CN205721989U - A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system - Google Patents

A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system Download PDF

Info

Publication number
CN205721989U
CN205721989U CN201620273003.7U CN201620273003U CN205721989U CN 205721989 U CN205721989 U CN 205721989U CN 201620273003 U CN201620273003 U CN 201620273003U CN 205721989 U CN205721989 U CN 205721989U
Authority
CN
China
Prior art keywords
modeling
computer
transformer station
control system
regulator control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620273003.7U
Other languages
Chinese (zh)
Inventor
印吉景
张宇蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Taizhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Taizhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Taizhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201620273003.7U priority Critical patent/CN205721989U/en
Application granted granted Critical
Publication of CN205721989U publication Critical patent/CN205721989U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

nullThe utility model discloses a kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system,Some on-site data gathering devices are respectively mounted in some actual transformer stations,Some outfans of on-site data gathering device are connected with the input of regulator control system,The outfan of regulator control system is connected with the input of computer 3D modeling,The outfan of computer 3D modeling is connected with the 3D panoramic indicator in scheduling hall,On-site data gathering device is for surveying and drawing substation field,The relative position of all devices in collection transformer station、The deviation angle and actual size,Regulator control system is for relative position、The parameter of the deviation angle and actual size be adjusted and will adjust after real-time Data Transmission to computer 3D modeling,Computer 3D modeling carries out three-dimensional modeling according to the data after gathering and processing to equipment original paper,And the device model after modeling carries out 360 ° of panoramas and shows.

Description

A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system
Technical field
This utility model relates to a kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system.
Background technology
Along with socioeconomic high speed development, the growth year by year of supply load, the continuous expansion of electrical network scale, the deep development of intelligent power grid technology, the continuous release of the advanced power grid operation management modes such as regulation and control unification, fortune inspection unification, it is also proposed higher requirement to the business skill of electrical network professional and technical personnel.Current dispatching automation is all based on D5000 system development, dispatching of power netwoks and monitoring business are carried out based on this systematic difference, this system belongs to 2D planarization and shows, normal information and the most all plane pictures of fault message and word are constituted, Informational Expression is single, and actual field situation can not be shown by panorama, not enough to on-the-spot object display power, professional especially being regulated and controled to personnel and there is certain visual angle blind zone, in accident analysis and processing procedure, the understanding to on-site actual situations has difficulties.
The frequency regenerated along with technology innovation is accelerated and the surge of transformer station's quantity, professional especially regulates and controls the disconnection that personnel understand that to scene existence is the biggest, there is the biggest potential safety hazard, the most current job requirement and rhythm also propose higher requirement to work efficiency, and everything all proposes new requirement to dispatch automated system.
Utility model content
This utility model provides a kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system, it bases oneself upon employing Virtual Simulation, any transformer station of 3Dization actual scene, panorama shows a secondary device running status, and carry out control manipulation on the platform, greatly promote professional to the grasp of on-site actual situations and understanding.
nullThis utility model have employed techniques below scheme: a kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system,It includes some on-site data gathering devices、Regulator control system,Some on-site data gathering devices are respectively mounted in some actual transformer stations,Some outfans of on-site data gathering device are connected with the input of regulator control system,The outfan of regulator control system is connected with the input of computer 3D modeling,The outfan of computer 3D modeling is connected with the 3D panoramic indicator in scheduling hall,Described on-site data gathering device is for surveying and drawing substation field,The relative position of all devices in collection transformer station、The deviation angle and actual size,Regulator control system is for relative position、The parameter of the deviation angle and actual size be adjusted and will adjust after real-time Data Transmission to computer 3D modeling,Computer 3D modeling carries out three-dimensional modeling according to the data after gathering and processing to equipment original paper,And the device model after modeling is assembled、Check and shown by 360 ° of panoramas of 3D panoramic indicator after rendering with three-dimensional specially good effect.
Described regulator control system is set to D5000 intelligent grid dispatching patcher.
This utility model has the advantages that after have employed above technical scheme, electric power system dispatching monitoring system under this utility model conventional two-dimensional different from the past pattern, the field apparatus picture of reaction is true to nature, and presence is strong, has extremely strong assistant regulating and controlling effect and understanding effect.This utility model can truly reflect transformer station's facilities and equipment details and feature, allows management personnel and technical staff get information about the facilities and equipment situation of transformer station;The real time data of electrical network production run is combined by this utility model with 3-D graphic, allows regulation and control personnel and operation maintenance personnel can obtain the up-to-date ruuning situation of current electric grid more intuitively, effectively guarantees power grid security, stable, high-quality operation;This utility model utilizes the Virtual Substation scene of three-dimensional visualization, training substation planning, build, make an inspection tour and operator, make full use of the multimedia presentation such as text, figure, 3-dimensional image, three-dimensional animation and sound and stimulate the vision of student, auditory nerve, transfer enthusiasm and the initiative of student, thus improve result of training;This utility model three-dimensional visualization represent transformer station, present the spatial relationship of transformer station's facilities and equipment, ancillary works designer carries out the design and analysis of reconstruction and extension project, and auxiliary construction unit carries out reconstruction and extension project construction;Spatial data based on this utility model, it is achieved transformer station's assets digital management;In Process of Engineering Construction, at different phase multi collect threedimensional model, can clear performance engineering construction situation and progress, for the acceptance of work and report provide foundation.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
nullIn FIG,This utility model provides a kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system,It includes some on-site data gathering devices、Regulator control system,The present embodiment includes 10 on-site data gathering devices,10 on-site data gathering devices are respectively mounted in 10 actual transformer stations,The outfan of 10 on-site data gathering devices is connected with the input of regulator control system,The outfan of regulator control system is connected with the input of computer 3D modeling,The outfan of computer 3D modeling is connected with the 3D panoramic indicator in scheduling hall,Described on-site data gathering device is for surveying and drawing substation field,The relative position of all devices in collection transformer station、The deviation angle and actual size,Regulator control system is for relative position、The parameter of the deviation angle and actual size be adjusted and will adjust after real-time Data Transmission to computer 3D modeling,Computer 3D modeling carries out three-dimensional modeling according to the data after gathering and processing to equipment original paper,And the device model after modeling is assembled、Check and shown by 360 ° of panoramas of 3D panoramic indicator after rendering with three-dimensional specially good effect,Described regulator control system is set to D5000 intelligent grid dispatching patcher.This utility model 3D based on Virtual Simulation transformer station panorama real-time monitoring system can break traditions pattern, base oneself upon employing Virtual Simulation, any transformer station of 3Dization actual scene, by computer screen and the giant-screen of extension, 360 degree of panoramas show a secondary device running status, and carry out control manipulation on the platform, and real time dynamic simulation field apparatus action situation, greatly promote regulation and control professional's grasp to on-site actual situations, deepen the understanding to transformer station's physical device operational circumstances.
On-site data gathering device: need to choose typical case transformer station, carry out field surveys, gathers in transformer station the key parameters such as the relative position of all devices, the deviation angle, actual size;Computer 3D modeling models in transformer station: first, carry out substation equipment element three-dimensional modeling, basic data according to gathering is modeled in unified coordinate system, secondly, complete model to assemble, single device model carries out specialty assembling respectively, region assembles and overall package, completes to connect each interregional interface;Finally, firmly collide and soft collision inspection, check whether electrical equipment occurs position to conflict with other specialty threedimensional models, including: electrical equipment and the collision etc. of civil engineering structure, then carry out the verification of three dimensions band electrical distance;Three-dimensional specially good effect renders: increase arbitrarily scaling, 360 degree check, the Premium Features of three-dimensional range.People can be allowed " to enter into " transformer station, on the spot in person all of transformer station of checking;Real-time data imputing system.Correspondence is carried out in D5000 device model after giving certain attribute by three-dimensional electrical model, the real time data of equipment in D5000 is attached on threedimensional model, enable regulation and control personnel to check the real time data of equipment intuitively, effectively guarantee power grid security, stable, high-quality operation.

Claims (2)

  1. null1. 3D transformer station based on a Virtual Simulation panorama real-time monitoring system,It is characterized in that it includes some on-site data gathering devices、Regulator control system,Some on-site data gathering devices are respectively mounted in some actual transformer stations,Some outfans of on-site data gathering device are connected with the input of regulator control system,The outfan of regulator control system is connected with the input of computer 3D modeling,The outfan of computer 3D modeling is connected with the 3D panoramic indicator in scheduling hall,Described on-site data gathering device is for surveying and drawing substation field,The relative position of all devices in collection transformer station、The deviation angle and actual size,Regulator control system is for relative position、The parameter of the deviation angle and actual size be adjusted and will adjust after real-time Data Transmission to computer 3D modeling,Computer 3D modeling carries out three-dimensional modeling according to the data after gathering and processing to equipment original paper,And the device model after modeling is assembled、Check and shown by 360 ° of panoramas of 3D panoramic indicator after rendering with three-dimensional specially good effect.
  2. 3D transformer station based on Virtual Simulation the most according to claim 1 panorama real-time monitoring system, is characterized in that described regulator control system is set to D5000 intelligent grid dispatching patcher.
CN201620273003.7U 2016-04-05 2016-04-05 A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system Expired - Fee Related CN205721989U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620273003.7U CN205721989U (en) 2016-04-05 2016-04-05 A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620273003.7U CN205721989U (en) 2016-04-05 2016-04-05 A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system

Publications (1)

Publication Number Publication Date
CN205721989U true CN205721989U (en) 2016-11-23

Family

ID=57311561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620273003.7U Expired - Fee Related CN205721989U (en) 2016-04-05 2016-04-05 A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system

Country Status (1)

Country Link
CN (1) CN205721989U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105894576A (en) * 2016-04-05 2016-08-24 国家电网公司 3D substation panoramic real-time control system based on virtual simulation technology
CN107369201A (en) * 2017-06-21 2017-11-21 安徽森度科技有限公司 A kind of transformer station's panorama 3D emulation modes
CN107368628A (en) * 2017-06-21 2017-11-21 安徽森度科技有限公司 A kind of intelligent substation accessory system based on emulation panorama 3D technology
CN110135670A (en) * 2018-02-08 2019-08-16 国网青海省电力公司经济技术研究院 The method for building up of project of transmitting and converting electricity technical economy intelligent evaluation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105894576A (en) * 2016-04-05 2016-08-24 国家电网公司 3D substation panoramic real-time control system based on virtual simulation technology
CN107369201A (en) * 2017-06-21 2017-11-21 安徽森度科技有限公司 A kind of transformer station's panorama 3D emulation modes
CN107368628A (en) * 2017-06-21 2017-11-21 安徽森度科技有限公司 A kind of intelligent substation accessory system based on emulation panorama 3D technology
CN110135670A (en) * 2018-02-08 2019-08-16 国网青海省电力公司经济技术研究院 The method for building up of project of transmitting and converting electricity technical economy intelligent evaluation

Similar Documents

Publication Publication Date Title
CN105894576A (en) 3D substation panoramic real-time control system based on virtual simulation technology
CN103093663B (en) Hydropower station three-dimensional precise modeling and visualization simulation training system and implementation method thereof
CN205721989U (en) A kind of 3D transformer station based on Virtual Simulation panorama real-time monitoring system
CN106802993A (en) A kind of exhibiting method of the operation of the electric network swim under three-dimensional scenic
CN102509330B (en) Application of virtual three-dimensional system of transformer substation on the basis of electric power geographic information system (GIS)
CN104166892A (en) Engineering management and control method and system based on three-dimensional design system
CN102360535A (en) Three-dimensional visual simulation training system and method
CN109360287A (en) Transmission line of electricity three-dimensional digital fortune inspection management system
CN109472483A (en) A kind of building-site modeling method and system based on BIM model and technology of taking photo by plane
CN103065513A (en) Three-dimensional virtual training system of transformer equipment
CN104537573A (en) Power grid operation information panoramic visualized display system
CN110276555A (en) Residential housing entity Life cycle analysis method based on internet and BIM
CN207096933U (en) Depot of urban railway transit vehicles operation maintenance management system based on BIM and VR technologies
CN103594005A (en) Three-dimensional simulation training system and method for transformer manufacturing process
CN110322564A (en) A kind of 3 D model construction method of the substation operation environment suitable for VR/AR
CN109215432A (en) A kind of power plant's operation training system based on VR virtual technology
CN101866462A (en) Supporting platform for product collaborative maintenance and maintenance method
CN103780873A (en) Method for realizing 3D scene display by transformer station video monitoring system
CN206991048U (en) Analogue system for transformer station
CN113936513A (en) Three-dimensional visualization-based wind power plant training method, device and equipment
CN102877443A (en) Sluice interaction control system based on virtual reality and technology of Internet of things
CN105844704A (en) Nuclear security 3D virtual simulation method
CN113128716A (en) Operation guidance interaction method and system
CN117409625A (en) Substation equipment training system and method based on mixed reality
CN108597340A (en) A kind of electric network swim three-dimensional electronic sand table Real-time modeling set method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20210405