CN205776348U - A kind of overlapping monoblock type pipe gallery prefabricated assembly structural - Google Patents

A kind of overlapping monoblock type pipe gallery prefabricated assembly structural Download PDF

Info

Publication number
CN205776348U
CN205776348U CN201620632781.0U CN201620632781U CN205776348U CN 205776348 U CN205776348 U CN 205776348U CN 201620632781 U CN201620632781 U CN 201620632781U CN 205776348 U CN205776348 U CN 205776348U
Authority
CN
China
Prior art keywords
overlapping
prefabricated
cast
place
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620632781.0U
Other languages
Chinese (zh)
Inventor
郭建涛
油新华
耿冬青
许国光
马庆松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Baili Engineering Technology Development Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Baili Engineering Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Baili Engineering Technology Development Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201620632781.0U priority Critical patent/CN205776348U/en
Application granted granted Critical
Publication of CN205776348U publication Critical patent/CN205776348U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of overlapping monoblock type pipe gallery prefabricated assembly structural, this structure includes the outside waterproofing layer that the outer surface of the bottom cushion below the piping lane prefabricated assembly structural arranged between the building enclosure in foundation ditch, building enclosure, piping lane prefabricated assembly structural and piping lane prefabricated assembly structural is coated with, being filled with backfill earthing above piping lane prefabricated assembly structural, outside structure, the outer surface in cast-in-place portion is coated with outside waterproofing layer.Construction method includes the operations such as prefabricated components processing, excavation of foundation pit, bottom slab concreting, side wall construction, construction of central division wall, top board construction and backfill soil.This utility model overcome underground engineering prefabricated present in the outstanding problem such as joints and seam waterproof, take base plate is cast-in-place, side wall monolayer overlaps, mid-board is double-layered and top board overlaps, each node is cast-in-place, outside is complete wraps waterproof version, ensure effective connection of node, it is ensured that node waterproof function.

Description

A kind of overlapping monoblock type pipe gallery prefabricated assembly structural
Technical field
This utility model relates to a kind of prefabricated assembly structural, the overlapping monoblock type assembling knot of a kind of pipe gallery Structure.
Background technology
Along with developing rapidly of economy and improving constantly of the level of urbanization, the exploitation of the underground space is the most increasing, combines Close underground pipe gallery and become the most domestic direction greatly developed in recent years.At present owing to being limited by execution conditions and waterproof requirement, Comprehensive underground pipe gallery agent structure is most commonly used that cast-in-place concrete structure.
But, owing to cast-type underground structure uses on-the-spot artificial field to pour, inevitably there is following defect and fraud Sick:
One, colligation and the concrete blinding of steel reinforcement cage installs and requires time for, and agent structure interior construction needs to use in a large number Template and support, not only result in claim for eot and also can cause waste of material;When two, pouring, quality is difficult to ensure.A large amount of existing Pouring concrete needs the time-consuming some time, is likely to occur leakiness of vibrating, affects the quality of structure when pouring.Three, wall surface levelling Degree is not easy to control, and the surface of cast-in-place structural occurs voids and pits unavoidably, and generally requiring process could use;If problem above is adopted The problem that above manual site pours typically can be solved with Wall-beam-column plate prefabricating technique.
But underground engineering assembling also has how the stress between a lot of technological difficulties, such as node protects the while of prefabricated Card: the assembling of existing underground engineering is prefabricated typically uses screw to be attached between precoated plate when node processing, screw Durability is very poor, it is impossible to ensure the service life of 100 years;Also have how the seam waterproof between prefabricated components processes: underground is tied Structure is waterproof it is generally required to multilayer flashing, full outsourcing flexible water and concrete self-waterproof, is once fabricated to assemble prefabricated knot Structure, then the node of prefabrication and assembly construction disconnects, the concrete self-waterproof of most critical will not play its due effect completely, and in advance Component coupling part processed also and is susceptible to infiltration and leaks.
The most prefabricated how to carry out in construction technology with cast-in-place part rationally and be connected, the most reasonably using prefabricated Wall-beam-column plate and the collocation form of cast-in-place part, and ensure that underground structure has good structural stability and water resistance, it is Underground engineering assembles the prefabricated problem needing solution badly.
Utility model content
The purpose of this utility model is to provide a kind of overlapping monoblock type pipe gallery prefabricated assembly structural, solve existingly The assembling of lower engineering is prefabricated, cannot ensure stress safety between node, and the seam of prefabricated components easily seeps water the skill leaked Art problem.
For achieving the above object, this utility model adopts the following technical scheme that
A kind of overlapping monoblock type pipe gallery prefabricated assembly structural, including being positioned at the building enclosure of foundation ditch, building enclosure Between the piping lane prefabricated assembly structural, bottom cushion below piping lane prefabricated assembly structural and the piping lane prefabricated assembly structural that arrange Outer surface cladding outside waterproofing layer, be filled with backfill earthing, described base pad above described piping lane prefabricated assembly structural Layer is laid along the lower horizontal of piping lane prefabricated assembly structural;
Described piping lane prefabricated assembly structural is by including the cast-in-place base plate of bottom, being positioned at the overlapping side on cast-in-place base plate both sides Wall, it is positioned at the overlapping mid-board in the middle of base plate and is positioned at the overlapping top board at overlapping side wall and overlapping mid-board top and connects composition Box-structure;
Described overlapping side wall is divided into the monolayer overlapping prefabricated portion of side wall and the monolayer overlapping cast-in-place portion of side wall, described overlapping mid-board Being divided into cast-in-place portion in the middle of prefabricated portion, double-layered mid-board both sides and double-layered mid-board, described overlapping top board is divided into overlapping top The prefabricated portion of plate and the overlapping cast-in-place portion of top board;
The described monolayer overlapping prefabricated portion of side wall, prefabricated portion, double-layered mid-board both sides and the overlapping prefabricated portion of top board connect shape Become prefabricated portion inside the box-structure on cast-in-place base plate of being fixed on, described cast-in-place base plate, monolayer the overlapping cast-in-place portion of side wall, double-layer overlapped Close cast-in-place portion and the overlapping cast-in-place portion of top board in the middle of mid-board and pour cast-in-place portion outside formation box-structure;
Outside described box-structure, the outer surface in cast-in-place portion is coated with outside waterproofing layer.
The described monolayer overlapping prefabricated portion of side wall is positioned at the inner side in the monolayer overlapping cast-in-place portion of side wall, and described monolayer overlapping side wall is pre- The bottom in portion processed is fixedly connected on the upper surface of cast-in-place base plate.
Prefabricated portion, described double-layered mid-board both sides is positioned at the both sides in cast-in-place portion in the middle of double-layered mid-board, described double The bottom in stacking conjunction prefabricated portion, mid-board both sides is fixedly connected on the upper surface of cast-in-place base plate.
The described prefabricated portion of overlapping top board is positioned at the downside in the overlapping cast-in-place portion of top board, and the two ends in the described prefabricated portion of overlapping top board are divided Lian Jie the top in the prefabricated portion in top and double-layered mid-board both sides in the monolayer overlapping prefabricated portion of side wall.
Described outside waterproofing layer includes base plate waterproofing, side wall waterproof layer and the waterproof roofing layer being connected as entirety, institute State base plate waterproofing to be laid on bottom cushion, between outside and the building enclosure of described side wall waterproof layer between be provided with levelling Layer, the upside of described waterproof roofing layer is backfilled with backfilling earthing.
The bottom in the prefabricated portion in bottom and double-layered mid-board both sides in the described monolayer overlapping prefabricated portion of side wall is all embedded with Branch sleeve, on described base plate, relevant position is embedded with joint bar, branch sleeve and joint bar by sleeve grouting connection.
Inside described box-structure, the side in prefabricated portion has been fixedly connected with steel reinforcement cage, and described steel reinforcement cage is embedded in box knot Outside structure in cast-in-place portion.
The prefabricated portion of described side wall and the prefabricated portion of mid-board and cast-in-place base plate all use the type of attachment that sleeve is in the milk, and base plate is pre- Doweling, the pre-buried branch sleeve in bottom in the prefabricated portion of side wall of relevant position, joint bar carries out sleeve filling after inserting branch sleeve Slurry.
The prefabricated portion of described side wall and mid-board prefabricated portion are required to when installing use diagonal brace to fix, and calculate the strong of diagonal brace Degree, it is ensured that concreting safety.
Compared with prior art this utility model has the characteristics that and beneficial effect:
This utility model is a kind of prefabricated structure that may be used for pipe gallery under the conditions of foundation ditch open cut and construction Method, it is adaptable to the construction of monolayer twin spans pipe gallery agent structure.
This utility model overcome underground engineering prefabricated present in the outstanding problem such as joints and seam waterproof, adopt Take base plate is cast-in-place, side wall monolayer overlaps, mid-board is double-layered and top board overlaps, each node is cast-in-place, and outside is wrapped waterproof entirely Version.
Prefabricated portion in this utility model precast construction all can make to use the form of factory for prefabrication's processing;Due to base Hole has been excavated, therefore has bigger working space inside foundation ditch, it is simple to main structure construction;Base plate is cast-in-place, and side wall uses The form of monolayer overlapping wall can be saved mould and the time of support in wall side of performing, and saves duration and cost;Mid-board uses double The form of stacking conjunction wall equally saves the time of formwork, and saves duration and cost;Top board uses superimposed sheet, and half is prefabricated Half is cast-in-place, and the beam in cast-in-place portion and the end face absolute altitude of plate are identical, need not perform beam slab inner support and template, saves the duration and becomes This, the cast-in-place portion of top board and wall node pour simultaneously simultaneously, coordinate the bar connecting mode of node, it is ensured that effectively connecting of node Connect, the overall strength and stiffness with local of reinforcement structure.
Owing to joint is cast-in-place, and overlapping portion muscle main with cast-in-place portion all can effectively be connected, and can guarantee that overlapping wall when pouring The changing of the relative positions will not be shifted, it is easy to meet the strict demand that main muscle is positioned by agent structure, it is easy to meet the force request of joint.With Time joint cast-in-place, therefore the waterproof effect of joint can be made to be greatly improved, it is easy to meet underground structure to waterproof strict Requirement, the most this precast construction and construction method also allow for the form using full bag waterproof, are formed in the outside of cast-in-place structural The annular waterproof construction system closed, strengthens concrete self-waterproof performance, it is ensured that underground structure occurs without infiltration and drainage, Ensure underground structure water resistance.
Construction party rule of the present utility model is conducive to overlapping integrated precast mounting technology popularization in underground engineering Application, facilitation is played in industrialization and industrialization for underground engineering.
Accompanying drawing explanation
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Reference: 1-building enclosure, 2-bottom cushion, the cast-in-place base plate of 3-, 4-monolayer overlapping the prefabricated portion of side wall, 5-monolayer overlaps in the middle of the cast-in-place portion of side wall, prefabricated portion, 6-double-layered mid-board both sides, the double-layered mid-board of 7-cast-in-place At the bottom of portion, the 8-overlapping prefabricated portion of top board, the 9-overlapping cast-in-place portion of top board, 10-backfill earthing, 11-outside waterproofing layer, 11.1- Plate waterproof layer, 11.2-side wall waterproof layer, 11.3-waterproof roofing layer.
Detailed description of the invention
Embodiment is shown in Figure 1, and a kind of overlapping monoblock type pipe gallery prefabricated assembly structural, is monolayer twin spans integrated pipe The construction of corridor agent structure.
This prefabricated assembly structural includes the prefabricated dress of piping lane arranged between the building enclosure 1 in foundation ditch, building enclosure 1 The outer surface cladding of bottom cushion 2 below distribution structure, piping lane prefabricated assembly structural and piping lane prefabricated assembly structural complete Outer waterproofing layer 11, is filled with backfill earthing 10 above described piping lane prefabricated assembly structural, described bottom cushion 2 is along the prefabricated dress of piping lane The lower horizontal of distribution structure is laid;
Described piping lane prefabricated assembly structural is by including the cast-in-place base plate 3 of bottom, being positioned at the overlapping side on cast-in-place base plate both sides Wall, it is positioned at the overlapping mid-board in the middle of base plate and is positioned at the overlapping top board at overlapping side wall and overlapping mid-board top and connects composition Box-structure;
Described overlapping side wall be divided into monolayer overlapping the prefabricated portion of side wall 4 and monolayer overlapping the cast-in-place portion of side wall 5, in described overlapping every Wall is divided into cast-in-place portion 7 in the middle of prefabricated portion, double-layered mid-board both sides 6 and double-layered mid-board, and described overlapping top board is divided into folded Close the prefabricated portion of top board 8 and the overlapping cast-in-place portion of top board 9;
The described monolayer overlapping prefabricated portion of side wall 4, prefabricated portion, double-layered mid-board both sides 6 and overlapping top board prefabricated portion 8 are even Connecing formation and be fixed on prefabricated portion inside the box-structure on cast-in-place base plate 3, described cast-in-place base plate 3, monolayer overlap the cast-in-place portion of side wall 5, in the middle of double-layered mid-board, cast-in-place portion 7 and the overlapping cast-in-place portion of top board 9 pour cast-in-place portion outside formation box-structure;
Outside described box-structure, the outer surface in cast-in-place portion is coated with outside waterproofing layer 11.
The described monolayer overlapping prefabricated portion of side wall 4 is positioned at the inner side in the monolayer overlapping cast-in-place portion of side wall 5, described monolayer overlapping side wall The bottom in prefabricated portion 4 is fixedly connected on the upper surface of cast-in-place base plate 3.
Prefabricated portion, described double-layered mid-board both sides 6 is positioned at the both sides in cast-in-place portion 7 in the middle of double-layered mid-board, described The bottom in prefabricated portion, double-layered mid-board both sides 6 is fixedly connected on the upper surface of cast-in-place base plate 3.
The described prefabricated portion of overlapping top board 8 is positioned at the downside in the overlapping cast-in-place portion of top board 9, the two of the described prefabricated portion of overlapping top board 8 End connects the top in the prefabricated portion in top and double-layered mid-board both sides 6 in the monolayer overlapping prefabricated portion of side wall 4 respectively.
Described outside waterproofing layer 11 includes base plate waterproofing 11.1, side wall waterproof layer 11.2 and the top board being connected as entirety Waterproof layer 11.3, described base plate waterproofing 11.1 is laid on bottom cushion 2, the outside of described side wall waterproof layer 11.2 with go along with sb. to guard him Being provided with screed-coat between structure 1, the upside of described waterproof roofing layer 11.3 is backfilled with backfilling earthing 10.
The bottom in the prefabricated portion in bottom and double-layered mid-board both sides in the described monolayer overlapping prefabricated portion of side wall is all embedded with Branch sleeve, on described base plate, relevant position is embedded with joint bar, branch sleeve and joint bar by sleeve grouting connection.
Inside described box-structure, the side in prefabricated portion has been fixedly connected with steel reinforcement cage, and described steel reinforcement cage is embedded in box knot Outside structure in cast-in-place portion.
The construction method of this overlapping monoblock type pipe gallery prefabricated assembly structural, construction procedure is as follows:
Step one, connects in factory for prefabrication's processing and has the monolayer overlapping prefabricated portion of side wall of steel reinforcement cage, connection to have steel reinforcement cage Prefabricated portion, double-layered mid-board both sides and connect and have the prefabricated portion of overlapping top board of steel reinforcement cage, and be transported to scene.
Step 2, foundation ditch layering open cut, the building enclosure 1 in the interior dewatering construction foundation ditch in hole, the shape of building enclosure can be coordinated Formula uses the support supporting of piling wall anchor, and belong to mass concrete needs to select rational Control Measures for Concrete Slump when concrete thickness is bigger Degree and reinforcement are vibrated and are guaranteed construction quality.
Step 3, after excavation of foundation pit to designed elevation, first performs bottom cushion 2 between building enclosure 1.
Step 4, lays base plate waterproofing 11.1 on bottom cushion 2.
Step 5, pours concrete the maintenance of cast-in-place base plate 3 on base plate waterproofing 11.1.
Step 6, after cast-in-place base plate reaches curing strength, smears screed-coat in the back of the body soil side of building enclosure, is then looking for Side wall waterproof layer 11.2 is laid in the inner side of flat bed, and the bottom of side wall waterproof layer 11.2 is around to outside the two ends of base plate waterproofing 11.1 Side, makes side wall waterproof layer 11.2 form overlap joint with base plate waterproofing 11.2 and ensure the lap of splice, the top of side wall waterproof layer 11.2 Portion extends, in order to form the waterproof water resistance guaranteeing structure of full bag.
Step 7, the inner side of side wall waterproof layer 11.2, cast-in-place base plate 3 both sides on the upside of hang and connect monolayer overlapping side The prefabricated portion of wall 4.
Step 8, with monolayer overlapping the prefabricated portion of side wall 4 and building enclosure 1 as template, steel reinforcement cage is positioned at monolayer to be poured The position in the overlapping cast-in-place portion of side wall, pours the concrete in the monolayer overlapping cast-in-place portion of side wall 5 between, and monolayer is overlapped side Vibrating in the concrete in the cast-in-place portion of wall 5 and the concrete junction of cast-in-place base plate 3 so that it is connects as one and maintenance;
Step 9, hangs on the upside of the centre of cast-in-place base plate 3 and connected double-layer overlapping prefabricated portion, mid-board both sides 6;
Step 10, with prefabricated portion 6, double-layered mid-board both sides as template, steel reinforcement cage be positioned to be poured double-layered in The position in cast-in-place portion in the middle of partition wall, pours cast-in-place portion concrete seven in the middle of double-layered mid-board in-between, and to pouring bilayer In the middle of overlapping mid-board, vibrate in the concrete in cast-in-place portion 7 and the concrete junction of cast-in-place base plate 3 so that it is connect as one and support Protect;
Step 11, hangs the overlapping prefabricated portion of top board 8, makes the two ends in the prefabricated portion of overlapping top board 8 be connected to overlap side The top 6 in the prefabricated portion in prefabricated portion 4 and double-layered mid-board both sides in wall, steel reinforcement cage is positioned at the cast-in-place portion of overlapping top board to be poured Position;
Step 12, pours the concrete in the overlapping cast-in-place portion of top board 9 in the upside in the overlapping prefabricated portion of top board 8, and to overlapping The concrete in the concrete in the cast-in-place portion of top board 9 cast-in-place portion 7 middle with the monolayer overlapping cast-in-place portion of side wall 5 and double-layered mid-board Vibrating in junction so that it is connects as one and maintenance;
Step 13, lays waterproof roofing layer 11.3, the two of waterproof roofing layer 11.3 in the upside in the overlapping cast-in-place portion of top board 9 Overlap at end and the top prolongation of side wall waterproof layer 11.2, and ensure the lap of splice, in order to form that full bag is waterproof guarantees structure Water resistance.
Step 14, fills out backfill earthing 10 in the upside of waterproof roofing layer 11.3.
The prefabricated portion of described side wall and the prefabricated portion of mid-board and cast-in-place base plate all use the type of attachment that sleeve is in the milk, and base plate is pre- Doweling, the pre-buried branch sleeve in bottom in the prefabricated portion of side wall of relevant position, joint bar carries out sleeve filling after inserting branch sleeve Slurry.
The prefabricated portion of described side wall and mid-board prefabricated portion are required to when installing use diagonal brace to fix, and calculate the strong of diagonal brace Degree, it is ensured that concreting safety.

Claims (7)

1. an overlapping monoblock type pipe gallery prefabricated assembly structural, it is characterised in that: include the building enclosure being positioned at foundation ditch (1) the piping lane prefabricated assembly structural, arranged between building enclosure (1), the bottom cushion (2) below piping lane prefabricated assembly structural with And the outside waterproofing layer (11) of the outer surface cladding of piping lane prefabricated assembly structural, fill out above described piping lane prefabricated assembly structural Having backfill earthing (10), described bottom cushion (2) is laid along the lower horizontal of piping lane prefabricated assembly structural;
Described piping lane prefabricated assembly structural be by include bottom cast-in-place base plate (3), be positioned at cast-in-place base plate both sides overlapping side wall, It is positioned at overlapping mid-board and being positioned at the overlapping side wall overlapping top board connection composition with overlapping mid-board top in the middle of base plate Box-structure;
Described overlapping side wall be divided into monolayer overlapping the prefabricated portion of side wall (4) and monolayer overlap the cast-in-place portion of side wall (5), in described overlapping every Wall is divided into cast-in-place portion (7) in the middle of prefabricated portion, double-layered mid-board both sides (6) and double-layered mid-board, and described overlapping top board divides For the overlapping prefabricated portion of top board (8) and the overlapping cast-in-place portion of top board (9);
The described monolayer overlapping prefabricated portion of side wall (4), prefabricated portion, double-layered mid-board both sides (6) and the overlapping prefabricated portion of top board (8) Connect formation and be fixed on prefabricated portion inside the box-structure on cast-in-place base plate (3), described cast-in-place base plate (3), monolayer overlapping side wall In the middle of cast-in-place portion (5), double-layered mid-board, cast-in-place portion (7) and the overlapping cast-in-place portion of top board (9) pour outside formation box-structure Cast-in-place portion;
Outside described box-structure, the outer surface in cast-in-place portion is coated with outside waterproofing layer (11).
Overlapping monoblock type pipe gallery prefabricated assembly structural the most according to claim 1, it is characterised in that: described monolayer is folded Close the prefabricated portion of side wall (4) and be positioned at the inner side of the monolayer overlapping cast-in-place portion of side wall (5), the end of the described monolayer overlapping prefabricated portion of side wall (4) Portion is fixedly connected on the upper surface of cast-in-place base plate (3).
Overlapping monoblock type pipe gallery prefabricated assembly structural the most according to claim 1 and 2, it is characterised in that: described double Stacking is closed prefabricated portion, mid-board both sides (6) and is positioned at the both sides of cast-in-place portion (7) in the middle of double-layered mid-board, described double-layered in The bottom in prefabricated portion, partition wall both sides (6) is fixedly connected on the upper surface of cast-in-place base plate (3).
Overlapping monoblock type pipe gallery prefabricated assembly structural the most according to claim 3, it is characterised in that: described overlapping top The prefabricated portion of plate (8) is positioned at the downside of the overlapping cast-in-place portion of top board (9), and the two ends of the described prefabricated portion of overlapping top board (8) connect list respectively Top and the top of prefabricated portion, double-layered mid-board both sides (6) in the prefabricated portion of side wall (4) is closed in stacking.
Overlapping monoblock type pipe gallery prefabricated assembly structural the most according to claim 1, it is characterised in that: described full outsourcing Waterproof layer (11) includes base plate waterproofing (11.1), side wall waterproof layer (11.2) and the waterproof roofing layer being connected as entirety (11.3), described base plate waterproofing (11.1) is laid on bottom cushion (2), the outside of described side wall waterproof layer (11.2) with enclose Being provided with screed-coat between protection structure (1), the upside of described waterproof roofing layer (11.3) is backfilled with backfilling earthing (10).
Overlapping monoblock type pipe gallery prefabricated assembly structural the most according to claim 3, it is characterised in that: described monolayer is folded The bottom in the prefabricated portion in bottom and double-layered mid-board both sides closing the prefabricated portion of side wall is all embedded with branch sleeve, on described base plate Relevant position is embedded with joint bar, branch sleeve and joint bar and is connected by sleeve grouting.
Overlapping monoblock type pipe gallery prefabricated assembly structural the most according to claim 1, it is characterised in that: described box is tied Inside structure, the side in prefabricated portion has been fixedly connected with steel reinforcement cage, and described steel reinforcement cage is embedded in outside box-structure in cast-in-place portion.
CN201620632781.0U 2016-06-24 2016-06-24 A kind of overlapping monoblock type pipe gallery prefabricated assembly structural Expired - Fee Related CN205776348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620632781.0U CN205776348U (en) 2016-06-24 2016-06-24 A kind of overlapping monoblock type pipe gallery prefabricated assembly structural

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620632781.0U CN205776348U (en) 2016-06-24 2016-06-24 A kind of overlapping monoblock type pipe gallery prefabricated assembly structural

Publications (1)

Publication Number Publication Date
CN205776348U true CN205776348U (en) 2016-12-07

Family

ID=58130294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620632781.0U Expired - Fee Related CN205776348U (en) 2016-06-24 2016-06-24 A kind of overlapping monoblock type pipe gallery prefabricated assembly structural

Country Status (1)

Country Link
CN (1) CN205776348U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013228A (en) * 2016-06-24 2016-10-12 中国建筑股份有限公司 Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof
CN106638670A (en) * 2017-01-20 2017-05-10 福建省建筑设计研究院 Semi-prefabricated pipe gallery and construction method
CN108661075A (en) * 2017-04-01 2018-10-16 周兆弟 Assembled underground one corridor
CN108661080A (en) * 2017-04-01 2018-10-16 周兆弟 The manufacturing method in assembled underground one corridor
CN108661094A (en) * 2017-04-01 2018-10-16 周兆弟 Ruggedized construction for underpass
CN110004980A (en) * 2019-04-29 2019-07-12 中铁第四勘察设计院集团有限公司 A kind of combined assembled underground structure and first inverse rear suitable construction method
CN110004981A (en) * 2019-04-29 2019-07-12 中铁第四勘察设计院集团有限公司 A kind of combined assembled underground structure and reversed construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013228A (en) * 2016-06-24 2016-10-12 中国建筑股份有限公司 Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof
CN106638670A (en) * 2017-01-20 2017-05-10 福建省建筑设计研究院 Semi-prefabricated pipe gallery and construction method
CN106638670B (en) * 2017-01-20 2019-07-26 福建省建筑设计研究院有限公司 Half prefabricated piping lane and construction method
CN108661075A (en) * 2017-04-01 2018-10-16 周兆弟 Assembled underground one corridor
CN108661080A (en) * 2017-04-01 2018-10-16 周兆弟 The manufacturing method in assembled underground one corridor
CN108661094A (en) * 2017-04-01 2018-10-16 周兆弟 Ruggedized construction for underpass
CN110004980A (en) * 2019-04-29 2019-07-12 中铁第四勘察设计院集团有限公司 A kind of combined assembled underground structure and first inverse rear suitable construction method
CN110004981A (en) * 2019-04-29 2019-07-12 中铁第四勘察设计院集团有限公司 A kind of combined assembled underground structure and reversed construction method
CN110004980B (en) * 2019-04-29 2024-03-15 中铁第四勘察设计院集团有限公司 Composite assembled underground structure and first-reverse-then-forward construction method

Similar Documents

Publication Publication Date Title
CN106013228B (en) A kind of overlapping monoblock type pipe gallery prefabricated assembly structural and its construction method
CN205776348U (en) A kind of overlapping monoblock type pipe gallery prefabricated assembly structural
CN105178357B (en) Prefabricated subsurface structure under foundation trench open cutting condition and construction method for prefabricated subsurface structure under foundation trench open cutting condition
WO2017206411A1 (en) Full-prefabricated superimposed assembly-type underground pipe gallery and connection node thereof
WO2017206412A1 (en) Superimposed assembly-type underground pipe gallery system and construction and manufacturing process
CN205276316U (en) Modular prefabricated piping lane
CN106703077B (en) Integral underground comprehensive pipe gallery structure of prefabricated assembly
CN108397200B (en) Back-fabricated construction method for tunnel connection section structure of subway station
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN110185135B (en) Basement bottom plate and outer wall waterproof structure and construction method
CN106284412A (en) A kind of prefabricated pipe gallery and construction method
CN109024679A (en) A kind of supporting and the integrated system of Pipe rack and construction method
CN211037072U (en) Piping lane bottom plate waterproof construction
CN108301466A (en) Integral prefabricated caisson of toilet and caisson of toilet construction and its construction method
CN104404985A (en) Construction method for basement floor post-cast strip waterproofing structure
CN110258640A (en) A kind of construction method of the overlapping wall system of covered back-digging
RU127093U1 (en) PILED FOUNDATION
CN108560588A (en) Assembled pipe gallery and its construction method
CN206052778U (en) A kind of steel and Combined concrete piping lane
CN106948502A (en) A kind of water-proof top cover and its construction method
CN206873491U (en) A kind of assembled piping lane
CN207582659U (en) A kind of assembled caisson of toilet, caisson soil stack pore structure and caisson placing structure
CN107083776B (en) A kind of basement raft foundation rear pouring tape construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207