A kind of raft foundation with fluid pipeline path
CN209434853U (en) It is a kind of to move the arragement construction for changing rear electric power pipe trench

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant