CN205776301U - Docking formula bedrock survey mark - Google Patents

Docking formula bedrock survey mark Download PDF

Info

Publication number
CN205776301U
CN205776301U CN201620522137.8U CN201620522137U CN205776301U CN 205776301 U CN205776301 U CN 205776301U CN 201620522137 U CN201620522137 U CN 201620522137U CN 205776301 U CN205776301 U CN 205776301U
Authority
CN
China
Prior art keywords
mark
bedrock
basement rock
hidden
surveying marker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620522137.8U
Other languages
Chinese (zh)
Inventor
朱祥山
于松松
邵成立
刘建英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO INSTITUTE OF SURVEYING AND MAPPING SURVEY
Original Assignee
QINGDAO INSTITUTE OF SURVEYING AND MAPPING SURVEY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO INSTITUTE OF SURVEYING AND MAPPING SURVEY filed Critical QINGDAO INSTITUTE OF SURVEYING AND MAPPING SURVEY
Priority to CN201620522137.8U priority Critical patent/CN205776301U/en
Application granted granted Critical
Publication of CN205776301U publication Critical patent/CN205776301U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

This utility model relates to surveying marker, especially docking formula bedrock survey mark and construction method thereof.Docking formula bedrock survey mark, is mainly made up of basement rock stake, surveying marker, land protection device three part;Described surveying marker is divided into upper and lower two parts, respectively visual observation mark and hidden observation monument, and both connect by connecting screw rod, and are positioned on same plumb line;The lower end of hidden observation monument is connected with basement rock stake by nut;Land protection device is arranged on the outside of visual observation mark.Docking formula bedrock survey mark of the present utility model, basement rock stake can guarantee that mark stability, will not settle with ground;Surveying marker is divided into again the visual surveying marker on top and the hidden surveying marker of bottom, remains the fast quick-recovery after strict geometrical relationship can guarantee that a position destruction between upper and lower mark.

Description

Docking formula bedrock survey mark
Technical field
This utility model relates to surveying marker, especially docking formula bedrock survey mark and construction method thereof.
Background technology
Current measurement control point is broadly divided into a few class, and the first is grade control point, uses survey monument more, for coagulation Soil or the hard building stones such as granite, cordierite are made.The second is non-hierarchical control point, general employing steel nail or the ferrum with copper core Nail, directly nail is on road surface.Survey monument is generally divided into markstone and lower markstone, and upper and lower markstone center is strictly at same plumb line On, (also some survey monument is xoncrete structure, installs rustless steel surveying marker at TOC), this type of markstone is usually Scope is taken up an area relatively greatly in face, is suitable for being laid in the openst area (such as mountain top, wasteland).Steel nail control point is typically laid in Road surface, road, but be easily destroyed, and there will be the phenomenon with roadbed subsidence, it is impossible to meet the purpose of life-time service.
The fast development of modern city, causes ground control point the most destroyed, and cannot recover.And in coastal cities Xincheng District, set up in beach area more, easily there is sedimentation phenomenon in newly-built road and greenbelt, cause being laid in ground Control point can not life-time service.
Utility model content
For overcoming problem above present in prior art, need to develop a kind of being suitable for and be laid in road or greenbelt Surveying marker, by the particular design of mark itself, and the construction method of advanced person, it is ensured that control point is not by surface subsidence shadow Ring, and after ground is destroyed still can the high-precision surveying marker of quick-recovery soon, to reduce workload and cost of investment Surveying marker.
This utility model solves its technical problem and the technical scheme is that docking formula bedrock survey mark, mainly by base Rock stake, surveying marker, land protection device three part composition;Described surveying marker is divided into upper and lower two parts, is respectively visual Observation monument and hidden observation monument, both connect by connecting screw rod, and are positioned on same plumb line;Hidden observation monument Lower end be connected with basement rock stake by nut;Land protection device is arranged on the outside of visual observation mark.
Described basement rock stake is made up of the screw-thread steel being positioned at center and the outside cement mortar poured, screw-thread steel upper End is welded with attaching nut.
The outside of described hidden observation monument is provided with rustless steel casing.
Described land protection device is for building well or cast iron sheath by laying bricks or stones.
Docking formula bedrock survey mark of the present utility model, basement rock stake can guarantee that mark stability, and it is heavy to occur with ground Fall;Surveying marker is divided into again the visual surveying marker on top and the hidden surveying marker of bottom, remains tight between upper and lower mark The geometrical relationship of lattice can guarantee that the fast quick-recovery after a position destruction.And construction method is simple.
Accompanying drawing explanation
Fig. 1 is the docking formula bedrock survey sign structure schematic diagram of embodiment 1;
Fig. 2 is the docking formula bedrock survey sign structure schematic diagram of embodiment 2.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, docking formula bedrock survey mark of the present utility model and construction method thereof are done in detail Thin explanation and elaboration.
The docking formula bedrock survey mark of embodiment 1 the present embodiment, as it is shown in figure 1, by basement rock stake 1, rustless steel casing 2, Hidden observation monument 3, visual observation mark 4, cast iron sheath 6 form, and hidden observation monument 3 and visual observation mark 4 are by even Connect screw rod 5 to connect, and be positioned on same plumb line;The lower end of hidden observation monument 3 is connected with basement rock stake 1 by nut;Can Outside installation cast iron sheath 6 depending on observation monument 4.
The docking formula bedrock survey mark of embodiment 2 the present embodiment, as in figure 2 it is shown, by basement rock stake 1, rustless steel casing 2, Hidden observation monument 3, visual observation mark 4, building well 6 by laying bricks or stones and form, hidden observation monument 3 and visual observation mark 4 are by connecting Screw rod 5 connects, and is positioned on same plumb line;The lower end of hidden observation monument 3 is connected with basement rock stake 1 by nut;Visually The outside of observation monument 4 is installed and is built well 6 by laying bricks or stones.
Basement rock stake 1 is mainly made up of the #425 cement mortar of outside 1:2 and the φ 28mm screw-thread steel of inside, and basement rock stake is deep Spend and be as the criterion entering middle decayed rock 2 meters.The geological conditions basement rock stake degree of depth of integration project location is between 3 meters to 25 meters. The a diameter of 180mm of basement rock stake, is coated with antirust paint and plastic protective film for plastics, and fills a triangle centering every 2 meter amperes outside screw-thread steel Support, to ensure that screw-thread steel is in the center of whole basement rock stake.
Visual observation mark 4 and ground are at a distance of 20CM.The outside of hidden observation monument 3 is provided with rustless steel casing 2 so that it is with Surrounding concrete separates.When visual observation mark is affected by external force and is produced displacement, will force visual observation mark with under The hidden observation monument in face is connecting disconnection at screw rod, owing to the visual surveying marker size on top is fixing, so when upper When portion's visual observation mark destroys, can repair by reinstalling visual observation mark, also can be by relatively even if not repairing Position is continuing with the hidden observation monument in bottom.The most hidden observation monument is connected with basement rock stake by attaching nut, hidden Observation monument and outer concrete utilize rustless steel casing to separate, therefore when external force is not the biggest, will not be corrupted to hidden base Rock point.When hidden observation monument part is also destroyed, also can according to by reinstall whole docking protection basement rock mark repair Multiple some position, control point or the fixed dimension according to mark obtain the coordinate of the basement rock stake of bottom.
According to a position, position, land protection device can be divided into builds well and cast iron sheath two kinds by laying bricks or stones.Greenbelt or open The land protection device in non-hard surface area is suitable for selection and builds well by laying bricks or stones;The hardened grounds such as bituminous paving are suitable for using cast iron to protect Set.
The construction method of embodiment 3 docking of the present utility model formula bedrock survey mark, specifically comprises the following steps that
1, the first excavation length of side is not less than 0.5 meter, the square hole of the degree of depth 0.9 meter, to have detected whether unknown object (pipeline Or pre-buried cable etc.), carrying out drilling followed by rig, drilling depth is as the criterion to reach below stable basement rock 2m;Probing In pore forming process, use φ 180mm advanced guide type drill bit to utilize drilling tool deadweight hole-enlarging hole-forming, and use low solid phase premium mud Retaining wall, it is ensured that creep into safety and prevent borehole collapse and undergauge;Following measures is taked in the control of bedrock hole perpendicularity: ground should be put down Whole, compacting, it is ensured that boring tower, rig vertical shaft center and aperture sight alignment;Drilling rod, drilling tool should keep glacing flatness, and flexibility is little;Adopt With lengthen drilling tool, go out the little drill bit of sword, light pressure, little pump amount are crept into;Use low solid phase premium mud guard aperture, clear hole, it is ensured that at the bottom of hole Basement rock powder is got rid of totally in time, in case major structure becomes hole deviation.
2, attaching nut is welded on the screw-thread steel of φ 28mm, intercepts according to drilling depth or be soldered to corresponding length, In manufacturing process, chain connected nut to be ensured is the most concentric with reinforcing bar.2 meters of need of reinforcing bar bottommost are fixed in basement rock, its upper part profit Do antirust treatment with epoxy resin and be wound around plastic sheeting, protecting top connecting bolt simultaneously.Reinforcing bar puts one every 2 meter amperes Triangle centering fixed support, is used for being in when determining reinforcing bar hand-hole the center of whole boring.
3, utilize rig vertically to be put in boring by reinforcing bar, fix after making whole device naturally vertical, so can ensure that It is at the center of whole boring, and keeps vertical.
4, rig is utilized to irrigate the #425 cement mortar of 1:2, residual mud in extrusion boring from the bottom up.
5, after the cement mortar solidification irrigated, by cement mortar cleaning unnecessary for top, by the connection spiral shell on reinforcing bar Female and hidden surveying marker lower end is connected, and is arranged on by surveying marker in basement rock stake.
6, after mark installs, hole fills concrete, fine sand to basement rock stake and hidden surveying marker junction successively; Concrete, fine sand are to hidden surveying marker and visual surveying marker junction, concrete;Finally build protection well by laying bricks or stones or cast iron is installed Sheath.

Claims (4)

1. docking formula bedrock survey mark, it is characterised in that: main by basement rock stake, surveying marker, land protection device three part Composition;Described surveying marker is divided into upper and lower two parts, respectively visual observation mark and hidden observation monument, and both are by even Connect screw rod to connect, and be positioned on same plumb line;The lower end of hidden observation monument is connected with basement rock stake by nut;Ground is protected Protection unit is arranged on the outside of visual observation mark.
Docking formula bedrock survey mark the most according to claim 1, it is characterised in that: described basement rock stake is mainly by being positioned at The screw-thread steel of center and the outside cement mortar poured are constituted, and the upper end of screw-thread steel is welded with attaching nut.
Docking formula bedrock survey mark the most according to claim 2, it is characterised in that: outside described hidden observation monument Side is provided with rustless steel casing.
4. according to the docking formula bedrock survey mark described in claim 1,2 or 3, it is characterised in that: described land protection dress It is set to build well or cast iron sheath by laying bricks or stones.
CN201620522137.8U 2016-06-01 2016-06-01 Docking formula bedrock survey mark Expired - Fee Related CN205776301U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620522137.8U CN205776301U (en) 2016-06-01 2016-06-01 Docking formula bedrock survey mark

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620522137.8U CN205776301U (en) 2016-06-01 2016-06-01 Docking formula bedrock survey mark

Publications (1)

Publication Number Publication Date
CN205776301U true CN205776301U (en) 2016-12-07

Family

ID=58136837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620522137.8U Expired - Fee Related CN205776301U (en) 2016-06-01 2016-06-01 Docking formula bedrock survey mark

Country Status (1)

Country Link
CN (1) CN205776301U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862901A (en) * 2016-06-01 2016-08-17 青岛市勘察测绘研究院 Docked type bed rock measuring marker and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862901A (en) * 2016-06-01 2016-08-17 青岛市勘察测绘研究院 Docked type bed rock measuring marker and construction method thereof
CN105862901B (en) * 2016-06-01 2018-04-20 青岛市勘察测绘研究院 Docking formula bedrock survey mark and its construction method

Similar Documents

Publication Publication Date Title
CN106641440B (en) A kind of transverse crossing railway line underground piping jacking construction method
CN104631470B (en) The large particle diameter sand gravel of high water level geology deep basal pit combination supporting construction method
CN103643918B (en) A kind of searching for Ordovician limestone mining area and the method preventing mine from seeping water
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN103088814A (en) Rotary drilling rig coordinated with percussion drill hole-forming construction method
CN103321245B (en) The construction method of the protective device of underground utilities during a kind of shield driving
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN103485320B (en) U-shaped inclinometer and mounting and embedding method thereof
CN104121895B (en) The stake bar at plane measurement of higher degree control point, soft clay area and method for embedding thereof
CN113216832B (en) Construction method for water milling and drilling of pile holes in karst areas
CN106988305A (en) A kind of pile-column pier construction method of underground integrated molding
CN104264663A (en) Hard cutting construction technology for secant piles
CN102494678A (en) Pavement settlement point arrangement apparatus in monitor measurement and burying method
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction
CN102304915B (en) New method for controlling top quality of drilled pile
CN103076010A (en) Fabrication method of forced centering observation pillar for precision engineering measurement and observation pillar
CN106759542A (en) The deformation monitoring of deep basal pit and the method for Deformation Prediction
CN205776301U (en) Docking formula bedrock survey mark
CN111155542B (en) PBA construction method tunnel waterproof curtain construction method based on hole guiding technology
CN105862901B (en) Docking formula bedrock survey mark and its construction method
CN202925575U (en) Pre-buried structure for core-drilling detection of foundation pile
CN203274729U (en) Soft soil area horizontal elevation measuring control point
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN202420500U (en) Pavement sedimentation point arranging device in monitoring measurement
CN110714459A (en) Construction method of cast-in-situ bored pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207