CN205741931U - A kind of Bridge Erector flexible leg twisted seat temporary fastening device - Google Patents
A kind of Bridge Erector flexible leg twisted seat temporary fastening device Download PDFInfo
- Publication number
- CN205741931U CN205741931U CN201620580441.8U CN201620580441U CN205741931U CN 205741931 U CN205741931 U CN 205741931U CN 201620580441 U CN201620580441 U CN 201620580441U CN 205741931 U CN205741931 U CN 205741931U
- Authority
- CN
- China
- Prior art keywords
- screw rod
- bridge erector
- nose girder
- support bar
- fastening device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of Bridge Erector flexible leg twisted seat temporary fastening device, Bridge Erector nose girder is flexibly connected with nose girder front leg strut by connected free bearing and pin, temporary fastening device includes fixing seat, screw rod, adjusting nut and support bar, fixing seat is fixing with nose girder front leg strut to be connected, screw rod is fixed with fixing seat, the lower end of support bar is connected with screw rod by adjusting nut, and the upper end of support bar is arranged on the lower section of free bearing.This utility model bridge machine become across during convert leg location time fix twisted seat, it is achieved nose girder front leg strut rigidity and flexible conversion, solve the problem disassembled with installation difficulty;Evade blue-collar security risk in work high above the ground, eliminate the high-risk operation of artificial fixing twisted seat;Greatly reduce workload, decrease cost payout, improve working performance, it is ensured that become the security and stability across construction, and this device is small, simple in construction, it is simple to safeguard and adjust, reducing manufacture difficulty.
Description
Technical field
This utility model relates to Bridge Erector technical field, particularly relates to a kind of Bridge Erector flexible leg twisted seat fixing dress temporarily
Put.
Background technology
900T fixed point hoisting type Bridge Erector work progress in, can run into a lot of box beam erection construction in become across special work
Condition, the method that current Bridge Erector becomes across construction employing conversion nose girder front leg strut with bridge machine front leg strut position realizes.DF900D
Bridge Erector nose girder supporting leg is band twisted seat flexible leg, needs operating personnel in high-altitude by upper twisted seat disassembling bolts when shifting one's position,
The position of twisted seat in adjustment, installs at another span location.Twisted seat from great, use chain block fix cumbersome and
Affecting working performance, the highest aerial impetus is little, and operation is complicated and has difficulties, and has the biggest potential safety hazard, and then may
Cause great security incident.
Utility model content
The purpose of this utility model is that provides a kind of Bridge Erector flexible leg strand to solve the problems referred to above
Seat temporary fastening device.
This utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of Bridge Erector flexible leg twisted seat temporary fastening device, described Bridge Erector nose girder by connected free bearing and
Pin flexibly connects with described nose girder front leg strut, and described temporary fastening device includes fixing seat, screw rod, adjusting nut and support
Bar, described fixing seat is fixing with the upper end of described nose girder front leg strut to be connected, and described screw rod is fixed with described fixing seat, described support
The lower end of bar is connected with described screw rod by described adjusting nut, and the upper end of described support bar is arranged on the lower section of described free bearing.
Specifically, described fixing seat is the steel plate being welded on described nose girder front leg strut, and described fixing seat is provided with through hole,
The upper end of described screw rod is connected through described through hole and by fixing nut and described fixing seat are vertically fixing.
Specifically, described adjusting nut is Double-ended nut, and the female thread of the first end of described adjusting nut is left hand thread,
The female thread of the second end of described adjusting nut is right-handed thread, and the upper end of described screw rod and the lower end of described support bar set respectively
It is equipped with the external screw thread corresponding with the two ends of described adjusting nut.
Further, what the middle part of described adjusting nut was provided perpendicular to its axis screws stress hole.
Preferably, described support bar is toggle-action lever, and described fixing seat, described screw rod, described adjusting nut and described
Strut quantity is two, and the axis along described free bearing is symmetrically distributed in the both sides of described nose girder front leg strut respectively.
Having the beneficial effects that of this utility model a kind of Bridge Erector flexible leg twisted seat temporary fastening device:
1) bridge machine become across during convert leg location time fix twisted seat, it is achieved nose girder front leg strut rigidity and flexible change
Change, solve the problem disassembled with installation difficulty;
2) evade blue-collar security risk in work high above the ground, eliminate the high-risk operation of artificial fixing twisted seat;
3) greatly reduce workload, decrease cost payout, improve working performance, it is ensured that become the safety across construction steady
Qualitative, and this device is small, simple in construction, it is simple to safeguard and adjust, reducing manufacture difficulty.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of Bridge Erector flexible leg twisted seat temporary fastening device described in the utility model.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings:
As it is shown in figure 1, this utility model one Bridge Erector flexible leg twisted seat temporary fastening device, Bridge Erector nose girder 9 leads to
Cross connected free bearing 8 and pin 7 flexibly connect with nose girder front leg strut 6, temporary fastening device include fixing seat 1, screw rod 2,
Adjusting nut 4 and support bar 5, fixing seat 1 is fixing with nose girder front leg strut 6 to be connected, and screw rod 2 is fixed with fixing seat 1, support bar 5
Lower end is connected with screw rod 2 by adjusting nut 4, and the upper end of support bar 5 is arranged on the lower section of free bearing 8, and fixing seat 1 is led for being welded on
The steel plate of beam front leg strut 6, fixing seat 1 is provided with through hole, and the upper end of screw rod 2 passes through hole and by fixing nut 3 with fixing
Seat 1 is the most fixing to be connected, and adjusting nut 4 is Double-ended nut, and the female thread of the first end of adjusting nut 4 is left hand thread, adjusts
The female thread of the second end of nut 4 is right-handed thread, and the upper end of screw rod 2 and the lower end of support bar 5 are respectively arranged with and adjust spiral shell
The external screw thread that the two ends of female 4 are corresponding, the middle part of adjusting nut 4 is provided perpendicular to the stress hole that screws of its axis, support bar 5
For toggle-action lever, and fixing seat 1, screw rod 2, adjusting nut 4 and support bar 5 quantity are two, respectively along the axis pair of free bearing 8
Claim the both sides being distributed in nose girder front leg strut 6.
The operation principle of this utility model a kind of Bridge Erector flexible leg twisted seat temporary fastening device is as follows:
Become as a example by into 24 meters of constructions by DF900D Bridge Erector 32 meters, as it is shown in figure 1, Bridge Erector is in 32 meters of span location
Time, when needs become when into 24 meters, auxiliary screwing device is inserted into and screws in stress hole in the middle part of adjusting nut 4, then lead to
Crossing to pull assists screwing device to make adjusting nut 4 rotate, because the female thread at screw on nut two ends is oppositely oriented, adjusts so rotating
During whole nut 4, the distance between screw rod 2 and support bar 5 can be made to increase or reduce, by screwing adjusting nut 4, regulating support
The height of bar 5, makes the upper end of support bar 5 be resisted against the both sides of downside of free bearing 8, thus define pin 7 rotate from by
Degree, it is achieved that the interim of free bearing 8 is fixed so that it is form rigid structure with nose girder front leg strut 6.
Then disassembling the connecting bolt between free bearing 8 and Bridge Erector nose girder 9, mobile above-mentioned rigid structure is to 24 meters of spans
Position, connect and fasten the bolt between free bearing 8 and Bridge Erector nose girder 9, the most again rotate adjusting nut 4, make support bar 5
Declining, and arrange certain space between free bearing 8, thus recover the flexible structure of nose girder front leg strut 6, Bridge Erector is normally set a roof beam in place.
Thus realize in whole leg location conversion process, substantially reduce workload, add become across security and stability.
The technical solution of the utility model is not limited to the restriction of above-mentioned specific embodiment, every according to skill of the present utility model
The technology deformation that art scheme is made, within each falling within protection domain of the present utility model.
Claims (5)
1. a Bridge Erector flexible leg twisted seat temporary fastening device, described Bridge Erector nose girder passes through connected free bearing and pin
Nail flexibly connects with described nose girder front leg strut, it is characterised in that: include fixing seat, screw rod, adjusting nut and support bar, described solid
Reservation is fixing with the upper end of described nose girder front leg strut to be connected, and described screw rod is fixed with described fixing seat, the lower end of described support bar
Being connected with described screw rod by described adjusting nut, the upper end of described support bar is arranged on the lower section of described free bearing.
A kind of Bridge Erector flexible leg twisted seat temporary fastening device the most according to claim 1, it is characterised in that: described solid
Reservation is the steel plate being welded on described nose girder front leg strut, and described fixing seat is provided with through hole, and the upper end of described screw rod passes institute
State through hole and be connected by fixing nut and described fixing seat are vertically fixing.
A kind of Bridge Erector flexible leg twisted seat temporary fastening device the most according to claim 2, it is characterised in that: described tune
Whole nut is Double-ended nut, and the female thread of the first end of described adjusting nut is left hand thread, the second end of described adjusting nut
Female thread be right-handed thread, the upper end of described screw rod and the lower end of described support bar are respectively arranged with and described adjusting nut
The external screw thread that two ends are corresponding.
A kind of Bridge Erector flexible leg twisted seat temporary fastening device the most according to claim 3, it is characterised in that: described tune
What the middle part of whole nut was provided perpendicular to its axis screws stress hole.
A kind of Bridge Erector flexible leg twisted seat temporary fastening device the most according to claim 3, it is characterised in that: described
Strut is toggle-action lever, and described fixing seat, described screw rod, described adjusting nut and described support bar quantity are two, respectively
Axis along described free bearing is symmetrically distributed in the both sides of described nose girder front leg strut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620580441.8U CN205741931U (en) | 2016-06-13 | 2016-06-13 | A kind of Bridge Erector flexible leg twisted seat temporary fastening device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620580441.8U CN205741931U (en) | 2016-06-13 | 2016-06-13 | A kind of Bridge Erector flexible leg twisted seat temporary fastening device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205741931U true CN205741931U (en) | 2016-11-30 |
Family
ID=57386013
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620580441.8U Withdrawn - After Issue CN205741931U (en) | 2016-06-13 | 2016-06-13 | A kind of Bridge Erector flexible leg twisted seat temporary fastening device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205741931U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105280589A (en) * | 2015-09-29 | 2016-01-27 | 武汉光迅科技股份有限公司 | Chip heat radiation assembly and chip circuit board thereof |
CN105887697A (en) * | 2016-06-13 | 2016-08-24 | 中铁八局集团第二工程有限公司 | Temporary flexible leg hinged support fixing device for bridge girder erection machine |
-
2016
- 2016-06-13 CN CN201620580441.8U patent/CN205741931U/en not_active Withdrawn - After Issue
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105280589A (en) * | 2015-09-29 | 2016-01-27 | 武汉光迅科技股份有限公司 | Chip heat radiation assembly and chip circuit board thereof |
CN105887697A (en) * | 2016-06-13 | 2016-08-24 | 中铁八局集团第二工程有限公司 | Temporary flexible leg hinged support fixing device for bridge girder erection machine |
CN105887697B (en) * | 2016-06-13 | 2019-01-11 | 中铁八局集团第二工程有限公司 | A kind of Bridge Erector flexible leg twisted seat temporary fastening device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103866986B (en) | Long span variable cross-section bolted spherical node net shell mounting method | |
CN102535646B (en) | Multidirectional error-adjustable node suitable for suspend-dome space structure | |
CN209010026U (en) | A kind of derrick crane attachment device reinforcement strut | |
CN206555567U (en) | A kind of antidetonation suspension and support | |
CN205741931U (en) | A kind of Bridge Erector flexible leg twisted seat temporary fastening device | |
CN205025117U (en) | Adjustable bearing diagonal is used in assembly type structure prefabricated component installation | |
CN208327164U (en) | Adaptive steel truss girder center of gravity, mounted angle change hoisting appliance | |
CN202850515U (en) | Regulating-type temporary supporting rod for inclined steel column installation | |
CN210813600U (en) | Fixing device for construction operation safety belt | |
CN202745199U (en) | Centering pitch point with adjustable error | |
CN207890943U (en) | The combined attachment device of tower crane | |
CN204126297U (en) | A kind of temporary support of steel truss roof | |
CN107100271B (en) | A method of steel member camber is adjusted using adjustable drawbar | |
CN207228750U (en) | Become length section triple strain combination emergent repairing tower | |
CN105887697B (en) | A kind of Bridge Erector flexible leg twisted seat temporary fastening device | |
CN209703979U (en) | A kind of construction coherent-wall scaffolding cantilever arrangement | |
CN201671354U (en) | Maintenance tool for steel grid structure rod pieces | |
CN104805902B (en) | It is a kind of to improve the structure of hangar stress performance | |
CN103938555B (en) | A kind of method for designing detecting reinforcing prestressing force adjustable support | |
CN209325179U (en) | Structure for supporting fire-fighting water pipe | |
CN208830492U (en) | A kind of steel column connection structure of assembled architecture | |
CN202072414U (en) | Wind resistant device of cable loading crane | |
CN208279232U (en) | A kind of derrick crane safety device being easily installed | |
CN221321697U (en) | Climbing device for climbing frame during high-rise structure | |
CN102444283A (en) | Lateral bracing structure of building formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20161130 Effective date of abandoning: 20190111 |