CN205749777U - A kind of insulation lead wire electrical test platform - Google Patents

A kind of insulation lead wire electrical test platform Download PDF

Info

Publication number
CN205749777U
CN205749777U CN201620405511.6U CN201620405511U CN205749777U CN 205749777 U CN205749777 U CN 205749777U CN 201620405511 U CN201620405511 U CN 201620405511U CN 205749777 U CN205749777 U CN 205749777U
Authority
CN
China
Prior art keywords
drainage thread
sleeve pipe
workbench
thread sleeve
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620405511.6U
Other languages
Chinese (zh)
Inventor
孙世勇
柯夏楠
宋海霞
刘朴明
丁超
范书荣
李峰
邢永和
张玉宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Weihai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620405511.6U priority Critical patent/CN205749777U/en
Application granted granted Critical
Publication of CN205749777U publication Critical patent/CN205749777U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model discloses a kind of insulation lead wire electrical test platform, including workbench and earth lead, workbench is provided with test lead support, on the workbench of test lead support side, on workbench, linear array has drainage thread support, drainage thread sleeve pipe is made up of removable section and standing part, removable section and standing part card are combined into complete drainage thread sleeve pipe, the standing part of drainage thread sleeve pipe is placed on drainage thread support, drainage thread is placed in drainage thread sleeve pipe, the two ends of drainage thread are separately fixed in two fixtures, fixture one end is high-voltage connection end, the removable section of drainage thread sleeve pipe is provided with grounding lead line end, ground wire is connected on it.This utility model can carry out electric preventive test to insulation lead wire, finds the insulation defect of insulation lead wire in time, it is ensured that uses safety.

Description

A kind of insulation lead wire electrical test platform
Technical field
This utility model relates to the electrical test of power system livewire work insulation lead wire, the insulation lead wire electrical test platform of a kind of electric preventive test being mainly used in insulation lead wire.
Background technology
It is known that insulation lead wire is mainly used in power system livewire work bypass operation method transfer load.So-called bypass operation method refers to install bypath system at circuit element two ends, by the switching of bypath system, realizes maintenance and the replacing of circuit element in the case of continued power.And insulation lead wire is exactly most widely used a kind of bypass equipment, by insulation lead wire transfer load, it is possible to ensure the continuous electricity consumption of all users in Awaiting Overhaul line range.
Other electrical bodies that may touch in operation and the grounding body insulation to be taked that cannot meet safe distance, by regulation requirement, are covered measure by livewire work.After insulation lead wire puts into operation, the load current of overhauled circuit need to be undertaken, and close together with operating personnel; but in addition to himself insulation protection; not taking other insulation to cover measure, therefore, it is whether safe that the quality of its insulating properties directly determines operating personnel.
In use, the destruction of its insulating properties is mainly by both sides reason for insulation lead wire: one is that insulation lead wire is scratched by sharp object during carrying and use;Two is that insulator arrangement suffers too high voltages to cause insulation breakdown.Wherein, the first damage directly can be found by naked eyes, but the equipment of insulation breakdown there is no obvious wound, it is impossible to finds in time, change, and brings great threat to the safety of operating personnel.In order to find the insulation hidden danger of insulation lead wire in time, there is personal injury in prevention, needs in the validity period (generally 8-10) of insulation lead wire, its regular (once a year) is checked, tests and detected.
Utility model content
The purpose of this utility model is to provide the assay device of a set of insulation lead wire electric preventive test, it is ensured that can find the insulation defect of insulation lead wire in time, it is ensured that the personal safety of operating personnel.
For reaching above-mentioned purpose, this utility model be the technical scheme is that
A kind of insulation lead wire electrical test platform, including workbench and earth lead, it is characterized in that, workbench is provided with test lead support, on the workbench of test lead support side, on workbench, linear array has drainage thread support, drainage thread sleeve pipe is made up of removable section and standing part, removable section and standing part card are combined into complete drainage thread sleeve pipe, the standing part of drainage thread sleeve pipe is placed on drainage thread support, drainage thread is placed in drainage thread sleeve pipe, the two ends of drainage thread are separately fixed in two fixtures, fixture one end is high-voltage connection end, the removable section of drainage thread sleeve pipe is provided with grounding lead line end, ground wire is connected on it.
Being provided with fixture support plate on described workbench, two fixtures at fixing drainage thread two ends are fixed on same fixture support plate, and drainage thread sleeve pipe is U-shaped.Two fixtures are fixed on same fixture support plate, and U-shaped being fixed in fixture of drainage thread sleeve pipe can make full use of workbench, reduce workbench length.
Described test lead support arranges the outside of fixture support plate.
This utility model has the following advantages (1) simple in construction, easy installation and removal.(2) changing test product convenient, work efficiency is high.(3) experimental phenomena is obvious, it is simple to judge experimental result.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further described.
Insulation lead wire electrical test platform of the present utility model, including workbench 1 and earth lead, workbench 1 is provided with test lead support 2, on the workbench 1 of test lead support 2 side, on workbench, linear array has drainage thread support 3, drainage thread sleeve pipe is made up of removable section 6 and standing part 7, removable section 6 and standing part 7 card are combined into complete drainage thread sleeve pipe, the standing part 7 of drainage thread sleeve pipe is placed on drainage thread support 3, drainage thread is placed in drainage thread sleeve pipe, the two ends of drainage thread are separately fixed in two fixtures 4, fixture 4 one end is high-voltage connection end 9, the removable section 6 of drainage thread sleeve pipe is provided with grounding lead line end 8, ground wire is connected on it.
Drainage thread support 3 can be arranged in a line, and fixture 4 is arranged on two ends, and this mode needs longer workbench, takes up room big.In the present embodiment, workbench 1 being provided with fixture support plate 5, two fixtures 4 at fixing drainage thread two ends are fixed on same fixture support plate 5, and drainage thread sleeve pipe is U-shaped.Two fixtures are fixed on same fixture support plate, and U-shaped being fixed in fixture of drainage thread sleeve pipe can make full use of workbench, reduce workbench length.
During test, being placed in by insulation lead wire in drainage thread sleeve pipe, in industrial frequency withstand voltage process of the test, test pressure 30kV, pressing time continues 1min, and the most each position is without puncturing, without flashover, without the most overheated, then test is passed through.The insulation defect of insulation lead wire can be found in time by detection.

Claims (3)

1. an insulation lead wire electrical test platform, including workbench and earth lead, it is characterized in that, workbench is provided with test lead support, on the workbench of test lead support side, on workbench, linear array has drainage thread support, drainage thread sleeve pipe is made up of removable section and standing part, removable section and standing part card are combined into complete drainage thread sleeve pipe, the standing part of drainage thread sleeve pipe is placed on drainage thread support, drainage thread is placed in drainage thread sleeve pipe, the two ends of drainage thread are separately fixed in two fixtures, fixture one end is high-voltage connection end, the removable section of drainage thread sleeve pipe is provided with grounding lead line end, ground wire is connected on it.
Described a kind of insulation lead wire electrical test platform the most according to claim 1, it is characterised in that being provided with fixture support plate on workbench, two fixtures at fixing drainage thread two ends are fixed on same fixture support plate, and drainage thread sleeve pipe is U-shaped.
Described a kind of insulation lead wire electrical test platform the most according to claim 2, it is characterised in that described test lead support arranges the outside of fixture support plate.
CN201620405511.6U 2016-05-06 2016-05-06 A kind of insulation lead wire electrical test platform Expired - Fee Related CN205749777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620405511.6U CN205749777U (en) 2016-05-06 2016-05-06 A kind of insulation lead wire electrical test platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620405511.6U CN205749777U (en) 2016-05-06 2016-05-06 A kind of insulation lead wire electrical test platform

Publications (1)

Publication Number Publication Date
CN205749777U true CN205749777U (en) 2016-11-30

Family

ID=57369864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620405511.6U Expired - Fee Related CN205749777U (en) 2016-05-06 2016-05-06 A kind of insulation lead wire electrical test platform

Country Status (1)

Country Link
CN (1) CN205749777U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110618362A (en) * 2019-10-15 2019-12-27 国网天津市电力公司 High-voltage test device for lightning arrester of power transmission line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110618362A (en) * 2019-10-15 2019-12-27 国网天津市电力公司 High-voltage test device for lightning arrester of power transmission line

Similar Documents

Publication Publication Date Title
CN104614650A (en) Inspection device for insulation tools and instruments in hot-line work
CN201514446U (en) High-voltage AC/DC test device for environmental monitoring
CN103267934B (en) A kind of Portable direct current test discharging rod
CN205749777U (en) A kind of insulation lead wire electrical test platform
CN106680586A (en) Transformer measuring discharge device
CN104155584A (en) Standardized experimental device for distribution network conducting wire shielding cover
CN105277751B (en) Sensor support device
CN203658522U (en) Safety equipment voltage withstand test special device
CN204945312U (en) Measure the servicing unit of insulating tool
CN208270622U (en) A kind of power distribution network arrester, isolator detecting bracket
CN203705590U (en) Floor-type special device for withstand voltage tests of safety equipment
CN203630291U (en) Performance detection device of insulation rod
CN203643561U (en) Standardized testing device for cross-arm shielding covers
CN202522537U (en) Insulating tool edge planar defect on-site detection device
CN204374369U (en) A kind of verifying attachment of live line work insulating Work tool
CN203909222U (en) Clamp plate electrode for 220 kV and greater insulation tool AC high-voltage holding test device
CN204613346U (en) A kind of ground loop detector
CN204241645U (en) A kind of connecting device being applied to the test of switch cart mechanism characteristics
CN103983872A (en) Method for evaluating electrical performance of composite insulating materials in switch cabinet
CN103728540A (en) Alternating-current / direct-current voltage withstand testing device for arc discharge monitoring
CN103018641B (en) Electrolysis direct current system voltage resistance experiment method
CN207502568U (en) Insulation protection device
CN105021963A (en) Auxiliary device for measuring insulated tools and instruments
CN103728541A (en) Standardized test device for cross arm shields
CN205120774U (en) Sensor supporting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20190506