CN205746865U - High temperature garbage gasification spray combustion tunnel system - Google Patents

High temperature garbage gasification spray combustion tunnel system Download PDF

Info

Publication number
CN205746865U
CN205746865U CN201620676389.6U CN201620676389U CN205746865U CN 205746865 U CN205746865 U CN 205746865U CN 201620676389 U CN201620676389 U CN 201620676389U CN 205746865 U CN205746865 U CN 205746865U
Authority
CN
China
Prior art keywords
gasification
combustion
wind
tunnel
spray combustion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620676389.6U
Other languages
Chinese (zh)
Inventor
刘国田
代吉发
李振衡
张大鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liu Zhenliang
Original Assignee
WEIFANG JINSIDA NEW ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIFANG JINSIDA NEW ENERGY TECHNOLOGY Co Ltd filed Critical WEIFANG JINSIDA NEW ENERGY TECHNOLOGY Co Ltd
Priority to CN201620676389.6U priority Critical patent/CN205746865U/en
Application granted granted Critical
Publication of CN205746865U publication Critical patent/CN205746865U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high temperature garbage gasification spray combustion tunnel system, including tunnel pedestal and reciprocating fire grate, installing at least two gasification spray burner unit on described tunnel pedestal, described gasification spray burner unit is end to end and forms the spray combustion tunnel consistent with described reciprocating fire grate incline direction;The setting in tilting spray combustion tunnel, along with rubbish moves to lower under the drive of reciprocating fire grate, rubbish sequentially enters drying, gasifying section in described spray combustion tunnel, gasification spray combustion section, carbonization spray combustion section and slag after-flame section, the hot blast that refuse gasification spray combustion produces improves constantly to lower temperature from eminence in described spray combustion tunnel, and the temperature eventually arriving at hot-blast outlet can reach 1200 DEG C 1300 DEG C, the toxic and harmful of all generations only could enter boiler furnace through high-temperature region, finally make rubbish be gasified totally spray combustion and thoroughly eliminate the discharge of the toxic and harmfuls such as two English, it is that the breakthrough shape to prior art is improved, there is great economic benefit and social benefit.

Description

High temperature garbage gasification spray combustion tunnel system
Technical field
This utility model relates to a kind of technical field of energy utilization, particularly relate to a kind of gasification spray is fired after heat energy jet to The giving energy by burning refuse release system of boiler.
Background technology
Municipal solid wastes incineration power generation has innoxious, resource and minimizing three advantages, to improving urban health Environmental activity is great, is a kind of optimum way processing domestic waste now, it has also become China's urban garbage disposal One of main method.And current domestic most waste incineration and generating electricity boiler thermal outputs are on the low side, directly influence waste incineration The economic benefit in power plant.The stable Combustion System of waste incineration and generating electricity boiler and adjustment are operating emphasis and difficult point, work Journey technical staff often focuses on the economic benefit of incineration firing, and the emission problem of incineration firing is placed in back burner, and this is also One of people's reason opposing waste incineration and generating electricity.
Fig. 7 show the structure of fire grate garbage burning electricity generation boiler, shows the flow process of waste incineration in figure.This fire grate rubbish Rubbish burning electricity generation boiler includes that body of heater 1 ', the middle and upper part of described body of heater 1 ' are provided with pyrotechnics outlet 11 ', the described tilted peace of body of heater 1 ' Equipped with reciprocating fire grate 2, described pyrotechnics outlet 11 ' is communicated to boiler heat-exchanger, the high-end place of described reciprocating fire grate 2 described Body of heater 1 ' is provided with charging aperture 12, and described charging aperture 12 connects the Multi-layer material-storing cabinet 3 that the gravity of reliable rubbish seals, described Multi-layer material-storing cabinet The bottom of 3 is provided with the material-pulling device of the charging aperture 12 that rubbish advances body of heater 1 ', the lower end of described reciprocating fire grate 2 described Body of heater 1 ' is provided with slag notch 13, and First air is blown into by the air chamber below reciprocating fire grate 2, with rubbish while waste layer Rubbish generation combustion reaction, secondary wind is blown into by the airduct above reciprocating fire grate 2, makes on escaping gas and fire grate unburnt Incineration firing.Owing to rubbish combustion process on fire grate starts to sequentially enter dry, Volatile, volatile matter combustion from bottom Burn, coke burns and slag after-flame five stages totally, and the gas that the volatile matter separated out produces after volatile combustion is direct Enter into boiler heat-exchanger, be discharged after heat exchange, flue gas comprises uncombusted volatile matter, two English etc. in the process Point, uncombusted volatile matter causes the waste of the energy, two English to cause the pollution of environment to poison, the therefore waste incineration of prior art The defect of the operation principle of generating produces great technical problem, and the discharge of harmful gas especially two English cannot eliminate, energy Source loss is serious, pollutes and poisons environment.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of change air direction of the supply, can form high-temperature gasification Pen Ran district, flue gas continue through high-temperature gasification Pen Ran district, two English are removed thoroughly, the gasification spray of sufficient high temperature garbage is fired in gasification spray Combustion tunnel system.
For solving above-mentioned technical problem, the technical solution of the utility model is: high temperature garbage gasification spray combustion tunnel system, with Boiler furnace connects, and including tunnel pedestal, described tunnel pedestal is tiltedly installed with reciprocating fire grate, and described tunnel pedestal is pacified Burner unit is sprayed, described gasification spray burner unit head and the tail phase equipped with gasifying across at least two above described reciprocating fire grate Connecing and form the spray combustion tunnel consistent with described reciprocating fire grate incline direction, described spray combustion the high-end of tunnel is provided with charging aperture, The low side in described spray combustion tunnel is provided with the hot-blast outlet being connected with described boiler furnace;The described tunnel base in described charging aperture direction Sealed feeder unit is installed on Zuo;
Described gasification spray burner unit includes arch body of heater, is provided with furnace chamber unit, described arch in described arch body of heater Body of heater be respectively arranged at two ends with unit feed mouth and unit discharging opening, the described unit feed mouth of adjacent described arch body of heater and institute State unit discharging opening to dock mutually;The sidewall of described arch body of heater is provided with gasification combustion-supporting cloth wind chamber, described gasification combustion-supporting cloth wind chamber It is provided with some sidewalls through described arch body of heater the gasification combustion-supporting wind-distributing pipe assembly on directive material surface, described gasification combustion-supporting Cloth wind chamber connects to be had for wind regime.
As preferred technical scheme, described gasification combustion-supporting cloth wind chamber is arranged on the roof of described arch body of heater, described Gasification combustion-supporting wind-distributing pipe assembly is arranged vertically downward.
As preferred technical scheme, described gasification combustion-supporting wind-distributing pipe assembly includes fixing with the roof of described furnace chamber unit Connect and run through the wind-distributing pipe plug socket of roof of described furnace chamber unit, described wind-distributing pipe plug socket is plugged with gasification combustion-supporting cloth Airduct.
As the improvement to technique scheme, the length of described gasification combustion-supporting wind-distributing pipe is different.
As the improvement to technique scheme, gasification combustion-supporting cloth wind described in part described wind-distributing pipe plug socket not grafting Pipe.
As the improvement to technique scheme, described gasification combustion-supporting wind-distributing pipe is refractory wind-distributing pipe.
As preferred technical scheme, the inwall of described furnace chamber unit includes refractory masses.
As the improvement to technique scheme, described sealed feeder unit includes the storing relying on rubbish gravity to seal Tower, the bottom of described Multi-layer material-storing cabinet is provided with the material-pulling device that rubbish advances described spray combustion tunnel.
As the improvement to technique scheme, described material-pulling device includes expeller, and described expeller connects to be had back and forth Pusher driving means.
As the improvement to technique scheme, the bottom of described reciprocating fire grate is provided with secondary wind distribution device.
Owing to have employed technique scheme, high temperature garbage gasification spray combustion tunnel system, it is connected with boiler furnace, including tunnel Road pedestal, described tunnel pedestal is tiltedly installed with reciprocating fire grate, described tunnel pedestal is provided with across described back and forth Above formula fire grate at least two gasification spray burner unit, described gasification spray burner unit end to end and form with described back and forth The spray combustion tunnel that formula fire grate incline direction is consistent, the high-end charging aperture that is provided with in described spray combustion tunnel, the low side in described spray combustion tunnel It is provided with the hot-blast outlet being connected with described boiler furnace;Sealing charging is installed on the described tunnel pedestal in described charging aperture direction Device;Described gasification spray burner unit includes arch body of heater, is provided with furnace chamber unit, described arch body of heater in described arch body of heater Be respectively arranged at two ends with unit feed mouth and unit discharging opening, the described unit feed mouth of adjacent described arch body of heater and described list Unit's discharging opening docks mutually;The sidewall of described arch body of heater is provided with gasification combustion-supporting cloth wind chamber, and described gasification combustion-supporting cloth wind chamber is provided with Some sidewalls through described arch body of heater the gasification combustion-supporting wind-distributing pipe assembly on directive material surface, described gasification combustion-supporting cloth wind Chamber connects to be had for wind regime;The setting in tilting spray combustion tunnel, along with rubbish moves to lower under the drive of reciprocating fire grate, rubbish Rubbish sequentially enters drying, gasifying section, gasification spray combustion section, carbonization spray combustion section and slag after-flame section, rubbish gas in described spray combustion tunnel The hot blast changing spray combustion generation improves constantly to lower temperature from eminence in described spray combustion tunnel, and eventually arrives at hot-blast outlet Temperature can reach 1200 DEG C-1300 DEG C, the pollution toxicity gas such as two English is primarily generated at drying, gasifying section, and part produces and exists Gasification spray combustion section, carbonization spray combustion section and slag after-flame section no longer produce toxic and harmful, the toxic and harmful of all generations Only could enter boiler furnace through high-temperature region, in the process, all harmful gass such as two English is completely broken down, institute There is unburnt macromole functional group to continue cracking after-flame, finally make rubbish be gasified totally and gasify spray combustion and thoroughly eliminate two The discharge of the toxic and harmfuls such as English, is that the breakthrough shape to prior art is improved, and has great economic benefit and society's effect Benefit.
Accompanying drawing explanation
The following drawings is only intended to, in schematically illustrating this utility model and explaining, not limit model of the present utility model Enclose.Wherein:
Fig. 1 is the structure principle chart of this utility model embodiment;
Fig. 2 is the structure principle chart of this utility model embodiment gasification spray burner unit;
Fig. 3 is the left view of Fig. 2;
Fig. 4 is the right view of Fig. 2;
Fig. 5 is this utility model embodiment structure principle chart for wind regime;
Fig. 6 is the structure principle chart of this utility model embodiment gasification combustion-supporting wind-distributing pipe;For ease of understanding, one of them gas Change combustion-supporting wind-distributing pipe to be not fully inserted into;
Fig. 7 is the fundamental diagram of prior art;
In figure: 1-tunnel pedestal;1 '-body of heater;11 '-pyrotechnics exports;12-charging aperture;12a-unit feed mouth;13-slags tap Mouthful;13a-unit discharging opening;14-hot-blast outlet;2-reciprocating fire grate;3-Multi-layer material-storing cabinet;41-expeller;The reciprocal pusher of 42-drives Device;5-gasification spray burner unit;51-arch body of heater;52-furnace chamber unit;53-refractory masses;54-gasification combustion-supporting cloth wind Chamber;55-wind-distributing pipe plug socket;56-gasification combustion-supporting wind-distributing pipe;6-spray combustion tunnel;7-boiler furnace;8-blower fan;9-secondary wind distribution Device.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, this utility model is expanded on further.In the following detailed description, only by saying Bright mode describes some one exemplary embodiment of the present utility model.Undoubtedly, those of ordinary skill in the art is permissible Recognize, in the case of without departing from spirit and scope of the present utility model, can be by various different modes to described Embodiment is modified.Therefore, accompanying drawing and description are inherently protection that is the most illustrative rather than that be used for limiting claim Scope.
As it is shown in figure 1, high temperature garbage gasification spray combustion tunnel system, it is connected with boiler furnace 7, including tunnel pedestal 1, described Being tiltedly installed with reciprocating fire grate 2 on tunnel pedestal 1, described reciprocating fire grate 2 is prior art fire grate, concrete structure and work Principle does not repeats them here, and the present embodiment uses reciprocating fire grate 2 as the retainer plate of refuse gasification spray combustion, makes rubbish in gasification Spray combustion is constantly rolled during advancing, so that gasification spray combustion is more abundant;It is provided with across in institute on described tunnel pedestal 1 Stating at least two gasification spray burner unit 5 above reciprocating fire grate 2, described gasification spray burner unit 5 is end to end and forms The spray combustion tunnel 6 consistent with described reciprocating fire grate 2 incline direction, the high-end charging aperture 12 that is provided with in described spray combustion tunnel 6, described The low side in spray combustion tunnel 6 is provided with the hot-blast outlet 14 being connected with described boiler furnace 7;The described tunnel in described charging aperture 12 direction On pedestal 1, sealed feeder unit is installed.
As shown in Figure 2, Figure 3 and Figure 4, described gasification spray burner unit 5 includes arch body of heater 51, in described arch body of heater 51 Being provided with furnace chamber unit 52, the inwall of described furnace chamber unit 52 includes refractory masses 53.The two ends of described arch body of heater 51 are divided It is not provided with unit feed mouth 12a and unit discharging opening 13a, the described unit feed mouth 12a of adjacent described arch body of heater 51 and institute State unit discharging opening 13a phase to dock;The sidewall of described arch body of heater 51 is provided with gasification combustion-supporting cloth wind chamber 54, described gasification combustion-supporting Cloth wind chamber 54 is provided with some sidewalls through described arch body of heater 51 the gasification combustion-supporting wind-distributing pipe assembly on directive material surface, institute State the connection of gasification combustion-supporting cloth wind chamber 54 to have for wind regime.Blower fan 8 is included for wind regime as it is shown in figure 5, described.
In the present embodiment, described gasification combustion-supporting cloth wind chamber 54 is arranged on the roof of described arch body of heater 51, described gasification Combustion-supporting wind-distributing pipe assembly is arranged vertically downward.As shown in Figure 6, described gasification combustion-supporting wind-distributing pipe assembly includes and described furnace chamber unit The roof of 52 fixes the wind-distributing pipe plug socket 55 of the roof connecting and running through described furnace chamber unit 52, described wind-distributing pipe plug socket 55 On be plugged with gasification combustion-supporting wind-distributing pipe 56.Grafting installing type structure designs, and makes the replacing of gasification combustion-supporting wind-distributing pipe 56 become convenient, Working service is the most reasonable, and described gasification combustion-supporting wind-distributing pipe 56 is refractory wind-distributing pipe, substantially increases gasification combustion-supporting cloth wind In the service life of pipe 56, solve the technical barrier of described gasification combustion-supporting wind-distributing pipe 56 easily ablation.Described gasification combustion-supporting cloth wind The length of pipe 56 is different, can form rotary wind in described furnace chamber unit 52, so that gasification spray combustion is the most thorough The end.Gasification combustion-supporting wind-distributing pipe 56 described in part described wind-distributing pipe plug socket 55 not grafting, this arrangement, make described wind-distributing pipe Plug socket 55 plays the effect of the shortest described gasification combustion-supporting wind-distributing pipe 56, makes the top of described furnace chamber unit 52 also have gasification The supply of combustion air, thoroughly eliminates gasification spray combustion dead angle.
Described sealed feeder unit include rely on rubbish gravity seal Multi-layer material-storing cabinet 3, the bottom of described Multi-layer material-storing cabinet 3 be provided with by Rubbish advances the material-pulling device in described spray combustion tunnel 6.Described material-pulling device includes expeller 41, and the connection of described expeller 41 has past Multiple pusher driving means 42.In the present embodiment, described reciprocal pusher driving means 42 is hydraulic cylinder, naturally it is also possible to use machinery Or electronic reciprocating motion drive mechanism, these mechanisms are known, and at this, it is no longer repeated.Described expeller 41 constantly will Partial material pushes in the charging aperture 12 in described spray combustion tunnel 6;Rubbish in described Multi-layer material-storing cabinet 3 is because of height and the effect of gravity On the one hand the gasification required rubbish of spray combustion it is provided, on the other hand plays the effect of sealing, it is ensured that flue gas will not be excessive.
The bottom of described reciprocating fire grate 2 is provided with secondary wind distribution device 9.In the present embodiment, described secondary wind distribution device 9 is It is arranged on the wind-distributing pipe of reciprocating fire grate 2 bottom part down, from the bottom of described reciprocating fire grate 2 to rubbish air feed, it is ensured that rubbish Further fully gasification spray combustion, prevent ashes from falling in the gap of described reciprocating fire grate 2.
What the present embodiment used is blower fan 8 for wind regime, and described blower fan 8 is by pipeline and each described gasification spray burner unit 5 Described gasification combustion-supporting cloth wind chamber 54 connect;Along with the promotion of reciprocating fire grate 2, rubbish constantly gasifies spray combustion until becoming ashes And the low side from described spray combustion tunnel 6 falls, described hot-blast outlet 14 ejection from described spray combustion tunnel 6 of the flame of high temperature is gone forward side by side Enter in boiler furnace 7, in making boiler furnace 7, be full of torch firing flame.The setting in tilting spray combustion tunnel 6, along with rubbish is past Moving to lower under the drive of compound fire grate 2, rubbish sequentially enters drying, gasifying section, gasification spray combustion in described spray combustion tunnel 6 Section, carbonization spray combustion section and slag after-flame section, the hot blast that refuse gasification spray combustion produces in described spray combustion tunnel 6 from eminence to lower Temperature improves constantly, and the pollution toxicity such as the temperature eventually arriving at hot-blast outlet 14 can reach 1200 DEG C-1300 DEG C, two English Gas is primarily generated at drying, gasifying section, and part produces in gasification spray combustion section, and carbonization spray combustion section and slag after-flame section no longer produce Toxic and harmful, the toxic and harmful of all generations only could enter boiler furnace 7 through high-temperature region, in this process In, all harmful gass such as two English is completely broken down, and all macromole functional groups not gasifying spray combustion continue to crack also After-flame, finally makes rubbish be gasified totally and sprays combustion and thoroughly eliminate the discharge of the toxic and harmfuls such as two English, be to prior art Breakthrough shape improve, there is great economic benefit and social benefit.
The foregoing is only the schematic detailed description of the invention of this utility model, be not limited to model of the present utility model Enclose.Any those skilled in the art, equivalent done on the premise of without departing from design of the present utility model and principle becomes Change and amendment, the scope of this utility model protection all should be belonged to.

Claims (10)

1. high temperature garbage gasification spray combustion tunnel system, is connected with boiler furnace, it is characterised in that: include tunnel pedestal, described tunnel Be tiltedly installed with reciprocating fire grate on road pedestal, described tunnel pedestal is provided with across above described reciprocating fire grate extremely Few two gasification spray burner unit, described gasification spray burner unit is end to end and forms and described reciprocating fire grate incline direction Consistent spray combustion tunnel, the high-end charging aperture that is provided with in described spray combustion tunnel, the low side in described spray combustion tunnel is provided with and described boiler The hot-blast outlet that burner hearth connects;On the described tunnel pedestal in described charging aperture direction, sealed feeder unit is installed;
Described gasification spray burner unit includes arch body of heater, is provided with furnace chamber unit, described arch body of heater in described arch body of heater Be respectively arranged at two ends with unit feed mouth and unit discharging opening, the described unit feed mouth of adjacent described arch body of heater and described list Unit's discharging opening docks mutually;The sidewall of described arch body of heater is provided with gasification combustion-supporting cloth wind chamber, and described gasification combustion-supporting cloth wind chamber is provided with Some sidewalls through described arch body of heater the gasification combustion-supporting wind-distributing pipe assembly on directive material surface, described gasification combustion-supporting cloth wind Chamber connects to be had for wind regime.
2. high temperature garbage gasification spray combustion tunnel system as claimed in claim 1, it is characterised in that: described gasification combustion-supporting cloth wind chamber Being arranged on the roof of described arch body of heater, described gasification combustion-supporting wind-distributing pipe assembly is arranged vertically downward.
3. high temperature garbage gasification spray combustion tunnel system as claimed in claim 1, it is characterised in that: described gasification combustion-supporting wind-distributing pipe Assembly includes the wind-distributing pipe plug socket fixing the roof being connected and running through described furnace chamber unit with the roof of described furnace chamber unit, institute State and on wind-distributing pipe plug socket, be plugged with gasification combustion-supporting wind-distributing pipe.
4. high temperature garbage gasification spray combustion tunnel system as claimed in claim 3, it is characterised in that: described gasification combustion-supporting wind-distributing pipe Length different.
5. high temperature garbage gasification spray combustion tunnel system as claimed in claim 3, it is characterised in that: part described wind-distributing pipe grafting Gasification combustion-supporting wind-distributing pipe described in seat not grafting.
6. high temperature garbage gasification spray combustion tunnel system as claimed in claim 3, it is characterised in that: described gasification combustion-supporting wind-distributing pipe For refractory wind-distributing pipe.
7. high temperature garbage gasification spray combustion tunnel system as claimed in claim 1, it is characterised in that: the inwall of described furnace chamber unit Including refractory masses.
8. the high temperature garbage gasification spray combustion tunnel system as described in claim 1 to 7 any claim, it is characterised in that: institute Stating the Multi-layer material-storing cabinet that sealed feeder unit includes relying on rubbish gravity to seal, the bottom of described Multi-layer material-storing cabinet is provided with described for rubbish propelling The material-pulling device in spray combustion tunnel.
9. high temperature garbage gasification spray combustion tunnel system as claimed in claim 8, it is characterised in that: described material-pulling device includes pushing away Material block, described expeller connects reciprocal pusher driving means.
10. the high temperature garbage gasification spray combustion tunnel system as described in claim 1 to 7 any claim, it is characterised in that: institute The bottom stating reciprocating fire grate is provided with secondary wind distribution device.
CN201620676389.6U 2016-06-30 2016-06-30 High temperature garbage gasification spray combustion tunnel system Active CN205746865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620676389.6U CN205746865U (en) 2016-06-30 2016-06-30 High temperature garbage gasification spray combustion tunnel system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620676389.6U CN205746865U (en) 2016-06-30 2016-06-30 High temperature garbage gasification spray combustion tunnel system

Publications (1)

Publication Number Publication Date
CN205746865U true CN205746865U (en) 2016-11-30

Family

ID=57381054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620676389.6U Active CN205746865U (en) 2016-06-30 2016-06-30 High temperature garbage gasification spray combustion tunnel system

Country Status (1)

Country Link
CN (1) CN205746865U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105972603A (en) * 2016-06-30 2016-09-28 潍坊金丝达新能源科技有限公司 Waste high-temperature gasification and spray combustion tunnel system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105972603A (en) * 2016-06-30 2016-09-28 潍坊金丝达新能源科技有限公司 Waste high-temperature gasification and spray combustion tunnel system

Similar Documents

Publication Publication Date Title
CN101294708A (en) City life rubbish fluidized bed gasification combustion processing method
CN102537975A (en) Circulating fluidized bed garbage incineration boiler and pollution control system with same
CN204611742U (en) A kind of reciprocating waste gas pyrolysis oven
CN206094112U (en) Sludge incineration system
CN103791486B (en) Vertical preheating segmentation low-temperature burning fixed bed boiler
CN205746864U (en) High temperature garbage gasification spray combustion electricity generation boiler
CN105114956B (en) High temperature garbage gasification power generation system
CN105114941A (en) Biomass high-temperature gasifying combustion furnace
CN104930519A (en) Efficient garbage combustion furnace
CN103939890B (en) Coal producing coal gas integral chain grate boiler
CN102734802A (en) Garbage incineration treatment equipment with efficient cyclone separator type secondary combustion chamber and application thereof
CN105972603A (en) Waste high-temperature gasification and spray combustion tunnel system
CN102242935A (en) Novel garbage and biomass fuel combustion furnace and combustion method
CN102759111A (en) Garbage cracking furnace
CN205746865U (en) High temperature garbage gasification spray combustion tunnel system
CN104197339A (en) Combined body of composite type rotating sludge incineration kiln and reciprocating type sludge incineration kiln
CN204943498U (en) High temperature garbage gasification power generation system
CN205560766U (en) Double -deck mechanical stoker formula waste gasification incineration boiler system
CN203744230U (en) Coal production gas integrated chain grate boiler
CN204693438U (en) A kind of high-efficiency refuse combustion furnace
CN106016275A (en) High temperature garbage gasification fuel spraying power generating boiler
CN106152146A (en) Multifunctional garbage high-temperature gasification spray combustion electricity generation boiler
CN205746872U (en) Multifunctional garbage high-temperature gasification spray combustion electricity generation boiler
CN205560762U (en) Mechanical stoker formula waste gasification incineration boiler system
CN106765123A (en) Large Copacity high temperature garbage gasification jet burning system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171130

Address after: No. 71, Yangjia village, quyi street, Changyi, Shandong

Patentee after: Liu Zhenliang

Address before: 261300 Changyi City, Weifang Province, the United States and the United States and the streets of the office of Tatsu Tatsu Tatsu wire

Patentee before: WEIFANG JINSIDA NEW ENERGY TECHNOLOGY CO., LTD.

TR01 Transfer of patent right