CN205772942U - A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure - Google Patents

A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure Download PDF

Info

Publication number
CN205772942U
CN205772942U CN201620490186.8U CN201620490186U CN205772942U CN 205772942 U CN205772942 U CN 205772942U CN 201620490186 U CN201620490186 U CN 201620490186U CN 205772942 U CN205772942 U CN 205772942U
Authority
CN
China
Prior art keywords
drag
line
tower crane
leap
construction technique
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620490186.8U
Other languages
Chinese (zh)
Inventor
闫肃
盖建卫
冯义涛
王海川
曹志权
宋斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201620490186.8U priority Critical patent/CN205772942U/en
Application granted granted Critical
Publication of CN205772942U publication Critical patent/CN205772942U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure, including the body of tower hoist with transverse arm, on described transverse arm, the one end near described body of tower hoist is provided with some drag-lines one, and the other end of this transverse arm is provided with some drag-lines two, described drag-line one and drag-line two have been fixedly connected with bridge rotating structure.The beneficial effects of the utility model: optimize rotator construction technique, the problem solving temporary support, it is ensured that the quality of rotator construction, improve efficiency of construction, similar engineering is had reference.

Description

A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure
Technical field
This utility model relates to a kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure.
Background technology
Yucheng grand bridge is crossed over Longhai Railway and is designed with rotator construction mode, and the logical long 98m of T structure that turns, bridge rotating structure is made up of lower rotary table, ball pivot, top rotary table, trailer system of turning, assist system, axis micro-tensioning system.Lower rotary table diameter 10.15m, high 1.05m;Top rotary table diameter 10.4m, high 2.5m, top rotary table ball pivot diameter 3.5m, lower rotary table ball pivot diameter 3.5m, upper and lower rotating disk all uses C50 slightly expanded concrete.Rotating part includes: top rotary table 145m3, pier shaft 387m3, beam body 1813 m3, attached 69 m of bridge floor3, add up to 2414 m3, 6276.4t.Rise the weight of mode coefficient and spike, bearing, temporary consolidation, suspension bracket etc. in view of concrete construction, rotating part gross weight about 6700t.In work progress, project management department finds that beam body deadweight is excessive, needs to use temporary support structure, but this existing line of big spanning, is not suitable for arranging Temporary Piers, and construction encounters a difficulty.
Therefore, develop a kind of problem solving temporary support and ensure the tower crane structure of quality of rotator construction, becoming the problem needing solution badly for insider.
Utility model content
For the above-mentioned technical problem in correlation technique, the utility model proposes a kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure, solve above-mentioned technical problem.
For realizing above-mentioned technical purpose, the technical solution of the utility model is achieved in that
A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure, including the body of tower hoist with transverse arm, on described transverse arm, the one end near described body of tower hoist is provided with some drag-lines one, and the other end of this transverse arm is provided with some drag-lines two, described drag-line one and drag-line two have been fixedly connected with bridge rotating structure.
Further, described body of tower hoist is movable arm type heavy type tower crane.
Further, described drag-line one is ordinary steel drag-line.
Further, described drag-line two is high-strength steel drag-line.
The beneficial effects of the utility model: optimize rotator construction technique, the problem solving temporary support, it is ensured that the quality of rotator construction, improve efficiency of construction, similar engineering is had reference.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, the accompanying drawing used required in embodiment will be briefly described below, apparently, accompanying drawing in describing below is only embodiments more of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the overall structure figure according to the most wired Bridge Rotation Construction Technique of the leap interim tower crane structure described in this utility model embodiment;
Fig. 2 is the structural representation of the drag-line according to the most wired Bridge Rotation Construction Technique of the leap shown in Fig. 1 interim tower crane structure and tower crane connecting portion;
Fig. 3 is the structural representation of the drag-line according to the most wired Bridge Rotation Construction Technique of the leap shown in Fig. 1 interim tower crane structure and bridge rotating connecting portion.
In figure:
1, body of tower hoist;2, drag-line one;3, drag-line two;4, bridge rotating structure.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained, broadly fall into the scope of this utility model protection.
As Figure 1-3, according to a kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure described in this utility model embodiment, including the body of tower hoist 1 with transverse arm, on described transverse arm, the one end near described body of tower hoist 1 is provided with some drag-lines 1, and the other end of this transverse arm is provided with some drag-lines 23, described drag-line 1 and drag-line 23 have been fixedly connected with bridge rotating structure 4.
Wherein, described body of tower hoist 1 is movable arm type heavy type tower crane;Wherein, described drag-line 1 is ordinary steel drag-line;Wherein, described drag-line 23 is high-strength steel drag-line.
Understand technique scheme of the present utility model for convenience, below by way of in specifically used mode, technique scheme of the present utility model is described in detail.
Described drag-line 1 and drag-line 23 are all embedded in bridge rotating structure 4, then drawn by body of tower hoist 1, described body of tower hoist 1 is arranged at support end, and rotate with the angular velocity identical with described bridge rotating structure 4, described drag-line 1 is positioned at nearly support end, and described drag-line 23 is positioned at remote support end, and this layout is mainly designed according to the stress of bridge rotating structure 4, cost can be reduced as far as possible in the case of ensureing that pulling force is enough.
In sum, by means of technique scheme of the present utility model, use tower crane to replace tradition Temporary Piers, not only can serve as support means but also the traffic of construction site will not be impacted.Regulation drag-line height makes its absolute altitude identical, and during rotator construction, bridge rotating structure rotational angular velocity is identical with the angular velocity that tower crane rotates, so that tower crane runs simultaneously with tumbler.Cable wire is sling swivel structure, can offset beam body deadweight, and need not arrange Temporary Piers, traffic under middle bridge cut-off.
The foregoing is only preferred embodiment of the present utility model; not in order to limit this utility model; all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (4)

1. cross over the most wired Bridge Rotation Construction Technique interim tower crane structure for one kind, including the body of tower hoist (1) with transverse arm, it is characterized in that, on described transverse arm, the one end near described body of tower hoist (1) is provided with some drag-lines one (2), and the other end of this transverse arm is provided with some drag-lines two (3), described drag-line one (2) and drag-line two (3) have been fixedly connected with bridge rotating structure (4).
A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure the most according to claim 1, it is characterised in that described body of tower hoist (1) is movable arm type heavy type tower crane.
A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure the most according to claim 2, it is characterised in that described drag-line one (2) is ordinary steel drag-line.
A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure the most according to claim 3, it is characterised in that described drag-line two (3) is high-strength steel drag-line.
CN201620490186.8U 2016-05-26 2016-05-26 A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure Active CN205772942U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620490186.8U CN205772942U (en) 2016-05-26 2016-05-26 A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620490186.8U CN205772942U (en) 2016-05-26 2016-05-26 A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure

Publications (1)

Publication Number Publication Date
CN205772942U true CN205772942U (en) 2016-12-07

Family

ID=58110840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620490186.8U Active CN205772942U (en) 2016-05-26 2016-05-26 A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure

Country Status (1)

Country Link
CN (1) CN205772942U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677749A (en) * 2018-01-18 2018-10-19 重庆溢权科技发展有限公司 A kind of PLC frequency-changing control systems of Bridge Rotation Construction Technique

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677749A (en) * 2018-01-18 2018-10-19 重庆溢权科技发展有限公司 A kind of PLC frequency-changing control systems of Bridge Rotation Construction Technique
CN108677749B (en) * 2018-01-18 2024-02-06 中铁二十三局集团第二工程有限公司 PLC frequency conversion control system for bridge swivel construction

Similar Documents

Publication Publication Date Title
CN201695331U (en) Flat turning device for continuous beam steel spherical hinge method
CN103194981B (en) System and method for bridge steel tower maritime vertical rotation construction
CN2795434Y (en) Variable amplitude link rod mechanism of rotary digging and drilling machine movable arm
CN202672832U (en) Rotatable seat double rocker arm and inner/outer stay wire suspension mixed derrick
CN203728443U (en) Combined tower crane with main and auxiliary boom structure
CN105110213A (en) Crane provided with counterweight balance mechanism adopting dead weight of hoisted object as well as crane transformation scheme
CN205775887U (en) A kind of large eccentricity rotary body device of Curved Stayed-cable Bridge
CN103832933B (en) A kind of group tower tower crane with auxiliary
CN205772942U (en) A kind of leap the most wired Bridge Rotation Construction Technique interim tower crane structure
CN103061521A (en) Torque type mounting method for cantilever steel truss of large stadium
CN205892580U (en) Decide brachium counter weight formula portal slewing crane
CN206590793U (en) Connect arm assembly and the movable arm tower crane comprising the device in the air
CN104499436B (en) The antitorque balance pier of swivel bridges mobile load
CN111691317A (en) Controllable anti-overturning swivel spherical hinge
CN102774761B (en) Arm section of truss arm, truss arm and crane
CN113896101B (en) Quick hoisting device of instrument for road and bridge construction
CN109607384A (en) The turn-over method of super-large-diameter shield machine knife disk
CN2893124Y (en) Derrick support device
CN205114897U (en) That climbs formula braced system in tower built -in is put has bad luck device certainly
CN207209830U (en) For the hoisting tooling at Bridge Beam bottom and pier stud small space
CN208618279U (en) Assembled railroad bridge rotator construction lifting rotation system
CN207646621U (en) The asymmetric mixing girder stayed-cable bridge horizontal swing structure of super-tonnage
CN204385632U (en) The antitorque balance pier of swivel bridges mobile load
CN203603043U (en) Permanent and temporary combined rotation body support system
CN212358035U (en) Controllable anti-overturning swivel spherical hinge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant