CN205703449U - Cage guide full-automatic metalworking pipeline - Google Patents

Cage guide full-automatic metalworking pipeline Download PDF

Info

Publication number
CN205703449U
CN205703449U CN201620298716.9U CN201620298716U CN205703449U CN 205703449 U CN205703449 U CN 205703449U CN 201620298716 U CN201620298716 U CN 201620298716U CN 205703449 U CN205703449 U CN 205703449U
Authority
CN
China
Prior art keywords
guide rail
vertical shift
guide
cage guide
conveying mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620298716.9U
Other languages
Chinese (zh)
Inventor
王佳斌
夏家兵
薛跃
夏军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangyun Machinery Manufacturing Co Ltd In City Of Zhangjiagang
Original Assignee
Zhangyun Machinery Manufacturing Co Ltd In City Of Zhangjiagang
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangyun Machinery Manufacturing Co Ltd In City Of Zhangjiagang filed Critical Zhangyun Machinery Manufacturing Co Ltd In City Of Zhangjiagang
Priority to CN201620298716.9U priority Critical patent/CN205703449U/en
Application granted granted Critical
Publication of CN205703449U publication Critical patent/CN205703449U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Specific Conveyance Elements (AREA)

Abstract

nullThe utility model discloses cage guide full-automatic metalworking pipeline,Including the frame being provided with transverse onveyer,Guide rail vertical shift conveying mechanism it is interval with in frame above transverse onveyer,It is arranged with transition blowing platform on rear side of each guide rail vertical shift conveying mechanism,Stock stop is set up separately on rear side of each transition blowing platform,Set up separately at each stock stop and the cage guide stopped by stock stop on transverse onveyer can be overturn forward the guide rail material stirring-up mechanism that inclined T-shaped is placed on the transition blowing platform in front,On front side of each guide rail vertical shift conveying mechanism, set up guide rail separately right mechanism,Jacking transverse-moving mechanism is set up separately below each guide rail vertical shift conveying mechanism,Cage guide on transition blowing platform can be sent into guide rail vertical shift conveying mechanism by jacking transverse-moving mechanism、And the cage guide feeding guide rail in guide rail vertical shift conveying mechanism is righted mechanism,It can be that ⊥ shape is put on transverse onveyer by cage guide that guide rail rights mechanism.This utility model has the advantage that work efficiency is high.

Description

Cage guide full-automatic metalworking pipeline
Technical field
This utility model relates to cage guide manufacture field, is specifically related to cage guide full-automatic metalworking pipeline.
Background technology
The car of cage type elevator is to realize stable vertical lift by sliding up and down along T-shaped guide rail.The structure of T-shaped guide rail is: include the guide rail body that cross section is T-shaped, and guide rail body is by fixed arm and is perpendicular to the leading arm in the middle part of fixed arm and forms.T-shaped guide rail, when installing and using, is to be fixed with building by the fixed arm of T-shaped guide rail, makes the leading arm of T-shaped guide rail be slidably matched with car, it is therefore necessary to ensure the quality of T-shaped guide rail.T-shaped guide rail all needs to carry out metalworking through excessive back of the body Milling Machining unit, mortise and tenon machining cell, the biggest back of the body Milling Machining unit is to use big back of the body milling machine that the fixed arm back side, two ends and the end face of T-shaped guide rail are carried on the back greatly milling, and mortise and tenon machining cell is to use cloudy tenon bed and sun tenon bed to offer cloudy tenon and sun tenon respectively at the two ends of T-shaped guide rail.
The metalworking process of the metalworking pipeline used at present is: after the most manually the cage guide being placed on transverse onveyer in ⊥ shape being overturn T-shaped placement, the most manually move in big back of the body milling machine and carry on the back greatly milling, after completing to carry on the back greatly milling operation, more manually cage guide upset is placed on transverse onveyer to later process conveying in ⊥ shape;After cage guide arrives cloudy tenon bed place station, the artificial cage guide T-shaped placement of upset being placed on transverse onveyer in ⊥ shape again, and remove Zhiyin tenon bed carries out the processing of cloudy tenon, after completing cloudy tenon operation, manually cage guide upset is placed on transverse onveyer in ⊥ shape again and carries to later process, after cage guide arrives cloudy tenon bed place station, the artificial cage guide T-shaped placement of upset being placed on transverse onveyer in ⊥ shape again, and remove Zhiyang tenon bed is carried out sun tenon processing, after completing sun tenon processing, manually cage guide upset is placed on transverse onveyer in ⊥ shape again.Above-mentioned metalworking pipeline exists that labor strength is big and ineffective shortcoming.
Utility model content
The purpose of this utility model is to provide the high cage guide of a kind of work efficiency full-automatic metalworking pipeline.
nullFor achieving the above object,This utility model adopts the technical scheme that described cage guide full-automatic metalworking pipeline,Including: frame,The transverse onveyer in order to lateral transfer cage guide it is provided with in frame,In frame above transverse onveyer, reach direction along cage guide is sequentially arranged at intervals with the guide rail vertical shift conveying mechanism of cage guide of the longitudinally fed T-shaped placement of some energy,It is respectively arranged with to place the transition blowing platform of cage guide in frame on rear side of each guide rail vertical shift conveying mechanism,The stock stop stopping cage guide reach it is respectively arranged with in frame on rear side of each transition blowing platform,Guide rail material stirring-up mechanism it is respectively arranged with in frame at each stock stop,The cage guide stopped by stock stop on transverse onveyer can be overturn forward inclined T-shaped and be placed on the transition blowing platform in front by guide rail material stirring-up mechanism,It is respectively arranged with guide rail in frame on front side of each guide rail vertical shift conveying mechanism and rights mechanism,It is also respectively provided with jacking transverse-moving mechanism in frame below each guide rail vertical shift conveying mechanism,Each jacking transverse-moving mechanism can be by the guide rail vertical shift conveying mechanism in the cage guide T-shaped feeding front on transition blowing platform、And the guide rail that the cage guide in guide rail vertical shift conveying mechanism is sent into front rights mechanism,Guide rail rights mechanism and can cage guide upset in ⊥ shape and be positioned on the transverse onveyer in front.
Further, aforesaid cage guide full-automatic metalworking pipeline, wherein: the structure of described guide rail vertical shift conveying mechanism is: include the longitudinally spaced installing rack being distributed in frame of at least two, hoist cylinder it is vertically provided with respectively at the top of each installing rack, the piston rod of each hoist cylinder upwards and is fixed with a crane, in each crane, expansion bearing has a work shape conveying roller respectively, each work shape conveying roller is respectively by the motor-driven rotation being installed in corresponding crane, when all work shape conveying rollers rotating in same direction simultaneously, all work shape conveying rollers are collectively forming the guide rail vertical shift delivery platform of the cage guide of the longitudinally fed T-shaped placement of energy.
Further, aforesaid cage guide full-automatic metalworking pipeline, wherein: the structure of described installing rack is: include in the upper installing rack being distributed up and down and lower installing rack, it is connected between upper installing rack with lower installing rack and has some screw rods, jack panel is fixed on a pair by the upper end of every screw rod respectively with upper installing rack, and jack panel is fixed with lower installing rack by the lower end of every screw rod respectively by a pair time.
By the enforcement of technique scheme, the utility model has the advantages that: can realize the conveying of the automatic metalworking to cage guide, labor strength is low, and work efficiency is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of cage guide described in the utility model full-automatic metalworking pipeline.
Fig. 2 is the structural representation of the guide rail vertical shift conveying mechanism shown in Fig. 1.
Fig. 3 is the full-automatic metalworking pipeline of the cage guide shown in Fig. 1 and the right side is carried on the back greatly milling machine, left carried on the back greatly milling machine, cloudy tenon bed and the mutual alignment relation schematic diagram of sun tenon bed.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
nullSuch as Fig. 1、Fig. 2、Shown in Fig. 3,Described cage guide full-automatic metalworking pipeline,Including: frame 1,The transverse onveyer 3 in order to lateral transfer cage guide 2 it is provided with in frame 1,In frame 1 above transverse onveyer 3, reach direction along cage guide 2 is sequentially arranged at intervals with the guide rail vertical shift conveying mechanism 4 of cage guide of the longitudinally fed T-shaped placement of some energy,It is respectively arranged with to place the transition blowing platform 5 of cage guide 2 in frame 1 on rear side of each guide rail vertical shift conveying mechanism 4,The stock stop 6 stopping cage guide 2 reach it is respectively arranged with in frame 1 on rear side of each transition blowing platform 5,It is respectively arranged with guide rail material stirring-up mechanism 7 in frame 1 at each stock stop 6,The cage guide 2 stopped by stock stop 6 on transverse onveyer 3 can be overturn forward inclined T-shaped and be placed on the transition blowing platform 5 in front by guide rail material stirring-up mechanism 7,It is respectively arranged with guide rail in frame 1 on front side of each guide rail vertical shift conveying mechanism 4 and rights mechanism 8,It is also respectively provided with jacking transverse-moving mechanism 9 in frame 1 below each guide rail vertical shift conveying mechanism 4,Each jacking transverse-moving mechanism 9 can be by the guide rail vertical shift conveying mechanism 4 in the cage guide 2 T-shaped feeding front on transition blowing platform 5、And the guide rail that the cage guide 2 in guide rail vertical shift conveying mechanism 4 is sent into front rights mechanism 8,Guide rail rights mechanism 8 can overturn in ⊥ shape and be positioned on the transverse onveyer in front 3 by cage guide 2;nullIn the present embodiment,It is provided with four guide rail vertical shift conveying mechanisms altogether、Four guide rail material stirring-up mechanisms、Four stock stop、Four transition blowing platforms、Four guide rails right mechanism and four jacking transverse-moving mechanisms,I.e. it is sequentially arranged at intervals with the first guide rail material stirring-up mechanism 7 along cage guide 2 direction that moves forward、First stock stop 6、First Transition blowing platform 5、First guide rail vertical shift conveying mechanism 4、First guide rail rights mechanism 8、Second guide rail material stirring-up mechanism 71、Second stock stop 61、Second transition blowing platform 51、Second guide rail vertical shift conveying mechanism 41、Second guide rail rights mechanism 81、3rd guide rail material stirring-up mechanism 72、Third gear material mechanism 62、3rd transition blowing platform 52、3rd guide rail vertical shift conveying mechanism 42、3rd guide rail rights mechanism 82、4th guide rail material stirring-up mechanism 73、Fourth gear material mechanism 63、4th transition blowing platform 53、4th guide rail vertical shift conveying mechanism 43、4th guide rail rights mechanism 83,It is provided with the first jacking transverse-moving mechanism 9 in frame 1 immediately below the first guide rail vertical shift conveying mechanism 4、It is provided with the second jacking transverse-moving mechanism 91 in frame 1 immediately below the second guide rail vertical shift conveying mechanism 41、It is provided with the 3rd jacking transverse-moving mechanism 92 in frame 1 immediately below 3rd guide rail vertical shift conveying mechanism 42、It is provided with the 4th jacking transverse-moving mechanism 93 in frame 1 immediately below 4th guide rail vertical shift conveying mechanism 43,So can right between mechanism 8 and the second stock stop 61 first、Second rights between mechanism 81 and third gear material mechanism 62、And the 3rd right form respectively to stack cage guide 2 on the transverse onveyer 3 between mechanism 82 and fourth gear material mechanism 63 accumulate region,Thus substantially increase the treatment effeciency to cage guide;nullIn the present embodiment,Due to the first guide rail vertical shift conveying mechanism 4、Second guide rail vertical shift conveying mechanism 41、3rd guide rail vertical shift conveying mechanism 42 is the most identical with the structure of the 4th guide rail vertical shift conveying mechanism 43,The most only illustrate as a example by the structure of the first guide rail vertical shift conveying mechanism 4,The structure of described first guide rail vertical shift conveying mechanism 4 is: include the longitudinally spaced installing rack being distributed in frame 1 of at least two,Hoist cylinder 10 it is vertically provided with respectively at the top of each installing rack,The piston rod of each hoist cylinder 10 upwards and is fixed with a crane 11,In each crane 11, expansion bearing has a work shape conveying roller 12 respectively,Each work shape conveying roller 12 is driven rotation by the motor 13 being installed in corresponding crane 11 respectively,When all work shape conveying rollers 12 rotating in same direction simultaneously,All work shape conveying rollers 12 are collectively forming the guide rail vertical shift delivery platform of the cage guide 2 of the longitudinally fed T-shaped placement of energy,Above-mentioned guide rail vertical shift conveying mechanism simple in construction,Convenient to install and maintain;In the present embodiment, owing to the structure of all installing racks is the most identical, the most only illustrate as a example by the structure of one of them installing rack, the structure of described installing rack is: include in the upper installing rack 14 being distributed up and down and lower installing rack 15, it is connected between upper installing rack 14 with lower installing rack 15 and has some screw rods 16, jack panel 17 is fixed on a pair by the upper end of every screw rod 16 respectively with upper installing rack 14, the lower end of every screw rod 16 is respectively by fixing with lower installing rack 15 jack panel 18 for a pair time, above-mentioned installing rack not only dismounts easy to maintenance, and can by regulation to jack panel 17 or lower jack panel 18 regulated spacing between upper installing rack 14 and lower installing rack 15, thus the height of work shape conveying roller 12 is adjusted;In actual applications, move forward direction along cage guide 2, right big back of the body milling machine 19 it is provided with on the right side of the first guide rail vertical shift conveying mechanism 4, left big back of the body milling machine 20 it is provided with in the left side of the second guide rail vertical shift conveying mechanism 41, it is provided with cloudy tenon bed 21 on the right side of the 3rd guide rail vertical shift conveying mechanism 42, is provided with sun tenon bed 22 in the left side of the 4th guide rail vertical shift conveying mechanism 43;
Operation principle of the present utility model is as follows:
nullFirst cage guide 2 is placed on transverse onveyer 3 in ⊥ shape,Transverse onveyer 3 drives cage guide 2 to move forward to the first stock stop 6,First guide rail material stirring-up mechanism 7 can overturn forward inclined T-shaped be placed on being parked in the cage guide 2 at the first stock stop 6 on First Transition blowing platform 5,Then the first jacking transverse-moving mechanism 9 is by the first guide rail vertical shift conveying mechanism 4 in the cage guide 2 T-shaped feeding front on First Transition blowing platform 5,Then make all work shape conveying rollers 12 in the first guide rail vertical shift conveying mechanism 4 rotate clockwise simultaneously,Thus automatically will be located in the cage guide 2 in the first guide rail vertical shift conveying mechanism 4 and send into right big back of the body milling machine 19 and carry out the fixed arm back side and the big back of the body milling operation of end face on the right side of cage guide,During cage guide 2 is sent into right big back of the body milling machine 19 by the first guide rail vertical shift conveying mechanism 4,Transverse onveyer 3 may proceed to move forward to cage guide 2 first stock stop 6,First guide rail material stirring-up mechanism 7 continues to overturn forward inclined T-shaped be placed on being parked in next the root cage guide 2 at the first stock stop 6 on First Transition blowing platform 5;
nullAfter cage guide 2 completes right side big back of the body Milling Machining,Make all work shape conveying rollers 12 in the first guide rail vertical shift conveying mechanism 4 rotate counterclockwise simultaneously,Thus cage guide is carried on the back greatly milling machine 19 from the right side retreats to the first guide rail vertical shift conveying mechanism 4 automatically,Then make the first jacking transverse-moving mechanism 9 that the first guide rail that front sent into by the cage guide 2 in first guide rail vertical shift conveying mechanism 4 is righted mechanism 8、And cage guide 2 T-shaped feeding the first guide rail vertical shift conveying mechanism 4 of metalworking on First Transition blowing platform 5, will be treated,Now,First guide rail rights mechanism 8 and can be overturn by cage guide 2 and be positioned on the transverse onveyer in front 3 in ⊥ shape,Transverse onveyer 3 then continues to move forward at the second stock stop 61 this cage guide 2,Then the second guide rail material stirring-up mechanism 71 can overturn forward inclined T-shaped be placed on being parked in the cage guide 2 at the second stock stop 61 on the second transition blowing platform 51,Then the second jacking transverse-moving mechanism 91 is by the second guide rail vertical shift conveying mechanism 41 in the cage guide 2 T-shaped feeding front on the second transition blowing platform 51,Then make all work shape conveying rollers 12 in the second guide rail vertical shift conveying mechanism 41 rotate counterclockwise simultaneously,Thus automatically will be located in the cage guide 2 in the second guide rail vertical shift conveying mechanism 41 and send into left big back of the body milling machine 20 and carry out the big back of the body milling operation of the fixed arm back side, cage guide great Qu side and end face,During cage guide 2 is sent into left big back of the body milling machine 20 by the second guide rail vertical shift conveying mechanism 41,Transverse onveyer 3 may proceed to move forward to cage guide 2 second stock stop 61,Second guide rail material stirring-up mechanism 71 continues to overturn forward inclined T-shaped be placed on being parked in next the root cage guide 2 at the second stock stop 61 on the second transition blowing platform 51;
nullAfter cage guide 2 completes left side big back of the body Milling Machining,Make all work shape conveying rollers 12 in the second guide rail vertical shift conveying mechanism 41 rotate clockwise simultaneously,Thus cage guide 2 is carried on the back greatly milling machine 20 from a left side retreats to the second guide rail vertical shift conveying mechanism 41 automatically,Then make the second jacking transverse-moving mechanism 91 that the second guide rail that front sent into by the cage guide 2 in second guide rail vertical shift conveying mechanism 41 is righted mechanism 81、And cage guide 2 T-shaped feeding the second guide rail vertical shift conveying mechanism 41 of metalworking on the second transition blowing platform 51, will be treated,Now,Second guide rail rights mechanism 81 and can be overturn by cage guide 2 and be positioned on the transverse onveyer in front 3 in ⊥ shape,Transverse onveyer 3 then continues to move forward to this cage guide 2 at third gear material mechanism 62,Then the 3rd guide rail material stirring-up mechanism 72 can overturn forward inclined T-shaped be placed on being parked in the cage guide 2 at third gear material mechanism 62 on the 3rd transition blowing platform 52,Then the 3rd jacking transverse-moving mechanism 92 is by the 3rd guide rail vertical shift conveying mechanism 42 in the cage guide 2 T-shaped feeding front on the 3rd transition blowing platform 52,Then make all work shape conveying rollers 12 in the 3rd guide rail vertical shift conveying mechanism 42 rotate clockwise simultaneously,Thus automatically will be located in the cage guide 2 in the 3rd guide rail vertical shift conveying mechanism 42 and send into cloudy tenon bed 21 carries out cloudy tenon processing,During cage guide 2 is sent into cloudy tenon bed 21 by the 3rd guide rail vertical shift conveying mechanism 42,Transverse onveyer 3 may proceed to move forward to cage guide 2 third gear material mechanism 62,3rd guide rail material stirring-up mechanism 72 continues to overturn forward inclined T-shaped be placed on being parked in next the root cage guide 2 at third gear material mechanism 62 on the 3rd transition blowing platform 52;
nullAfter cage guide 2 completes cloudy tenon processing,Make all work shape conveying rollers 12 in the 3rd guide rail vertical shift conveying mechanism 42 rotate counterclockwise simultaneously,Thus automatically cage guide 2 is retreated to the 3rd guide rail vertical shift conveying mechanism 42 from cloudy tenon bed 21,Then make the 3rd jacking transverse-moving mechanism 92 that the 3rd guide rail that front sent into by the cage guide 2 in the 3rd guide rail vertical shift conveying mechanism 42 is righted mechanism 82、And cage guide 2 T-shaped feeding the 3rd guide rail vertical shift conveying mechanism 42 of metalworking will be treated on the 3rd transition blowing platform 52,Now,3rd guide rail rights mechanism 82 and can be overturn by cage guide 2 and be positioned on the transverse onveyer in front 3 in ⊥ shape,Transverse onveyer 3 then continues to move forward to this cage guide 2 at fourth gear material mechanism 63,Then the 4th guide rail material stirring-up mechanism 73 can overturn forward inclined T-shaped be placed on being parked in the cage guide 2 at fourth gear material mechanism 63 on the 4th transition blowing platform 53,Then the 4th jacking transverse-moving mechanism 93 is by the 4th guide rail vertical shift conveying mechanism 43 in the cage guide 2 T-shaped feeding front on the 4th transition blowing platform 53,Then make all work shape conveying rollers 12 in the 4th guide rail vertical shift conveying mechanism 43 rotate counterclockwise simultaneously,Thus automatically will be located in the cage guide 2 in the 4th guide rail vertical shift conveying mechanism 43 send into sun tenon bed 22 in carry out sun tenon processing,During cage guide 2 is sent into sun tenon bed 22 by the 4th guide rail vertical shift conveying mechanism 43,Transverse onveyer 3 may proceed to move forward to cage guide 2 fourth gear material mechanism 63,4th guide rail material stirring-up mechanism 73 continues to overturn forward inclined T-shaped be placed on being parked in next the root cage guide 2 at fourth gear material mechanism 63 on the 4th transition blowing platform 53;
After cage guide 2 completes sun tenon processing, make all work shape conveying rollers 12 in the 4th guide rail vertical shift conveying mechanism 43 rotate clockwise simultaneously, thus automatically cage guide 2 is retreated to the 4th guide rail vertical shift conveying mechanism 43 from sun tenon bed 22, then make the 4th jacking transverse-moving mechanism 93 that the 4th guide rail that front sent into by the cage guide 2 in the 4th guide rail vertical shift conveying mechanism 43 is righted mechanism 83, and cage guide 2 T-shaped feeding the 4th guide rail vertical shift conveying mechanism 43 of metalworking will be treated on the 4th transition blowing platform 53, now, 4th guide rail rights mechanism 83 and can be overturn by cage guide 2 and be positioned on the transverse onveyer in front 3 in ⊥ shape;By aforesaid operations, i.e. complete the conveying of the automatic metalworking to cage guide.The advantage that this utility model has can realize the automatic metalworking conveying to cage guide, labor strength is low, work efficiency is high.

Claims (3)

  1. null1. cage guide full-automatic metalworking pipeline,Including: frame,It is characterized in that: in frame, be provided with the transverse onveyer in order to lateral transfer cage guide,In frame above transverse onveyer, reach direction along cage guide is sequentially arranged at intervals with the guide rail vertical shift conveying mechanism of cage guide of the longitudinally fed T-shaped placement of some energy,It is respectively arranged with to place the transition blowing platform of cage guide in frame on rear side of each guide rail vertical shift conveying mechanism,The stock stop stopping cage guide reach it is respectively arranged with in frame on rear side of each transition blowing platform,Guide rail material stirring-up mechanism it is respectively arranged with in frame at each stock stop,The cage guide stopped by stock stop on transverse onveyer can be overturn forward inclined T-shaped and be placed on the transition blowing platform in front by guide rail material stirring-up mechanism,It is respectively arranged with guide rail in frame on front side of each guide rail vertical shift conveying mechanism and rights mechanism,It is also respectively provided with jacking transverse-moving mechanism in frame below each guide rail vertical shift conveying mechanism,Each jacking transverse-moving mechanism can be by the guide rail vertical shift conveying mechanism in the cage guide T-shaped feeding front on transition blowing platform、And the guide rail that the cage guide in guide rail vertical shift conveying mechanism is sent into front rights mechanism,Guide rail rights mechanism and can cage guide upset in ⊥ shape and be positioned on the transverse onveyer in front.
  2. Cage guide the most according to claim 1 full-automatic metalworking pipeline, it is characterized in that: the structure of described guide rail vertical shift conveying mechanism is: include the longitudinally spaced installing rack being distributed in frame of at least two, hoist cylinder it is vertically provided with respectively at the top of each installing rack, the piston rod of each hoist cylinder upwards and is fixed with a crane, in each crane, expansion bearing has a work shape conveying roller respectively, each work shape conveying roller is respectively by the motor-driven rotation being installed in corresponding crane, when all work shape conveying rollers rotating in same direction simultaneously, all work shape conveying rollers are collectively forming the guide rail vertical shift delivery platform of the cage guide of the longitudinally fed T-shaped placement of energy.
  3. Cage guide the most according to claim 2 full-automatic metalworking pipeline, it is characterized in that: the structure of described installing rack is: include in the upper installing rack being distributed up and down and lower installing rack, it is connected between upper installing rack with lower installing rack and has some screw rods, jack panel is fixed on a pair by the upper end of every screw rod respectively with upper installing rack, and jack panel is fixed with lower installing rack by the lower end of every screw rod respectively by a pair time.
CN201620298716.9U 2016-04-12 2016-04-12 Cage guide full-automatic metalworking pipeline Active CN205703449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620298716.9U CN205703449U (en) 2016-04-12 2016-04-12 Cage guide full-automatic metalworking pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620298716.9U CN205703449U (en) 2016-04-12 2016-04-12 Cage guide full-automatic metalworking pipeline

Publications (1)

Publication Number Publication Date
CN205703449U true CN205703449U (en) 2016-11-23

Family

ID=57310817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620298716.9U Active CN205703449U (en) 2016-04-12 2016-04-12 Cage guide full-automatic metalworking pipeline

Country Status (1)

Country Link
CN (1) CN205703449U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105773273A (en) * 2016-04-12 2016-07-20 张家港市张运机械制造有限公司 Full-automatic metal processing conveyer line for elevator guiderails
CN108639723A (en) * 2018-05-31 2018-10-12 张家港美斐电梯导轨有限公司 Convey the synchronous full-automatic metalworking pipeline of cage guide

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105773273A (en) * 2016-04-12 2016-07-20 张家港市张运机械制造有限公司 Full-automatic metal processing conveyer line for elevator guiderails
CN108639723A (en) * 2018-05-31 2018-10-12 张家港美斐电梯导轨有限公司 Convey the synchronous full-automatic metalworking pipeline of cage guide

Similar Documents

Publication Publication Date Title
CN204250826U (en) The automatic metalworking travel line of cage guide free parking type
CN104370070B (en) Cage guide semi-automatic metalworking pipeline
CN104444128B (en) The automatic metalworking pipeline of cage guide step-by-step movement
CN104370072B (en) Cage guide accumulative and travel type automatic metalworking pipeline
CN111377231B (en) Low-position hole reserving stacking production line
CN205294555U (en) Lift conveyor
CN103639252A (en) Flexible full-automatic plate rolling production line
CN203581979U (en) Automatic plate supplying machine
CN103962844A (en) Blank conveying system for automatic elevator guide rail machining production line
CN205703449U (en) Cage guide full-automatic metalworking pipeline
CN104985038B (en) Horse head arc panel moulding apparatus
CN204250822U (en) Cage guide S. A. metalworking travel line
CN201525641U (en) Automatic feeding machine
CN105773273A (en) Full-automatic metal processing conveyer line for elevator guiderails
CN206589306U (en) A kind of automatic delivering mechanism of die-sinking machine
CN208531586U (en) A kind of building template conveys continuous transfer device online
CN206813901U (en) A kind of aluminum-alloy wheel is heat-treated automatic charging device
CN203592029U (en) Flexible fully automatic coiled plate production line
CN103213800A (en) Automatic stereoscopic warehouse unit cargo self-aligning storage platform and alignment method thereof
CN207205264U (en) A kind of Intelligent mobile feed device
CN204250798U (en) The automatic metalworking travel line of cage guide step wise
CN201907853U (en) Loading-unloading device of single-position equipment
CN211681108U (en) Material feeding mechanism of multifunctional milling material forming machine
CN211732695U (en) Blank storage device with improved structure
CN211732981U (en) Automatic shaping, separating and conveying device for copper plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant